# | Status: | Implemented by: | System: | Interlock: | Description: |
---|---|---|---|---|---|
2024-213 Implemented on: 2024-04-26 | Removed | David Bandiera In consultation with: , | Fire Alarm System | SA L1 Smoke detectors SA L1 Smoke detectors | Hot work in SAL1 ISIS area. Sm ... Hot work in SAL1 ISIS area. Smoke detectors 02:007-012, 02:007-018, 02:007-019, 02:007-027, 02:007-028 disarmed. |
2024-212 Implemented on: 2024-04-26 | Removed | David Bandiera In consultation with: , | Fire Alarm System | 02:001-141, 146, 147, 149 02:001-141, 146, 147, 149 | Hot work nearby at M9H through ... Hot work nearby at M9H throughout the day |
2024-211 Implemented on: 2024-04-26 | Removed | Chris Sooley In consultation with: Ryan Lovelidge, | Fire Alarm System | Detectors 13:075-016 through 0 ... Detectors 13:075-016 through 019 | Concrete cutting in IAMI Concrete cutting in IAMI |
2024-209 Implemented on: 2024-04-25 | Removed | Eric Chapman In consultation with: , | Fire Alarm System | ME 141 duct smokes disabled fo ... ME 141 duct smokes disabled for soldering | Soldering in ME141 AHU, repair ... Soldering in ME141 AHU, repair of evaporator coil refrigerant leak. |
2024-208 Implemented on: 2024-04-25 | Removed | Travis Kurucz In consultation with: , | Fire Alarm System | Detectors 13:075-016 through 0 ... Detectors 13:075-016 through 019 | Concrete cutting in IAMI Concrete cutting in IAMI |
2024-204 Implemented on: 2024-04-24 | Active | Eric Chapman In consultation with: , | Services | Al-ALCW South Heat exchanger H ... Al-ALCW South Heat exchanger H15 and H16 valves closed | Al-ALCW offline with RAW leak ... Al-ALCW offline with RAW leak in South Heat exchanger ME-31. Valves H15 and H16 fully closed to stop leak. |
2024-202 Implemented on: 2024-04-24 | Removed | Gauhar Hayat In consultation with: , | Fire Alarm System | RCA Smoke detectors 03:20-014, ... RCA Smoke detectors 03:20-014, 03:20-015 disarmed. | Floor renovation in RCA buildi ... Floor renovation in RCA building. |
2024-201 Implemented on: 2024-04-24 | Removed | Travis Kurucz In consultation with: , | Fire Alarm System | Detectors 13:075-016 through 0 ... Detectors 13:075-016 through 019 | Concrete cutting in IAMI Concrete cutting in IAMI |
2024-199 Implemented on: 2024-04-23 | Removed | Eric Chapman In consultation with: , | Fire Alarm System | SA L1 Smoke detectors SA L1 Smoke detectors | Hot work in SAL1 ISIS area. Sm ... Hot work in SAL1 ISIS area. Smoke detectors 02:007-012, 02:007-018, 02:007-019, 02:007-027, 02:007-028 disarmed. |
2024-198 Implemented on: 2024-04-23 | Removed | Gauhar Hayat In consultation with: , | Fire Alarm System | RCA Smoke detectors 03:20-014, ... RCA Smoke detectors 03:20-014, 03:20-015 disarmed. | Floor renovation in RCA buildi ... Floor renovation in RCA building. |
2024-197 Implemented on: 2024-04-23 | Removed | Travis Kurucz In consultation with: Elena Bylinskaia, | Fire Alarm System | Detectors 13:075-016 through 0 ... Detectors 13:075-016 through 019 | Concrete cutting in IAMI Concrete cutting in IAMI |
2024-196 Implemented on: 2024-04-22 | Removed | Frank Hosta In consultation with: , | Fire Alarm System | SA L1 Smoke detectors SA L1 Smoke detectors | Hot work in SAL1 ISIS area. Sm ... Hot work in SAL1 ISIS area. Smoke detectors 02:007-012, 02:007-019, 02:007-027, 02:007-028 disarmed. |
2024-195 Implemented on: 2024-04-22 | Removed | Frank Hosta In consultation with: , | Fire Alarm System | 03:20-014, 03:20-015 03:20-014, 03:20-015 | Floor renovation in RCA buildi ... Floor renovation in RCA building. |
2024-192 Implemented on: 2024-04-22 | Removed | Riley Schick-Martin In consultation with: , | Fire Alarm System | Detectors 13:075-016 through 0 ... Detectors 13:075-016 through 019 | Concrete cutting in IAMI Concrete cutting in IAMI |
2024-191 Implemented on: 2024-04-19 | Active | Ryan Lovelidge In consultation with: , | Targets | BL2C4 STF Supply Resistivity BL2C4 STF Supply Resistivity | STF Supply Resistivity reads " ... STF Supply Resistivity reads "PLCDat" error causing cyclotron trip. This is a known problem; see Fault 13917. This signal should be used as a diagnostic readback only, and not as an interlock.
*Do not remove this defeat until supply resistivity signal has been removed as a BL2C4 interlock. |
2024-187 Implemented on: 2024-04-17 | Removed | Ryan Lovelidge In consultation with: , | Fire Alarm System | SA L1 Smoke detectors SA L1 Smoke detectors | Hot work in SAL1 ISIS area. Sm ... Hot work in SAL1 ISIS area. Smoke detectors 02:007-012, 02:007-019, 02:007-027, 02:007-028 disarmed. |
2024-186 Implemented on: 2024-04-16 | Removed | Chris Sooley In consultation with: Ryan Lovelidge, | Fire Alarm System | 13:075-067 IAMI Grnd-Hot Lab S ... 13:075-067 IAMI Grnd-Hot Lab Sprinkler input disabled | Device is causing frequent nui ... Device is causing frequent nuisance alarms on FAS panel. |
2024-185 Implemented on: 2024-04-16 | Removed | Chris Sooley In consultation with: Ryan Lovelidge, | Fire Alarm System | 03:20-014, 03:20-015 03:20-014, 03:20-015 | Floor renovation in RCA buildi ... Floor renovation in RCA building. |
2024-184 Implemented on: 2024-04-15 | Removed | Elena Bylinskaia In consultation with: Elena Bylinskaia, Elena Bylinskaia | Fire Alarm System | SA L1 Smoke detectors SA L1 Smoke detectors | Hot work in SAL1 ISIS area. Sm ... Hot work in SAL1 ISIS area. Smoke detectors 02:007-012, 02:007-019, 02:007-027, 02:007-028 disarmed. |
2024-183 Implemented on: 2024-04-15 | Removed | Elena Bylinskaia In consultation with: , | Fire Alarm System | 03:20-014, 03:20-015 03:20-014, 03:20-015 | Floor renovation in RCA buildi ... Floor renovation in RCA building. |
2024-182 Implemented on: 2024-04-12 | Removed | Elena Bylinskaia In consultation with: Elena Bylinskaia, Elena Bylinskaia | Fire Alarm System | SAL1 Smoke detectors disarmed ... SAL1 Smoke detectors disarmed for grinding in ISIS area. | Grinding work in SAL1 ISIS are ... Grinding work in SAL1 ISIS area. Smoke detectors 02:007-012, 02:007-019, 02:007-027, 02:007-028 disarmed. |
2024-181 Implemented on: 2024-04-11 | Removed | Jas Uppal In consultation with: , | Fire Alarm System | SAL1 smoke detectors disarmed ... SAL1 smoke detectors disarmed for hot work. | Hot work in SAL1 ISIS area. Sm ... Hot work in SAL1 ISIS area. Smoke detectors 02:007-012, 02:007-019, 02:007-027, 02:007-028 disarmed. |
2024-179 Implemented on: 2024-04-10 | Removed | Riley Schick-Martin In consultation with: , | Fire Alarm System | Zones 1 & 2 monitoring until 1 ... Zones 1 & 2 monitoring until 17:00 | Construction in IAMI Construction in IAMI |
2024-177 Implemented on: 2024-04-09 | Removed | Jas Uppal In consultation with: , | Fire Alarm System | Meson Hall B2 Smoke Detectors: ... Meson Hall B2 Smoke Detectors: 02:001-146, 147, 149, and 151. | Hot work. Hot work. |
2024-175 Implemented on: 2024-04-08 | Removed | Eric Chapman In consultation with: , | Fire Alarm System | IAMI B1 and B2 sprinkler flow ... IAMI B1 and B2 sprinkler flow switches, Zone 1 and 2 test | Demolish and Remove Sprinkler ... Demolish and Remove Sprinkler Lines in B2 Shell Space in IAMI. |
2024-174 Implemented on: 2024-04-05 | Removed | Kevin Lucow In consultation with: , | Fire Alarm System | Meson Hall B2 Smoke Detectors: ... Meson Hall B2 Smoke Detectors: 02:001-146, 147, 149, and 151. | Hot work. Hot work. |
2024-173 Implemented on: 2024-04-05 | Removed | Kevin Lucow In consultation with: , | Fire Alarm System | IAMI B1 Power Supply Room, Det ... IAMI B1 Power Supply Room, Detectors 13:075-001 and 13:075-003. | Hot work in area. Hot work in area. |
2024-172 Implemented on: 2024-04-05 | Removed | Kevin Lucow In consultation with: , | Fire Alarm System | Chemistry Annex B1 Smoke Detec ... Chemistry Annex B1 Smoke Detectors 03:020-014 and 03:020-015. | Constructions and hot work. Constructions and hot work. |
2024-171 Implemented on: 2024-04-05 | Removed | Kevin Lucow In consultation with: , | Fire Alarm System | Chemistry Annex B1 Smoke Detec ... Chemistry Annex B1 Smoke Detectors 03:020-014 and 03:020-015. | Constructions and hot work. Constructions and hot work. |
2024-169 Implemented on: 2024-04-04 | Removed | Ryan Anderson In consultation with: , | Fire Alarm System | ME-141 Duct smoke detectors ME-141 Duct smoke detectors | Drilling work on SAB2 Drilling work on SAB2 |
2024-168 Implemented on: 2024-04-04 | Removed | Ryan Anderson In consultation with: , | Fire Alarm System | Chemistry Annex B1 Smoke Detec ... Chemistry Annex B1 Smoke Detectors 03:020-014 and 03:020-015. | Hot work. Hot work. |
2024-167 Implemented on: 2024-04-03 | Removed | Ryan Anderson In consultation with: , | Fire Alarm System | Chemistry Annex B1 Smoke Detec ... Chemistry Annex B1 Smoke Detectors 03:020-014 and 03:020-015. | Hot work. Hot work. |
2024-166 Implemented on: 2024-04-02 | Removed | Ryan Anderson In consultation with: , | Fire Alarm System | Chemistry Annex B1 Smoke Detec ... Chemistry Annex B1 Smoke Detectors 03:020-014 and 03:020-015. | Hot work. Hot work. |
2024-160 Implemented on: 2024-03-22 | Removed | Riley Schick-Martin In consultation with: , | Fire Alarm System | ISAC II Accelerator Vault beam ... ISAC II Accelerator Vault beam detectors, 06:065-001,2,&3 | Annual crane inspections Annual crane inspections |
2024-150 Implemented on: 2024-03-13 | Removed | Ryan Lovelidge In consultation with: , | Fire Alarm System | Meson hall smoke detectors Meson hall smoke detectors | 02:001-127/128/129/131/132/133 ... 02:001-127/128/129/131/132/133/135/139/140/141/144/146/147/148/149/150/151/152/154/163 disarmed for grinding around M9. |
2024-144 Implemented on: 2024-03-07 | Removed | Kevin Lucow In consultation with: , | Fire Alarm System | Chemistry Annex B1 Smoke Detec ... Chemistry Annex B1 Smoke Detectors 03:020-014 and 03:020-015. | Hot work. Hot work. |
2024-143 Implemented on: 2024-03-07 | Removed | Brandon Humphries In consultation with: , | Safety | ANM6 and AGM6 (Counts, WARN an ... ANM6 and AGM6 (Counts, WARN and TRIP) | Two radiation monitors (ARIEL ... Two radiation monitors (ARIEL Neutron Monitor #6 and ARIEL Gamma Monitor #6) were physically removed to allow for 284' level shielding blocks to be removed (for BL4N work). |
2024-136 Implemented on: 2024-03-01 | Removed | Gauhar Hayat In consultation with: Eric Chapman, Kevin Lucow | Safety | Breathable Air CO Monitor defe ... Breathable Air CO Monitor defeated (IBOP 1615 "GAS MONITOR 15 NOT TRIPPED"). | ARIEL Carbon Monoxide Monitor ... ARIEL Carbon Monoxide Monitor 2 replacement. |
2024-135 Implemented on: 2024-02-29 | Removed | Chris Sooley In consultation with: Ryan Lovelidge, Dale Nagra | Fire Alarm System | RCA B1 smoke detectors 03:020- ... RCA B1 smoke detectors 03:020-014 and 03:020-015, 04:027-15 | Welding and grinding work in R ... Welding and grinding work in RCA B1 level to be performed in Room 043 (B1 level, RCA3), and Room 017 (B1 level RCA 2). Hot work permit (HWP) #1065 covers work to be completed in areas. |
2024-130 Implemented on: 2024-02-26 | Removed | Chris Sooley In consultation with: Dale Nagra, Ryan Lovelidge | Fire Alarm System | IAMI smoke detectors. IAMI smoke detectors. | Detectors 13:075-001 to 004, 1 ... Detectors 13:075-001 to 004, 13:075-013 to 019, 13:075-22, 13:075-086 to 089, 13:076-23 to 24, 13:076-50 to 53, and 13:076-60 & 61 disabled. |
2024-126 Implemented on: 2024-02-22 | Removed | Travis Kurucz In consultation with: Ryan Lovelidge, | Safety | IBOP 1614 - Gas Monitor 14 IBOP 1614 - Gas Monitor 14 | MSRV replacing CO filters on t ... MSRV replacing CO filters on the breathable air unit 2. Monitor pinned until work is finished. |
2024-123 Implemented on: 2024-02-22 | Removed | Travis Kurucz In consultation with: Ryan Lovelidge, | Fire Alarm System | IAMI smoke detectors. IAMI smoke detectors. | Detectors 13:075-001 to 004, 1 ... Detectors 13:075-001 to 004, 13:075-013 to 019, 13:075-22, 13:075-086 to 089, 13:076-23 to 24, 13:076-50 to 53, and 13:076-60 & 61 disabled. |
2024-120 Implemented on: 2024-02-21 | Removed | Travis Kurucz In consultation with: Eric Chapman, | Fire Alarm System | IAMI smoke detectors. IAMI smoke detectors. | Detectors 13:075-001 to 004, 1 ... Detectors 13:075-001 to 004, 13:075-013 to 019, 13:075-22, 13:075-086 to 089, 13:076-23 to 24, 13:076-50 to 53, and 13:076-60 & 61 disabled. |
2024-118 Implemented on: 2024-02-20 | Removed | Travis Kurucz In consultation with: , | Fire Alarm System | RCA1 L1 smoke detectors disarm ... RCA1 L1 smoke detectors disarmed | Disarmed RCA1 L1 03:020-21 & 2 ... Disarmed RCA1 L1 03:020-21 & 22 for maitenance work. |
2024-117 Implemented on: 2024-02-20 | Removed | Travis Kurucz In consultation with: , | Fire Alarm System | SA G smoke detectors disabled ... SA G smoke detectors disabled temporarily for smoke in lunch room | SA G level detectors 02:008-33 ... SA G level detectors 02:008-33 to 35 disabled for clearing out smoke in the lunch room. |
2024-116 Implemented on: 2024-02-20 | Removed | Travis Kurucz In consultation with: , | Fire Alarm System | RCA1 L1 smoke detectors disarm ... RCA1 L1 smoke detectors disarmed | Disarmed RCA1 L1 3:20-21 & 22 ... Disarmed RCA1 L1 3:20-21 & 22 for maitenance work. |
2024-115 Implemented on: 2024-02-20 | Removed | Travis Kurucz In consultation with: , | Fire Alarm System | IAMI smoke detectors. IAMI smoke detectors. | Detectors 13:075-001 to 004, 1 ... Detectors 13:075-001 to 004, 13:075-013 to 019, 13:075-086 to 089, 13:076-22 to 24, 13:076-50 to 53, and 13:076-60 & 61 disabled. Disabled IAMI bell circuit in addition. |
2024-114 Implemented on: 2024-02-16 | Removed | Riley Schick-Martin In consultation with: , | Fire Alarm System | IAMI smoke detectors. IAMI smoke detectors. | Detectors 13:075-001 to 004, 1 ... Detectors 13:075-001 to 004, 13:075-013 to 019, 13:075-086 to 089, 13:076-23 & 24, 13:076-23 & 24, 13:076-50 to 53, and 13:076-60 & 61 disabled. |
2024-108 Implemented on: 2024-02-15 | Removed | Gauhar Hayat In consultation with: Eric Chapman, Kevin Lucow | Fire Alarm System | SAL1 smoke detectors disarmed ... SAL1 smoke detectors disarmed for hot work. | Hot work in SAL1 ISIS I2 room. ... Hot work in SAL1 ISIS I2 room. Smoke detectors 02:007-012, 02:007-016, 02:007-017, 02:007-018, 02:007-019, 02:007-027, 02:007-028 disarmed. |
2024-107 Implemented on: 2024-02-15 | Removed | Gauhar Hayat In consultation with: Eric Chapman, Kevin Lucow | Fire Alarm System | IAMI smoke detectors. IAMI smoke detectors. | Detectors 13:075-001 to 004, 1 ... Detectors 13:075-001 to 004, 13:075-013 to 019, and 13:075-086 to 089 disabled. |
2024-105 Implemented on: 2024-02-14 | Removed | Eric Chapman In consultation with: , | Fire Alarm System | IAMI smoke detectors and bell ... IAMI smoke detectors and bell circutis. | Detectors 13:075-001 to 004, 1 ... Detectors 13:075-001 to 004, 13:075-013 to 019, and 13:075-086 to 089 disabled. |
2024-104 Implemented on: 2024-02-14 | Removed | Gauhar Hayat In consultation with: Eric Chapman, Kevin Lucow | Fire Alarm System | All zones taken offline with F ... All zones taken offline with FAS Monitoring for annual inspection. | FAS Annual Inspection. FAS Annual Inspection. |
2024-103 Implemented on: 2024-02-13 | Removed | Kevin Lucow In consultation with: , | Fire Alarm System | IAMI smoke detectors and bell ... IAMI smoke detectors and bell circutis. | Detectors 13:075-001 to 004, 1 ... Detectors 13:075-001 to 004, 13:075-013 to 019, and 13:075-086 to 089 disabled. IAMI bell circuit disarmed. |
2024-102 Implemented on: 2024-02-13 | Removed | Gauhar Hayat In consultation with: Eric Chapman, Kevin Lucow | Fire Alarm System | All zones taken offline with F ... All zones taken offline with FAS Monitoring for annual inspection. | FAS Annual Inspection. FAS Annual Inspection. |
2024-101 Implemented on: 2024-02-12 | Removed | David Bandiera In consultation with: , | Fire Alarm System | IAMI B1, B2, and duct smoke de ... IAMI B1, B2, and duct smoke detectors disabled. IAMI bell circuit disarmed. | Smoke detectors 13:075-001 thr ... Smoke detectors 13:075-001 through 004, 13;075-013 through 019, and 13:075-086 through 089 disarmed for the day for cutting and re-welding of nuclear exhaust ducting. Disarmed bell circuit in addition. |
2024-100 Implemented on: 2024-02-12 | Removed | Ryan Anderson In consultation with: , | Fire Alarm System | FAS Zones 1 & 2 offline FAS Zones 1 & 2 offline | Annual Fire Alarm System testi ... Annual Fire Alarm System testing |
2024-98 Implemented on: 2024-02-09 | Removed | David Bandiera In consultation with: , | Fire Alarm System | IAMI B1, B2, and duct smoke de ... IAMI B1, B2, and duct smoke detectors disabled. IAMI bell circuit disarmed. | Smoke detectors 13:075-001 thr ... Smoke detectors 13:075-001 through 004, 13;075-013 through 019, and 13:075-086 through 089 disarmed for the day for cutting and re-welding of nuclear exhaust ducting. Disarmed bell circuit in addition. |
2024-97 Implemented on: 2024-02-09 | Removed | Ryan Anderson In consultation with: , | Fire Alarm System | FAS Zones 1 & 2 offline FAS Zones 1 & 2 offline | Annual Fire Alarm System testi ... Annual Fire Alarm System testing |
2024-95 Implemented on: 2024-02-08 | Removed | Gauhar Hayat In consultation with: Chris Sooley, Ryan Lovelidge | Fire Alarm System | IAMI B1, B2, and duct smoke de ... IAMI B1, B2, and duct smoke detectors disabled. IAMI bell circuit disarmed. | Smoke detectors 13:075-001 thr ... Smoke detectors 13:075-001 through 004, 13;075-013 through 019, and 13:075-086 through 089 disarmed for the day for cutting and re-welding of nuclear exhaust ducting. Disarmed bell circuit in addition. |
2024-94 Implemented on: 2024-02-08 | Removed | Gauhar Hayat In consultation with: Chris Sooley, Ryan Lovelidge | Fire Alarm System | Chemistry Annex (RCA1) B1 hall ... Chemistry Annex (RCA1) B1 hallway smoke detectors, 03:020-014 and 03:020-015. | Renovation work in RCA. Renovation work in RCA. |
