SEARCH RESULTS for DEFEATS

ACK = Requires Acknowledgement
# Status: Implemented by: System: Interlock: Description:
2024-245 Implemented on: 2024-05-13 Removed Chloe Beaumier-Martin In consultation with: , Vacuum INVS change from standard conf ... INVS change from standard configuration Requested for Davids WP "Open ... Requested for Davids WP "Open SHC aluminum lid to investigate a contamination issue on one shielding block surface on north side of cell in TH. " Tank suit and respirator were worn during the job.
2024-243 Implemented on: 2024-05-10 Active Rob Shanks In consultation with: , Optics CSB:INTRFS1 and CSB:INTRFS0 CSB:INTRFS1 and CSB:INTRFS0 Interlock bypass requested by ... Interlock bypass requested by Joseph Adegun to allow CSB:RFAMP1 and 0 to stay on while CSB:CM current setpoint is below 100A. As there is no CSB:CM force available, CSB:INTRFS0/1 was nominated. Operator pointed out that CSB:INTRFS1 bypass may cause CSB:RFAMP1 to ignore its vacuum and water flow interlock as well. Joseph agreed to continue as a test.
2024-242 Implemented on: 2024-05-10 Removed Rob Shanks In consultation with: , Safety INVS change from standard conf ... INVS change from standard configuration North HotCell Slave manipulato ... North HotCell Slave manipulator inspection is causing loss of NHC depression. EF12 has been raised from 94$ to 99% and DAMP4 has been raised from 22% to 51%.
2024-239 Implemented on: 2024-05-09 Removed Eric Lee In consultation with: Jas Uppal, Vacuum SCB3:IG2 Force OK. SCB3:IG2 Force OK. DCR received SCB3:IG2 WARN ala ... DCR received SCB3:IG2 WARN alarm and SCB3 He level alarm. (Summary from ISAC eLog entry 2024-05-09 06:22:07). SCB3:IG2 WARN alarm tripped closed He supply valve. David Kishi requested to Force SCB3:IG2 OK to recover helium level.
2024-232 Implemented on: 2024-05-06 Removed Eric Lee In consultation with: , Optics CSB:INTRFS1 bypassed briefly. CSB:INTRFS1 bypassed briefly. Interlock bypass requested by ... Interlock bypass requested by Joseph Adegun to allow CSB:RFAMP1 to stay on while CSB:CM current setpoint is below 100A. As there is no CSB:CM force available, CSB:INTRFS was nominated. Operator pointed out that CSB:INTRFS1 bypass may cause CSB:RFAMP1 to ignore its vacuum and water flow interlock as well. Joseph agreed to continue as a test.
2024-228 Implemented on: 2024-05-03 Removed Rene Tanaja In consultation with: , Safety INVS change from standard conf ... INVS change from standard configuration Spent target move from the sto ... Spent target move from the storage vault to the SHC and for retrieving parasitic target, causing pulsed alarms. EF-12 was raised from 94.2% to 99.0% and DAMP5 was opened from 50% to 74.5% to get the flow rate through the South HotCell high enough to clear the pulsed alarm.
2024-227 Implemented on: 2024-05-02 Removed Chloe Beaumier-Martin In consultation with: , Vacuum SEBT3B:RV1 bypassed SEBT3B:RV1 bypassed As requested by Barry Davids. ... As requested by Barry Davids. SEBT3B:BP4 just died, and he needs to rough out section using SEBT3B:BP1 instead. SEBT3B:IV2 is already bypassed (covered under WP I2024-04-30-3).
2024-224 Implemented on: 2024-05-01 Removed Rene Tanaja In consultation with: , Safety INVS change from standard conf ... INVS change from standard configuration TM3 containment box move from ... TM3 containment box move from TMH to the SHC. EF-12 was raised from 94.0% to 99.0% and DAMP5 was opened from 50% to 72% to get the flow rate through the South Hot Cell high enough to clear the pulsed alarm.
2024-222 Implemented on: 2024-04-30 Active Chloe Beaumier-Martin In consultation with: , Vacuum SEBT3B:IV2 bypassed SEBT3B:IV2 bypassed Required for scope setup neede ... Required for scope setup needed for the installation and alignment of TIP chamber.This was requested by Shaun Georges, under Barry Davids work permit. Note has been added to WPI2024-04-30-3.
2024-221 Implemented on: 2024-04-30 Removed Rene Tanaja In consultation with: , Services TCS:MP2 and MP3 TCS:MP2 and MP3 TM3 HV tests at the TCS. TM3 HV tests at the TCS.
2024-219 Implemented on: 2024-04-29 Active Chloe Beaumier-Martin In consultation with: , Vacuum ITE:SV6 bypassed ITE:SV6 bypassed As requested by Carla Babcock, ... As requested by Carla Babcock, in order to test pumping of new ITE gas system. This test should only take ~10 mins, unless any issues arise.
2024-217 Implemented on: 2024-04-29 Active Chloe Beaumier-Martin In consultation with: , Vacuum IOS:IVO and MCIS:IV1 Bypassed IOS:IVO and MCIS:IV1 Bypassed Requested by Chris Charles for ... Requested by Chris Charles for MCIS source startup, required until interlocks are updated.
2024-216 Implemented on: 2024-04-29 Removed Rene Tanaja In consultation with: , Safety INVS change from standard conf ... INVS change from standard configuration Module move from SMP to SHC is ... Module move from SMP to SHC is causing pulsed alarms. EF-12 was raised from 94.2% to 99.0% and DAMP5 was opened from 50% to 74% to get the flow rate through the South HotCell high enough to clear the pulsed alarm.
2024-214 Implemented on: 2024-04-26 Removed Rob Shanks In consultation with: , Safety INVS change from standard conf ... INVS change from standard configuration Module move from SMP to SHC is ... Module move from SMP to SHC is causing pulsed alarms. EF-12 was raised from 94.2% to 99.2% and DAMP5 was opened from 50% to 80% to get the flow rate through the South HotCell high enough to clear the pulsed alarm.
2024-210 Implemented on: 2024-04-25 Removed Kristofer Cottingham In consultation with: , Vacuum ITE:SV6 ITE:SV6 Requested by C. Babcock to tes ... Requested by C. Babcock to test the new ITE gas system under WP I2024-04-25-6.
2024-205 Implemented on: 2024-04-24 Removed Kristofer Cottingham In consultation with: , Vacuum SCB1:BV2A, SCB1:BV2B SCB1:BV2A, SCB1:BV2B SCB1:BP2 is unable to meet the ... SCB1:BP2 is unable to meet the interlock conditions for these backing valves. The backing valves need to be opened for the module to be pumped down to complete checklist 4 in document-25709 as part of WP I2024-04-23-3. This bypass is requested by S. Kiy.
2024-203 Implemented on: 2024-04-24 Removed Rob Shanks In consultation with: , Vacuum CDS:HSPV2, CDST:HSV1, CDST:HCV ... CDS:HSPV2, CDST:HSV1, CDST:HCV1, SCB1:HWV1, SCB1:HSPV1, SCB2:HWV1, SCB2:HSPV1, SCB3:HWV1, SCB3:HSPV1 Bypasses requested by Johnson ... Bypasses requested by Johnson C. for initial scrubbing and cool-down of SC-Linac.
2024-194 Implemented on: 2024-04-22 Active Ed Parton In consultation with: , Optics CSB:CM CSB:CM Test of plasma at low mag fiel ... Test of plasma at low mag field
2024-193 Implemented on: 2024-04-22 Removed Rob Shanks In consultation with: Eric Lee, Safety INVS change from standard conf ... INVS change from standard configuration Wire-routing on TM3 in South H ... Wire-routing on TM3 in South HotCell taking place. Removal of module cap is causing loss of depression. Adjusting system to prevent pulsed alarms. EF-12 raised to 99.2%, DAMP5 raised from 50% to 60%. All depressions are satisfied at this time.
2024-189 Implemented on: 2024-04-18 Removed Hanna Dahl In consultation with: , Vacuum IIS:IV2 bypassed IIS:IV2 bypassed Needed for testing WP I2024-04 ... Needed for testing WP I2024-04-17-2 with P. Kunz (IIS vacuum bypass installation). The interlock chain for the IV has IIS:TP2 on, and TP2 has been removed from the beamline, which was the purpose of the bypass done in the WP. I couldn't force TP2 on so I had to bypass the interlocks on the IV. Peter wants to leave it like this overnight to make sure it pumps down okay.
2024-188 Implemented on: 2024-04-18 Removed Hanna Dahl In consultation with: , Vacuum IIS:RV2/2A/2B interlocks bypas ... IIS:RV2/2A/2B interlocks bypassed Bypasses needed to test the re ... Bypasses needed to test the results of WP# I2024-04-17-2 (IIS vacuum bypass installation). Details can be seen in elog 2024-04-18 11:44:35. Bypasses were needed for ~2 mins to test if all of these valves roughed down the vacuum space.
2024-180 Implemented on: 2024-04-10 Removed Ed Parton In consultation with: , Safety INVS change from standard conf ... INVS change from standard configuration TM3 move WP#I2024-04-09-4. EF- ... TM3 move WP#I2024-04-09-4. EF-12 to 99.9%, DAMP5 open to 89%
2024-178 Implemented on: 2024-04-09 Removed Ed Parton In consultation with: , Safety INVS change from standard conf ... INVS change from standard configuration TM3 move WP#I2024-04-09-4. EF- ... TM3 move WP#I2024-04-09-4. EF-12 to 99.9%, DAMP5 open to 94%
2024-170 Implemented on: 2024-04-04 Removed Eric Lee In consultation with: , Vacuum DSB:PV8 EPICS interlock. DSB:PV8 EPICS interlock. Brief interlock bypass was app ... Brief interlock bypass was applied to DSB:PV8 with permission from Derek Orth.
