Implementation
Removal
Interlock Defeat
System(s) Affected:
Services
Interlock to be Defeated:
AL-ALCW , MM Booster, De-ionizer pumps, D-10, D-2 off
Implementation:
Number:
Date:
2024-05-02
Time:
10:15:00
2024-226
Implemented By:
Elena Bylinskaia
In Consultation With:
Status:
Removed
Estimated Duration:
3 days
Reason for Defeat:
AL-ALCW system shut off for Lid-Up operation
Number of Yellow Tags:
5
Location of Defeat Tag(s):
SAB3 - D-10, D-2. SAB2 AL-ALCW pump VFD, MM Booster Pump VFD, Toggle switch on De-ionizer MCC
How Was Defeat Implemented?
Where is Defeat Located?:
Al-LCW system shut off, appropriate valves closed.
SAB2, SAB3
Describe Alternate Protection:
Valves mujst be opened for Al-ALCW system start up.
Fault Reports:
Work Permits:
Disables:
Interlock Defeat
Removal:
Number:
Date:
2024-05-02
Time:
16:45:00
2024-226
Removed by:
Eric Chapman
Status:
Removed
Interlock Verification Method:
System restarted May 2, 2024 with lid up. MM Booster pump remains off. Deionizer pump on.
Number of Tags Removed:
10
Comments:
Riley Schick-Martin:
2024-05-02 16:45:37.247412
D-10 and D-2 valves reopened. Al-ALCW main pump restarted to pressurize the system while the lid is up. MM booster and Deionizer pumps remain off.
Elena Bylinskaia:
2024-05-02 10:13:53.838025
AL-ALCW system shut off for Lid-Up operation.
Brandon Humphries
David Bandiera
Elena Bylinskaia
Jason Wait
Sierra Dean
Robert Scheepmaker
Eric Chapman
Ryan Lovelidge
Riley Schick-Martin
Dale Nagra
Travis Kurucz
Chris Sooley
Kevin Lucow
Jas Uppal
Kathleen Genge
Gauhar Hayat
Frank Hosta
Ryan Anderson