2024-93 Implemented on: 2024-02-08 | Removed | Gauhar Hayat In consultation with: Chris Sooley, Ryan Lovelidge | Fire Alarm System | All zones taken offline with F ... All zones taken offline with FAS Monitoring for annual inspection. | FAS Annual Inspection. FAS Annual Inspection. |
2024-92 Implemented on: 2024-02-07 | Removed | Ryan Lovelidge In consultation with: , | Fire Alarm System | PHE smoke detectors 02:002-050 ... PHE smoke detectors 02:002-050/051/063/069/070 disarmed | Welding in the PHE magnet test ... Welding in the PHE magnet test area. |
2024-91 Implemented on: 2024-02-07 | Removed | Chris Sooley In consultation with: , | Fire Alarm System | IAMI B1, B2, and duct smoke de ... IAMI B1, B2, and duct smoke detectors disabled. IAMI bell circuit disarmed. | Smoke detectors 13:075-001 thr ... Smoke detectors 13:075-001 through 004, 13;075-013 through 019, and 13:075-086 through 089 disarmed for the day for cutting and re-welding of nuclear exhaust ducting. Disarmed bell circuit in addition. |
2024-90 Implemented on: 2024-02-07 | Removed | Gauhar Hayat In consultation with: Ryan Lovelidge, Chris Sooley | Fire Alarm System | All zones taken offline with F ... All zones taken offline with FAS Monitoring for annual inspection. | FAS Annual Inspection. FAS Annual Inspection. |
2024-89 Implemented on: 2024-02-07 | Removed | Chris Sooley In consultation with: Ryan Lovelidge, | Fire Alarm System | Chemistry Annex (RCA1) B1 hall ... Chemistry Annex (RCA1) B1 hallway smoke detectors, 03:020-014 and 03:020-015. | Renovation work in RCA. Renovation work in RCA. |
2024-88 Implemented on: 2024-02-06 | Removed | Ryan Lovelidge In consultation with: , | Fire Alarm System | ISAC 2 power supply room smoke ... ISAC 2 power supply room smoke detectors 06:063-002/003 disarmed | Above detectors disarmed for n ... Above detectors disarmed for nearby grinding for 4 hours. |
2024-87 Implemented on: 2024-02-06 | Removed | Ryan Lovelidge In consultation with: , | Fire Alarm System | PHE smoke detectors 02:002-050 ... PHE smoke detectors 02:002-050/051/063/069/070 disarmed | Welding in the PHE magnet test ... Welding in the PHE magnet test area. |
2024-86 Implemented on: 2024-02-06 | Removed | Chris Sooley In consultation with: Gauhar Hayat, | Fire Alarm System | All zones taken offline with F ... All zones taken offline with FAS Monitoring for annual inspection. | FAS Annual Inspection. FAS Annual Inspection. |
2024-85 Implemented on: 2024-02-06 | Removed | Chris Sooley In consultation with: , | Fire Alarm System | IAMI B1, B2, and duct smoke de ... IAMI B1, B2, and duct smoke detectors disabled. IAMI bell circuit disarmed. | Smoke detectors 13:075-001 thr ... Smoke detectors 13:075-001 through 004, 13;075-013 through 019, and 13:075-086 through 089 disarmed for the day for cutting and re-welding of nuclear exhaust ducting. Disarmed bell circuit in addition. |
2024-84 Implemented on: 2024-02-05 | Removed | Travis Kurucz In consultation with: Robert Scheepmaker, | Fire Alarm System | Chemistry Annex (RCA1) B1 hall ... Chemistry Annex (RCA1) B1 hallway smoke detectors, 03:020-014 and 03:020-015. | Renovation work in RCA. Renovation work in RCA. |
2024-83 Implemented on: 2024-02-05 | Removed | Travis Kurucz In consultation with: , | Fire Alarm System | IAMI B1, B2, and duct smoke de ... IAMI B1, B2, and duct smoke detectors disabled. IAMI bell circuit disarmed. | Smoke detectors 13:075-001 thr ... Smoke detectors 13:075-001 through 004, 13;075-013 through 019, and 13:075-086 through 089 disarmed for the day for cutting and re-welding of nuclear exhaust ducting. Disarmed bell circuit in addition. |
2024-82 Implemented on: 2024-02-05 | Removed | Travis Kurucz In consultation with: Robert Scheepmaker, | Fire Alarm System | All zones taken offline with F ... All zones taken offline with FAS Monitoring for annual inspection. | FAS Annual Inspection. FAS Annual Inspection. |
2024-81 Implemented on: 2024-02-05 | Removed | Travis Kurucz In consultation with: Robert Scheepmaker, | Fire Alarm System | FAS zone 1 & 2 offline, bell c ... FAS zone 1 & 2 offline, bell circuits in node 2, 3, 4 offline. | Zone 2 and bell circuits offli ... Zone 2 and bell circuits offline for relocation of a fire alarm bell. Zone 1 taken offline due to fault 16544. |
2024-80 Implemented on: 2024-02-02 | Removed | Travis Kurucz In consultation with: Robert Scheepmaker, | Fire Alarm System | Chemistry Annex (RCA1) B1 hall ... Chemistry Annex (RCA1) B1 hallway smoke detectors, 03:020-014 and 03:020-015. | Renovation work in RCA Renovation work in RCA |
2024-79 Implemented on: 2024-02-02 | Removed | Travis Kurucz In consultation with: Robert Scheepmaker, | Fire Alarm System | IAMI B1, B2, and duct smoke de ... IAMI B1, B2, and duct smoke detectors disabled. IAMI bell circuit disarmed. | Smoke detectors 13:075-001 thr ... Smoke detectors 13:075-001 through 004, 13;075-013 through 019, and 13:075-086 through 089 disarmed for the day for cutting and re-welding of nuclear exhaust ducting. Disarmed bell circuit in addition. |
2024-78 Implemented on: 2024-02-02 | Removed | Travis Kurucz In consultation with: Robert Scheepmaker, | Fire Alarm System | All zones taken offline with F ... All zones taken offline with FAS Monitoring for annual inspection. | FAS Annual Inspection FAS Annual Inspection |
2024-77 Implemented on: 2024-02-01 | Removed | Jas Uppal In consultation with: , | Fire Alarm System | Chemistry Annex (RCA1) B1 hall ... Chemistry Annex (RCA1) B1 hallway smoke detectors, 03:020-014 and 03:020-015. | Renovation work in RCA Renovation work in RCA |
2024-75 Implemented on: 2024-02-01 | Removed | Jas Uppal In consultation with: , | Fire Alarm System | IAMI B1, B2, and duct smoke de ... IAMI B1, B2, and duct smoke detectors disabled | Smoke detectors 13:075-001 thr ... Smoke detectors 13:075-001 through 004, 13;075-013 through 019, and 13:075-086 through 089 disarmed for the day for cutting and re-welding of nuclear exhaust ducting. |
2024-73 Implemented on: 2024-02-01 | Removed | Riley Schick-Martin In consultation with: , | Fire Alarm System | All zones taken offline with F ... All zones taken offline with FAS Monitoring for annual inspection. | FAS Annual Inspection FAS Annual Inspection |
2024-72 Implemented on: 2024-01-31 | Removed | Riley Schick-Martin In consultation with: , | Fire Alarm System | Chemistry Annex (RCA1) B1 hall ... Chemistry Annex (RCA1) B1 hallway smoke detectors, 03:020-014 and 03:020-015. | Renovation work in RCA Renovation work in RCA |
2024-71 Implemented on: 2024-01-31 | Removed | Robin Swanson In consultation with: Riley Schick-Martin, Jas Uppal | Fire Alarm System | All zones taken offline with F ... All zones taken offline with FAS Monitoring for annual inspection. | FAS Annual Inspection FAS Annual Inspection |
2024-70 Implemented on: 2024-01-31 | Removed | Riley Schick-Martin In consultation with: , | Fire Alarm System | IAMI B1, B2, and duct smoke de ... IAMI B1, B2, and duct smoke detectors disabled | Smoke detectors 13:075-001 thr ... Smoke detectors 13:075-001 through 004, 13;075-013 through 019, and 13:075-086 through 089 disarmed for the day for cutting and re-welding of nuclear exhaust ducting. |
2024-69 Implemented on: 2024-01-31 | Active | Brandon Humphries In consultation with: , | Ion sources and injection BL | EGUN BIAS Voltage Auto-Ramp ut ... EGUN BIAS Voltage Auto-Ramp utility Max current limit | At the end of the year in 2023 ... At the end of the year in 2023 while beam was sending to EGUN:FC1, the EGUN:BIAS current read-back (EGUN:BIAS:RDCUR) made a significant jump up to ~1 mA. Since then, this is the normal level the EGUN:BIAS current reaches when ramped up. Because of this EGUN:BIAS current reading increase, the ramping utility wouldn't reach all the way up to 300 kV. The ramping utility needed to have it's Max current limit increased from 1 mA to 1.2 mA. This limit increase was implemented on Tuesday January 30 (WP#A2024-01-30-2). This defeat will be removed once the origin of this EGUN:BIAS current jump is discovered and resolved (being tracked in the issue tracker). |
2024-68 Implemented on: 2024-01-31 | Removed | Jas Uppal In consultation with: , | Fire Alarm System | Zone 1 and 2, Nodes 2-4 off li ... Zone 1 and 2, Nodes 2-4 off line | WP#C2024-01-29-1. Relocation ... WP#C2024-01-29-1. Relocation of bells |
2024-66 Implemented on: 2024-01-30 | Removed | Robin Swanson In consultation with: Riley Schick-Martin, Jas Uppal | Fire Alarm System | Chemistry Annex (RCA1) B1 hall ... Chemistry Annex (RCA1) B1 hallway smoke detectors, 03:020-014 and 03:020-015. | Renovation work in RCA Renovation work in RCA |
2024-63 Implemented on: 2024-01-29 | Removed | Gauhar Hayat In consultation with: Eric Chapman, Kevin Lucow | Fire Alarm System | All zones taken offline with F ... All zones taken offline with FAS Monitoring for annual inspection. | FAS Annual Inspection FAS Annual Inspection |
2024-62 Implemented on: 2024-01-29 | Removed | Gauhar Hayat In consultation with: Eric Chapman, Kevin Lucow | Fire Alarm System | IAMI L1, B1 & B2 smoke detecto ... IAMI L1, B1 & B2 smoke detectors disabled, Zone 2 & 1 offline | Smoke detectors 13:075-001 thr ... Smoke detectors 13:075-001 through 004, 13;075-013 through 019, 13:075-034 through 045 and 13:075-086 through 089 disarmed for the day for cutting and re-welding of nuclear exhaust ducting. Zone 2 & 1 taken offline until 17:30 (Zone 1 due to fault 16544) |
2024-61 Implemented on: 2024-01-29 | Removed | Eric Chapman In consultation with: , | Fire Alarm System | ARIEL North detectors ARIEL North detectors | Coring in tgt hall through to ... Coring in tgt hall through to B1-08. Devices: 09:91-1-3,5-8,19; 09:92-1,2,11,15,18,19; 09:93-1,3-14,16,17,19,35; 09:94-42,45; 09:95-1,2,4; 09:98-1 |
2024-60 Implemented on: 2024-01-29 | Removed | Gauhar Hayat In consultation with: Eric Chapman, Kevin Lucow | Fire Alarm System | Chemistry Annex (RCA1) B1 hall ... Chemistry Annex (RCA1) B1 hallway smoke detectors, 03:020-014 and 03:020-015. | Renovation work in RCA Renovation work in RCA |
2024-59 Implemented on: 2024-01-26 | Removed | Gauhar Hayat In consultation with: , | Fire Alarm System | ARIEL North detectors ARIEL North detectors | Coring in tgt hall through to ... Coring in tgt hall through to B1-08. Devices: 09:91-1-3,5-8,19; 09:92-1,2,11,15,18,19; 09:93-1,3-14,16,17,19,35; 09:94-42,45; 09:95-1,2,4; 09:98-1 |
2024-58 Implemented on: 2024-01-26 | Removed | Gauhar Hayat In consultation with: , | Fire Alarm System | IAMI L1, B1 & B2 smoke detecto ... IAMI L1, B1 & B2 smoke detectors disabled, Zone 2 & 1 offline | Smoke detectors 13:075-001 thr ... Smoke detectors 13:075-001 through 004, 13;075-013 through 019, 13:075-034 through 045 and 13:075-086 through 089 disarmed for the day for cutting and re-welding of nuclear exhaust ducting. Zone 2 & 1 taken offline until 17:30 (Zone 1 due to fault 16544) |
2024-57 Implemented on: 2024-01-25 | Removed | Ryan Anderson In consultation with: , | Fire Alarm System | ARIEL North detectors ARIEL North detectors | Coring in tgt hall through to ... Coring in tgt hall through to B1-08. Devices: 09:91-1-3,5-8,19; 09:92-1,2,11,15,18,19; 09:93-1,3-14,16,17,19,35; 09:94-42,45; 09:95-1,2,4; 09:98-1 |
2024-56 Implemented on: 2024-01-25 | Removed | David Bandiera In consultation with: , | Fire Alarm System | Pull Station 03:020-003 disarm ... Pull Station 03:020-003 disarmed. Bell Circuits for Node 2, Node 3, Node 4 disarmed. | Relocation of Manual Pull Stat ... Relocation of Manual Pull Station 03:020-003 in RCA 1 & 2 B1 |
2024-55 Implemented on: 2024-01-25 | Removed | David Bandiera In consultation with: , | Safety | IBOP 1919 Pinned 'ISAC Summary ... IBOP 1919 Pinned 'ISAC Summary Services OK' | Safety Group replacing failing ... Safety Group replacing failing flammable gas sensor (Flammable gas monitor #3) in DRAGON area in ISAC. |
2024-54 Implemented on: 2024-01-25 | Removed | Ryan Anderson In consultation with: , | Fire Alarm System | IAMI L1, B1 & B2 smoke detecto ... IAMI L1, B1 & B2 smoke detectors disabled, Zone 2 & 1 offline | Smoke detectors 13:075-001 thr ... Smoke detectors 13:075-001 through 004, 13;075-013 through 019, 13:075-034 through 045 and 13:075-086 through 089 disarmed for the day for cutting and re-welding of nuclear exhaust ducting.
Zone 2 & 1 taken offline until 17:30 (Zone 1 due to fault 16544) |
2024-53 Implemented on: 2024-01-25 | Removed | Ryan Anderson In consultation with: , | Fire Alarm System | Chemistry Annex (RCA1) B1 hall ... Chemistry Annex (RCA1) B1 hallway smoke detectors, 03:020-014 and 03:020-015. | Renovation work in RCA Renovation work in RCA |
2024-51 Implemented on: 2024-01-24 | Removed | Ryan Anderson In consultation with: , | Fire Alarm System | IAMI L1, B1 & B2 smoke detecto ... IAMI L1, B1 & B2 smoke detectors disabled, Zone 2 & 1 offline | Smoke detectors 13:075-001 thr ... Smoke detectors 13:075-001 through 004, 13;075-013 through 019, 13:075-034 through 045 and 13:075-086 through 089 disarmed for the day for cutting and re-welding of nuclear exhaust ducting.
Zone 2 & 1 taken offline until 17:30 (Zone 1 due to fault 16544) |
2024-50 Implemented on: 2024-01-24 | Removed | Ryan Anderson In consultation with: , | Fire Alarm System | Chemistry Annex (RCA1) B1 hall ... Chemistry Annex (RCA1) B1 hallway smoke detectors, 03:020-014 and 03:020-015. | Renovation work in RCA Renovation work in RCA |
2024-49 Implemented on: 2024-01-23 | Removed | Ryan Anderson In consultation with: , | Fire Alarm System | ARIEL North detectors ARIEL North detectors | Coring in tgt hall through to ... Coring in tgt hall through to B1-08. Devices: 09:91-1-3,5-8,19; 09:92-1,2,11,15,18,19; 09:93-1,3-14,16,17,19,35; 09:94-42,45; 09:95-1,2,4; 09:98-1 |
2024-47 Implemented on: 2024-01-23 | Removed | Ryan Anderson In consultation with: , | Fire Alarm System | IAMI L1, B1 & B2 smoke detecto ... IAMI L1, B1 & B2 smoke detectors disabled, Zone 2 & 1 offline | Smoke detectors 13:075-001 thr ... Smoke detectors 13:075-001 through 004, 13;075-013 through 019, 13:075-034 through 045 and 13:075-086 through 089 disarmed for the day for cutting and re-welding of nuclear exhaust ducting.
Zone 2 & 1 taken offline until 17:30 (Zone 1 due to fault 16544) |
2024-46 Implemented on: 2024-01-23 | Removed | Ryan Anderson In consultation with: , | Fire Alarm System | Chemistry Annex (RCA1) B1 hall ... Chemistry Annex (RCA1) B1 hallway smoke detectors, 03:020-014 and 03:020-015. | Renovation work in RCA Renovation work in RCA |
2024-45 Implemented on: 2024-01-22 | Removed | Ryan Lovelidge In consultation with: , | Fire Alarm System | SA smoke detectors 02:008-028/ ... SA smoke detectors 02:008-028/029/030/031 | Opening up the floor in the SA ... Opening up the floor in the SA above the RF HVPS to install a cellphone signal booster. |
2024-44 Implemented on: 2024-01-22 | Removed | Chris Sooley In consultation with: Dale Nagra, Ryan Lovelidge | Fire Alarm System | ARIEL North detectors ARIEL North detectors | Coring in tgt hall through to ... Coring in tgt hall through to B1-08. Devices: 09:91-1-3,5-8,19; 09:92-1,2,11,15,18,19; 09:93-1,3-14,16,17,19,35; 09:94-42,45; 09:95-1,2,4; 09:98-1 |
2024-43 Implemented on: 2024-01-22 | Removed | Chris Sooley In consultation with: Dale Nagra, | Fire Alarm System | IAMI L1, B1 & B2 smoke detecto ... IAMI L1, B1 & B2 smoke detectors disabled, Zone 2 & 1 offline | Smoke detectors 13:075-001 thr ... Smoke detectors 13:075-001 through 004, 13;075-013 through 019, 13:075-034 through 045 and 13:075-086 through 089 disarmed for the day for cutting and re-welding of nuclear exhaust ducting.
Zone 2 & 1 taken offline until 17:30 (Zone 1 due to fault 16544) |
2024-42 Implemented on: 2024-01-22 | Removed | Dale Nagra In consultation with: , | Fire Alarm System | Chemistry Annex (RCA1) B1 hall ... Chemistry Annex (RCA1) B1 hallway smoke detectors, 03:020-014 and 03:020-015. | Renovation work in RCA Renovation work in RCA |
2024-41 Implemented on: 2024-01-19 | Removed | Chris Sooley In consultation with: , | Fire Alarm System | IAMI L1, B1 & B2 smoke detecto ... IAMI L1, B1 & B2 smoke detectors disabled, Zone 2 & 1 offline | Smoke detectors 13:075-001 thr ... Smoke detectors 13:075-001 through 004, 13;075-013 through 019, 13:075-034 through 045 and 13:075-086 through 089 disarmed for the day for cutting and re-welding of nuclear exhaust ducting.
Zone 2 & 1 taken offline until 17:30 (Zone 1 due to fault 16544) |
2024-40 Implemented on: 2024-01-19 | Removed | Ryan Lovelidge In consultation with: , | Fire Alarm System | ARIEL North detectors ARIEL North detectors | Coring in tgt hall through to ... Coring in tgt hall through to B1-08. Devices: 09:91-1-3,5-8,19; 09:92-1,2,11,15,18,19; 09:93-1,3-14,16,17,19,35; 09:94-42,45; 09:95-1,2,4; 09:98-1 |
2024-39 Implemented on: 2024-01-19 | Removed | Dale Nagra In consultation with: , | Fire Alarm System | RCA1 B1 hallway smoke detector ... RCA1 B1 hallway smoke detectors, 03:020-014 and 03:020-015. | Renovation work in RCA Renovation work in RCA |
2024-38 Implemented on: 2024-01-16 | Removed | Travis Kurucz In consultation with: Elena Bylinskaia, | Fire Alarm System | ARIEL North detectors ARIEL North detectors | Coring in tgt hall through to ... Coring in tgt hall through to B1-08. Devices: 09:91-1-3,5-8,19; 09:92-1,2,11,15,18,19; 09:93-1,3-14,16,17,19,35; 09:94-42,45; 09:95-1,2,4; 09:98-1 |
2024-37 Implemented on: 2024-01-16 | Removed | Travis Kurucz In consultation with: Elena Bylinskaia, | Fire Alarm System | IAMI L1, B1 & B2 smoke detecto ... IAMI L1, B1 & B2 smoke detectors, Zone 2 & 1 in test mode and IAMI bells disabled. | Smoke detectors 13:075-001 thr ... Smoke detectors 13:075-001 through 004, 13;075-013 through 019, 13:075-034 through 045 and 13:075-086 through 089 disarmed for the day for cutting and re-welding of nuclear exhaust ducting.