2024-165 Implemented on: 2024-04-02 Removed James Mossman In consultation with: , Vacuum CSB:VV7A CSB:VV7A Bypass requested by Joseph Ade ... Bypass requested by Joseph Adegun for leak checking CSB. CSB was opened for a job to address HV trips during operation. Leak check is being done after closing up CSB to ensure CSB can achieve good vacuum.
2024-164 Implemented on: 2024-03-27 Removed Hanna Dahl In consultation with: , Safety INVS change from standard conf ... INVS change from standard configuration For D. Wang's WP #I2024-03-27- ... For D. Wang's WP #I2024-03-27-3, INVS adjustment required to silence pulsed alarms. Damper 3 was taken out of PID Loop and opened from 50% to 56%. South Hot Cell Damper 5 was increased from 59% to 86% to achieve >744 CFM flow rate to satisfy pulse alarm.
2024-163 Implemented on: 2024-03-25 Removed Kristofer Cottingham In consultation with: , Vacuum CSB:RVC9 CSB:RVC9 Requested by J. Adegun to pump ... Requested by J. Adegun to pump the backing line while CSB:VV7A is connected to a pump. This is related to the work requiring defeat 2024-156 with active work permit I2024-03-04-4.
2024-162 Implemented on: 2024-03-25 Removed Kristofer Cottingham In consultation with: , Vacuum CSB:PV7 CSB:PV7 Requested by J. Adegun to help ... Requested by J. Adegun to help pump down the backing line while a pump is also connected to CSB:VV7A. This is related to the work requiring defeat 2024-156 with active work permit I2024-03-04-4.
2024-161 Implemented on: 2024-03-25 Removed Kristofer Cottingham In consultation with: , Vacuum CDS:HSPV1, CDST:HCV1, CDST:HSV ... CDS:HSPV1, CDST:HCV1, CDST:HSV1 Required for scrubbing helium ... Required for scrubbing helium on cryogenics system under WP I2024-03-25-5.
2024-156 Implemented on: 2024-03-15 Removed Eric Lee In consultation with: , Vacuum CSB:VV7A CSB:VV7A Bypass requested by Joseph Ade ... Bypass requested by Joseph Adegun for leak checking CSB. CSB was opened for a job to address HV trips during operation. Leak check is being done after closing up CSB to ensure CSB can achieve good vacuum.
2024-154 Implemented on: 2024-03-14 Removed James Mossman In consultation with: Rob Shanks, Other Test (please ignore) Test (please ignore) testing. testing.
2024-152 Implemented on: 2024-03-14 Removed Eric Lee In consultation with: , Vacuum SEBT2:VV4A bypass SEBT2:VV4A bypass Related to WP# I2024-02-20-3, ... Related to WP# I2024-02-20-3, for leak checking after open IRIS scattering chamber. IRIS personnel are doing leak checking. This bypass is not listed on the WP, but the VV is after the experimental border valve. Request came from a student from IRIS (Gabe), who was working under directions from Martin Alcorta to request the bypass.Comment will be added to the WP.
2024-151 Implemented on: 2024-03-14 Removed Eric Lee In consultation with: , Vacuum DSB:IV2 force OFF. DSB:IV2 force OFF. DSB:IV2 was disabled by removi ... DSB:IV2 was disabled by removing its control cable (2024-148). HEBT:RV8 had to be opened to rough down the section between HEBT:IV8 and HEBT:IV8D as part of vacuum recovery after PLC1 work (ISAC WP# I2024-03-13-2). This defeat is temporary.
2024-149 Implemented on: 2024-03-13 Removed Eric Lee In consultation with: Tiffany Angus, Vacuum DSB:IV2 force OFF. DSB:IV2 force OFF. DSB:IV2 was disabled by removi ... DSB:IV2 was disabled by removing its control cable. DSB:RV4 had to be opened to rough down the section between DSB:IV2 and DSB:IV6.
2024-146 Implemented on: 2024-03-11 Removed James Mossman In consultation with: , Vacuum SEBT2:VV4A bypass SEBT2:VV4A bypass Related to WP# I2024-02-20-3, ... Related to WP# I2024-02-20-3, for Open IRIS scattering chamber, crane target in and out for maintenance, align, and pumpdown. IRIS personnel are doing leak checking. This bypass is not listed on the WP, but the VV is after the experimental boarder valve, and M. Alcorta Moreno requested the bypass. Comment will be added to the WP.
2024-145 Implemented on: 2024-03-11 Removed Ed Parton In consultation with: , Vacuum SEBT2:VV4A bypass SEBT2:VV4A bypass Related to WP# I2024-02-20-3, ... Related to WP# I2024-02-20-3, for Open IRIS scattering chamber, crane target in and out for maintenance, align, and pumpdown. IRIS personnel are doing leak checking. This bypass is not listed on the WP, but the VV is after the experimental boarder valve, and M. Alcorta Moreno requested the bypass. Comment will be added to the WP.
2024-134 Implemented on: 2024-02-27 Removed Hanna Dahl In consultation with: , Vacuum SEBT2:VV4A bypass SEBT2:VV4A bypass Related to WP# I2024-02-20-3, ... Related to WP# I2024-02-20-3, for Open IRIS scattering chamber, crane target in and out for maintenance, align, and pumpdown. IRIS personnel are doing leak checking. This bypass is not listed on the WP, but the VV is after the experimental boarder valve, and M. Alcorta Moreno requested the bypass. Comment will be added to the WP.
2024-133 Implemented on: 2024-02-26 Removed Ed Parton In consultation with: , Vacuum IOS:IV0 bypassed IOS:IV0 bypassed WOrk on starting up MCIS WOrk on starting up MCIS
2024-132 Implemented on: 2024-02-26 Removed Hanna Dahl In consultation with: , Vacuum SCC1:HWV1 and SCC3:HWV1 bypass ... SCC1:HWV1 and SCC3:HWV1 bypassed Requested by J. Cheung, requir ... Requested by J. Cheung, required for work under WP# I2024-02-26-1: SCC1/SCC3 Helium Pressure Transducer Repair.
2024-129 Implemented on: 2024-02-23 Removed Hanna Dahl In consultation with: , Vacuum CDST:HSV1 bypassed CDST:HSV1 bypassed Requested by cryogenics expert ... Requested by cryogenics expert, required for work under I2024-02-21-3: SCC1 Helium Valve Leak Check.
2024-125 Implemented on: 2024-02-22 Removed Hanna Dahl In consultation with: , Safety INV:DPG5 and INVMON:DPG5 force ... INV:DPG5 and INVMON:DPG5 forced Forced South Hot Cell depressi ... Forced South Hot Cell depression ok to avoid Target Hall alarm during WP# I2024-02-22-2 for ISAC1 Nuclear Ventilation Pressure transmitter calibration work.
2024-124 Implemented on: 2024-02-22 Removed Ed Parton In consultation with: , Vacuum MCIS:IV1 bypassed MCIS:IV1 bypassed +Reinstalling MCIS cart to OLI ... +Reinstalling MCIS cart to OLIS
2024-121 Implemented on: 2024-02-21 Removed Kristofer Cottingham In consultation with: , Vacuum SCB4:HWV1, SCB5:HWV1, SCC1:HWV ... SCB4:HWV1, SCB5:HWV1, SCC1:HWV1, SCC3:HWV1, SCB5:HSPV1, SCB5:HCV1 bypassed Requested by cryogenics expert ... Requested by cryogenics expert, required for work under I2024-02-21-3: SCC1 Helium Valve Leak Check.
2024-113 Implemented on: 2024-02-15 Removed Eric Lee In consultation with: , Vacuum ITE:BIASPLC interlock. ITE:BIASPLC interlock. Annual ITE HV testing by Targe ... Annual ITE HV testing by Target/Ion Source expert. Interlock bypass was approved by Carla Babcock.
2024-112 Implemented on: 2024-02-15 Removed Eric Lee In consultation with: , Optics ITE:EE interlock. ITE:EE interlock. Annual ITE HV testing by Targe ... Annual ITE HV testing by Target/Ion Source expert. Interlock bypass was requested by Carla Babcock.
2024-111 Implemented on: 2024-02-15 Removed Eric Lee In consultation with: , Optics ITE:BIAS interlock ITE:BIAS interlock Annual ITE HV testing by Targe ... Annual ITE HV testing by Target/Ion Source expert. Interlock bypass was requested by Carla Babcock.
2024-110 Implemented on: 2024-02-15 Removed Eric Lee In consultation with: , Optics ITE:EE interlock. ITE:EE interlock. Annual ITE HV testing by Targe ... Annual ITE HV testing by Target/Ion Source expert. Interlock bypass was requested by Carla Babcock.
2024-109 Implemented on: 2024-02-15 Removed Eric Lee In consultation with: , Optics ITE:BIAS interlock ITE:BIAS interlock Annual ITE HV testing by Targe ... Annual ITE HV testing by Target/Ion Source expert. Interlock bypass was requested by Carla Babcock.
2024-106 Implemented on: 2024-02-14 Removed Chloe Beaumier-Martin In consultation with: , Safety INVS change from standard conf ... INVS change from standard configuration For Frank S's WP #I2024-02-14- ... For Frank S's WP #I2024-02-14-2, INVS adjustment required to silence pulsed alarms. Damper 3 was taken out of PID Loop and opened from 50% to 70%. South Hot Cell Damper 5 was increased from 59% to 70% to achieve >744 CFM flow rate to satisfy pulse alarm.