Zone 2 & 1 placed into test mode until 16:00 (Zone 1 due to fault 16544) and bells disarmed in IAMI building for sprinkler demolition on B2 level. (see comment section of WP) |
2024-36 Implemented on: 2024-01-16 | Removed | Travis Kurucz In consultation with: Elena Bylinskaia, | Fire Alarm System | IAMI L1, B1 & B2 smoke detecto ... IAMI L1, B1 & B2 smoke detectors | Smoke detectors 13:075-001 thr ... Smoke detectors 13:075-001 through 004, 13;075-013 through 019, 13:075-034 through 045 and 13:075-086 through 089 disarmed for the day for cutting and re-welding of nuclear exhaust ducting. |
2024-35 Implemented on: 2024-01-16 | Removed | Travis Kurucz In consultation with: Elena Bylinskaia, | Fire Alarm System | RCA1 B1 hallway smoke detector ... RCA1 B1 hallway smoke detectors, 03:020-014 and 03:020-015. | Renovation work in RCA Renovation work in RCA |
2024-33 Implemented on: 2024-01-15 | Removed | Robin Swanson In consultation with: Riley Schick-Martin, | Fire Alarm System | IAMI L1, B1 & B2 smoke detecto ... IAMI L1, B1 & B2 smoke detectors, Zone 2 & 1 in test mode IAMI bells disabled. | Smoke detectors 13:075-001 thr ... Smoke detectors 13:075-001 through 004, 13;075-013 through 019, 13:075-034 through 045 and 13:075-086 through 089 disarmed for the day for cutting and re-welding of nuclear exhaust ducting.
Zone 2 & 1 placed into test mode for 8hrs (Zone 1 due to fault 16544) and bells disarmed in IAMI building for sprinkler demolition on B2 level. (see comment section of WP) |
2024-32 Implemented on: 2024-01-15 | Removed | Robin Swanson In consultation with: Riley Schick-Martin, | Fire Alarm System | IAMI L1, B1 & B2 smoke detecto ... IAMI L1, B1 & B2 smoke detectors | Smoke detectors 13:075-001 thr ... Smoke detectors 13:075-001 through 004, 13;075-013 through 019, 13:075-034 through 045 and 13:075-086 through 089 disarmed for the day for cutting and re-welding of nuclear exhaust ducting. |
2024-31 Implemented on: 2024-01-15 | Removed | Riley Schick-Martin In consultation with: , | Fire Alarm System | ARIEL North detectors ARIEL North detectors | Coring in tgt hall through to ... Coring in tgt hall through to B1-08. Devices: 09:91-1-3,5-8,19; 09:92-1,2,11,15,18,19; 09:93-1,3-14,16,17,19,35; 09:94-42,45; 09:95-1,2,4; 09:98-1 |
2024-29 Implemented on: 2024-01-12 | Removed | Eric Chapman In consultation with: , | Fire Alarm System | RCA1 B1 hallway smoke detector ... RCA1 B1 hallway smoke detectors, 03:020-014 and 03:020-015. | Renovation work in RCA Renovation work in RCA |
2024-28 Implemented on: 2024-01-12 | Removed | Eric Chapman In consultation with: , | Fire Alarm System | MOB AHU #5 duct smoke, zone 1 ... MOB AHU #5 duct smoke, zone 1 MOB | AHU #5 burner startup, suspect ... AHU #5 burner startup, suspect dust burnoff, system has not run for a while. |
2024-27 Implemented on: 2024-01-12 | Removed | Gauhar Hayat In consultation with: Eric Chapman, | Fire Alarm System | ARIEL Target Hall LBDs and VES ... ARIEL Target Hall LBDs and VESDA Tunnel Smoke Detector disarmed. | ARIEL Target Hall LBDs and VES ... ARIEL Target Hall LBDs and VESDA Tunnel Smoke Detector disarmed for hot work. 09:095-001, 09:095-002, 09:094-045 disarmed. |
2024-24 Implemented on: 2024-01-12 | Removed | Gauhar Hayat In consultation with: Eric Chapman, | Fire Alarm System | IAMI L1, B1 & B2 smoke detecto ... IAMI L1, B1 & B2 smoke detectors | Smoke detectors 13:075-001 thr ... Smoke detectors 13:075-001 through 004, 13;075-013 through 019, 13:075-034 through 045 and 13:075-086 through 089 disarmed for the day for cutting and re-welding of nuclear exhaust ducting. |
2024-23 Implemented on: 2024-01-11 | Removed | Eric Chapman In consultation with: , | Fire Alarm System | Ariel Target Hall Smoke Detect ... Ariel Target Hall Smoke Detectors disabled. | Target Hall Linear Beam Detect ... Target Hall Linear Beam Detectors and VESDA Tunnel Smoke Detector disabled for hot work in target hall. |
2024-22 Implemented on: 2024-01-11 | Removed | Eric Chapman In consultation with: , | Fire Alarm System | RCA1 B1 hallway smoke detector ... RCA1 B1 hallway smoke detectors, 03:020-014 and 03:020-015. | Renovation work. Renovation work. |
2024-21 Implemented on: 2024-01-11 | Removed | Eric Chapman In consultation with: , | Fire Alarm System | IAMI L1, B1 & B2 smoke detecto ... IAMI L1, B1 & B2 smoke detectors | Smoke detectors 13:075-001 thr ... Smoke detectors 13:075-001 through 004, 13;075-013 through 019, 13:075-034 through 045 and 13:075-086 through 089 disarmed for the day for cutting and re-welding of nuclear exhaust ducting. |
2024-20 Implemented on: 2024-01-10 | Removed | Frank Hosta In consultation with: , | Fire Alarm System | 13:075-067 IAMI Grnd Hot lab ... 13:075-067 IAMI Grnd Hot lab Sprink Low Air | Repeated troubles from 13:075- ... Repeated troubles from 13:075-067^2 "Input monitoring: Open line, IAMI Grnd-Hot Lab Sprnk.Low Air". The alarm was going off every 30 seconds. |
2024-19 Implemented on: 2024-01-10 | Removed | Eric Chapman In consultation with: , | Services | SA1-13 MH-LCW pump shut down f ... SA1-13 MH-LCW pump shut down for maintenance | MH-LCW system running on SA1-1 ... MH-LCW system running on SA1-12. |
2024-17 Implemented on: 2024-01-10 | Removed | Travis Kurucz In consultation with: Eric Chapman, | Fire Alarm System | RCA1 B1 hallway smoke detector ... RCA1 B1 hallway smoke detectors, 03:020-014 and 03:020-015. | Renovation work. Renovation work. |
2024-16 Implemented on: 2024-01-10 | Removed | Travis Kurucz In consultation with: , | Fire Alarm System | IAMI L1, B1 & B2 smoke detecto ... IAMI L1, B1 & B2 smoke detectors | Smoke detectors 13:075-001 thr ... Smoke detectors 13:075-001 through 004, 13;075-013 through 019, 13:075-034 through 045 and 13:075-086 through 089 disarmed for the day for cutting and re-welding of nuclear exhaust ducting. |
2024-13 Implemented on: 2024-01-09 | Removed | Travis Kurucz In consultation with: Eric Chapman, | Fire Alarm System | IAMI L1, B1 & B2 smoke detecto ... IAMI L1, B1 & B2 smoke detectors | Smoke detectors 13:075-001 thr ... Smoke detectors 13:075-001 through 004, 13;075-013 through 019, 13:075-034 through 045 and 13:075-086 through 089 disarmed for the day for cutting and re-welding of nuclear exhaust ducting. |
2024-12 Implemented on: 2024-01-09 | Removed | Travis Kurucz In consultation with: Eric Chapman, | Fire Alarm System | RCA1 B1 hallway smoke detector ... RCA1 B1 hallway smoke detectors, 03:020-014 and 03:020-015. | Renovation work. Renovation work. |
2024-10 Implemented on: 2024-01-08 | Removed | Gauhar Hayat In consultation with: Ryan Lovelidge, | Fire Alarm System | Ariel Target Hall Smoke Detect ... Ariel Target Hall Smoke Detectors disabled. | Target Hall Linear Beam Detect ... Target Hall Linear Beam Detectors and VESDA Tunnel Smoke Detector disabled for hot work in target hall. |
2024-9 Implemented on: 2024-01-08 | Removed | Ryan Lovelidge In consultation with: , | Fire Alarm System | IAMI L1, B1 & B2 smoke detecto ... IAMI L1, B1 & B2 smoke detectors | Smoke detectors 13:075-001 thr ... Smoke detectors 13:075-001 through 004, 13;075-013 through 019, 13:075-034 through 045 and 13:075-086 through 089 disarmed for the day for cutting and re-welding of nuclear exhaust ducting. |
2024-8 Implemented on: 2024-01-05 | Removed | Gauhar Hayat In consultation with: Elena Bylinskaia, Ryan Lovelidge | Fire Alarm System | IAMI B2 smoke detectors and du ... IAMI B2 smoke detectors and duct detectors; 13:075-13 thru 19, 86 thru 89 | Leak testing of ventilation fi ... Leak testing of ventilation filter. |
2024-7 Implemented on: 2024-01-04 | Removed | Frank Hosta In consultation with: , | Fire Alarm System | FAS Zone 1 and Zone 2 Offline, ... FAS Zone 1 and Zone 2 Offline, Node 13 bells disarmed. | Zone 1 and Zone 2 taken offlin ... Zone 1 and Zone 2 taken offline via ACME Monitoring until 18:00. IAMI Node 13 bell circuits disarmed also. |
2024-6 Implemented on: 2024-01-03 | Removed | Chris Sooley In consultation with: Chris Sooley, Chris Sooley | Safety | Air Monitors #24, 25, 26 have ... Air Monitors #24, 25, 26 have been un-defeated | Air Monitors 24, 25, 26 have b ... Air Monitors 24, 25, 26 have been de-pinned in the back of Rack A CSS-RMS interface panel. ATG has had a PLC failure and is requesting DCR Ops to monitor the signals for these air monitors overnight and inform ATG Ops if there are any alarms. |
2024-4 Implemented on: 2024-01-03 | Removed | Frank Hosta In consultation with: , | Fire Alarm System | FAS Zone 1 and Zone 2 Offline, ... FAS Zone 1 and Zone 2 Offline, Node 13 bells disarmed. | Zone 1 and Zone 2 taken offlin ... Zone 1 and Zone 2 taken offline via ACME Monitoring until 17:00. IAMI Node 13 bell circuits disarmed also. |
2024-3 Implemented on: 2024-01-03 | Removed | Frank Hosta In consultation with: , | Fire Alarm System | ARIEL Target Hall Linear Beam ... ARIEL Target Hall Linear Beam Detectors 09:095-001/002 and B2 VESDA 09:094-045 | ARIEL Target Hall construction ... ARIEL Target Hall construction. |
2024-2 Implemented on: 2024-01-03 | Removed | Dale Nagra In consultation with: , | Fire Alarm System | 05:054-002, 003, 004. ISAC-1 T ... 05:054-002, 003, 004. ISAC-1 Target Hall Beam Detectors | Fill MPET SC Magnet with Liq. ... Fill MPET SC Magnet with Liq. He |
2023-671 Implemented on: 2023-12-23 | Active | Eric Chapman In consultation with: , | Services | MAB cooling towers, numerous c ... MAB cooling towers, numerous cells switched off, low cooling demand | Low cooling demand, accelerato ... Low cooling demand, accelerators offline for shutdown. Allow for regulation of system temperatures. |
2023-670 Implemented on: 2023-12-22 | Removed | Riley Schick-Martin In consultation with: , | Fire Alarm System | IAMI B2 smoke detectors and du ... IAMI B2 smoke detectors and duct detectors; 13:075-13 thru 19, 86 thru 89 | Leak testing of ventilation fi ... Leak testing of ventilation filter. |
2023-669 Implemented on: 2023-12-22 | Removed | Eric Chapman In consultation with: , | Fire Alarm System | RCA1 B1 hallway smoke detector ... RCA1 B1 hallway smoke detectors, 03:020-014 and 03:020-015. | Renovation work. Renovation work. |
2023-668 Implemented on: 2023-12-22 | Active | Chris Sooley In consultation with: Chris Sooley, Jas Uppal | Services | Al-ALCW Heat Exchangers Valves ... Al-ALCW Heat Exchangers Valves H-18 closed and D-17 throttled | MM and RF off for shutdown. MM and RF off for shutdown. |
2023-667 Implemented on: 2023-12-21 | Removed | Ryan Lovelidge In consultation with: , | Fire Alarm System | RCA1 B1 hallway smoke detector ... RCA1 B1 hallway smoke detectors, 03:020-014 and 03:020-015. | Renovation work. Renovation work. |
2023-666 Implemented on: 2023-12-20 | Removed | Kevin Lucow In consultation with: , | Fire Alarm System | RCA1 B1 hallway smoke detector ... RCA1 B1 hallway smoke detectors, 03:020-014 and 03:020-015. | Renovation work. Renovation work. |
2023-663 Implemented on: 2023-12-19 | Removed | Ryan Lovelidge In consultation with: , | Fire Alarm System | 02:007-003/012/013/016/018/019 02:007-003/012/013/016/018/019 | ISIS area smoke detectors disa ... ISIS area smoke detectors disarmed for nearby coring. |
2023-662 Implemented on: 2023-12-19 | Removed | Kevin Lucow In consultation with: , | Fire Alarm System | RCA1 B1 hallway smoke detector ... RCA1 B1 hallway smoke detectors, 03:020-014 and 03:020-015. | Renovation work. Renovation work. |
2023-661 Implemented on: 2023-12-18 | Removed | Robin Swanson In consultation with: Frank Hosta, | Fire Alarm System | ARIEL Target Hall Linear Beam ... ARIEL Target Hall Linear Beam Detectors 09:095-001/002 and B2 VESDA 09:094-045 | ARIEL Target Hall construction ... ARIEL Target Hall construction. |
2023-660 Implemented on: 2023-12-18 | Removed | Travis Kurucz In consultation with: , | Fire Alarm System | RCA1 B1 hallway smoke detector ... RCA1 B1 hallway smoke detectors, 03:020-014 and 03:020-015. | Renovation work. Renovation work. |
2023-659 Implemented on: 2023-12-15 | Removed | Robin Swanson In consultation with: Kathleen Genge, Dale Nagra | Safety | Air monitor #31 working warn l ... Air monitor #31 working warn limit increased | Air monitor #31 working warn l ... Air monitor #31 working warn limit raised from 50k to 75k counts with permission from RSO (Rock Neveau) and RPG. |
2023-657 Implemented on: 2023-12-15 | Removed | Robin Swanson In consultation with: , | Fire Alarm System | ARIEL Target Hall Linear Beam ... ARIEL Target Hall Linear Beam Detectors 09:095-001, 09:095-002 and B2 VESDA 09:094-045 | ARIEL Target Hall construction ... ARIEL Target Hall construction. |
2023-655 Implemented on: 2023-12-14 | Removed | David Bandiera In consultation with: , | Fire Alarm System | All FAS Zones offline until 16 ... All FAS Zones offline until 16:00 | Fire suppression quarterly ins ... Fire suppression quarterly inspection by OH&S + contractor |
2023-654 Implemented on: 2023-12-14 | Removed | Chris Sooley In consultation with: , | Fire Alarm System | RCA1 B1 hallway smoke detector ... RCA1 B1 hallway smoke detectors, 03:020-014 and 03:020-015. | Renovation work. Renovation work. |
2023-653 Implemented on: 2023-12-13 | Removed | Gauhar Hayat In consultation with: Elena Bylinskaia, Ryan Lovelidge | Fire Alarm System | RCA1 B1 hallway smoke detector ... RCA1 B1 hallway smoke detectors, 03:020-014 and 03:020-015. | Renovation work. Renovation work. |
2023-652 Implemented on: 2023-12-12 | Removed | Chris Sooley In consultation with: , | Fire Alarm System | RCA1 B1 hallway smoke detector ... RCA1 B1 hallway smoke detectors, 03:020-014 and 03:020-015. | Renovation work. Renovation work. |
2023-649 Implemented on: 2023-12-11 | Removed | Kevin Lucow In consultation with: , | Fire Alarm System | RCA1 B1 hallway smoke detector ... RCA1 B1 hallway smoke detectors, 03:020-014 and 03:020-015. | Renovation work. Renovation work. |
2023-648 Implemented on: 2023-12-10 | Removed | Kevin Lucow In consultation with: , | Fire Alarm System | RCA1 B1 hallway smoke detector ... RCA1 B1 hallway smoke detectors, 03:020-014 and 03:020-015. | Renovation work. Renovation work. |
2023-647 Implemented on: 2023-12-09 | Removed | Kevin Lucow In consultation with: , | Fire Alarm System | RCA1 B1 hallway smoke detector ... RCA1 B1 hallway smoke detectors, 03:020-014 and 03:020-015. | Renovation work. Renovation work. |
2023-646 Implemented on: 2023-12-08 | Removed | Kevin Lucow In consultation with: , | Fire Alarm System | ARIEL Target Hall Linear Beam ... ARIEL Target Hall Linear Beam Detectors 09:095-001, 09:095-002. | ARIEL Target Hall crane moveme ... ARIEL Target Hall crane movement and construction. |
2023-645 Implemented on: 2023-12-08 | Removed | Robin Swanson In consultation with: , | Fire Alarm System | RCA1 B1 hallway smoke detector ... RCA1 B1 hallway smoke detectors, 03:20-014 & 15 | Renovation work in area until ... Renovation work in area until 9pm |
2023-644 Implemented on: 2023-12-07 | Removed | Chris Sooley In consultation with: , | Fire Alarm System | RCA1 B1 hallway smoke detector ... RCA1 B1 hallway smoke detectors, 03:20-014 & 15 | Renovation work in area until ... Renovation work in area until end of day |
2023-643 Implemented on: 2023-12-06 | Removed | Travis Kurucz In consultation with: Eric Chapman, Riley Schick-Martin | Fire Alarm System | Zone 1 & 2, IAMI G & L1 detect ... Zone 1 & 2, IAMI G & L1 detectors | Smoke being used for ventilati ... Smoke being used for ventilation tests. |
2023-642 Implemented on: 2023-12-06 | Removed | Riley Schick-Martin In consultation with: , | Fire Alarm System | RCA1 B1 hallway smoke detector ... RCA1 B1 hallway smoke detectors, 03:20-014 & 15 | Renovation work in area until ... Renovation work in area until end of day |
2023-641 Implemented on: 2023-12-05 | Removed | Travis Kurucz In consultation with: Eric Chapman, Riley Schick-Martin | Services | Al-ALCW Heat Exchangers Valves ... Al-ALCW Heat Exchangers Valves H-18 closed and D-17 throttled | MM and RF off for maintenance ... MM and RF off for maintenance day. |
2023-640 Implemented on: 2023-12-05 | Removed | Riley Schick-Martin In consultation with: , | Fire Alarm System | Zone 1 & 2, IAMI G & L1 detect ... Zone 1 & 2, IAMI G & L1 detectors | Smoke being used for ventilati ... Smoke being used for ventilation tests. |
2023-639 Implemented on: 2023-12-05 | Removed | Eric Chapman In consultation with: , | Fire Alarm System | Zone 4 test and numerous ARIEL ... Zone 4 test and numerous ARIEL B2 smoke detectors. | Hot cell ducting smoke test. ... Hot cell ducting smoke test. FAS in Zone 4 test until 18:00. Nearby smoke detectors 09-094-003/4/9/10/13/14, VESDA detector 09-094-045 and Target hall linear beam detectors 09-095-001/002 disarmed for duration of testing. |
2023-638 Implemented on: 2023-12-04 | Active | Gauhar Hayat In consultation with: Ryan Lovelidge, | Targets | T2CS:FGTGT TRIP LOW lowered fr ... T2CS:FGTGT TRIP LOW lowered from 2.8 GPM to 2.5 GPM. | Lowered on suggestion by Alber ... Lowered on suggestion by Albert from Remote Handling. Value is stable, but at threshold currently. |
2023-637 Implemented on: 2023-12-04 | Removed | Ryan Lovelidge In consultation with: , | Fire Alarm System | FAS Zone 1 and Zone 2 Offline, ... FAS Zone 1 and Zone 2 Offline, Node 13 bells disarmed. | Zone 1 and Zone 2 taken offlin ... Zone 1 and Zone 2 taken offline via ACME Monitoring until 18:00. IAMI Node 13 bell circuits disarmed also. |
2023-636 Implemented on: 2023-12-02 | Removed | Frank Hosta In consultation with: , | Targets | STF byp-008 ion exchanger retu ... STF byp-008 ion exchanger return flow | BYP-006 STF target cooling wat ... BYP-006 STF target cooling water flow signal noisy, dropping below trip warn sometimes. Approved by Steve Sapriken and Yetvart Hosepyan. |
2023-635 Implemented on: 2023-12-01 | Removed | Ryan Lovelidge In consultation with: , | Fire Alarm System | FAS Zone 1 and Zone 2 Offline, ... FAS Zone 1 and Zone 2 Offline, Node 13 bells disarmed. | Zone 1 and Zone 2 taken offlin ... Zone 1 and Zone 2 taken offline via ACME Monitoring until 18:00. IAMI Node 13 bell circuits disarmed also. |
2023-634 Implemented on: 2023-11-30 | Removed | Robin Swanson In consultation with: Frank Hosta, | Fire Alarm System | Smoke detectors ARIEL L2 09-09 ... Smoke detectors ARIEL L2 09-093-008/009/010 disabled | VFD capacitor reforming of NV: ... VFD capacitor reforming of NV:EFL203 in ARIEL L2 |
2023-633 Implemented on: 2023-11-30 | Removed | Frank Hosta In consultation with: , | Fire Alarm System | FAS Zone 1 and Zone 2 Offline, ... FAS Zone 1 and Zone 2 Offline, Node 13 bells disarmed. | Zone 1 and Zone 2 taken offlin ... Zone 1 and Zone 2 taken offline via ACME Monitoring until 18:00. IAMI Node 13 bell circuits disarmed also. |
2023-631 Implemented on: 2023-11-29 | Removed | Chris Sooley In consultation with: David Bandiera, | Fire Alarm System | FAS Zone 1 and Zone 2 Offline FAS Zone 1 and Zone 2 Offline | Zone 1 and Zone 2 taken offlin ... Zone 1 and Zone 2 taken offline via ACME Monitoring until 17:30. |
2023-629 Implemented on: 2023-11-29 | Removed | Frank Hosta In consultation with: , | Fire Alarm System | FAS Zone 2 Offline and Node 13 ... FAS Zone 2 Offline and Node 13 bell circuits disarmed. | Zone 2 taken offline via ACME ... Zone 2 taken offline via ACME Monitoring until 16:00. Installation of new relay in AHU. |
2023-622 Implemented on: 2023-11-24 | Removed | Chris Sooley In consultation with: , | Fire Alarm System | FAS Zone 4 Offline FAS Zone 4 Offline | Maintenance on ARIEL VESDA sys ... Maintenance on ARIEL VESDA system. |
2023-621 Implemented on: 2023-11-23 | Active | Eric Chapman In consultation with: , | Ion sources and injection BL | ISIS beam loss trip level lowe ... ISIS beam loss trip level lowered to 10uA | Losses reading up to -10uA aft ... Losses reading up to -10uA after vacuum improvements in ISIS. IB 461 trip threshold (ISIS beamloss) lowered from nominal of 20uA to 10uA at request of Yuri Bylinsky as a precautionary measure until losses can be recalibrated. |
2023-620 Implemented on: 2023-11-23 | Removed | Ryan Anderson In consultation with: , | Fire Alarm System | ARIEL Target Hall Linear Beam ... ARIEL Target Hall Linear Beam Detectors 09:095-001 and B2 VESDA 09:094-045 | ARIEL Target Hall construction ... ARIEL Target Hall construction. |
2023-619 Implemented on: 2023-11-22 | Removed | Eric Chapman In consultation with: , | Optics | Temporary 1AQ16 power supply r ... Temporary 1AQ16 power supply running with no interlocks | One of the 1AQ16 power supplie ... One of the 1AQ16 power supplies failed and has been replaced by a temporary replacement. This replacement 1AQ16 power supply is currently running with no interlocks. |
2023-613 Implemented on: 2023-11-19 | Removed | Eric Chapman In consultation with: , | Ion sources and injection BL | Cryo 165 gate valve temperatur ... Cryo 165 gate valve temperature interlock | Cryo 165 cold head above trip ... Cryo 165 cold head above trip threshold auto closing gate valve. Cryo effectively pumping on the beamline despite being over temperature interlock value improving vacuum from 9e-7T to 3e-7T on IG155. |
2023-612 Implemented on: 2023-11-18 | Removed | Ryan Lovelidge In consultation with: , | Safety | Air monitor #31 working warn l ... Air monitor #31 working warn limit | Air monitor #31 working warn l ... Air monitor #31 working warn limit raised from 40k to 45k counts with permission from Brad Noakes. |
2023-609 Implemented on: 2023-11-17 | Removed | Eric Chapman In consultation with: , | Ion sources and injection BL | ISIS beam loss trip limit incr ... ISIS beam loss trip limit increased to 30uA | ISIS beam loss trip limit incr ... ISIS beam loss trip limit increased to 30uA. Increased spills in ISIS due to suspected vacuum issues. Nominal trip point 20uA. |
2023-608 Implemented on: 2023-11-17 | Removed | Eric Chapman In consultation with: , | Ion sources and injection BL | Cryo 165 gate valve temperatur ... Cryo 165 gate valve temperature interlock | Poor ISIS vacuum trips machine ... Poor ISIS vacuum trips machine on ISIS beam loss, pumping required to maintain beam delivery. Cryo 165 cold head above trip threshold auto closing gate valve. |
2023-607 Implemented on: 2023-11-17 | Removed | David Bandiera In consultation with: Frank Hosta, | Vacuum | B2A:IG3 'forced' ON in the byp ... B2A:IG3 'forced' ON in the bypass/force menu 2A EPICS EDM | B2A:IG3 forced ON in EPICS aft ... B2A:IG3 forced ON in EPICS after consulting with Edi. The ion gauge reading is noisy and causing the vacuum valves 2AVVA3 and 2AVVA4 to close. |
2023-604 Implemented on: 2023-11-16 | Removed | Gauhar Hayat In consultation with: Ryan Lovelidge, | Fire Alarm System | Smoke detectors 05:052-029 to ... Smoke detectors 05:052-029 to 033 in ISAC Penthouse disarmed for Filter Work. | ISAC1 HEPA Filter testing in I ... ISAC1 HEPA Filter testing in ISAC Penthouse. |
2023-602 Implemented on: 2023-11-16 | Removed | Ryan Lovelidge In consultation with: , | Fire Alarm System | 09:095-002 ARIEL target hall E ... 09:095-002 ARIEL target hall East linear beam detector | Device faulty, goes into alarm ... Device faulty, goes into alarm state when rearmed. |
2023-601 Implemented on: 2023-11-16 | Removed | Gauhar Hayat In consultation with: Ryan Lovelidge, | Fire Alarm System | ARIEL Target Hall Linear Beam ... ARIEL Target Hall Linear Beam Detectors 09:095-001 and B2 VESDA 09:094-045 | ARIEL Target Hall construction ... ARIEL Target Hall construction. |
2023-600 Implemented on: 2023-11-16 | Removed | Kevin Lucow In consultation with: , | Ion sources and injection BL | ISIS beam loss limit increased ... ISIS beam loss limit increased to 25 uA. | ISIS beam loss limit increased ... ISIS beam loss limit increased from 20 to 25 uA.
With beam off, ISIS beam loss has an offset of up to 5 uA. |
2023-597 Implemented on: 2023-11-14 | Removed | Gauhar Hayat In consultation with: Ryan Lovelidge, Elena Bylinskaia | Fire Alarm System | ARIEL Target Hall Linear Beam ... ARIEL Target Hall Linear Beam Detectors 09:095-001, 09:095-002 and B2 VESDA 09:094-045 | ARIEL Target Hall construction ... ARIEL Target Hall construction. |
2023-596 Implemented on: 2023-11-11 | Removed | Travis Kurucz In consultation with: Eric Chapman, Riley Schick-Martin | Services | Cu-ALCW and Al-ALCW surge tank ... Cu-ALCW and Al-ALCW surge tanks valved closed. | Tanks valved closed due to pow ... Tanks valved closed due to power outage as to not overfill them. |
2023-595 Implemented on: 2023-11-10 | Removed | Riley Schick-Martin In consultation with: , | Safety | IBOP 0102, 0106, 0124, 1510, 1 ... IBOP 0102, 0106, 0124, 1510, 1511, 1615, 1621, 1622 | Power is out. Silencing nuisan ... Power is out. Silencing nuisance alarms until devices can be restored. |
2023-594 Implemented on: 2023-11-10 | Removed | David Bandiera In consultation with: , | Services | Al-ALCW Heat Exchangers Valves ... Al-ALCW Heat Exchangers Valves H-18 closed and D-17 throttled | Main Magnet and RF Off due to ... Main Magnet and RF Off due to power outage |
2023-592 Implemented on: 2023-11-10 | Removed | Frank Hosta In consultation with: , | Fire Alarm System | ARIEL Target Hall Linear Beam ... ARIEL Target Hall Linear Beam Detectors 09:095-001, 09:095-002 and B2 VESDA 09:094-045 | ARIEL Target Hall construction ... ARIEL Target Hall construction. |
2023-591 Implemented on: 2023-11-09 | Removed | Chris Sooley In consultation with: , | Fire Alarm System | ARIEL Target Hall Linear Beam ... ARIEL Target Hall Linear Beam Detectors 09:095-001, 09:095-002 and B2 VESDA 09:094-045 | ARIEL Target Hall construction ... ARIEL Target Hall construction. |
2023-590 Implemented on: 2023-11-08 | Removed | Chris Sooley In consultation with: , | Fire Alarm System | ARIEL Target Hall Linear Beam ... ARIEL Target Hall Linear Beam Detectors 09:095-001, 09:095-002 and B2 VESDA 09:094-045 | ARIEL Target Hall construction ... ARIEL Target Hall construction. |
2023-588 Implemented on: 2023-11-07 | Removed | Chris Sooley In consultation with: , | Fire Alarm System | ARIEL Target Hall Linear Beam ... ARIEL Target Hall Linear Beam Detectors 09:095-001, 09:095-002 and B2 VESDA 09:094-045 | ARIEL Target Hall construction ... ARIEL Target Hall construction. |
2023-586 Implemented on: 2023-11-06 | Removed | Ryan Anderson In consultation with: , | Safety | IL1A scan deactivated IL1A scan deactivated | IL1A scans are tripping cyclot ... IL1A scans are tripping cyclotron while BL1A is defined off for addressing CAMAC issues |
2023-585 Implemented on: 2023-11-06 | Removed | Ryan Anderson In consultation with: , | Fire Alarm System | ARIEL Target Hall Linear Beam ... ARIEL Target Hall Linear Beam Detectors 09:095-001, 09:095-002 and B2 VESDA 09:094-045 | ARIEL Target Hall construction ... ARIEL Target Hall construction. |
2023-584 Implemented on: 2023-11-01 | Removed | Riley Schick-Martin In consultation with: , | Fire Alarm System | 01:035-040 MOB G Elevator Lobb ... 01:035-040 MOB G Elevator Lobby; 01:035-009 MOB AHU #1 duct | Grinding work in MOB Grinding work in MOB |
2023-582 Implemented on: 2023-10-31 | Removed | Riley Schick-Martin In consultation with: , | Fire Alarm System | 01:035-040 MOB G Elevator Lobb ... 01:035-040 MOB G Elevator Lobby; 01:035-009 MOB AHU #1 duct | Grinding work in MOB Grinding work in MOB |
2023-581 Implemented on: 2023-10-31 | Removed | Eric Chapman In consultation with: , | Fire Alarm System | ARIEL target hall and Vesda de ... ARIEL target hall and Vesda detectors | Concrete pour in ARIEL target ... Concrete pour in ARIEL target hall with pumper truck. |
2023-579 Implemented on: 2023-10-27 | Removed | Gauhar Hayat In consultation with: , | Fire Alarm System | MHESA L1 Filter Room Detector ... MHESA L1 Filter Room Detector 02:001-033 disarmed. | MHESA L1 Filter Room Detector ... MHESA L1 Filter Room Detector 02:001-033 disarmed for fume hood filter testing. |
2023-577 Implemented on: 2023-10-27 | Removed | Gauhar Hayat In consultation with: Elena Bylinskaia, Ryan Lovelidge | Fire Alarm System | ARIEL Target Hall LBDs disarme ... ARIEL Target Hall LBDs disarmed for ARIEL Crane Work | Overhead Crane work being done ... Overhead Crane work being done in target hall. |
2023-576 Implemented on: 2023-10-24 | Removed | Brandon Humphries In consultation with: , | Ion sources and injection BL | EGUN:BIAS interlock defeated, ... EGUN:BIAS interlock defeated, EGUN:CATHB signal forced and vacuum interlock changed | To allow for EGUN:BIAS HV cond ... To allow for EGUN:BIAS HV conditioning without tripping at the usual vacuum trip point or needing the EGUN:CATHB running. To prevent trips and allow for conditioning, the EGUN:BIAS vacuum interlock was changed from 1e-7 Torr (interlock was "EGUN:IG1 < 100nTorr") to 1e-6 Torr ("EGUN:IG1 < 1uTorr"). For EGUN:BIAS HV conditioning, the HV cabling is configured in such a way that the EGUN:CATHB and EGUN:CHT are disconnected. To allow for the EGUN:BIAS to turned on for conditioning, the "EGUN:CATHB>50V" interlock has been forced to be okay. This allows for protection from the other EGUN:BIAS interlocks (instead of bypassing the EGUN:BIAS through EPICS as described in the procedure). Defeat was approved by Friedhelm and implemented by Gelo (of Controls group). |
2023-575 Implemented on: 2023-10-24 | Removed | Robin Swanson In consultation with: Frank Hosta, | Services | Al-ALCW Heat Exchangers Valves ... Al-ALCW Heat Exchangers Valves H-18 closed and D-17 throttled | Main magnet OFF for UCN measur ... Main magnet OFF for UCN measurements |
2023-574 Implemented on: 2023-10-24 | Removed | Frank Hosta In consultation with: , | Fire Alarm System | ARIEL Target Hall Linear Beam ... ARIEL Target Hall Linear Beam Detectors 09:095-001, 09:095-002 and B2 VESDA 09:094-045 | ARIEL Target Hall construction ... ARIEL Target Hall construction. |
2023-572 Implemented on: 2023-10-20 | Removed | David Bandiera In consultation with: , | Fire Alarm System | IAMI B2 Smoke Detectors 13:075 ... IAMI B2 Smoke Detectors 13:075-013 through 13:075-019 & 13:075-086 | Welding and Cutting on B2 leve ... Welding and Cutting on B2 level of IAMI building. |
2023-571 Implemented on: 2023-10-19 | Removed | Kevin Lucow In consultation with: , | Safety | BSM 63 warning increased. BSM 63 warning increased. | BSM 63 warning level increased ... BSM 63 warning level increased from 30% to 40% for thorium irradiation at IPF. |
2023-570 Implemented on: 2023-10-19 | Removed | Jas Uppal In consultation with: , | Fire Alarm System | 2:001-023 - 26, 034 2:001-023 - 26, 034 | Construction work in clean roo ... Construction work in clean room (remove window to facilitate gantry removal) |
2023-569 Implemented on: 2023-10-18 | Removed | Brandon Humphries In consultation with: , | Vacuum | EHGMS:SV01, EHMC:SV01, EHRPC:S ... EHGMS:SV01, EHMC:SV01, EHRPC:SV01, EHCD:FPV01, EHCD:FPV04, EHCD:FPV06, EINJ:FPVCD, EACA:FPVCD interlocks bypassed | Cryogenics group is scrubbing ... Cryogenics group is scrubbing the helium system in preparation for cool down. |
2023-565 Implemented on: 2023-10-13 | Removed | Travis Kurucz In consultation with: Riley Schick-Martin, | Targets | BYP-003 STF Water Jacket HIGH ... BYP-003 STF Water Jacket HIGH level Pinned | Target water doesn't settle co ... Target water doesn't settle correctly without a target, so this is pinned as per Steve S requesting ops to keep the pump running. |
2023-563 Implemented on: 2023-10-12 | Removed | Kevin Lucow In consultation with: , | Targets | BL2C4 STF Supply Resistivity BL2C4 STF Supply Resistivity | STF Supply Resistivity reads " ... STF Supply Resistivity reads "PLCDat" error causing cyclotron trip. This is a known problem; see Fault 13917. This signal should be used as a diagnostic readback only, and not as an interlock.