2024-99 Implemented on: 2024-02-09 Removed Eric Lee In consultation with: , Vacuum CDS:CDM1:CDSTNTS2 CDS:CDM1:CDSTNTS2 SCD:VV2 interlock chain requir ... SCD:VV2 interlock chain requires CDS:CDM1:CDSTNTS2 xfer >273 K. CDS:CDM1:CDSTNTS2:SCALETEMP was ~ 295 K, but the interlock was not satisfied. Interlock was forced OK.
2024-74 Implemented on: 2024-02-01 Removed Rob Shanks In consultation with: James Mossman, Safety INVS change from standard conf ... INVS change from standard configuration For Frank S's WP #I2024-02-01- ... For Frank S's WP #I2024-02-01-1, INVS adjustment required to silence pulsed alarms. Damper 3 was taken out of PID Loop and opened from 43% to 60%. South Hot Cell Damper 5 was increased from 59.2% to 68% to achieve >744 CFM flow rate to satisfy pulse alarm.
2024-67 Implemented on: 2024-01-30 Removed Rob Shanks In consultation with: , Vacuum SEBT:VV0 SEBT:VV0 Due to another e-fault on the ... Due to another e-fault on the readback of the SEBT cold finger temperature, the interlocks of VV0 need to be Bypassed in order to be able to open it.
2024-65 Implemented on: 2024-01-29 Removed Hanna Dahl In consultation with: , Other SCC3:HWV1 SCC3:HWV1 At request of J. Cheung, there ... At request of J. Cheung, there is an associated WP which requests these interlocks to by bypassed, for SCC3 liquid helium supply stinger vacuum leak.
2024-52 Implemented on: 2024-01-24 Removed Blair Stringer In consultation with: , Optics TCS:BIAS TCS:BIAS Work being performed on TCS:BI ... Work being performed on TCS:BIAS controls
2024-48 Implemented on: 2024-01-23 Removed Ed Parton In consultation with: , Vacuum ITE:RV4, ITH:RV1, ITM:SV2, ITM ... ITE:RV4, ITH:RV1, ITM:SV2, ITM:SV3, ITM:SV4 Following the temporary ventil ... Following the temporary ventilation procedure for ISAC target module moves at the request of D. Wang for the move of TM4 from ITE to SHC. WP I2024-01-23-2.
2024-34 Implemented on: 2024-01-15 Removed Ed Parton In consultation with: , Safety INVMONALPHATH_OK INVMONALPHATH_OK Filter paper clog in Alpha CAM ... Filter paper clog in Alpha CAM monitor. RPG Brad has defeated the alarm until someone from the group can fix tape.
2024-30 Implemented on: 2024-01-11 Removed Chloe Beaumier-Martin In consultation with: , Vacuum ILE2:IV14M forced ILE2:IV14M forced Needed to pump down polarizer ... Needed to pump down polarizer section while decelerator tube installed through.J.Lassen authorized ILE2:IV14M to be forced closed while physically open.
2024-26 Implemented on: 2024-01-12 Removed Rob Shanks In consultation with: Tiffany Angus, Safety AIRMS Mon#89 WARN and TRIP AIRMS Mon#89 WARN and TRIP To prevent spurious alarms dur ... To prevent spurious alarms during period of no beam delivery until monitor can be fixed.
2024-18 Implemented on: 2024-01-10 Removed Rob Shanks In consultation with: , Safety INVS change from standard conf ... INVS change from standard configuration For Frank S's WP #I2024-01-10- ... For Frank S's WP #I2024-01-10-1, INVS adjustment required to silence pulsed alarms. Damper 4 was put into PID Loop and Damper 3 was taken out of PID Loop. South Hot Cell Damper 5 was increased from 59.2%-->70.2% to achieve >744 CFM flow rate to satisfy pulse alarm. This was identified in the work permit.
2024-15 Implemented on: 2024-01-09 Active Blair Stringer In consultation with: Rob Shanks, Vacuum SCC2:HWV1 SCC2:HWV1 Removing SCC2 for repairs. Thi ... Removing SCC2 for repairs. This Bypass can be removed after SCC2 has been reinstalled.
2024-11 Implemented on: 2024-01-08 Removed Rob Shanks In consultation with: , Vacuum ITW:RV4, ITH:RV1, ITM:SV2, ITM ... ITW:RV4, ITH:RV1, ITM:SV2, ITM:SV3, ITM:SV4 Following the temporary ventil ... Following the temporary ventilation procedure for ISAC target module moves at the request of D. Wang for the move of TM2 from ITW to SHC. WP I2024-01-08-6.
2024-1 Implemented on: 2024-01-02 Active Kristofer Cottingham In consultation with: , Optics TCS:BIAS bypassed TCS:BIAS bypassed TCS:DIF1 is fluttering around ... TCS:DIF1 is fluttering around its OK threshold of 10.0 GPM, intermittently interlocking the TCS:BIAS. There is no option in EPICS to force the TCS:DIF1 signal, so C. Babcock requested TCS:BIAS be forced on for TCS work.
2023-665 Implemented on: 2023-12-19 Removed Blair Stringer In consultation with: , Other SCB1:HTR33, SCB2:HTR33, SCB3:H ... SCB1:HTR33, SCB2:HTR33, SCB3:HTR33, SCC1:HTR33, SCC2:HTR33, SCC3:HTR33 Turning off cryo for shutdown. ... Turning off cryo for shutdown. These need to be defeated in order to warm up the LINAC
2023-664 Implemented on: 2023-12-19 Removed Blair Stringer In consultation with: , Other CDS:HSPV1, CDS:HSPV2 CDS:HSPV1, CDS:HSPV2 Turning off cryogenics for shu ... Turning off cryogenics for shutdown
2023-651 Implemented on: 2023-12-11 Removed Ed Parton In consultation with: , Vacuum ILE1B:RV18 ILE1B:RV18 GRIFFIN experimenters need to ... GRIFFIN experimenters need to open & close RV18 for tape box roughing
2023-632 Implemented on: 2023-11-29 Removed Blair Stringer In consultation with: , Vacuum ILE2A:IV11 vacuum interlocks ILE2A:IV11 vacuum interlocks For OSAKA run. Vacuum gauge on ... For OSAKA run. Vacuum gauge on the other side may not be readable via EPICS, thus never satisfying the interlocks.
2023-630 Implemented on: 2023-11-29 Removed Eric Lee In consultation with: , Other Bypass CDS:HSPV1 Bypass CDS:HSPV1 Required for SCRF cavity test. ... Required for SCRF cavity test. Requested by Johnson Cheung.
2023-628 Implemented on: 2023-11-29 Removed Eric Lee In consultation with: , Safety INVS DAMP4 change from standar ... INVS DAMP4 change from standard configuration. For David Wang's WP# I2023-11- ... For David Wang's WP# I2023-11-27-2, INVS adjustment required to silence pulsed alarms. North Hot Cell Damper 4 increased 18-->20% to satisfy depression above threshold and pulsed alarm.
2023-627 Implemented on: 2023-11-29 Removed Eric Lee In consultation with: , Safety INVS change from standard conf ... INVS change from standard configuration For David W's WP #I2023-11-28- ... For David W's WP #I2023-11-28-1, INVS adjustment required to silence pulsed alarms. South Hot Cell Damper 5 increased from 48.5%-->63% to achieve 744 CFM flow rate to satisfy pulse alarm. This was identified in the work permit.
2023-626 Implemented on: 2023-11-28 Removed Rene Tanaja In consultation with: , Safety INVS change from standard conf ... INVS change from standard configuration For David W's WP #I2023-11-28- ... For David W's WP #I2023-11-28-1, INVS adjustment required to silence pulsed alarms. North Hot Cell Damper 4 increased 18-->21% to satisfy depression above threshold.
2023-625 Implemented on: 2023-11-27 Removed Rene Tanaja In consultation with: , Vacuum ILE2A:IV11 vacuum interlocks ILE2A:IV11 vacuum interlocks For OSAKA run. Vacuum gauge on ... For OSAKA run. Vacuum gauge on the other side may not be readable via EPICS, thus never satisfying the interlocks.
2023-624 Implemented on: 2023-11-27 Removed Rene Tanaja In consultation with: , Vacuum IIS:RV1 and IV2 IIS:RV1 and IV2 Need to pump down the downstre ... Need to pump down the downstream IIS section, but IIS:TP2 and BP2 are not presently functional.
2023-623 Implemented on: 2023-11-27 Removed Tiffany Angus In consultation with: , Safety INVS change from standard conf ... INVS change from standard configuration For Chad's WP #I2023-11-27-2, ... For Chad's WP #I2023-11-27-2, INVS adjustment required to silence pulsed alarms. North Hot Cell Damper 4 increased 18-->20% to satisfy depression above threshold.
2023-617 Implemented on: 2023-11-21 Removed Tiffany Angus In consultation with: , Vacuum Bypass IIS:IV2 & IIS:RV2 Bypass IIS:IV2 & IIS:RV2 To pump down IIS chamber throu ... To pump down IIS chamber through upstream section as IIS:TP2 is broken, P.Kunz' request.