*Do not remove this defeat until supply resistivity signal has been removed as a BL2C4 interlock. |
2023-562 Implemented on: 2023-10-12 | Removed | Elena Bylinskaia In consultation with: Elena Bylinskaia, Elena Bylinskaia | Ion sources and injection BL | Cryo #147 temperature I/L bypa ... Cryo #147 temperature I/L bypassed. | Temperature is at warning leve ... Temperature is at warning level. |
2023-561 Implemented on: 2023-10-12 | Removed | Gauhar Hayat In consultation with: Elena Bylinskaia, Ryan Lovelidge | Fire Alarm System | Ariel Target Hall LBDs and Ves ... Ariel Target Hall LBDs and Vesda Smoke Detectors Disarmed | Ariel Target Hall LBDs and VES ... Ariel Target Hall LBDs and VESDA Smoke Detectors 09:094-045 and 09:094-047 disarmed for soldering work in Ariel Target Hall. |
2023-555 Implemented on: 2023-10-10 | Removed | Frank Hosta In consultation with: , | Safety | STF 7 : Target return resistiv ... STF 7 : Target return resistivity. | Resistivity not recovering wit ... Resistivity not recovering without beam on. Message reader being flooded with messages. |
2023-550 Implemented on: 2023-10-06 | Removed | David Bandiera In consultation with: , | Fire Alarm System | ARIEL Target Hall Linear Beam ... ARIEL Target Hall Linear Beam Detectors 09:095-001, 09:095-002 and B2 VESDA 09:094-045 | ARIEL Target Hall construction ... ARIEL Target Hall construction. |
2023-549 Implemented on: 2023-10-06 | Removed | Travis Kurucz In consultation with: Eric Chapman, Riley Schick-Martin | Fire Alarm System | FAS All zones offline for Bell ... FAS All zones offline for Bell testing | Testing FAS bells around site. ... Testing FAS bells around site. |
2023-546 Implemented on: 2023-10-05 | Removed | Chris Sooley In consultation with: , | Fire Alarm System | ARIEL Target Hall Linear Beam ... ARIEL Target Hall Linear Beam Detectors 09:095-001, 09:095-002 and B2 VESDA 09:094-045 | ARIEL Target Hall construction ... ARIEL Target Hall construction. |
2023-543 Implemented on: 2023-10-04 | Removed | Chris Sooley In consultation with: , | Fire Alarm System | ARIEL Target Hall Linear Beam ... ARIEL Target Hall Linear Beam Detectors 09:095-001, 09:095-002 and B2 VESDA 09:094-045 | ARIEL Target Hall construction ... ARIEL Target Hall construction. |
2023-539 Implemented on: 2023-10-03 | Removed | Chris Sooley In consultation with: , | Fire Alarm System | ARIEL Target Hall Linear Beam ... ARIEL Target Hall Linear Beam Detectors 09:095-001, 09:095-002 and B2 VESDA 09:094-045 | ARIEL Target Hall construction ... ARIEL Target Hall construction. |
2023-538 Implemented on: 2023-10-03 | Removed | Ryan Lovelidge In consultation with: , | Safety | I1507 pinned at IBOP I1507 pinned at IBOP | MHESA B1 RCR1 RM6 WARN alarm p ... MHESA B1 RCR1 RM6 WARN alarm pinned at I1507 following power bump. |
2023-535 Implemented on: 2023-09-29 | Removed | Kevin Lucow In consultation with: , | Fire Alarm System | RCA1 B1 smoke detectors 03:020 ... RCA1 B1 smoke detectors 03:020-014 and 03:020-015 | Construction. Construction. |
2023-534 Implemented on: 2023-09-29 | Removed | Ryan Anderson In consultation with: , | Fire Alarm System | ARIEL Target Hall Linear Beam ... ARIEL Target Hall Linear Beam Detectors 09:095-001, 09:095-002 and B2 VESDA 09:094-045 | ARIEL Target Hall construction ... ARIEL Target Hall construction. |
2023-533 Implemented on: 2023-09-28 | Removed | Travis Kurucz In consultation with: Eric Chapman, Riley Schick-Martin | Fire Alarm System | RCA1 B1 smoke detectors 03:020 ... RCA1 B1 smoke detectors 03:020-014/015 | Floor replacement, removal of ... Floor replacement, removal of old tiles will generate some dust. |
2023-532 Implemented on: 2023-09-28 | Removed | Travis Kurucz In consultation with: Eric Chapman, Riley Schick-Martin | Fire Alarm System | ARIEL Target Hall Linear Beam ... ARIEL Target Hall Linear Beam Detectors 09:095-001, 09:095-002 and B2 VESDA 09:094-045 | ARIEL Target Hall construction ... ARIEL Target Hall construction. |
2023-531 Implemented on: 2023-09-27 | Removed | Travis Kurucz In consultation with: Eric Chapman, Riley Schick-Martin | Fire Alarm System | RCA1 B1 smoke detectors 03:020 ... RCA1 B1 smoke detectors 03:020-014/015 | Floor replacement, removal of ... Floor replacement, removal of old tiles will generate some dust. |
2023-530 Implemented on: 2023-09-27 | Removed | Travis Kurucz In consultation with: Eric Chapman, Riley Schick-Martin | Fire Alarm System | ARIEL Target Hall Linear Beam ... ARIEL Target Hall Linear Beam Detectors 09:095-001, 09:095-002 and B2 VESDA 09:094-045 | ARIEL Target Hall construction ... ARIEL Target Hall construction. |
2023-528 Implemented on: 2023-09-26 | Removed | Eric Chapman In consultation with: , | Fire Alarm System | RCA1 B1 smoke detectors 03:020 ... RCA1 B1 smoke detectors 03:020-014/015 | Floor replacement, removal of ... Floor replacement, removal of old tiles will generate some dust. |
2023-527 Implemented on: 2023-09-26 | Removed | Travis Kurucz In consultation with: , | Fire Alarm System | ARIEL Target Hall Linear Beam ... ARIEL Target Hall Linear Beam Detectors 09:095-001, 09:095-002 and B2 VESDA 09:094-045 | ARIEL Target Hall construction ... ARIEL Target Hall construction. |
2023-525 Implemented on: 2023-09-25 | Removed | Ryan Lovelidge In consultation with: , | Fire Alarm System | RCA1 B1 smoke detectors 03:020 ... RCA1 B1 smoke detectors 03:020-014/015 | Floor replacement, removal of ... Floor replacement, removal of old tiles will generate some dust. |
2023-524 Implemented on: 2023-09-25 | Removed | Gauhar Hayat In consultation with: Elena Bylinskaia, Ryan Lovelidge | Fire Alarm System | ARIEL Target Hall Linear Beam ... ARIEL Target Hall Linear Beam Detectors 09:095-001, 09:095-002 and B2 VESDA 09:094-045 | ARIEL Target Hall construction ... ARIEL Target Hall construction. |
2023-522 Implemented on: 2023-09-22 | Removed | Gauhar Hayat In consultation with: Elena Bylinskaia, Ryan Lovelidge | Safety | IBOP I1507 and I1508 pinned du ... IBOP I1507 and I1508 pinned due to MHESA RCR1 Fume Hood work. | MHESA B1 RCR1 Fume Hood work b ... MHESA B1 RCR1 Fume Hood work being done. |
2023-521 Implemented on: 2023-09-22 | Removed | Gauhar Hayat In consultation with: Elena Bylinskaia, Ryan Lovelidge | Fire Alarm System | ARIEL Fan Room Smoke Detectors ... ARIEL Fan Room Smoke Detectors 09:093-008, 009 and 010 disarmed. | Disarmed for Nuclear Ventilati ... Disarmed for Nuclear Ventilation Fan Stack work. |
2023-520 Implemented on: 2023-09-22 | Removed | Gauhar Hayat In consultation with: Elena Bylinskaia, Ryan Lovelidge | Fire Alarm System | ARIEL Target Hall Linear Beam ... ARIEL Target Hall Linear Beam Detectors 09:095-001, 09:095-002 and B2 VESDA 09:094-045 | ARIEL Target Hall construction ... ARIEL Target Hall construction. |
2023-519 Implemented on: 2023-09-21 | Removed | Robin Swanson In consultation with: Dale Nagra, | Fire Alarm System | ARIEL Target Hall Linear Beam ... ARIEL Target Hall Linear Beam Detectors 09:095-001, 09:095-002 and B2 VESDA 09:094-045 | ARIEL Target Hall construction ... ARIEL Target Hall construction. |
2023-518 Implemented on: 2023-09-20 | Removed | Brandon Humphries In consultation with: , | Vacuum | EHGMS:SV01, EHCDFPV01, EHCD:FP ... EHGMS:SV01, EHCDFPV01, EHCD:FPV04, EHCD:FPV06, EINJ:FPVCD, EACA:FPVCD interlocks bypassed | Cryogenics group is scrubbing ... Cryogenics group is scrubbing the helium system in preparation for cool down. |
2023-517 Implemented on: 2023-09-20 | Removed | Robin Swanson In consultation with: Dale Nagra, | Fire Alarm System | ARIEL Target Hall Linear Beam ... ARIEL Target Hall Linear Beam Detectors 09:095-001, 09:095-002 and B2 VESDA 09:094-045 | ARIEL Target Hall construction ... ARIEL Target Hall construction. |
2023-516 Implemented on: 2023-09-19 | Removed | Frank Hosta In consultation with: , | Fire Alarm System | FAS Zone 2 offline FAS Zone 2 offline | Investigating multiple issues ... Investigating multiple issues with FAS system. |
2023-515 Implemented on: 2023-09-19 | Removed | Frank Hosta In consultation with: , | Fire Alarm System | ARIEL Target Hall Linear Beam ... ARIEL Target Hall Linear Beam Detectors 09:095-001, 09:095-002 and B2 VESDA 09:094-045 | ARIEL Target Hall construction ... ARIEL Target Hall construction. |
2023-514 Implemented on: 2023-09-18 | Removed | David Bandiera In consultation with: , | Fire Alarm System | RCA1 B1 South Smoke Detector 0 ... RCA1 B1 South Smoke Detector 03:020-014 | Job requiring cutting will gen ... Job requiring cutting will generate dust in the local area. No hot work to be performed. |
2023-513 Implemented on: 2023-09-18 | Removed | David Bandiera In consultation with: , | Fire Alarm System | FAS All zones offline until 15 ... FAS All zones offline until 1500 | Winterization of fire suppress ... Winterization of fire suppression glycol systems |
2023-512 Implemented on: 2023-09-18 | Removed | Chris Sooley In consultation with: , | Fire Alarm System | ARIEL Target Hall Linear Beam ... ARIEL Target Hall Linear Beam Detectors 09:095-001, 09:095-002 and B2 VESDA 09:094-045 | ARIEL Target Hall construction ... ARIEL Target Hall construction. |
2023-511 Implemented on: 2023-09-15 | Removed | Kevin Lucow In consultation with: , | Fire Alarm System | ARIEL Target Hall Linear Beam ... ARIEL Target Hall Linear Beam Detectors 09:095-001, 09:095-002 and B2 VESDA 09:094-045 | ARIEL Target Hall construction ... ARIEL Target Hall construction. |
2023-510 Implemented on: 2023-09-14 | Removed | Ryan Anderson In consultation with: , | Fire Alarm System | Ariel Smoke Detectors 09:095-0 ... Ariel Smoke Detectors 09:095-001, 09:095-002, 09:094-045 | ARIEL Target Hall construction ... ARIEL Target Hall construction work involving cutting, grinding and welding |
2023-509 Implemented on: 2023-09-13 | Removed | Eric Chapman In consultation with: , | Ion sources and injection BL | Cryo 165 gate valve temperatur ... Cryo 165 gate valve temperature interlock | Poor ISIS vacuum trips machine ... Poor ISIS vacuum trips machine on ISIS beam loss, pumping required to maintain beam delivery. Cryo 165 cold head above trip threshold auto closing gate valve. |
2023-508 Implemented on: 2023-09-13 | Removed | Eric Chapman In consultation with: , | Ion sources and injection BL | Cryo 147 gate valve temperatur ... Cryo 147 gate valve temperature interlock | Poor ISIS vacuum trips machine ... Poor ISIS vacuum trips machine on ISIS beam loss, pumping required to maintain beam delivery. Cryo 147 cold head above trip threshold auto closing gate valve. |
2023-507 Implemented on: 2023-09-12 | Removed | Ryan Anderson In consultation with: , | Safety | STF Ion exchanger supply flow ... STF Ion exchanger supply flow pinned | Flow level is continuing to ge ... Flow level is continuing to get worse, is toggling at trip limit. |
2023-505 Implemented on: 2023-09-12 | Removed | Ryan Anderson In consultation with: , | Fire Alarm System | Ariel Smoke Detectors 09:095-0 ... Ariel Smoke Detectors 09:095-001, 09:095-002, 09:094-045 | ARIEL Target Hall construction ... ARIEL Target Hall construction work involving cutting, grinding and welding |
2023-504 Implemented on: 2023-09-12 | Removed | Ryan Anderson In consultation with: , | Fire Alarm System | RCA2 B1 room 11 detectors offl ... RCA2 B1 room 11 detectors offline | Hot work in room 11 for ductin ... Hot work in room 11 for ducting installation |
2023-503 Implemented on: 2023-09-11 | Removed | Travis Kurucz In consultation with: Riley Schick-Martin, | Fire Alarm System | FAS All zones offline until 15 ... FAS All zones offline until 1500 | Work on fire suppression water ... Work on fire suppression water system gauges to be performed all around site. |
2023-502 Implemented on: 2023-09-11 | Removed | Travis Kurucz In consultation with: Riley Schick-Martin, | Fire Alarm System | Ariel Smoke Detectors 09:095-0 ... Ariel Smoke Detectors 09:095-001, 09:095-002, 09:094-045 | ARIEL Target Hall construction ... ARIEL Target Hall construction work involving cutting, grinding and welding |
2023-500 Implemented on: 2023-09-08 | Removed | Travis Kurucz In consultation with: Riley Schick-Martin, Eric Chapman | Fire Alarm System | FAS devices 002-096, 002-089, ... FAS devices 002-096, 002-089, 002-088 | Work in trailer GG. Work in trailer GG. |
2023-498 Implemented on: 2023-09-06 | Removed | Gauhar Hayat In consultation with: Ryan Lovelidge, | Fire Alarm System | RCA AHU and dumb waiter smoke ... RCA AHU and dumb waiter smoke detectors | Brazing in room 011 on ground ... Brazing in room 011 on ground level of RCA. RCA AHU #4 and #5 duct smokes Devices 03-019-040 and 041 disarmed. Dumb waiter shaft smoke detector 03-019-028 also disarmed. |
2023-496 Implemented on: 2023-09-01 | Removed | Robin Swanson In consultation with: Frank Hosta, | Fire Alarm System | FAS Zone 1 offline FAS Zone 1 offline | Investigating an issue with a ... Investigating an issue with a Tamper switch under the MOB auditorium East Stairwell. |
2023-494 Implemented on: 2023-08-31 | Removed | Eric Chapman In consultation with: , | Ion sources and injection BL | Cryo 147 Gate valve temperatur ... Cryo 147 Gate valve temperature interlock | Failure of neighbouring cryopu ... Failure of neighbouring cryopump 128 caused degradation of ISIS beamline vacuum, limiting injected current due to elevated losses on skimmer 4. Discussion with Tim S weeks ago was that cryo 147 could be bypassed if required to regain vacuum in ISIS due to poor performance of cryo 165. |
2023-489 Implemented on: 2023-08-29 | Removed | David Bandiera In consultation with: , | Fire Alarm System | FAS Zone 3 offline and Node 5 ... FAS Zone 3 offline and Node 5 & Node 6 Bell Circuits Disarmed | Fire Suppression system inspec ... Fire Suppression system inspection and testing by outside contractors. |
2023-485 Implemented on: 2023-08-28 | Removed | Ryan Anderson In consultation with: , | Fire Alarm System | All zones disabled All zones disabled | Semi-annual fire supression sy ... Semi-annual fire supression system inspection and testing |
2023-483 Implemented on: 2023-08-25 | Removed | Eric Chapman In consultation with: , | Safety | BSM 63 working level raised fr ... BSM 63 working level raised from 30 to 35 | Thorium targets at installed a ... Thorium targets at installed at IPF. Temporary approval granted to irradiate thorium until Sept 30, 2023. |
2023-482 Implemented on: 2023-08-25 | Removed | Eric Chapman In consultation with: , | Fire Alarm System | RCA AHU and dumb waiter smoke ... RCA AHU and dumb waiter smoke detectors | Brazing in room 011 on ground ... Brazing in room 011 on ground level of RCA. RCA AHU #4 and #5 duct smokes Devices 03-019-040 and 041 disarmed. Dumb waiter shaft smoke detector 03-019-028 also disarmed. |
2023-481 Implemented on: 2023-08-24 | Removed | Gauhar Hayat In consultation with: Jas Uppal, Kathleen Genge | Safety | Air Monitor #31 warn limit low ... Air Monitor #31 warn limit lowered to 40 KCPM. | As instructed by Head of RPG. As instructed by Head of RPG. |
2023-480 Implemented on: 2023-08-24 | Removed | Eric Chapman In consultation with: Riley Schick-Martin, | Fire Alarm System | RCA B1 smoke detectors RCA B1 smoke detectors | Outside contractor grinding in ... Outside contractor grinding in area, installation of new card access system in RCA room 07 |
2023-476 Implemented on: 2023-08-22 | Removed | Riley Schick-Martin In consultation with: , | Fire Alarm System | MOB AHU duct smoke detectors 0 ... MOB AHU duct smoke detectors 01:035-035 & 01:035-009 | Brazing in the walk-in freezer ... Brazing in the walk-in freezer. |
2023-474 Implemented on: 2023-08-18 | Removed | Gauhar Hayat In consultation with: Ryan Lovelidge, Elena Bylinskaia | Fire Alarm System | Smoke detectors in MHESA B1 La ... Smoke detectors in MHESA B1 Lab disarmed for fume hood calibration. | 02:001-005 and 02:001-006 smok ... 02:001-005 and 02:001-006 smoke detectors disarmed to allow for smoke testing of Fume Hood. |
2023-473 Implemented on: 2023-08-18 | Removed | Gauhar Hayat In consultation with: Ryan Lovelidge, Elena Bylinskaia | Fire Alarm System | Ariel Smoke Detectors 09:095-0 ... Ariel Smoke Detectors 09:095-001, 09:095-002, 09:094-045 | ARIEL Target Hall construction ... ARIEL Target Hall construction work involving cutting, grinding and welding |
2023-471 Implemented on: 2023-08-17 | Removed | Gauhar Hayat In consultation with: , | Fire Alarm System | MHESA Smoke Detectors Disabled ... MHESA Smoke Detectors Disabled for Hot work. | Hot Work being done in MHESA G ... Hot Work being done in MHESA G Floor. |
2023-469 Implemented on: 2023-08-17 | Removed | Dale Nagra In consultation with: , | Targets | STF Ion Exchanger Return Resis ... STF Ion Exchanger Return Resistivity pinned at STF BYP 010 | PLCData error coming through a ... PLCData error coming through after meter replacement yesterday. Requested to pin the signal to run beam. Present readback is below 6 Mohm and in trip mode. |
2023-468 Implemented on: 2023-08-17 | Removed | Gauhar Hayat In consultation with: , | Fire Alarm System | Zone 2 offline until 17:00; Be ... Zone 2 offline until 17:00; Bells disarmed in Zone 2. | FAS bell fault investigation FAS bell fault investigation |
2023-467 Implemented on: 2023-08-17 | Removed | Gauhar Hayat In consultation with: , | Fire Alarm System | Ariel Smoke Detectors 09:095-0 ... Ariel Smoke Detectors 09:095-001, 09:095-002, 09:094-045 | ARIEL Target Hall construction ... ARIEL Target Hall construction work involving cutting, grinding and welding |
2023-466 Implemented on: 2023-08-17 | Removed | Eric Chapman In consultation with: , | Targets | STF Ion Exchanger Return Resis ... STF Ion Exchanger Return Resistivity pinned at STF BYP 010 | PLCData error coming through a ... PLCData error coming through after meter replacement yesterday. Requested to pin the signal to run beam. |
2023-464 Implemented on: 2023-08-16 | Removed | Riley Schick-Martin In consultation with: , | Fire Alarm System | 09:095-001, 09:095-002, 09:094 ... 09:095-001, 09:095-002, 09:094-045 | ARIEL Target Hall construction ... ARIEL Target Hall construction work involving cutting, grinding and welding |
2023-463 Implemented on: 2023-08-15 | Removed | Riley Schick-Martin In consultation with: , | Fire Alarm System | Zone 2 offline until 17:00 Zone 2 offline until 17:00 | FAS bell fault investigation FAS bell fault investigation |
2023-462 Implemented on: 2023-08-15 | Removed | Riley Schick-Martin In consultation with: , | Services | Al-ALCW Heat Exchangers Valves ... Al-ALCW Heat Exchangers Valves H-18 closed and D-17 throttled | Main magnet OFF for UCN measur ... Main magnet OFF for UCN measurements |
2023-461 Implemented on: 2023-08-15 | Removed | Riley Schick-Martin In consultation with: , | Fire Alarm System | 09:095-001, 09:095-002, 09:094 ... 09:095-001, 09:095-002, 09:094-045 | ARIEL Target Hall construction ... ARIEL Target Hall construction work involving cutting, grinding and welding |
2023-459 Implemented on: 2023-08-14 | Removed | Chris Sooley In consultation with: Chris Sooley, | Fire Alarm System | 09:095-001, 09:095-002, 09:094 ... 09:095-001, 09:095-002, 09:094-045 | ARIEL Target Hall construction ... ARIEL Target Hall construction work involving cutting, grinding and welding |
2023-457 Implemented on: 2023-08-11 | Removed | Chris Sooley In consultation with: Ryan Lovelidge, | Fire Alarm System | 09:095-001, 09:095-002, 09:094 ... 09:095-001, 09:095-002, 09:094-045 | ARIEL Target Hall construction ... ARIEL Target Hall construction work involving cutting, grinding and welding |
2023-455 Implemented on: 2023-08-10 | Removed | Ryan Anderson In consultation with: , | Safety | MHESA flammable gas alarms and ... MHESA flammable gas alarms and ISAC services alarm pinned | Gas alarm calibration Gas alarm calibration |
2023-454 Implemented on: 2023-08-10 | Removed | Ryan Anderson In consultation with: , | Fire Alarm System | 09:095-001, 09:095-002, 09:094 ... 09:095-001, 09:095-002, 09:094-045 | ARIEL Target Hall construction ... ARIEL Target Hall construction work involving cutting, grinding and welding |
2023-453 Implemented on: 2023-08-09 | Removed | Ryan Anderson In consultation with: , | Safety | M9A beamblocker IN limit pinne ... M9A beamblocker IN limit pinned | Work being done testing and co ... Work being done testing and commissioning beamline |
2023-452 Implemented on: 2023-08-09 | Removed | Ryan Anderson In consultation with: , | Fire Alarm System | 09:095-001, 09:095-002, 09:094 ... 09:095-001, 09:095-002, 09:094-045 | ARIEL Target Hall construction ... ARIEL Target Hall construction work involving cutting, grinding and welding |
2023-450 Implemented on: 2023-08-08 | Removed | Ryan Anderson In consultation with: , | Fire Alarm System | FAS all zones put into test mo ... FAS all zones put into test mode | FAS all zones put into test mo ... FAS all zones put into test mode for faulty bell replacement. |
2023-449 Implemented on: 2023-08-08 | Removed | Ryan Anderson In consultation with: , | Fire Alarm System | 09:095-001, 09:095-002, 09:094 ... 09:095-001, 09:095-002, 09:094-045 | ARIEL Target Hall construction ... ARIEL Target Hall construction work involving cutting, grinding and welding |
2023-447 Implemented on: 2023-08-04 | Active | Riley Schick-Martin In consultation with: , | Optics | BL2A Q9, Q12, Q15, B3, B4 flow ... BL2A Q9, Q12, Q15, B3, B4 flow switch interlock limits | Less flow through magnet circu ... Less flow through magnet circuit since pumps tripped in power bump. |
2023-445 Implemented on: 2023-08-04 | Removed | Travis Kurucz In consultation with: Eric Chapman, Riley Schick-Martin | Fire Alarm System | 09:095-001, 09:095-002, 09:094 ... 09:095-001, 09:095-002, 09:094-045 | ARIEL Target Hall construction ... ARIEL Target Hall construction work involving cutting, grinding and welding |
2023-444 Implemented on: 2023-08-04 | Removed | Eric Chapman In consultation with: , | Fire Alarm System | RCA B1 hallway smoke detector RCA B1 hallway smoke detector | Floor installation in RCA B1 r ... Floor installation in RCA B1 room 11 nearby. Contractor requesting smoke be disabled. Contact Kevin Edwards (BWXT) 778-370-3355 |
2023-443 Implemented on: 2023-08-04 | Removed | Riley Schick-Martin In consultation with: , | Fire Alarm System | FAS monitoring Zone 2 & output ... FAS monitoring Zone 2 & output devices disarmed in Node 8 | FAS device relocation. Zone 2 ... FAS device relocation. Zone 2 offline until 16:00 |
2023-442 Implemented on: 2023-08-03 | Removed | Ryan Lovelidge In consultation with: , | Fire Alarm System | 09:095-001, 09:095-002, 09:094 ... 09:095-001, 09:095-002, 09:094-045 | ARIEL Target Hall construction ... ARIEL Target Hall construction work involving cutting, grinding and welding |
2023-441 Implemented on: 2023-08-03 | Removed | Gauhar Hayat In consultation with: , | Fire Alarm System | Smoke Detector 8:42-005 disarm ... Smoke Detector 8:42-005 disarmed, Zone 2 offline for FAS Work | FAS system work. FAS system work. |
2023-438 Implemented on: 2023-08-02 | Removed | Ryan Lovelidge In consultation with: , | Fire Alarm System | 09:095-001, 09:095-002, 09:094 ... 09:095-001, 09:095-002, 09:094-045 | ARIEL Target Hall construction ... ARIEL Target Hall construction work involving cutting, grinding and welding |
2023-435 Implemented on: 2023-08-01 | Removed | Ryan Lovelidge In consultation with: , | Fire Alarm System | FAS all zones put into test mo ... FAS all zones put into test mode | FAS all zones put into test mo ... FAS all zones put into test mode for faulty bell replacement. |
2023-434 Implemented on: 2023-08-01 | Removed | Ryan Lovelidge In consultation with: , | Fire Alarm System | 09:095-001, 09:095-002, 09:094 ... 09:095-001, 09:095-002, 09:094-045 | ARIEL Target Hall construction ... ARIEL Target Hall construction work involving cutting, grinding and welding |
2023-433 Implemented on: 2023-07-31 | Removed | David Bandiera In consultation with: , | Fire Alarm System | 05:054-002, 003, 004. ISAC-1 T ... 05:054-002, 003, 004. ISAC-1 Target Hall Beam Detectors | ISAC-1 Target Hall crane work ... ISAC-1 Target Hall crane work by R.H. group |
2023-432 Implemented on: 2023-07-31 | Removed | Dale Nagra In consultation with: , | Fire Alarm System | FAS all zones put into test mo ... FAS all zones put into test mode | FAS all zones put into test mo ... FAS all zones put into test mode |
2023-431 Implemented on: 2023-07-31 | Removed | David Bandiera In consultation with: , | Fire Alarm System | 09:095-001, 09:095-002, 09:094 ... 09:095-001, 09:095-002, 09:094-045 | ARIEL Target Hall construction ... ARIEL Target Hall construction work involving cutting, grinding and welding |
2023-430 Implemented on: 2023-07-30 | Removed | Robin Swanson In consultation with: Frank Hosta, Dale Nagra | Fire Alarm System | FAS all zones put into test mo ... FAS all zones put into test mode | FAS all zones put into test mo ... FAS all zones put into test mode |
2023-427 Implemented on: 2023-07-29 | Removed | Robin Swanson In consultation with: Dale Nagra, Frank Hosta | Fire Alarm System | FAS all zones put into test mo ... FAS all zones put into test mode | FAS all zones put into test mo ... FAS all zones put into test mode |
2023-426 Implemented on: 2023-07-28 | Removed | Dale Nagra In consultation with: , | Fire Alarm System | FAS Zone 2 Offline for IAMI wo ... FAS Zone 2 Offline for IAMI work | Zone 2 taken offline via ACME ... Zone 2 taken offline via ACME Monitoring until 14:00. |
2023-425 Implemented on: 2023-07-28 | Removed | Robin Swanson In consultation with: Dale Nagra, | Fire Alarm System | Zone 4 Ariel building in test ... Zone 4 Ariel building in test mode, bells off. | Siemens tech investigating fau ... Siemens tech investigating faults reported in the building. |
2023-424 Implemented on: 2023-07-28 | Removed | Travis Kurucz In consultation with: , | Fire Alarm System | Smoke Detectors 03:020-014 and ... Smoke Detectors 03:020-014 and 03:020-015 disabled in RCA1 B1. | BWXT Renovation Work being don ... BWXT Renovation Work being done in area. |
2023-422 Implemented on: 2023-07-27 | Removed | Chris Sooley In consultation with: , | Fire Alarm System | ARIEL Target Hall Linear Beam ... ARIEL Target Hall Linear Beam Detectors 09:095-001 & 002 | Welding in target hall Welding in target hall |
2023-421 Implemented on: 2023-07-27 | Removed | David Bandiera In consultation with: , | Fire Alarm System | All Zones offline for site-wid ... All Zones offline for site-wide Fire Drill | Site wide Fire Drill at 09:00. ... Site wide Fire Drill at 09:00. All zones offline as a precaution. |
2023-420 Implemented on: 2023-07-27 | Removed | David Bandiera In consultation with: , | Fire Alarm System | Smoke Detectors 03:020-014 and ... Smoke Detectors 03:020-014 and 03:020-015 disabled in RCA1 B1. | BWXT Renovation Work being don ... BWXT Renovation Work being done in area. |
2023-419 Implemented on: 2023-07-26 | Removed | David Bandiera In consultation with: , | Fire Alarm System | ARIEL Target Hall Linear Beam ... ARIEL Target Hall Linear Beam Detectors 09:095-001 & 002 | Welding in target hall Welding in target hall |
2023-418 Implemented on: 2023-07-26 | Removed | David Bandiera In consultation with: , | Fire Alarm System | ARIEL Target Hall Linear Beam ... ARIEL Target Hall Linear Beam Detectors 09:095-001 & 002 | Fix cameras on ARIEL Target Ha ... Fix cameras on ARIEL Target Hall Crane by R.H. Group |
2023-417 Implemented on: 2023-07-26 | Removed | Chris Sooley In consultation with: , | Fire Alarm System | FAS Zone 2 Offline for FAS wor ... FAS Zone 2 Offline for FAS work. | Zone 2 taken offline via ACME ... Zone 2 taken offline via ACME Monitoring until 17:00. |
2023-415 Implemented on: 2023-07-26 | Removed | Chris Sooley In consultation with: , | Fire Alarm System | Smoke Detectors 03:020-014 and ... Smoke Detectors 03:020-014 and 03:020-015 disabled in RCA1 B1. | BWXT Renovation Work being don ... BWXT Renovation Work being done in area. |
2023-411 Implemented on: 2023-07-25 | Removed | David Bandiera In consultation with: , | Fire Alarm System | FAS Zone 2 Offline, Node 2 Bel ... FAS Zone 2 Offline, Node 2 Bell Circuits disarmed for FAS work. | Zone 2 taken offline via ACME ... Zone 2 taken offline via ACME Monitoring; Node 2 Bell Circuits disarmed for FAS Ground Fault troubleshooting. Until 17:00. |
2023-410 Implemented on: 2023-07-25 | Removed | David Bandiera In consultation with: , | Fire Alarm System | Smoke Detectors 03:020-014 and ... Smoke Detectors 03:020-014 and 03:020-015 disabled in RCA1 B1. | BWXT Renovation Work being don ... BWXT Renovation Work being done in area. |
2023-409 Implemented on: 2023-07-24 | Removed | Kevin Lucow In consultation with: , | Fire Alarm System | FAS Zone 2 in test and PIF CR ... FAS Zone 2 in test and PIF CR smoke detector disarmed. | Relocating smoke detector. Relocating smoke detector. |
2023-408 Implemented on: 2023-07-24 | Removed | Ryan Anderson In consultation with: , | Fire Alarm System | Smoke Detectors 03:020-014 and ... Smoke Detectors 03:020-014 and 03:020-015 disabled in RCA1 B1. | BWXT Renovation Work being don ... BWXT Renovation Work being done in area. |
2023-406 Implemented on: 2023-07-21 | Removed | Ryan Anderson In consultation with: , | Fire Alarm System | ARIEL L2 filter room smoke det ... ARIEL L2 filter room smoke detectors 09:093-008,9,10 | Hot work in area Hot work in area |
2023-405 Implemented on: 2023-07-21 | Removed | Ryan Anderson In consultation with: , | Fire Alarm System | Smoke Detectors 03:020-014 and ... Smoke Detectors 03:020-014 and 03:020-015 disabled in RCA1 B1. | BWXT Renovation Work being don ... BWXT Renovation Work being done in area. |
2023-404 Implemented on: 2023-07-20 | Removed | Riley Schick-Martin In consultation with: , | Fire Alarm System | ARIEL L2 filter room smoke det ... ARIEL L2 filter room smoke detectors 09:093-008,9,10 | Hot work in area Hot work in area |
2023-402 Implemented on: 2023-07-20 | Removed | David Bandiera In consultation with: , | Fire Alarm System | Smoke Detectors 03:020-014 and ... Smoke Detectors 03:020-014 and 03:020-015 disabled in RCA1 B1. | BWXT Renovation Work being don ... BWXT Renovation Work being done in area. |
2023-398 Implemented on: 2023-07-19 | Removed | Travis Kurucz In consultation with: Riley Schick-Martin, | Fire Alarm System | Smoke Detectors 03:020-014 and ... Smoke Detectors 03:020-014 and 03:020-015 disabled in RCA1 B1. | BWXT Renovation Work being don ... BWXT Renovation Work being done in area. |
2023-397 Implemented on: 2023-07-18 | Removed | Ryan Lovelidge In consultation with: , | RF | Dee gap water line E in TC tem ... Dee gap water line E in TC temp warning | Warn only taken off scan, TC i ... Warn only taken off scan, TC is ~4C warmer than usual but is stable. Trip element is still on scan. |
2023-395 Implemented on: 2023-07-18 | Removed | Travis Kurucz In consultation with: Riley Schick-Martin, | Fire Alarm System | Smoke detectors 02:008-24,25,2 ... Smoke detectors 02:008-24,25,26,27,30,31 Defeated | Relocation of some Thermocoupl ... Relocation of some Thermocouples in the SA computer room. |
2023-393 Implemented on: 2023-07-18 | Removed | Travis Kurucz In consultation with: Riley Schick-Martin, | Fire Alarm System | Smoke Detectors 03:020-014 and ... Smoke Detectors 03:020-014 and 03:020-015 disabled in RCA1 B1. | BWXT Renovation Work being don ... BWXT Renovation Work being done in area. |
2023-392 Implemented on: 2023-07-17 | Removed | Gauhar Hayat In consultation with: , | Fire Alarm System | Ariel Target Hall Smoke Detect ... Ariel Target Hall Smoke Detectors (09:095-001 and 09:095-002) disabled | Welding work being done in Tar ... Welding work being done in Target Hall. |
2023-391 Implemented on: 2023-07-17 | Removed | Gauhar Hayat In consultation with: Ryan Lovelidge, | Fire Alarm System | IAMI L1 and L2 Smoke Detectors ... IAMI L1 and L2 Smoke Detectors (13:075-42 to 45; 13:076-050) disarmed for IAMI Repair Work | Cutting work being done in IAM ... Cutting work being done in IAMI building. |
2023-390 Implemented on: 2023-07-17 | Removed | Gauhar Hayat In consultation with: , | Fire Alarm System | FAS Zone 2 Offline, Node 2 dis ... FAS Zone 2 Offline, Node 2 disarmed for FAS work. | Zone 2 taken offline via ACME ... Zone 2 taken offline via ACME Monitoring; Node 2 disarmed for Meson Hall smoke detector work. |
2023-389 Implemented on: 2023-07-17 | Removed | Gauhar Hayat In consultation with: , | Fire Alarm System | Smoke Detectors 03:020-014 and ... Smoke Detectors 03:020-014 and 03:020-015 disabled in RCA1 B1. | BWXT Renovation Work being don ... BWXT Renovation Work being done in area. |
2023-388 Implemented on: 2023-07-13 | Removed | Robin Swanson In consultation with: Dale Nagra, | Fire Alarm System | Chemistry Annex B1 Smoke detec ... Chemistry Annex B1 Smoke detectors 03:020-014 and 03:020-015. | Construction work. Construction work. |
2023-387 Implemented on: 2023-07-12 | Removed | Robin Swanson In consultation with: Dale Nagra, | Fire Alarm System | 09:093-009 ARIEL L2-305 Filter ... 09:093-009 ARIEL L2-305 Filter room cntr detector disarmed | 09:093-009 ARIEL L2-305 Filter ... 09:093-009 ARIEL L2-305 Filter room cntr detector disarmed, workers soldering in the area. |
2023-386 Implemented on: 2023-07-12 | Removed | Robin Swanson In consultation with: , | Vacuum | EACA:VV0A interlock bypassed f ... EACA:VV0A interlock bypassed for leak check. | EACA:VV0A interlock bypassed f ... EACA:VV0A interlock bypassed for leak check of EACA isolation vacuum. Leak checker connected downstream of EACA:VV0A. |
2023-385 Implemented on: 2023-07-12 | Removed | Dale Nagra In consultation with: , | Fire Alarm System | Zone 4 offline Zone 4 offline | Relocating a smoke detector aw ... Relocating a smoke detector away from a crane rail. Zone 4 Node 9. Smoke detector 09:091-031 Ariel node 9 bells off as well.
|
2023-384 Implemented on: 2023-07-12 | Removed | Dale Nagra In consultation with: , | Fire Alarm System | Zone 3 offline Zone 3 offline | ISAC2 AC10 Replacement. Some s ... ISAC2 AC10 Replacement. Some soldering required as well. |
2023-383 Implemented on: 2023-07-12 | Removed | Travis Kurucz In consultation with: Riley Schick-Martin, | Fire Alarm System | Chemistry Annex B1 Smoke detec ... Chemistry Annex B1 Smoke detectors 03:020-014 and 03:020-015. | Construction work. Construction work. |
2023-382 Implemented on: 2023-07-11 | Removed | Dale Nagra In consultation with: , | Fire Alarm System | Zone 3 offline Zone 3 offline | ISAC2 AC10 Replacement. Some s ... ISAC2 AC10 Replacement. Some soldering required as well. |
2023-381 Implemented on: 2023-07-10 | Removed | David Bandiera In consultation with: , | Fire Alarm System | 02:001-094 SA B2 East Manual P ... 02:001-094 SA B2 East Manual Pull Station removed | Manual pull station was "Not R ... Manual pull station was "Not Responding" and generating frequent troubles on the FAS. Preliminary troubleshooting was not effective so the pull station was removed. |
2023-380 Implemented on: 2023-07-10 | Removed | Chris Sooley In consultation with: , | Fire Alarm System | Chemistry Annex B1 Smoke detec ... Chemistry Annex B1 Smoke detectors 03:020-014 and 03:020-015. | Construction work. Construction work. |
2023-379 Implemented on: 2023-07-10 | Removed | David Bandiera In consultation with: , | Fire Alarm System | ARIEL L2 Filter Room Smoke Det ... ARIEL L2 Filter Room Smoke Detectors 09:093-008 & -009. | Installation of the Nuclear Ve ... Installation of the Nuclear Ventilation Fan in ARIEL Penthouse. No cutting/grinding but possibility to kick up dust during work. |
2023-378 Implemented on: 2023-07-07 | Removed | Chris Sooley In consultation with: David Bandiera, | Fire Alarm System | Duct Smoke detector 02:002-051 ... Duct Smoke detector 02:002-051 input disabled | Ehall Exhaust Fan Speed Change ... Ehall Exhaust Fan Speed Change work. |
2023-376 Implemented on: 2023-07-07 | Removed | David Bandiera In consultation with: , | Fire Alarm System | Zone 2 offline and Node 2 Bell ... Zone 2 offline and Node 2 Bell Circuits disarmed | Troubleshooting faulty manual ... Troubleshooting faulty manual pull station 02:001-094 |
2023-375 Implemented on: 2023-07-07 | Removed | Chris Sooley In consultation with: , | Fire Alarm System | 13:075-001 and 003 smoke detec ... 13:075-001 and 003 smoke detectors | Work being done in IAMI power ... Work being done in IAMI power supply room. |
2023-374 Implemented on: 2023-07-06 | Removed | Kevin Lucow In consultation with: , | Fire Alarm System | All Zones in Test Mode for 4 h ... All Zones in Test Mode for 4 hours. | FAS testing and verification. FAS testing and verification. |
2023-373 Implemented on: 2023-07-06 | Removed | Kevin Lucow In consultation with: , | Fire Alarm System | Chemistry Annex B1 Smoke detec ... Chemistry Annex B1 Smoke detectors 03:020-014 and 03:020-015. | Construction work. Construction work. |
2023-372 Implemented on: 2023-07-05 | Removed | Kevin Lucow In consultation with: , | Fire Alarm System | All Zones in Test Mode. All Zones in Test Mode. | FAS testing and verification. FAS testing and verification. |
2023-371 Implemented on: 2023-07-05 | Removed | Kevin Lucow In consultation with: , | Fire Alarm System | Chemistry Annex B1 Smoke detec ... Chemistry Annex B1 Smoke detectors 03:020-014 and 03:020-015. | Construction work. Construction work. |
2023-370 Implemented on: 2023-07-04 | Removed | Jas Uppal In consultation with: , | Fire Alarm System | 13-07-001 and 003 smoke detect ... 13-07-001 and 003 smoke detectors | Work being done in IAMI power ... Work being done in IAMI power supply room. |
2023-369 Implemented on: 2023-07-04 | Removed | Ryan Anderson In consultation with: , | Fire Alarm System | All FAS Zones in test mode All FAS Zones in test mode | FAS testing FAS testing |
2023-368 Implemented on: 2023-07-04 | Removed | Ryan Anderson In consultation with: , | Fire Alarm System | Chemistry Annex B1 Smoke dete ... Chemistry Annex B1 Smoke detectors 03:020-014 and 03:020-015 disarmed. | Construction work. Construction work. |
2023-367 Implemented on: 2023-06-30 | Removed | Brandon Humphries In consultation with: , | Safety | Beam Loss HV signal in the MPS ... Beam Loss HV signal in the MPS FSD | The logic for the BLM_OK signa ... The logic for the BLM_OK signal (labelled "Beam Loss HV" on FSD page) had a condition that monitored the EGUN:BIAS HV signal. If this signal was NOT OK, it would ignore the BLM settings and just show as OKAY. This resulted in confusion and an E-Fault today. |
2023-366 Implemented on: 2023-06-30 | Removed | Travis Kurucz In consultation with: Riley Schick-Martin, | Fire Alarm System | Chemistry Annex B1 Smoke dete ... Chemistry Annex B1 Smoke detectors 03:020-014 and 03:020-015 disarmed. | Construction work. Construction work. |