2023-615 Implemented on: 2023-11-20 Removed Ed Parton In consultation with: Tiffany Angus, Safety PID PID DAMP3 & 4 in PID, DAMP 5 out o ... DAMP3 & 4 in PID, DAMP 5 out of PID, opened to 97%
2023-611 Implemented on: 2023-11-18 Active Rob Shanks In consultation with: Tiffany Angus, Other Lockouts on ARIEL Active Sump, ... Lockouts on ARIEL Active Sump, P1&2 Until the ARIEL target(s) are ... Until the ARIEL target(s) are irradiated, lockout is not required to prevent operation of the ARIEL Active Sump.
2023-610 Implemented on: 2023-11-17 Removed Nina He In consultation with: , Vacuum ILE2:IV14M closed ILE2:IV14M closed Ruohong requested to Force off ... Ruohong requested to Force off ILE2:IV14M that will close IV14M from EPICS.
2023-606 Implemented on: 2023-11-16 Removed Nina He In consultation with: , Vacuum ILE:IV11 bypass ILE:IV11 bypass ILE:IV11 needs to be open for ... ILE:IV11 needs to be open for tuning to TITAN but it has a wrong interlock.
2023-605 Implemented on: 2023-11-16 Removed Nina He In consultation with: , Vacuum Bypass IIS:IV2 Bypass IIS:IV2 To pump down IIS chamber as II ... To pump down IIS chamber as IIS:TP2 is broken. Friedhelm requested to bypass IIS:IV2 then we can pump down IIS chamber through IIS:TP1 and IIS:TP1A.
2023-603 Implemented on: 2023-11-16 Removed James Mossman In consultation with: , Other Bypass CDS:HSPV2 Bypass CDS:HSPV2 Required for cooldown of Cryog ... Required for cooldown of Cryogenics system after power outage. Requested by Rowan
2023-599 Implemented on: 2023-11-15 Removed James Mossman In consultation with: , Other Bypass CDS:HSPV1 Bypass CDS:HSPV1 Required for cooldown of Cryog ... Required for cooldown of Cryogenics system after power outage. Requested by Johnson Cheung
2023-598 Implemented on: 2023-11-14 Removed Kristofer Cottingham In consultation with: , Vacuum SCB3:CDM4 TS27 SCB3:CDM4 TS27 Roughing of SCB3 was requested ... Roughing of SCB3 was requested by the RF expert, but SCB3:RV2 would not open because the "SCB3:CDM4 TS27 temp ok" interlock was not satisfied. The temperature needs to read 290 K but was at 289 K. J. Cheung gave the approval to force the temperature sensor to allow the roughing valve to open.
2023-593 Implemented on: 2023-11-10 Removed Nina He In consultation with: Rob Shanks, Vacuum ILE2:IV14M closed ILE2:IV14M closed Ruohong needs to open ILE2:VV1 ... Ruohong needs to open ILE2:VV15 and ILE2:IV14M needs to be kept open status. She requested to set it "Force off" then she can open ILE2:VV15.
2023-589 Implemented on: 2023-11-07 Removed Rene Tanaja In consultation with: , Safety INVS changes from standard Con ... INVS changes from standard Configuration For WP #I2023-11-06-2. INVS ad ... For WP #I2023-11-06-2. INVS adjustments needed to be made to silence pulsed alarms, as per RIBON instructions. Damp 3 was put in PID, damp 4 increased from 20.1->25.1%.
2023-587 Implemented on: 2023-11-06 Active Tiffany Angus In consultation with: , Other TCS:TS5 forced ok TCS:TS5 forced ok TCS:TS5 falsely reading 0 (efa ... TCS:TS5 falsely reading 0 (efault 16306), analyzer needs to be replaced.
2023-583 Implemented on: 2023-11-01 Removed Blair Stringer In consultation with: , Services TUDA-II disconnect (in open po ... TUDA-II disconnect (in open position) Connect TUDA GND in ISAC-II Connect TUDA GND in ISAC-II
2023-580 Implemented on: 2023-10-30 Removed Nina He In consultation with: , Vacuum ILE2:IMG9 forced on ILE2:IMG9 forced on ILE2:IMG9 tripped off and time ... ILE2:IMG9 tripped off and time out. Friedhelm approved to force it on for over night for bNMR run.
2023-578 Implemented on: 2023-10-27 Removed Hanna Dahl In consultation with: , Vacuum SEBT1:IV3 and IV4 SEBT1:IV3 and IV4 As per WP# I2023-10-27-5: "The ... As per WP# I2023-10-27-5: "The gate valves SEBT1:IV3 and SEBT1: IV4 will need to be opened at atmosphere. Both sides of both IV3 and IV4 will be confirmed to be at atmosphere prior to proceeding.Interlocks currently prevent the opening of IV3 and IV4 in this configuration, so the will need to be bypassed open in order to site down the beampipe (HERACLES section is already opened)." Ops/Martin have confirmed that both sides of the valves are at atmosphere. SEBT1:IV0 closed and interlocked, SEBT:IV20 closed and interlocks not bypassed. SEBT:FV12 is open and armed.
2023-573 Implemented on: 2023-10-20 Removed Rob Shanks In consultation with: , Vacuum AGTC:RV16 AGTC:RV16 The interlocks for IGTC:RV16 r ... The interlocks for IGTC:RV16 require EBIS:IV0 to be closed. EBIS:IV0 has been disconnected for some time now so this signal is not satisfied in the interlock chain. This prevents AGTC:RV16 from opening for roughing.
2023-568 Implemented on: 2023-10-17 Removed Rene Tanaja In consultation with: , Other SEBT2:SID5 interlocks bypassed SEBT2:SID5 interlocks bypassed Needs to be inserted for IRIS ... Needs to be inserted for IRIS setup and beam delivery, while watchdog is still not functional.
2023-567 Implemented on: 2023-10-17 Removed Tiffany Angus In consultation with: , Vacuum SEBT2:IG5 forced ok SEBT2:IG5 forced ok M.Alcorta's request due to det ... M.Alcorta's request due to detector in vicinity that is sensitive to light, SEBT2:IG5 ok required to open SEBT2:IV4. Force required through IRIS run, scheduled to end Tues. Oct. 24.
2023-559 Implemented on: 2023-10-11 Removed Kristofer Cottingham In consultation with: , Vacuum IIS:RV2, 2A, 2B IIS:RV2, 2A, 2B Pumping down the IIS section r ... Pumping down the IIS section requires bypassing the roughing valves, which has been requested by Peter Kunz. The section needs to be pumped down again on 2023-10-16 and the bypass can be removed then.
2023-558 Implemented on: 2023-10-11 Removed Kristofer Cottingham In consultation with: , Vacuum SEBT2:VV4 SEBT2:VV4 Requested by Martin Alcorta Mo ... Requested by Martin Alcorta Moreno for leak checking.
2023-557 Implemented on: 2023-10-11 Removed Kristofer Cottingham In consultation with: , Vacuum SEBT2:VV4A SEBT2:VV4A Requested by Martin Alcorta Mo ... Requested by Martin Alcorta Moreno for leak checking.
2023-554 Implemented on: 2023-10-10 Removed Rene Tanaja In consultation with: , Vacuum SEBT2:VV4A SEBT2:VV4A scattering chamber work scattering chamber work
2023-553 Implemented on: 2023-10-10 Removed Blair Stringer In consultation with: , Vacuum SEBT2:VV4A SEBT2:VV4A scattering chamber work scattering chamber work
2023-551 Implemented on: 2023-10-06 Removed Chloe Beaumier-Martin In consultation with: , Safety INVS changes from standard con ... INVS changes from standard configuration For WP# I2023-10-06-5. As per ... For WP# I2023-10-06-5. As per D. Wangs email instruction: "the dampers 3 and damper 4 should be in PID mode. Damper 5 should be fixed to a certain percentage (60%?)" to keep FG5 above 750CFM. Damp3 and Damp4 were put in PID, Damp5 taken out of PID and increased to 61.0%
2023-548 Implemented on: 2023-10-05 Removed Hanna Dahl In consultation with: , Vacuum ILT:VV42 ILT:VV42 Leak checking to take place re ... Leak checking to take place requiring VV42 to be opened with turbos on.
2023-547 Implemented on: 2023-10-05 Removed Hanna Dahl In consultation with: , Safety INVS changes from standard Con ... INVS changes from standard Configuration For WP #I2023-10-05-3. INVS ad ... For WP #I2023-10-05-3. INVS adjustments needed to be made to silence pulsed alarms. As per D. Wangs instructions: "The damp 4 should be increased and fixed to a percentage that FG4 is above 750cfm. The damper 3, and 5 should be in PID mode. You will be contacted before the block removing." Damp 3 was put in PID, damp 4 increased from 18.3->43.3%.
2023-544 Implemented on: 2023-10-04 Removed Tiffany Angus In consultation with: , Other South Hot Cell Nuclear Ventila ... South Hot Cell Nuclear Ventilation depression FORCED OK x2 Intermittent/repetitive pulsed ... Intermittent/repetitive pulsed alarm due to module move: loss of depression + insufficient flow. Work permit indicated rib ops didn't have to intervene but it was too disruptive.
2023-541 Implemented on: 2023-10-03 Removed Hanna Dahl In consultation with: , Vacuum SEBT2:VV4A SEBT2:VV4A Leak checking to take place re ... Leak checking to take place requiring VV4A to be opened with turbos on.
2023-537 Implemented on: 2023-08-30 Removed Eric Lee In consultation with: , Vacuum IMS:IG7 forced ON. IMS:IG7 forced ON. As per Bypass History, IMS:IG7 ... As per Bypass History, IMS:IG7 was blinking on 2023-08-30. Gauge was forced ON on 2023-08-30 at 12:58. Vacuum group investigated and requested to have this gauge turned on on September 5. This Defeat was filled out to capture the Force currently in place. Force was originally approved by Friedhelm Ames.