2023-365 Implemented on: 2023-06-29 | Removed | Ryan Lovelidge In consultation with: , | Fire Alarm System | Chemistry Annex B1 Smoke dete ... Chemistry Annex B1 Smoke detectors 03:020-014 and 03:020-015 disarmed. | Construction work. Construction work. |
2023-364 Implemented on: 2023-06-29 | Removed | Elena Bylinskaia In consultation with: Elena Bylinskaia, Elena Bylinskaia | Fire Alarm System | Zone 4 offline, Node 9 disarme ... Zone 4 offline, Node 9 disarmed. | Work on FAS upgrade in the ARI ... Work on FAS upgrade in the ARIEL area. |
2023-363 Implemented on: 2023-06-28 | Removed | Ryan Lovelidge In consultation with: , | Fire Alarm System | Chemistry Annex B1 Smoke dete ... Chemistry Annex B1 Smoke detectors 03:020-014 and 03:020-015 disarmed. | Construction work. Construction work. |
2023-361 Implemented on: 2023-06-27 | Removed | Ryan Lovelidge In consultation with: , | Fire Alarm System | Chemistry Annex B1 Smoke dete ... Chemistry Annex B1 Smoke detectors 03:020-014 and 03:020-015 disarmed. | Construction work. Construction work. |
2023-360 Implemented on: 2023-06-27 | Removed | Gauhar Hayat In consultation with: , | Fire Alarm System | 06:064-001 ISAC Penthouse Smok ... 06:064-001 ISAC Penthouse Smoke Detector Disarmed | Hot work in ISAC Penthouse. Hot work in ISAC Penthouse. |
2023-359 Implemented on: 2023-06-27 | Removed | Gauhar Hayat In consultation with: , | Fire Alarm System | FAS Zone 2 and 3 offline for F ... FAS Zone 2 and 3 offline for Fire Alarm System work | Zones 2 and 3 offline for FIre ... Zones 2 and 3 offline for FIre Alarm system work. |
2023-358 Implemented on: 2023-06-27 | Removed | Gauhar Hayat In consultation with: , | Fire Alarm System | Zone 4 Offline for FAS Work Zone 4 Offline for FAS Work | Work being done on FAS system. Work being done on FAS system. |
2023-356 Implemented on: 2023-06-26 | Removed | Frank Hosta In consultation with: , | Fire Alarm System | Chemistry Annex B1 Smoke dete ... Chemistry Annex B1 Smoke detectors 03:020-014 and 03:020-015 disarmed. | Construction work. Construction work. |
2023-355 Implemented on: 2023-06-26 | Removed | Dale Nagra In consultation with: , | Fire Alarm System | FAS Zone 1,2, 3, 4 offline FAS Zone 1,2, 3, 4 offline | Quarterly Fire Suppression Sys ... Quarterly Fire Suppression System Inspection. Bells are defeated for all zones as well as requested by Tejinder Sanghera. Defeated until 16:00 today. |
2023-354 Implemented on: 2023-06-26 | Removed | Frank Hosta In consultation with: , | Fire Alarm System | FAS Zone 4 offline and Node 9 ... FAS Zone 4 offline and Node 9 bells disabled | Replacing Fire Alarm devices a ... Replacing Fire Alarm devices as per FAS upgrades |
2023-352 Implemented on: 2023-06-24 | Removed | Eric Chapman In consultation with: , | Targets | 2A3DSP-TC2 and TC3 trip limits ... 2A3DSP-TC2 and TC3 trip limits lowered from default | 2A3DSP-WFS2 water flow togglin ... 2A3DSP-WFS2 water flow toggling not OK and bypassed. 2A3DSP-TC2 and TC3 trip limits lowered from default of 120C to 95C and 90C respectively, 2A3DSP-TC1 lowered from 50C to 36C. Requested by Carla Babcock via elog. This was the best way I could think to ensure we satisfy her request. |
2023-351 Implemented on: 2023-06-24 | Removed | Chris Sooley In consultation with: David Bandiera, Robert Scheepmaker | Targets | 2A3DSP-WFS2 Shield Plug Water ... 2A3DSP-WFS2 Shield Plug Water Flow | 2A3DSP-WFS2 keeps toggling NOT ... 2A3DSP-WFS2 keeps toggling NOT OK signal and tripping the beam off. |
2023-350 Implemented on: 2023-06-24 | Removed | Travis Kurucz In consultation with: Eric Chapman, Riley Schick-Martin | Targets | 2C4 Ion Exchanger Flow (bypass ... 2C4 Ion Exchanger Flow (bypass #8) pinned. | Signal is noisy and causing tr ... Signal is noisy and causing trips. Issue to be resolved next maitenance period. Pinned on advisement by Louis M. |
2023-349 Implemented on: 2023-06-23 | Removed | Dale Nagra In consultation with: , | Fire Alarm System | Chemistry Annex B1 Smoke dete ... Chemistry Annex B1 Smoke detectors 03:020-014 and 03:020-015 disarmed. | Construction work. Construction work. |
2023-348 Implemented on: 2023-06-23 | Removed | Frank Hosta In consultation with: , | Fire Alarm System | FAS Zone 4 offline and Node 9 ... FAS Zone 4 offline and Node 9 bells disabled | Replacing Fire Alarm devices a ... Replacing Fire Alarm devices as per FAS upgrades |
2023-347 Implemented on: 2023-06-22 | Removed | David Bandiera In consultation with: , | Fire Alarm System | FAS Zone 1 offline until 14:00 FAS Zone 1 offline until 14:00 | New fire alarm bell installati ... New fire alarm bell installation in MOB North |
2023-346 Implemented on: 2023-06-22 | Removed | Chris Sooley In consultation with: David Bandiera, Robert Scheepmaker | Fire Alarm System | AHU #9 Duct smoke detector: 01 ... AHU #9 Duct smoke detector: 01:035-035 | MOB-AHU9 AC unit- repair with ... MOB-AHU9 AC unit- repair with new parts. Brazing will be taking place. Hot work permit authorized by Terry. |
2023-345 Implemented on: 2023-06-22 | Removed | Chris Sooley In consultation with: , | Fire Alarm System | RCA1 B1 Smoke detectors 03:020 ... RCA1 B1 Smoke detectors 03:020-014 and 03:020-015 disarmed. | Construction work. Construction work. |
2023-344 Implemented on: 2023-06-22 | Removed | Chris Sooley In consultation with: , | Fire Alarm System | FAS Zone 4 offline and Node 9 ... FAS Zone 4 offline and Node 9 bells disabled | Replacing Fire Alarm devices a ... Replacing Fire Alarm devices as per FAS upgrades |
2023-341 Implemented on: 2023-06-21 | Removed | David Bandiera In consultation with: Robert Scheepmaker, | Fire Alarm System | FAS Zone 1 offline until 12:00 FAS Zone 1 offline until 12:00 | New fire alarm bell installati ... New fire alarm bell installation in MOB North |
2023-339 Implemented on: 2023-06-21 | Removed | David Bandiera In consultation with: , | Fire Alarm System | FAS Zone 4 offline and Node 9 ... FAS Zone 4 offline and Node 9 bells disabled | Replacing Fire Alarm devices a ... Replacing Fire Alarm devices as per FAS upgrades |
2023-337 Implemented on: 2023-06-20 | Removed | Chris Sooley In consultation with: , | Safety | MHESA RCR1 RM 6 Warn and Alarm ... MHESA RCR1 RM 6 Warn and Alarm pinned in IBOP cabinet | RCR1 Fume Hood and Hot Cell 6 ... RCR1 Fume Hood and Hot Cell 6 Monthly Blower Maintenance
|
2023-335 Implemented on: 2023-06-20 | Removed | David Bandiera In consultation with: , | Fire Alarm System | FAS Zone 4 offline and Node 9 ... FAS Zone 4 offline and Node 9 bells disabled | Replacing Fire Alarm devices a ... Replacing Fire Alarm devices as per FAS upgrades |
2023-334 Implemented on: 2023-06-19 | Removed | Travis Kurucz In consultation with: Eric Chapman, Riley Schick-Martin | Safety | Air monitor #16 Air monitor #16 | Working limit changed from 20 ... Working limit changed from 20 to 22 KCPM until end of target (scheduled during beam development June 20). See email from B Noakes at RPG. |
2023-333 Implemented on: 2023-06-19 | Removed | Ryan Anderson In consultation with: , | Fire Alarm System | Node 9 alarms Node 9 alarms | FAS system upgrades in ARIEL FAS system upgrades in ARIEL |
2023-332 Implemented on: 2023-06-19 | Removed | Ryan Anderson In consultation with: , | Fire Alarm System | 13:075-001 and 13:075-003 13:075-001 and 13:075-003 | IAMI welding work. IAMI welding work. |
2023-331 Implemented on: 2023-06-19 | Removed | Ryan Anderson In consultation with: , | Fire Alarm System | FAS Zone 4 offline and Node 9 ... FAS Zone 4 offline and Node 9 bells disabled | Replacing Fire Alarm devices a ... Replacing Fire Alarm devices as per FAS upgrades |
2023-329 Implemented on: 2023-06-16 | Removed | Ryan Anderson In consultation with: , | Fire Alarm System | Service Annex L1/L2 ISIS area ... Service Annex L1/L2 ISIS area smoke detectors | Saudering work Saudering work |
2023-328 Implemented on: 2023-06-16 | Removed | Kevin Lucow In consultation with: , | Fire Alarm System | IAMI B1 smoke detectors 13:075 ... IAMI B1 smoke detectors 13:075-001 and 13:075-003 | IAMI welding work. IAMI welding work. |
2023-327 Implemented on: 2023-06-16 | Removed | Frank Hosta In consultation with: , | Fire Alarm System | RCA1 B1 Smoke detectors 03:020 ... RCA1 B1 Smoke detectors 03:020-014 and 03:020-015 disarmed. | Construction work. Construction work. |
2023-326 Implemented on: 2023-06-15 | Removed | Ryan Lovelidge In consultation with: , | Vacuum | B2A:IG4 'forced' in the bypass ... B2A:IG4 'forced' in the bypass/force menu 2A EPICS EDM | B2A:IG4 is off and times out w ... B2A:IG4 is off and times out when we try to turn it on. After speaking with Edi and Dimo we suspect a faulty ion gauge since the backing pressure for this section's turbopump is comparable to the rest of the beamline. Element defeated so we can open 2AVA4 and deliver beam to 2A. |
2023-324 Implemented on: 2023-06-15 | Removed | Travis Kurucz In consultation with: Riley Schick-Martin, Eric Chapman | Safety | MHESA RCR1 RM 6 Warn and Alarm ... MHESA RCR1 RM 6 Warn and Alarm pinned in IBOP cabinet | RCR Lab Static Pressure Transm ... RCR Lab Static Pressure Transmitters yearly calibration. |
2023-322 Implemented on: 2023-06-15 | Removed | Eric Chapman In consultation with: , | Fire Alarm System | Service Annex L1 smoke detecto ... Service Annex L1 smoke detectors | Smoke detectors disarmed on L1 ... Smoke detectors disarmed on L1 level of service annex near ISIS for domestic water plumbing work/pipe sweating. |
2023-321 Implemented on: 2023-06-15 | Removed | Travis Kurucz In consultation with: Eric Chapman, Riley Schick-Martin | Fire Alarm System | 13:075-001 and 13:075-003 13:075-001 and 13:075-003 | IAMI welding work. IAMI welding work. |
2023-320 Implemented on: 2023-06-15 | Removed | David Bandiera In consultation with: , | Fire Alarm System | RCA1 B1 Smoke detectors 03:020 ... RCA1 B1 Smoke detectors 03:020-014 and 03:020-015 disarmed. | Construction work. Construction work. |
2023-318 Implemented on: 2023-06-14 | Removed | Brandon Humphries In consultation with: , | Safety | High energy section BLMs High energy section BLMs | Performing beam spill measurem ... Performing beam spill measurements in the high energy section for confirming calibrations. Need to see full measurements of losses without BLMs tripping. |
2023-317 Implemented on: 2023-06-14 | Removed | Travis Kurucz In consultation with: Eric Chapman, Riley Schick-Martin | Fire Alarm System | 13:075-001 and 13:075-003 13:075-001 and 13:075-003 | IAMI welding work. IAMI welding work. |
2023-316 Implemented on: 2023-06-14 | Removed | Riley Schick-Martin In consultation with: , | Fire Alarm System | Zone 4 offline with ACME until ... Zone 4 offline with ACME until 1500h | VESDA system reset VESDA system reset |
2023-315 Implemented on: 2023-06-14 | Removed | Travis Kurucz In consultation with: Eric Chapman, Riley Schick-Martin | Fire Alarm System | RCA B1 Smoke detectors 03:020- ... RCA B1 Smoke detectors 03:020-14 and 03:-20-15 disarmed. | Construction work. Construction work. |
2023-314 Implemented on: 2023-06-13 | Removed | Travis Kurucz In consultation with: Eric Chapman, Riley Schick-Martin | Services | Al-ALCW Heat Exchangers Valves ... Al-ALCW Heat Exchangers Valves H-18 closed and D-17 throttled | Main magnet OFF Main magnet OFF |
2023-312 Implemented on: 2023-06-13 | Removed | Travis Kurucz In consultation with: Eric Chapman, Riley Schick-Martin | Safety | MHESA RCR1 RM 6 Warn and Alarm ... MHESA RCR1 RM 6 Warn and Alarm pinned in IBOP cabinet | RCR Lab Static Pressure Transm ... RCR Lab Static Pressure Transmitters yearly calibration. |
2023-311 Implemented on: 2023-06-13 | Removed | Riley Schick-Martin In consultation with: , | Fire Alarm System | 05:054-002,3,&4 ISAC EXP Hall ... 05:054-002,3,&4 ISAC EXP Hall detectors | Liquid Helium fill at TITAN pl ... Liquid Helium fill at TITAN platform. |
2023-310 Implemented on: 2023-06-13 | Removed | Riley Schick-Martin In consultation with: , | Fire Alarm System | RCA B1 Smoke detectors 03:020- ... RCA B1 Smoke detectors 03:020-14 and 03:-20-15 disarmed. | Construction work. Construction work. |
2023-309 Implemented on: 2023-06-13 | Removed | Chris Sooley In consultation with: David Bandiera, | Services | Al-ALCW Heat Exchangers Valves ... Al-ALCW Heat Exchangers Valves H-18 closed and D-17 throttled | Main magnet OFF Main magnet OFF |
2023-308 Implemented on: 2023-06-12 | Removed | Elena Bylinskaia In consultation with: Elena Bylinskaia, Elena Bylinskaia | Fire Alarm System | 13:075-001 and 13:075-003 13:075-001 and 13:075-003 | IAMI welding work. IAMI welding work. |
2023-307 Implemented on: 2023-06-12 | Removed | Gauhar Hayat In consultation with: , | Fire Alarm System | Node 2 offline, Node 8 disarme ... Node 2 offline, Node 8 disarmed. | Fire Alarm System work as part ... Fire Alarm System work as part of Phase 3 Fire Alarm System upgrades. |
2023-305 Implemented on: 2023-06-09 | Removed | Elena Bylinskaia In consultation with: Elena Bylinskaia, Elena Bylinskaia | Fire Alarm System | IAMI B1 smoke detectors 13:075 ... IAMI B1 smoke detectors 13:075-001 and 13:075-003 | IAMI welding work. IAMI welding work. |
2023-304 Implemented on: 2023-06-09 | Removed | Elena Bylinskaia In consultation with: Elena Bylinskaia, Elena Bylinskaia | Fire Alarm System | RCA B1 Smoke detectors 03:020- ... RCA B1 Smoke detectors 03:020-14 and 03:-20-15 disarmed. | Construction work. Construction work. |
2023-303 Implemented on: 2023-06-09 | Removed | Ryan Lovelidge In consultation with: , | Fire Alarm System | 02:001-009/10/11/12 MHESA B1 ... 02:001-009/10/11/12 MHESA B1 smoke detectors | MHESA B1 smoke detectors disar ... MHESA B1 smoke detectors disarmed for floor replacement, duration is 8 hours |
2023-301 Implemented on: 2023-06-08 | Removed | Robin Swanson In consultation with: Frank Hosta, | Fire Alarm System | Zone 2 Offline via ACME Monito ... Zone 2 Offline via ACME Monitoring; Bell circuits disabled in Nodes 7 | Fire alarm devices in stores a ... Fire alarm devices in stores and design office being upgraded. |
2023-300 Implemented on: 2023-06-08 | Removed | Travis Kurucz In consultation with: Riley Schick-Martin, Eric Chapman | Fire Alarm System | RCA B1 Smoke Detectors 03:020- ... RCA B1 Smoke Detectors 03:020-014 and 03:020-015 | Construction work. Construction work. |
2023-297 Implemented on: 2023-06-07 | Removed | Robin Swanson In consultation with: Dale Nagra, Frank Hosta | Fire Alarm System | Trailer GG zones 02:002-088, 0 ... Trailer GG zones 02:002-088, 089 and 001 | Removal of existing waterlines ... Removal of existing waterlines in janitor closet of Trailer GG. Old pipes to be desolder and reworked to new location. |
2023-296 Implemented on: 2023-06-07 | Removed | Dale Nagra In consultation with: , | Fire Alarm System | FAS Smoke on IAMI B2, 13:075.0 ... FAS Smoke on IAMI B2, 13:075.001 and 13:075.003 | IAMI welding work. Hot work p ... IAMI welding work. Hot work permit completed. |
2023-295 Implemented on: 2023-06-07 | Removed | Dale Nagra In consultation with: , | Fire Alarm System | Zone 2 Offline via ACME Monito ... Zone 2 Offline via ACME Monitoring; Bell circuits disabled in Nodes 7 | Fire alarm devices in stores a ... Fire alarm devices in stores and design office being upgraded. |
2023-294 Implemented on: 2023-06-07 | Removed | Dale Nagra In consultation with: , | Fire Alarm System | RCA B1 Smoke Detectors 03:020- ... RCA B1 Smoke Detectors 03:020-014 and 03:020-015 | Construction work. Construction work. |
2023-293 Implemented on: 2023-06-06 | Removed | Dale Nagra In consultation with: , | Fire Alarm System | FAS Smoke on IAMI B2, 13:075.0 ... FAS Smoke on IAMI B2, 13:075.001 and 13:075.003 | IAMI welding work. Hot work p ... IAMI welding work. Hot work permit completed. |
2023-292 Implemented on: 2023-06-06 | Removed | Dale Nagra In consultation with: , | Fire Alarm System | RCA B1 Smoke Detectors 03:020- ... RCA B1 Smoke Detectors 03:020-014 and 03:020-015 | Construction work. Construction work. |
2023-291 Implemented on: 2023-06-06 | Removed | Dale Nagra In consultation with: , | Fire Alarm System | Zone 2 Offline via ACME Monito ... Zone 2 Offline via ACME Monitoring; Bell circuits disabled in Nodes 3 and 4 | Fire alarm devices in stores a ... Fire alarm devices in stores and design office being upgraded. |
2023-290 Implemented on: 2023-06-05 | Removed | David Bandiera In consultation with: , | Fire Alarm System | RCA B1 Smoke Detectors 03:020- ... RCA B1 Smoke Detectors 03:020-014 and 03:020-015 | Construction work. Construction work. |
2023-289 Implemented on: 2023-06-05 | Removed | Chris Sooley In consultation with: David Bandiera, Robert Scheepmaker | Fire Alarm System | Zone 2 Offline via ACME Monito ... Zone 2 Offline via ACME Monitoring; Bell circuits disabled in Nodes 3 and 4 | Fire alarm devices in RCA bein ... Fire alarm devices in RCA being upgraded. |
2023-288 Implemented on: 2023-06-02 | Removed | Chris Sooley In consultation with: David Bandiera, | Fire Alarm System | Zone 2 Offline via ACME Monito ... Zone 2 Offline via ACME Monitoring; Bell circuits disabled in Nodes 3 and 4 | Fire alarm devices in RCA bein ... Fire alarm devices in RCA being upgraded. |
2023-287 Implemented on: 2023-06-01 | Removed | Ryan Anderson In consultation with: , | Fire Alarm System | RCA1 B1 Smoke Detectors 03:020 ... RCA1 B1 Smoke Detectors 03:020-014, 03:020-015 disarmed for Renovation Work | Disabled smoke detectors for B ... Disabled smoke detectors for BWXT renovation work. |
2023-286 Implemented on: 2023-06-01 | Removed | Ryan Anderson In consultation with: , | Fire Alarm System | Zone 2 Offline via ACME Monito ... Zone 2 Offline via ACME Monitoring; Bell circuits disabled in Nodes 3 and 4 | Fire alarm devices in RCA bein ... Fire alarm devices in RCA being upgraded. |
2023-284 Implemented on: 2023-05-31 | Removed | Kevin Lucow In consultation with: , | Fire Alarm System | RCA B1 Smoke Detectors 03:020- ... RCA B1 Smoke Detectors 03:020-014 and 03:020-015 | Construction work. Construction work. |
2023-283 Implemented on: 2023-05-31 | Removed | Ryan Anderson In consultation with: , | Fire Alarm System | Zone 2 Offline via ACME Monito ... Zone 2 Offline via ACME Monitoring; Bell circuits disabled in Nodes 3 and 4 | Fire alarm devices in RCA bein ... Fire alarm devices in RCA being upgraded. |
2023-282 Implemented on: 2023-05-30 | Removed | Travis Kurucz In consultation with: Eric Chapman, Riley Schick-Martin | Fire Alarm System | Smoke detectors 008-024, 008-2 ... Smoke detectors 008-024, 008-25, 008-26, 008-27, 008-030, 008-031 | For running ethernet cabling u ... For running ethernet cabling under the floor in the computer room. |
2023-281 Implemented on: 2023-05-30 | Removed | Ryan Anderson In consultation with: , | Fire Alarm System | Zone 2 Offline via ACME Monito ... Zone 2 Offline via ACME Monitoring; Bell circuits disabled in Nodes 3 and 4 | Fire alarm devices in RCA bein ... Fire alarm devices in RCA being upgraded. |
2023-280 Implemented on: 2023-05-29 | Removed | Gauhar Hayat In consultation with: , | Fire Alarm System | Node 4 Fire Alarm Devices not ... Node 4 Fire Alarm Devices not responding (04:027 and 04:028) | Old Fire Alarm devices in RCA3 ... Old Fire Alarm devices in RCA3 currently being replaced as part of Phase 2 Fire Alarm system upgrades.