2023-536 Implemented on: 2023-09-29 Removed Eric Lee In consultation with: , Vacuum SEBT3B:IV2 interlock SEBT3B:IV2 interlock For installing telescope for S ... For installing telescope for SEBT3B Target Chamber alignment. This was identified and highlighted in the associated ISAC WP#I2023-09-29-3.
2023-529 Implemented on: 2023-09-26 Removed Rob Shanks In consultation with: , Vacuum SEBT2:VV4A SEBT2:VV4A Leak checking to take place re ... Leak checking to take place requiring VV4A to be opened with turbos on.
2023-526 Implemented on: 2023-09-25 Removed Nina He In consultation with: , Vacuum SEBT2:IV4 SEBT2:IV4 For SEBT2 alignment. Martin re ... For SEBT2 alignment. Martin requires that this IV be bypassed so that it may all be opened at atmosphere. Only IV4 will need to be opened.
2023-523 Implemented on: 2023-09-22 Removed Eric Lee In consultation with: , Vacuum SEBT2:VV4A interlock. SEBT2:VV4A interlock. Leak checking by IRIS after op ... Leak checking by IRIS after opening their Scattering Chamber as per ISAC WP#I2023-09-19-4.
2023-506 Implemented on: 2023-09-12 Removed Hanna Dahl In consultation with: , Vacuum IIS:RV2/2A/2B IIS:RV2/2A/2B Required for pumpdown of the I ... Required for pumpdown of the IIS section. Temporarily bypassed until the vacuum is good enough to remove them. Done with P. Kunz.
2023-501 Implemented on: 2023-09-08 Removed Hanna Dahl In consultation with: , Safety INVS changes from standard Con ... INVS changes from standard Configuration For WP #I2023-09-08-3. INVS ad ... For WP #I2023-09-08-3. INVS adjustments needed to be made to silence pulsed alarms. As per D. Wangs instructions: "To switch it off, you could put damper 3 and damper 4 in PID mode. Then adjust and fix damper 5 to a certain percentage that FG5 flow rate is above 750CFM. The system should be reset to original when the job is done and the blanking plate is replaced." Damp 3 and 4 were put in PID, damp 5 increased from 42.8->61.8%.
2023-499 Implemented on: 2023-09-06 Removed Eric Lee In consultation with: Rob Shanks, Vacuum RFQ:GV4 RFQ:GV4 As per D. Orth, interlock bypa ... As per D. Orth, interlock bypassed to allow RFQ:GV4 open for RFQ:CP4 temperature up to 25 K. Interlock condition requires RFQ:CP4 < 20K, but degrading RFQ:CP4 performance resulted in RFQ:CP4 temperature reaching just above 20 K when opened to the beamline. O. Shelbaya was consulted.
2023-497 Implemented on: 2023-09-05 Removed Rob Shanks In consultation with: , Vacuum ITE:RV4, ITH:RV1, ITM:SV2, ITM ... ITE:RV4, ITH:RV1, ITM:SV2, ITM:SV3, ITM:SV4 Following the temporary ventil ... Following the temporary ventilation procedure for ISAC target module moves at the request of D. Wang for the move of TM4 from TCS to ITE. WP I2023-09-05-1.
2023-495 Implemented on: 2023-09-01 Removed Hanna Dahl In consultation with: , Safety INVS changes from standard Con ... INVS changes from standard Configuration For WP #I2023-09-01-1. INVS ad ... For WP #I2023-09-01-1. INVS adjustments needed to be made to silence pulsed alarms. DAMP4 opened from 18.3% to 47.3%. DAMP5 adjusted from 50% to 100%.
2023-493 Implemented on: 2023-08-31 Removed Chloe Beaumier-Martin In consultation with: , Other CDS:HSPV2 CDS:HSPV2 Phase-I Coldbox defrost by Cry ... Phase-I Coldbox defrost by Cryogenics group as per WP#I2023-08-31-2 for Johnson Cheung.
2023-490 Implemented on: 2023-08-30 Removed Nina He In consultation with: , Safety INVS changes from standard Con ... INVS changes from standard Configuration For WP #I2023-08-30-1. INVS ad ... For WP #I2023-08-30-1. INVS adjustments needed to be made to silence pulsed alarms. DAMP4 opened from 20.5% to 55.5%.
2023-488 Implemented on: 2023-08-29 Removed Kristofer Cottingham In consultation with: , Vacuum ITE:RV4, ITH:RV1, ITM:SV2, ITM ... ITE:RV4, ITH:RV1, ITM:SV2, ITM:SV3, ITM:SV4 Following the temporary ventil ... Following the temporary ventilation procedure for ISAC target module moves at the request of D. Wang for the move of TM4 from ITE to NHC. WP I2023-08-29-3.
2023-487 Implemented on: 2023-08-29 Removed Hanna Dahl In consultation with: , Safety INVS changes from standard Con ... INVS changes from standard Configuration For WP #I2023-08-29-3. INVS ad ... For WP #I2023-08-29-3. INVS adjustments needed to be made to silence pulsed alarms. DAMP4 opened from 20.5% to 59.5%. Elog entry 2023-08-29 08:11:52 shows the 'standard' configuration.
2023-486 Implemented on: 2023-08-28 Removed Kristofer Cottingham In consultation with: , Services INVS changes from standard Con ... INVS changes from standard Configuration For WP #I2023-08-28-6. INVS ad ... For WP #I2023-08-28-6. INVS adjustments needed to be made to silence pulsed alarms. PID turned turned on for DAMP3 and DAMP4 opened from 20.5% to 58.5% following D. Wang's instructions. Elog entry 2023-08-28 12:31:10 shows the 'standard' configuration.
2023-475 Implemented on: 2023-08-18 Removed Blair Stringer In consultation with: , Vacuum Bypass SEBT3B:IV2 Bypass SEBT3B:IV2 SEBT3B:IV2 bypass applied to o ... SEBT3B:IV2 bypass applied to open it for TIGRESS doing alignment through the beam line. Both side of SEBT3B:IV2 are at atmosphere.
2023-472 Implemented on: 2023-08-17 Removed Nina He In consultation with: , Vacuum Bypass SEBT3B:IV2 Bypass SEBT3B:IV2 SEBT3B:IV2 bypass applied to o ... SEBT3B:IV2 bypass applied to open it for TIGRESS doing alignment through the beam line. Both side of SEBT3B:IV2 are at atmosphere.
2023-458 Implemented on: 2023-08-11 Removed Kristofer Cottingham In consultation with: Eric Lee, Vacuum CDST:NPV4 bypassed CDST:NPV4 bypassed Requested by David Kishi to ad ... Requested by David Kishi to address S-Bend Cold Finger high temperature issue.
2023-456 Implemented on: 2023-08-10 Removed Kristofer Cottingham In consultation with: , Vacuum ILE2:IV14M ILE2:IV14M Rouhong Li and Gelo Remon requ ... Rouhong Li and Gelo Remon requested the valve be forced off and on as part of testing for WP I2023-08-10-3. This defeat is for documentation purposes. The test is complete.
2023-451 Implemented on: 2023-08-08 Removed Nina He In consultation with: , Services Not interlock - changes from s ... Not interlock - changes from standard Configuration For WP #I2023-08-08-4. INVS ad ... For WP #I2023-08-08-4. INVS adjustments needed to be made to silence pulsed alarms. PID turned turned on for damp 3. Damp 3 was 100% and damp 4 was 55%. Elogs 2023-08-08 10:01:59 show 'standard' configs.
2023-448 Implemented on: 2023-08-04 Removed Kristofer Cottingham In consultation with: Eric Lee, Tiffany Angus Safety IBRMS1:RMS23 IBRMS1:RMS23 B. Noakes confirmed via a phon ... B. Noakes confirmed via a phone the warn limit on RMS#23 could be raised from 10 uSv to 20 uSv for to 211Fr Francium run.
2023-440 Implemented on: 2023-08-02 Removed Hanna Dahl In consultation with: , Vacuum MEBT:IG2 MEBT:IG2 The IG kept tripping, it was a ... The IG kept tripping, it was able to be turned back on a handful of times, but within a few seconds-minutes, it would trip off again. MEBT:IG2 needs to be on for the bunch rotator, which needed to be on for EMMA setup.
2023-439 Implemented on: 2023-08-02 Removed Hanna Dahl In consultation with: , Safety IBRMS1:RMS22 IBRMS1:RMS22 J. Behr asked B. Noakes if the ... J. Behr asked B. Noakes if the warn limit on RMS#22 could be raised from 10usV to 20uSv due to 211Fr Francium run. B. Noakes agreed via email and phone call.
2023-437 Implemented on: 2023-08-02 Removed Ed Parton In consultation with: Rob Shanks, Vacuum ILE2:IV11, ILE:AC8D, ILE:IV17 ILE2:IV11, ILE:AC8D, ILE:IV17 ILE:IG17 forced good ILE:IG17 forced good
2023-429 Implemented on: 2023-07-29 Removed Chloe Beaumier-Martin In consultation with: , Vacuum ILZ:IV6 ILZ:IV6 For TRINAT run. Due to ongoing ... For TRINAT run. Due to ongoing limit switch issues,this IV must be forced.
2023-428 Implemented on: 2023-07-29 Removed Chloe Beaumier-Martin In consultation with: , Vacuum ILZ:IG1 and ILZ:IG2 ILZ:IG1 and ILZ:IG2 Both ILZ:IG1 and IG2 are not w ... Both ILZ:IG1 and IG2 are not working and have to be forced ok in order to open ILZ:IV6 and ILZ:IV10 for TRINAT run.
2023-416 Implemented on: 2023-07-26 Removed Chloe Beaumier-Martin In consultation with: , Vacuum RFQ:GV4 RFQ:GV4 As per O.Shelbaya, interlock b ... As per O.Shelbaya, interlock bypassed to allow GV4 open for IRIS delivery. Interlock condition requires RFQ:CP4<20K and temperature is stable around 21K.
2023-414 Implemented on: 2023-07-25 Removed Tiffany Angus In consultation with: , Other ITW:HS & ITW:TGHT temperature ... ITW:HS & ITW:TGHT temperature trip thresholds increased temporarily ITW:HS trip threshold increase ... ITW:HS trip threshold increased 50-->55C


ITW:TGHT trip threshold increased 40-->45C


R.Mendoza's wp I2023-07-25-5 @ Carla's request
2023-412 Implemented on: 2023-07-25 Removed Tiffany Angus In consultation with: , Vacuum SEBT3:BV5 interlocks bypassed SEBT3:BV5 interlocks bypassed @ D.Yates' request to rough fa ... @ D.Yates' request to rough faster than restrictor in SEBT3:RV5 allows. (no wp.)
2023-407 Implemented on: 2023-07-21 Removed Eric Lee In consultation with: , Services ISAC-II AC4 output temperature ... ISAC-II AC4 output temperature. AC4 output air thermocouple is ... AC4 output air thermocouple is malfunctioning, reading temperatures in the negative range, causing the cooling coils to shut off, in turn causing the output air to not be cooled, which warms up the network room temperature.
2023-400 Implemented on: 2023-07-19 Removed James Mossman In consultation with: , Vacuum SEBT2:VV4A bypass SEBT2:VV4A bypass For leak checking by IRIS. For leak checking by IRIS.
2023-396 Implemented on: 2023-07-18 Removed Kristofer Cottingham In consultation with: Rene Tanaja, Vacuum ITE:BV3, ITE:BV4, ITE:BV4S ITE:BV3, ITE:BV4, ITE:BV4S Bypassing the backing values f ... Bypassing the backing values for a few turbo pumps to get them going and ensure that they are working before we end maintenance day. Requested by David Wang.
2023-362 Implemented on: 2023-06-27 Removed James Mossman In consultation with: , Vacuum IOS:IV7 IOS:IV7 Requested by OLIS experts for ... Requested by OLIS experts for IOS:FC6 work
2023-357 Implemented on: 2023-06-26 Removed James Mossman In consultation with: , Vacuum ILE2:IV19 ILE2:IV19 Requested by Ruohong for Laser ... Requested by Ruohong for Laser alignment
2023-353 Implemented on: 2023-06-25 Removed Rene Tanaja In consultation with: , Other CDST:NPV4 CDST:NPV4 Cryogenics expert needed it to ... Cryogenics expert needed it to take care of an issue with the DSB cold finger cooling.
2023-343 Implemented on: 2023-06-21 Removed Rene Tanaja In consultation with: , Other SEBT2:SID5 SEBT2:SID5 It is interlocked with SEBT2:S ... It is interlocked with SEBT2:SID5:BIAS:WDOK. Martin Alcorta confirms that this needs to be updated, but still has not. In the meantime, the cup needs to be inserted for the starting IRIS run. Martin A. has approved the bypass.
2023-342 Implemented on: 2023-06-21 Removed Tiffany Angus In consultation with: , Vacuum SEBT2:IG5 forced ok SEBT2:IG5 forced ok M.Alcorta's request due to det ... M.Alcorta's request due to detector in vicinity that is sensitive to light, SEBT2:IG5 ok required to open SEBT2:IV4. Force required through IRIS run, scheduled to end Sun. July 2.
2023-340 Implemented on: 2023-06-21 Removed Nina He In consultation with: , Services Not interlock - changes from s ... Not interlock - changes from standard Configuration For WP #I2023-06-21-1. INVS ad ... For WP #I2023-06-21-1. INVS adjustments needed to be made to silence pulsed alarms. PID turned turned on for damp 3. Damp 3 was 100% and damp 4 was 55%. Elogs 2023-06-21 08:52:07 show 'standard' configs.
2023-338 Implemented on: 2023-06-20 Removed Chloe Beaumier-Martin In consultation with: , Vacuum ILE2A:IV11 Forced OFF (Closed) ... ILE2A:IV11 Forced OFF (Closed) ILE2A:IV11 is stuck in a timeo ... ILE2A:IV11 is stuck in a timeout state and will not reset. This valve must be closed for ILE2A section venting (ILE2:VV20) for Ruohong Li, covered by WP#I2023-06-19-3.
2023-336 Implemented on: 2023-06-20 Removed Tiffany Angus In consultation with: James Mossman, Vacuum IMS:IG11 forced ok IMS:IG11 forced ok IMS:IG11 tripped (timeout), ti ... IMS:IG11 tripped (timeout), times out again on restart attempts.
2023-325 Implemented on: 2023-06-15 Removed Blair Stringer In consultation with: , Vacuum SEBT2:VV4A SEBT2:VV4A Requested for Martin for chamb ... Requested for Martin for chamber. No WP needed since its a VV and not an IV.
2023-319 Implemented on: 2023-06-14 Removed Nina He In consultation with: , Vacuum SEBT2:VV4A bypass SEBT2:VV4A bypass For leak checking by IRIS, req ... For leak checking by IRIS, requested by Martin.
2023-313 Implemented on: 2023-06-13 Removed Chloe Beaumier-Martin In consultation with: , Vacuum SEBT2:VV4A bypass SEBT2:VV4A bypass For leak checking by IRIS. For leak checking by IRIS.
2023-306 Implemented on: 2023-06-09 Removed Tiffany Angus In consultation with: , Other CDST:HCV1, CDST:HSV1 interlock ... CDST:HCV1, CDST:HSV1 interlocks bypassed in EPICS. Phase I Coldbox Defrost, entir ... Phase I Coldbox Defrost, entire SCLinac will be cooled by Phase-II for ~1 week; wp# I2023-06-09-4 by Johnson.
2023-302 Implemented on: 2023-06-08 Removed Hanna Dahl In consultation with: , Vacuum SEBT2:VV4A bypass SEBT2:VV4A bypass For leak checking by IRIS. For leak checking by IRIS.
2023-299 Implemented on: 2023-06-07 Removed Rob Shanks In consultation with: , Vacuum SEBT2:VV4 bypass SEBT2:VV4 bypass Pumping through VV needed to c ... Pumping through VV needed to conduct leak checking.
2023-298 Implemented on: 2023-06-07 Removed Hanna Dahl In consultation with: , Vacuum SEBT2:VV4A bypass SEBT2:VV4A bypass For leak checking by IRIS Mart ... For leak checking by IRIS Martin.
2023-276 Implemented on: 2023-05-26 Removed Eric Lee In consultation with: Tiffany Angus, Services NVS Damper 1 PID Loop. NVS Damper 1 PID Loop. Not a Defeat, but a configurat ... Not a Defeat, but a configuration change. NVS Damper1 PID was changing the position frequently. The Target Pit & Pre-Separator depression was oscillating between 0.18" WC and 0.27" WC. Some times, the low spots would dip below alarm threshold is 0.17 " WC. ITE shielding blocks were put in this morning and target manual nuclear ventilation damper was set to ITE this morning. Target Hall experts pointed out that in this configuration on ITE, Target Pit & Pre-Separator depression may be sensitive.
2023-274 Implemented on: 2023-05-26 Removed Eric Lee In consultation with: , Vacuum ILE2:IV11 Forced OFF. ILE2:IV11 Forced OFF. ILE2:IV11 FORCED OFF. ILE2:IV1 ... ILE2:IV11 FORCED OFF. ILE2:IV11 was locked out locally in the CLOSED position and its control cable was disconnected.
2023-273 Implemented on: 2023-05-26 Removed Eric Lee In consultation with: , Vacuum ILE2:IV11 ILE2:IV11 ILE2:IV11 was locked out local ... ILE2:IV11 was locked out locally in the CLOSED position and its control cable was disconnected.
2023-271 Implemented on: 2023-05-25 Removed Tiffany Angus In consultation with: Jonathan Aoki, Other ITW:FC5 interlocks bypass ITW:FC5 interlocks bypass ITW:FC5 non-safety system inte ... ITW:FC5 non-safety system interlocks bypassed (due to ITW at atmosphere so ITW:IV5 not able to be open) to briefly take out of beampath for completion of ISAC Beam Control Device Annual Test Procedure.
2023-246 Implemented on: 2023-05-04 Active Kristofer Cottingham In consultation with: , Vacuum CDS:TCM2:CDSNTC2 CDS:TCM2:CDSNTC2 Existing defeat being added fo ... Existing defeat being added for documentation. Details in EPICS: "was forced on by jlewis on 2017-08-28 14:06:58. Reason: Forced at request of D. Kishi."
2023-244 Implemented on: 2023-05-01 Active Kristofer Cottingham In consultation with: , Vacuum SCRF:HSPV1 and SCRF:HCV1 SCRF:HSPV1 and SCRF:HCV1 Existing defeat being added fo ... Existing defeat being added for documentation. Details in EPICS: "was bypassed by ninahe on 2022-10-28 10:39:31. Reason: Bypass for David Kishi."
2023-243 Implemented on: 2023-05-01 Active Kristofer Cottingham In consultation with: , Vacuum CDS:CDM1:CDSTHCTS1 and CDS:CDM ... CDS:CDM1:CDSTHCTS1 and CDS:CDM1:CDSTHCTS2 Existing defeat being added fo ... Existing defeat being added for documentation. Details in EPICS: "was forced on by magua on 2018-05-15 08:29:42. Reason: Requested by David K."
2023-241 Implemented on: 2023-05-01 Active Kristofer Cottingham In consultation with: , Vacuum SCC3:CDM3:TS20 SCC3:CDM3:TS20 Existing defeat being added fo ... Existing defeat being added for documentation. Details in EPICS: "forced on by angust on 2018-02-20 07:45:31. Reason: Database inconsistency, force presumably lost in reboot."
From force history: "by angust on 2012-04-07 19:13:53. Reason: Vlad's request."
2023-240 Implemented on: 2023-05-01 Active Kristofer Cottingham In consultation with: , Vacuum SCC3:CDM2:TS15 SCC3:CDM2:TS15 Existing defeat being added fo ... Existing defeat being added for documentation. Details in EPICS: "forced on by roberts on 2020-10-13 13:05:53. Reason: Need to force sensor OK to condition cavity."
2023-239 Implemented on: 2023-05-01 Active Kristofer Cottingham In consultation with: , Vacuum SCC1:CDM2:TS15 SCC1:CDM2:TS15 Existing defeat being added fo ... Existing defeat being added for documentation. Details in EPICS: "forced on by roberts on 2020-10-13 12:07:49. Reason: Need to force this sensor to allow for conditioning. The sensors pick up the RF."
2023-238 Implemented on: 2023-05-01 Active Kristofer Cottingham In consultation with: , Vacuum SCB5:CDM4:TS27 SCB5:CDM4:TS27 Existing defeat being added fo ... Existing defeat being added for documentation. Details in EPICS: "forced on by angust on 2021-10-04 08:43:10. Reason: 289 K, need 290 K to open RV2 with module warm; discussed with Devon."
2023-237 Implemented on: 2023-05-01 Active Kristofer Cottingham In consultation with: , Vacuum SCB5:CDM3:TS20 SCB5:CDM3:TS20 Existing defeat being added fo ... Existing defeat being added for documentation. Details in EPICS: "forced on by angust on 2021-10-04 08:42:18. Reason: reading ~17 K despite module warm."
2023-236 Implemented on: 2023-05-01 Active Kristofer Cottingham In consultation with: , Vacuum SCB5:CDM2:TS11 SCB5:CDM2:TS11 Existing defeat being added fo ... Existing defeat being added for documentation. Details in EPICS: "SCB5:CDM2:TS11 was forced on by bstringer on 2018-05-29 14:19:11. Reason: Forced for operation. OK'd by Vlad."
2023-235 Implemented on: 2023-05-01 Active Kristofer Cottingham In consultation with: , Vacuum SCB5:CDM1:TS8 SCB5:CDM1:TS8 Existing defeat being added fo ... Existing defeat being added for documentation. Details in EPICS: "SCB5:CDM1:TS8 was forced on by angust on 2020-06-30 08:07:24. Reason: lost force presumably in ioc reboot."
In force history: "Reason: Bypassed for Vladimir. By jonaoki on 2010-04-20 16:20:06"
2023-234 Implemented on: 2023-05-01 Active Kristofer Cottingham In consultation with: , Vacuum SCB5:CDM1:TS3 SCB5:CDM1:TS3 Existing defeat being added fo ... Existing defeat being added for documentation. Details in EPICS: "SCB5:CDM1:TS3 was forced on by bstringer on 2022-06-14 08:25:26. Reason: Keeps tripping the cavity. Yao does not think this sensor is showing the correct temp and says there are others and we are ok to force this one."
2023-233 Implemented on: 2023-05-01 Active Kristofer Cottingham In consultation with: , Vacuum SCB5:CDM1:TS2 SCB5:CDM1:TS2 Existing defeat being added fo ... Existing defeat being added for documentation. Details in EPICS: "SCB5:CDM1:TS2 was forced on by jlewis on 2018-05-28 15:52:06. Reason: Forcing at request of RF group for stability test."
2023-232 Implemented on: 2023-05-01 Active Kristofer Cottingham In consultation with: , Vacuum SCB1:CDM1:TS2 and other SCLina ... SCB1:CDM1:TS2 and other SCLinac TSs Existing defeat being added fo ... Existing defeat being added for documentation. Details in EPICS: "SCB1:CDM1:TS2 was forced on by magua on 2018-05-18 13:14:16. Reason: Requested by SCRF experts."
2023-231 Implemented on: 2023-05-01 Active Kristofer Cottingham In consultation with: , Vacuum SCB2:CDM2:TS11 SCB2:CDM2:TS11 Existing defeat being added fo ... Existing defeat being added for documentation. Details in EPICS: "SCB2:CDM2:TS11 was forced on by jmossman on 2019-08-15 10:58:42. Reason: database inconsistency caused force to be lost. SCB2:CAV4 amplifier tripping frequently on temperature. Known issue with expected force as workaround. Confirmed with Tiffany Angus.
2023-230 Implemented on: 2023-05-01 Active Kristofer Cottingham In consultation with: , Vacuum SCB2:CDM1:TS8 SCB2:CDM1:TS8 Existing defeat being added fo ... Existing defeat being added for documentation. Details in EPICS: "SCB2:CDM1:TS8 was forced on by angust on 2018-09-24 08:28:08. Reason: lost in reboot?"
In EPICS force history: "Reason: For Vladimir Z. By spencerkiy on 2013-05-01 09:43:01."
2023-229 Implemented on: 2023-05-01 Active Kristofer Cottingham In consultation with: , Vacuum SCB2:CDM1:TS5 SCB2:CDM1:TS5 Existing defeat being added fo ... Existing defeat being added for documentation. Details in EPICS: "SCB2:CDM1:TS5 was forced on by angust on 2018-08-24 15:32:28. Reason: force reapplication for Vladimir."
2023-228 Implemented on: 2023-05-01 Active Kristofer Cottingham In consultation with: , Vacuum SCB2:CDM1:TS2 SCB2:CDM1:TS2 Existing defeat being added fo ... Existing defeat being added for documentation. Details in EPICS: "SCB2:CDM1:TS2 was forced on by angust on 2018-07-09 06:31:23. Reason: tripping amplifier."
2023-226 Implemented on: 2023-05-01 Active Kristofer Cottingham In consultation with: , Vacuum IOS:EXTFCSS IOS:EXTFCSS Existing defeat being added fo ... Existing defeat being added for documentation. Details in EPICS: ""*** Database inconsistency: EPICS has the IOS:EXTFCSS forced but database has not ***"
2023-225 Implemented on: 2023-05-01 Active Kristofer Cottingham In consultation with: , Vacuum ITE:REPLT ITE:REPLT Existing defeat being added fo ... Existing defeat being added for documentation. Details in EPICS: "*** Database inconsistency: EPICS has the ITE:REPLT forced but database has not ***"
2023-223 Implemented on: 2023-05-01 Active Kristofer Cottingham In consultation with: , Vacuum ITE:WFB1:X11X21 ITE:WFB1:X11X21 Existing defeat being added fo ... Existing defeat being added for documentation. Details in EPICS: "ITE:WFB1:X11X21 was forced on by angust on 2011-03-03 08:31:08. Reason: defeat #303 still in effect."

Defeat #303: "Water leak on exit modules 1 and 2 (elog 2009-06-10 15:51:10) (Pierre's memo was forwarded to IOPS from Violeta Toma June 18 2009)."

SEARCH RESULTS for DISABLES

ACK = Requires Acknowledgement
# Status: Implemented by: System: Device: Reason:
2024-234 Implemented on: 2024-05-06 Active Eric Lee In consultation with: , Optics IMS:Q1-Q6 (IMS HV power supply ... IMS:Q1-Q6 (IMS HV power supply enable Ch. 2 ) IMS:TP3 cleanup and inspection ... IMS:TP3 cleanup and inspection work by Derek Orth and company required lockout on IMS:Q1-Q6 .
2024-148 Implemented on: 2024-03-13 Active Rob Shanks In consultation with: Eric Lee, Vacuum DSB:IV2 DSB:IV2 To prevent beam delivery into ... To prevent beam delivery into ISAC-II until the new Current Monitoring System has been commissioned.
2024-147 Implemented on: 2024-03-12 Removed James Mossman In consultation with: Eric Lee, RF SCB2 Amplifier control cable SCB2 Amplifier control cable Damaged pin on control cable c ... Damaged pin on control cable caused spark affecting entire SCB2 control system.
2024-139 Implemented on: 2024-03-04 Removed Ed Parton In consultation with: , Optics CSB magnet coil power supplies ... CSB magnet coil power supplies & HV power supply CSB repairs CSB repairs
2024-127 Implemented on: 2024-02-22 Removed Hanna Dahl In consultation with: , Other East Shield Door Switch East Shield Door Switch As I was opening the ISAC-II a ... As I was opening the ISAC-II accelerator vault door I heard something that sounded like something fell. I ran around to check the track and saw that a piece of wood had fallen, so I ran back and pushed the 'stop' button. The piece of wood must have been leaning against the sliding door, and when it started to move it fell, by the time I pressed the 'stop' button, the wood had just became lodged between the door and the wall. It doesn't look like it's lodged tight enough to cause damage, but it is lodged enough that I can't pull it out by hand. I tried to re-close the door so I could pull it out, but the door wouldn't respond to the 'close' command. I removed the key that controls the power to the door so that it couldn't be 'opened' anymore, and reached out to T. Kauss. We looked at it locally and he said that he will try to get it out tomorrow. Submitting as a disable so that the location of the 'East Shield Door Switch' key is documented, it is in the RIB lock box.
2024-122 Implemented on: 2024-02-21 Removed Hanna Dahl In consultation with: , Other P-516 #2, P-517 #14, P-519 #14 ... P-516 #2, P-517 #14, P-519 #14 and #18. SCB2:RF:IN1, SCB3:RF:IN3, SCB5:RF:IN3 and IN4. These disables are required fo ... These disables are required for WP# I2024-02-21-4. (Bypass safety chain of RF amplifiers). This work required that the OFF signal be defeated for SCB2#1, SCB3#3, SCB5#3 and SCB5#4. Therefore, these were locked out such that power can't possibly be sent to the cavities.
2024-25 Implemented on: 2024-01-12 Removed Rob Shanks In consultation with: Tiffany Angus, Vacuum AYS:IV1 AYS:IV1 To prevent beam delivery to th ... To prevent beam delivery to the ARIEL Yield Station while AIRMS Mon#89 is Defeated.
2023-618 Implemented on: 2023-11-21 Removed Rob Shanks In consultation with: Tiffany Angus, Vacuum ILE2A:IV11 ILE2A:IV11 Need to ensure that ILE2A:IV11 ... Need to ensure that ILE2A:IV11 is not opened while beamline is open to air downstream of IV11.
2023-566 Implemented on: 2023-10-12 Removed Tiffany Angus In consultation with: Rene Tanaja, Other IMS:CEM20 cable(s?) connected ... IMS:CEM20 cable(s?) connected to CEM @ end of IIS CEM20 is presently connected t ... CEM20 is presently connected to a CEM at the end of IIS and the HV is permanently on (even with the bias saying that it's not on). Because of that, it presently has no interlock protection, so we have to make sure that intense beam is not sent to it, so keep FC2 in unless we are tuning a sufficiently low-intensity beam (as directed by Peter K. or Aurelia L., or someone working with them) needs to be sent there.
2023-446 Implemented on: 2023-08-04 Active Tiffany Angus In consultation with: , Vacuum HEBT:VV2 control cable locked ... HEBT:VV2 control cable locked out HEBT:VV2 does NOT have a restr ... HEBT:VV2 does NOT have a restrictor. To protect HEBT foils, this section must be vented via HEBT:VV5.
2023-436 Implemented on: 2023-08-01 Removed Blair Stringer In consultation with: , RF MEBT rebuncher MEBT rebuncher Water leak on the rebuncher. ... Water leak on the rebuncher. Device breaker has been switched off and lockout appllied
2023-413 Implemented on: 2023-07-25 Removed Rob Shanks In consultation with: Tiffany Angus, Safety Mass Separator HV Cage access Mass Separator HV Cage access Exposed conductors on Mass Sep ... Exposed conductors on Mass Separator Magnet pose a risk of shock. Mass Separator Magnet must be confirmed off before allowing access to the HV Cage.
2023-394 Implemented on: 2023-07-18 Active Rob Shanks In consultation with: Tiffany Angus, Vacuum ITM:SV7 ITM:SV7 Valve has been Disabled in the ... Valve has been Disabled in the "open" position to ensure free-flow of gasses through the ventilation leg.







additional comment: valve would only be closed during module moves to divert air through ITM:SV8 and MP2.
2023-266 Implemented on: 2023-05-23 Removed Hanna Dahl In consultation with: , Vacuum ILE2:IV11 ILE2:IV11 To prevent beam from going thr ... To prevent beam from going through the polarizer.
2022-144 Implemented on: 2022-05-30 Active Ed Parton In consultation with: , Optics ALTS:FC19 ALTS:FC19 Repair Repair
2022-86 Implemented on: 2022-04-22 Active Blair Stringer In consultation with: Tiffany Angus, Vacuum AGTS:IV40 AGTS:IV40 Actuators will be installed on ... Actuators will be installed on ILT:B43/46 but the ARIEL Safety System hasn't yet been integrated into the ISS. This disable will prevent beam from ARIEL to be accelerated in ISAC.
2021-353 Implemented on: 2021-10-27 Active Tiffany Angus In consultation with: , Other SEBT3B:LPM4 SEBT3B:LPM4 Spencer's request, 'September ... Spencer's request, 'September EMMA run saw large radiation fields from this box... after investigating was surprised to learn LPMs have fixed aperture always in beam, 0.7” diameter still quite large, but smaller than standard 2” diameter HEBT/SEBT beam pipe. Most LPMs installed at waists in beam so not an issue, however there seems to have been an oversight in design of EMMA beamline, as beam very large after Q4 as converges towards EMMA focus, actually slightly larger than 0.7” diameter... believe this is reason we always find had to ‘lose’ some beam from FC20 to SEBT3B:FC4 to get good alignment to EMMA:FC10.'
2021-246 Implemented on: 2021-07-13 Active Rene Tanaja In consultation with: , Other P-522 breaker for A/C XDC-1 P-522 breaker for A/C XDC-1 MCC-AA ground fault. MCC-AA ground fault.
2019-31 Implemented on: 2019-09-07 Active James Mossman In consultation with: Jonathan Aoki, Services IRIS disconnect (in closed pos ... IRIS disconnect (in closed position) Opening this disconnect will c ... Opening this disconnect will cause IRIS electronic infrastructure to 'float' (i.e. remove its connection to ground). This could create a personnel hazard (risk of electrical shock) and must only be done with strict hazard mitigation controls in place under the direction of the TRIUMF site electrical engineer.
2019-30 Implemented on: 2019-09-07 Active James Mossman In consultation with: Jonathan Aoki, Services TUDA-I disconnect (in closed p ... TUDA-I disconnect (in closed position) Opening this disconnect will c ... Opening this disconnect will cause TUDA-I electronic infrastructure to 'float' (i.e. remove its connection to ground). This could create a personnel hazard (risk of electrical shock) and must only be done with strict hazard mitigation controls in place under the direction of the TRIUMF site electrical engineer.
2019-28 Implemented on: 2019-09-06 Active James Mossman In consultation with: Jonathan Aoki, Services TUDA-II disconnect (in closed ... TUDA-II disconnect (in closed position) Opening this disconnect will c ... Opening this disconnect will cause TUDA-II electronic infrastructure to 'float' (i.e. remove its connection to ground). This could create a personnel hazard (risk of electrical shock) and must only be done with strict hazard mitigation controls in place under the direction of the TRIUMF site electrical engineer.
2019-24 Implemented on: 2019-08-21 Active Jonathan Aoki In consultation with: , Services GRIFFIN GB-1.2X disconnect (in ... GRIFFIN GB-1.2X disconnect (in closed position) Opening this disconnect will c ... Opening this disconnect will cause GRIFFIN electronic infrastructire to 'float' (i.e. remove its connection to ground). This could create a personnel hazard (risk of electrical shock) and must only be done with strict hazard mitigation controls in place under the direction of the TRIUMF site electrical engineer.
2019-7 Implemented on: 2019-03-18 Active James Mossman In consultation with: , Optics SCB1:YCB0 SCB1:YCB0 Device removed and moved to SC ... Device removed and moved to SCC1
2019-6 Implemented on: 2019-03-18 Active James Mossman In consultation with: , Optics SCB1:XCB0 SCB1:XCB0 Device removed and moved to SC ... Device removed and moved to SCC1
2016-688 Implemented on: 2016-07-06 Active Jonathan Aoki In consultation with: , Optics SEBT1:YCB3 SEBT1:YCB3 Shroud removed from SEBT1:YCB3 Shroud removed from SEBT1:YCB3
2016-687 Implemented on: 2016-07-06 Active Jonathan Aoki In consultation with: , Optics SEBT1:XCB3 SEBT1:XCB3 Shroud removed from SEBT1:XCB3 Shroud removed from SEBT1:XCB3
2016-686 Implemented on: 2016-07-06 Active Jonathan Aoki In consultation with: , Optics SEBT1:Q5 SEBT1:Q5 Shroud removed from SEBT1:Q5 Shroud removed from SEBT1:Q5
2016-685 Implemented on: 2016-07-06 Active Jonathan Aoki In consultation with: , Optics SEBT1:Q4 SEBT1:Q4 Shroud removed from SEBT1:Q4 Shroud removed from SEBT1:Q4
2016-684 Implemented on: 2016-07-06 Active Jonathan Aoki In consultation with: , Optics SEBT1:Q6 SEBT1:Q6 Shroud removed from SEBT1:Q6 Shroud removed from SEBT1:Q6
2012-3 Implemented on: 2012-08-04 Active Blair Stringer In consultation with: Brandon Humphries, Optics HEBT:Q4 HEBT:Q4 devices has been leaking water ... devices has been leaking water since june 28, 2012. HEBT:Q3 had its polarity switched to allow for HEBT:Q4 to be turned off. power and water disabled. Lock and key are with beamlines (Doug Preddy)
2009-1 Implemented on: 2009-05-05 Active Blair Stringer In consultation with: Ed Parton, Vacuum ITH:SV5S ITH:SV5S The valve is not needed. It h ... The valve is not needed. It has not been physically taken out of the vacuum line, but controls has removed all access and taken the valve out of the interlocks. (done on Sep22/08)