|
2023-279 Implemented on: 2023-05-29 | Removed | Brandon Humphries In consultation with: , | Vacuum | EACA:IG1E interlocks bypassed EACA:IG1E interlocks bypassed | EACA:IP1E must be run in local ... EACA:IP1E must be run in local mode due to a faulty cable (E-Fault 15848). So to allow the ion gauge in the same section (EACA:IG1E) to remain running, it must be bypassed. |
2023-278 Implemented on: 2023-05-29 | Removed | Travis Kurucz In consultation with: Riley Schick-Martin, | Fire Alarm System | MHESA B1 02:001-007 defeated MHESA B1 02:001-007 defeated | Disabled smoke detector for MH ... Disabled smoke detector for MHESA Fume hood testing. |
2023-277 Implemented on: 2023-05-29 | Removed | Travis Kurucz In consultation with: , | Fire Alarm System | Zone 2 Offline via ACME Monito ... Zone 2 Offline via ACME Monitoring; Bell circuits disabled in Nodes 3 and 4 | Fire alarm devices in RCA bein ... Fire alarm devices in RCA being upgraded. |
2023-275 Implemented on: 2023-05-26 | Active | Travis Kurucz In consultation with: Riley Schick-Martin, | Safety | Gas Monitor 2 Bypassed Gas Monitor 2 Bypassed | Monitor was a summary readback ... Monitor was a summary readback for the superconducting solenoid in M9B that has been physically removed, and tripped when a wire was pulled. Pinned at Doug Preddy's advisement. |
2023-272 Implemented on: 2023-05-25 | Removed | Riley Schick-Martin In consultation with: , | Fire Alarm System | DCR & computer room smoke dete ... DCR & computer room smoke detectors (floor & ceiling) 02:008-20,21,22,23,24,27,28,29,30,31,32,33 | Cable pull requires movement o ... Cable pull requires movement of ceiling tiles. Detectors disarmed for dust. |
2023-270 Implemented on: 2023-05-25 | Removed | Riley Schick-Martin In consultation with: , | Fire Alarm System | RCA1 B1 Smoke Detectors 03:020 ... RCA1 B1 Smoke Detectors 03:020-014, 03:020-015 disarmed for Renovation Work | Disabled smoke detectors for B ... Disabled smoke detectors for BWXT renovation work. |
2023-269 Implemented on: 2023-05-24 | Removed | Gauhar Hayat In consultation with: , | Fire Alarm System | Zone 3 Offline via ACME Monito ... Zone 3 Offline via ACME Monitoring; 06:062-004 disarmed for work in ISAC-II EH | Braising work being done in IS ... Braising work being done in ISAC-II EH. |
2023-268 Implemented on: 2023-05-24 | Removed | Gauhar Hayat In consultation with: , | Fire Alarm System | RCA1 B1 Smoke Detectors 03:020 ... RCA1 B1 Smoke Detectors 03:020-014, 03:020-015 disarmed for Renovation Work | Disabled smoke detectors for B ... Disabled smoke detectors for BWXT renovation work. |
2023-265 Implemented on: 2023-05-23 | Removed | Gauhar Hayat In consultation with: , | Fire Alarm System | RCA1 B1 Smoke Detectors 03:020 ... RCA1 B1 Smoke Detectors 03:020-014, 03:020-015 disarmed for Renovation Work | Disabled smoke detectors for B ... Disabled smoke detectors for BWXT renovation work. |
2023-264 Implemented on: 2023-05-23 | Removed | Gauhar Hayat In consultation with: , | Fire Alarm System | ISAC-II Accelerator Vault LBD ... ISAC-II Accelerator Vault LBD disarmed for Overhead Crane inspections | Annual overhead crane PM inspe ... Annual overhead crane PM inspections. |
2023-263 Implemented on: 2023-05-19 | Removed | Dale Nagra In consultation with: , | Fire Alarm System | 03:020-014 / 03:020-015 RCA1 ... 03:020-014 / 03:020-015 RCA1 B1 South Smoke Detector | Construction / renovation invo ... Construction / renovation involving cutting of steel in RCA1 B1. Device in question set off Fire Alarm about an hour ago. |
2023-262 Implemented on: 2023-05-18 | Removed | David Bandiera In consultation with: Robert Scheepmaker, | Fire Alarm System | 03:020-015 RCA1 B1 South Smoke ... 03:020-015 RCA1 B1 South Smoke Detector | Construction / renovation invo ... Construction / renovation involving cutting of steel in RCA1 B1. Device in question set off Fire Alarm about an hour ago. |
2023-261 Implemented on: 2023-05-18 | Removed | David Bandiera In consultation with: , | Fire Alarm System | 09:095-001/002 ARIEL target h ... 09:095-001/002 ARIEL target hall linear beam detectors | cutting rebar protruding from ... cutting rebar protruding from recent concrete pour |
2023-260 Implemented on: 2023-05-17 | Removed | David Bandiera In consultation with: , | Fire Alarm System | 09:095-001/002 ARIEL target h ... 09:095-001/002 ARIEL target hall linear beam detectors | cutting rebar protruding from ... cutting rebar protruding from recent concrete pour |
2023-258 Implemented on: 2023-05-16 | Active | Eric Chapman In consultation with: , | Targets | 2C Beam Stop TC 2C Beam Stop TC | Temperature readback is noisy. Temperature readback is noisy. |
2023-256 Implemented on: 2023-05-11 | Removed | Brandon Humphries In consultation with: , | Safety | High energy section BLMs High energy section BLMs | Performing beam spill measurem ... Performing beam spill measurements in the high energy section for confirming calibrations. Need to see full measurements of losses without BLMs tripping. |
2023-255 Implemented on: 2023-05-11 | Active | Eric Chapman In consultation with: , | Targets | BL1A T1 target flow trip and w ... BL1A T1 target flow trip and warn | T1 target flows running a bit ... T1 target flows running a bit low despite MRO over maintenance. Warning and trip limits lowered ~10% to avoid nuisance trips/messages. OK'd with Adam Newsome. |
2023-253 Implemented on: 2023-05-11 | Removed | Eric Chapman In consultation with: , | Fire Alarm System | Detector 5-051-046 ISAC TMB B1 ... Detector 5-051-046 ISAC TMB B1 COLD LAB | Annual calibration (smoke test ... Annual calibration (smoke test) of Fume hood in ISAC I cold lab. |
2023-249 Implemented on: 2023-05-04 | Removed | Chris Sooley In consultation with: David Bandiera, | Targets | STF Ion Exchanger Return Resis ... STF Ion Exchanger Return Resistivity pinned at STF BYP 010 | Low resistivity. Steve request ... Low resistivity. Steve requested to pin the signal to run beam. |
2023-248 Implemented on: 2023-05-04 | Removed | Chris Sooley In consultation with: Chris Sooley, David Bandiera | Targets | STF Water jacket water level ( ... STF Water jacket water level (BYP-005) defeated | Data readback not representing ... Data readback not representing the correct value. Steve approved pinning the water jacket level readback. |
2023-218 Implemented on: 2023-04-29 | Removed | Kevin Lucow In consultation with: , | RF | IBOP 0213: RF Resonators Latch ... IBOP 0213: RF Resonators Latched | CSS lost resonator latching si ... CSS lost resonator latching signal. CSS reads "Resonators: Some Unlatched" |
2023-146 Implemented on: 2023-03-18 | Active | Eric Chapman In consultation with: , | Other / Misc | 2C7 faraday cup water flow byp ... 2C7 faraday cup water flow bypassed | 2C7 water flow interlock bypas ... 2C7 water flow interlock bypassed since May 25 2015. Flow read back poor with current configuration, flow meter requires upgrade. Discussed with Steve Sapriken and bypass is still valid. |
2023-103 Implemented on: 2023-02-14 | Active | Brandon Humphries In consultation with: , | Vacuum | EHDT:IMG6 interlocks bypassed EHDT:IMG6 interlocks bypassed | The vacuum in the EHDT:DB6B va ... The vacuum in the EHDT:DB6B vacuum section is too good with EHDT:IP6 and EHDT:NP6 running for EHDT:IMG6 to read. So IP6 is turned off and the EHDT:IMG6 interlocks are bypassed to allow it to run. |
2022-218 Implemented on: 2022-08-03 | Active | Eric Chapman In consultation with: , | Targets | 2A2DSP-TC1 shield plug water t ... 2A2DSP-TC1 shield plug water temp bypassed | Shield plug water temp signal ... Shield plug water temp signal noisy tripping beam. Not real |
2022-147 Implemented on: 2022-05-31 | Active | Jason Wait In consultation with: , | Safety | Air Monitor #5 "ISAC Total Sta ... Air Monitor #5 "ISAC Total Stack Exhaust AlphaTEL1" CSS signal defeated (Pinned in Rack A in DCR) | Air Monitor #5 "ISAC Total Sta ... Air Monitor #5 "ISAC Total Stack Exhaust AlphaTEL1" signal has been moved to Air Monitor #32 "spare" until further notice. |
2022-90 Implemented on: 2022-04-26 | Active | Riley Schick-Martin In consultation with: , | Services | Gas monitor 13 ( Breathable Ai ... Gas monitor 13 ( Breathable Air 1, SAB1) | Monox detector requires servic ... Monox detector requires servicing. |
2021-381 Implemented on: 2021-11-16 | Active | Kyle Mollard In consultation with: , | Safety | Air Monitor #17 - ISAC B2 Air ... Air Monitor #17 - ISAC B2 Air Sampling Rm 4 bkgrnd | False alarms despite attempts ... False alarms despite attempts of repair by Safety Systems Group. Defeat approved by J.Mildenberger until 2022.
|
2021-377 Implemented on: 2021-11-12 | Active | Dale Nagra In consultation with: , | Other / Misc | STF PLC bypass 034/035 STF PLC bypass 034/035 | STF stack valve removed from w ... STF stack valve removed from water package. Note: 034/035 are the limit switches for the stack valve. |
2021-314 Implemented on: 2021-09-19 | Active | Eric Chapman In consultation with: , | Targets | 2A3COL-TC2 2A3COL-TC2 | 2A3COL-TC2 readback suddenly d ... 2A3COL-TC2 readback suddenly dropped to -95C at 08:39 15 Sept 2021. TC2 bypassed for this run. |
2021-220 Implemented on: 2021-06-24 | Active | Micheal Donohoe In consultation with: , | RF | LESW Spill TC #1 (RF,322) LESW Spill TC #1 (RF,322) | Noisy readback causing beam to ... Noisy readback causing beam to trip. |
2021-203 Implemented on: 2021-06-15 | Active | Riley Schick-Martin In consultation with: , | Targets | 2A3COL-TC3 2A3COL-TC3 | TC is reading -95 deg. Defeat ... TC is reading -95 deg. Defeat approved by Alex Gottberg. |
2021-179 Implemented on: 2021-05-28 | Active | Brandon Humphries In consultation with: , | Optics | EHDT:Q6 removed from MPS Optic ... EHDT:Q6 removed from MPS Optics OK summary | EHDT:Q6 should not be used for ... EHDT:Q6 should not be used for the upcoming beam time to allow for using the last three BPMs up to EHD for beam position interlock. This device was already degaussed then locked out (2021-134), this defeat will allow for satisfying the MPS Optics OK summary (would usually fail if device wasn't on). |
2021-169 Implemented on: 2021-05-25 | Active | Dale Nagra In consultation with: Eric Chapman, | Ion sources and injection BL | Skimmer #1 "B" side cable grou ... Skimmer #1 "B" side cable grounded | Skimmer #1 trip at 5am. With ... Skimmer #1 trip at 5am. With beam and optics off in skimmer #1 section still in alarm. |
2021-116 Implemented on: 2021-04-14 | Active | Elena Bylinskaia In consultation with: Elena Bylinskaia, | Safety | IBOP I1416 pinned IBOP I1416 pinned | BL 1U BB locked out for 1U exc ... BL 1U BB locked out for 1U exclusion area reconfiguration. IBOP I1416 pinned to allow 1A operation. |
2020-58 Implemented on: 2020-11-27 | Active | Jason Wait In consultation with: , | RF | ILRF,617 "DEE gap water W out ... ILRF,617 "DEE gap water W out TC T/C OVERTEMP (RF,513) | Defeated until resolved - Nois ... Defeated until resolved - Noisy read-back is causing RF trips. *Do not retire this defeat until Fault Report 13317 is resolved. If ILRF 617 is found back on scan, disable it again. Fault is intermittent and will trip again. See defeats 8507 and 8805 |
2020-52 Implemented on: 2020-06-03 | Active | Jason Wait In consultation with: , | Safety | EHD:TS03 alarm signal EHD:TS03 alarm signal | Until TS03 is repaired - TS03 ... Until TS03 is repaired - TS03 is fount to be faulty and is causing unnecessary alarms |
2020-42 Implemented on: 2020-10-12 | Active | Jason Wait In consultation with: , | Optics | 1AQ13 Flow meter trip limit re ... 1AQ13 Flow meter trip limit reduced from "4 to 4.5 GPM" to "3 to 3.5 GPM" | 1AQ13 flow meter trip point re ... 1AQ13 flow meter trip point reduced from 4-4.5GPM to 3-3.5GPM - Water flow to magnet is below previous trip limit |
2020-36 Implemented on: 2020-06-08 | Active | Jason Wait In consultation with: , | Safety | Neutron Monitor #11 Warn limit ... Neutron Monitor #11 Warn limit lowered to 10 uS from 30 uS | Neutron Monitor #11 warn limit ... Neutron Monitor #11 warn limit changed from 30 uS to 10 uS until ongoing M9 work is completed, while 1B is planned to receive beam. From paper defeat: "This change makes it safer, no protection is being removed or defeated" |
2020-35 Implemented on: 2020-04-20 | Active | Jas Uppal In consultation with: , | Ion sources and injection BL | ISIS Skimmer-4 cable #61-0853 ISIS Skimmer-4 cable #61-0853 | Section alarming with no beam ... Section alarming with no beam on it. |
2019-56 Implemented on: 2019-11-13 | Active | Micheal Donohoe In consultation with: , | Safety | Gas Monitor #17 Gas Monitor #17 | Work has started for implement ... Work has started for implementing Gas Monitor #17, an O2 deficiency monitor for TEM MOB149. |
2019-54 Implemented on: 2019-10-01 | Active | Micheal Donohoe In consultation with: , | RF | Quadrant 1 SW 1 signal bypasse ... Quadrant 1 SW 1 signal bypassed for resonator latching unit | Signal bypassed in order for l ... Signal bypassed in order for latching unit to work and provide "resonator latched" signal in DCR. Refer to DF #8485. |
2019-53 Implemented on: 2019-09-19 | Active | Jas Uppal In consultation with: , | Targets | 2A2COL-TC2 Collimator Plate Te ... 2A2COL-TC2 Collimator Plate Temp | TC reading 304C. TC reading 304C. |
2019-52 Implemented on: 2019-09-02 | Active | Micheal Donohoe In consultation with: , | Optics | 1AQ15 Water Flow Trip Limit In ... 1AQ15 Water Flow Trip Limit Increased | P/S tripping on mag flow. P/S tripping on mag flow. |
2019-50 Implemented on: 2019-07-31 | Active | Micheal Donohoe In consultation with: , | Targets | (U+D)/Total trip limit increas ... (U+D)/Total trip limit increased | No reason given on defeat form ... No reason given on defeat form. Reason given on defeat yellow tag: Wrong calculation on new electronics for 1AT1 protect. |
2019-48 Implemented on: 2019-04-18 | Active | Micheal Donohoe In consultation with: , | Optics | 2C4VSM2 Mag OK interlock 2C4VSM2 Mag OK interlock | Magnet thermal switch most lik ... Magnet thermal switch most likely faulty. Issue occurred in Nov/18 and thought repaired. |
2019-47 Implemented on: 2019-04-18 | Active | Jas Uppal In consultation with: , | Optics | M9 Q1 and Q2 (as shielding) M9 Q1 and Q2 (as shielding) | Until M9 Q1 and Q2 are reinsta ... Until M9 Q1 and Q2 are reinstalled. There are 2 steel shielding blocks in place of Q1 and Q2 to shield the downstream area. |
2018-783 Implemented on: 2018-10-25 | Active | Jas Uppal In consultation with: , | Other / Misc | LESW spill #2 thermocouple (RF ... LESW spill #2 thermocouple (RF,321) | Erratic temperature readings w ... Erratic temperature readings were causing cyclotron trips. |
2018-782 Implemented on: 2018-10-16 | Active | Jas Uppal In consultation with: , | Optics | 1BVB2 Mag Temp interlock bypas ... 1BVB2 Mag Temp interlock bypassed | Temp interlock faulty Temp interlock faulty |
2018-780 Implemented on: 2018-07-26 | Active | Jas Uppal In consultation with: , | Targets | BL2A2 and 2A3 Dump trip limits ... BL2A2 and 2A3 Dump trip limits adjusted | Values too low for normal oper ... Values too low for normal operation. |
2018-778 Implemented on: 2018-04-20 | Active | Jas Uppal In consultation with: , | Other / Misc | IL2C 7,8 2C wall trip and warn ... IL2C 7,8 2C wall trip and warn temperature | To facilitate higher currents ... To facilitate higher currents down 2C4 |
2017-6 Implemented on: 2017-04-13 | Active | Jason Wait In consultation with: , | Vacuum | Lower Alarm limit in EHDT:IM66 ... Lower Alarm limit in EHDT:IM66 | EHDT:IM66 is reading close to ... EHDT:IM66 is reading close to the lower alarm limit (1 e^-10 Torr) and is causing nuisance alarms |
2017-2 Implemented on: 2017-08-22 | Active | Micheal Donohoe In consultation with: , | Optics | 1AQ15 ground current detection ... 1AQ15 ground current detection circuit bypassed | Ground currents in 1AQ15 are l ... Ground currents in 1AQ15 are low. With 1AQ15 current at ~750A, ground current is approximately 4A. |
2017-1 Implemented on: 2017-06-30 | Active | Micheal Donohoe In consultation with: , | Ion sources and injection BL | ISIS SK-1 Cable #610817 ISIS SK-1 Cable #610817 | SKIMMER section alarms with no ... SKIMMER section alarms with no beam on. |
2016-691 Implemented on: 2016-04-15 | Active | Jas Uppal In consultation with: , | Ion sources and injection BL | Skimmer #5 cable #61-0866 grou ... Skimmer #5 cable #61-0866 grounded | Cable was found to be faulty Cable was found to be faulty |
2016-690 Implemented on: 2016-11-01 | Active | Micheal Donohoe In consultation with: , | Targets | STF leak sensor STF leak sensor | Steve reports sensor is presen ... Steve reports sensor is presently NOT installed in nominal location and has possibly failed. |
2016-689 Implemented on: 2016-05-16 | Active | Micheal Donohoe In consultation with: , | Vacuum | BL1A TNF Vacuum BL1A TNF Vacuum | Vacuum at TNF jumped up. Vacuum at TNF jumped up. |
2015-3 Implemented on: 2015-08-04 | Active | Jas Uppal In consultation with: , | Vacuum | 1ACG3 trip value 1ACG3 trip value | Suspect 1A vacuum leak near T2 ... Suspect 1A vacuum leak near T2. |
2015-2 Implemented on: 2015-06-01 | Active | Jas Uppal In consultation with: , | Optics | M11 Septum TC #2 (TG304) M11 Septum TC #2 (TG304) | Noisy signal is causing trips. Noisy signal is causing trips. |
2015-1 Implemented on: 2015-05-29 | Active | Jas Uppal In consultation with: , | Optics | M11Q1 Magnet Overtemp M11Q1 Magnet Overtemp | Power supply is required to ru ... Power supply is required to run. |
2014-1 Implemented on: 2014-08-24 | Active | Jas Uppal In consultation with: , | Services | IBOP #1512: MESA Basement Rm01 ... IBOP #1512: MESA Basement Rm01A Airflow | Fume hood has not been operati ... Fume hood has not been operational in over 1 year. Fan is being removed. |
2013-1 Implemented on: 2013-05-10 | Active | Jas Uppal In consultation with: , | Ion sources and injection BL | Skimmer #2 cables:#61-0827, 61 ... Skimmer #2 cables:#61-0827, 61-0828, 61-0830 | Skimmer #2 plates discharging. Skimmer #2 plates discharging. |
2011-2 Implemented on: 2011-07-11 | Active | Jas Uppal In consultation with: , | Ion sources and injection BL | SK61-0869 Grounded SK61-0869 Grounded | Periodic signal found in cable ... Periodic signal found in cable/skimmer. |
2010-1 Implemented on: 2010-06-15 | Active | Kathleen Genge In consultation with: , | Targets | 2A2COL-TC3 2A2COL-TC3 | 80 C limit is too low for BL2A ... 80 C limit is too low for BL2A operation. Past defeats (May 23, 2007 #4371, Oct. 31, 2007 #4616 for 2A3COL). |
2007-1 Implemented on: 2007-10-10 | Active | Kathleen Genge In consultation with: , | Targets | 2A2DSP-TC3 2A2DSP-TC3 | 2A2DSP-TC3 hardware I/P defeat ... 2A2DSP-TC3 hardware I/P defeat pinned. |
1999-1 Implemented on: 1999-08-13 | Active | Kathleen Genge In consultation with: , | Targets | TNF collimator thermocouple A ... TNF collimator thermocouple A & B | Disabled TNF collimator A+B by ... Disabled TNF collimator A+B by shorting thermocouple circuits. Taken Col. temp off scan on Xscan Manager. |
1998-1 Implemented on: 1998-11-06 | Active | Kathleen Genge In consultation with: , | Diagnostics | LESW back-up spill monitor HV ... LESW back-up spill monitor HV ok signal to safety | HV ok signal to safety defeate ... HV ok signal to safety defeated; spill monitor is a spare |
# | Status: | Implemented by: | System: | Device: | Reason: |
---|---|---|---|---|---|
2024-207 Implemented on: 2024-04-24 | Active | David Bandiera In consultation with: , | Shielding | Cyclotron Ignition Key and BL1 ... Cyclotron Ignition Key and BL1 Ignition Key locked out | Shielding blocks removed from ... Shielding blocks removed from SE corner of Cyclotron Vault Roof for BL1 Diagnostics cable pull. |
2024-206 Implemented on: 2024-04-24 | Active | Ryan Anderson In consultation with: , | Shielding | Cyclotron and BL1A Ignition ke ... Cyclotron and BL1A Ignition key | Shielding blocks by SE corner ... Shielding blocks by SE corner of Vault Roof removed for cabling work |
2024-200 Implemented on: 2024-04-23 | Active | Gauhar Hayat In consultation with: , | Safety | Breathable Air Use Disabled. Breathable Air Use Disabled. | ARIEL compressor motor overhau ... ARIEL compressor motor overhaul |
2024-176 Implemented on: 2024-04-08 | Active | Eric Chapman In consultation with: , | Services | Al-ALCW chain valve Al-ALCW chain valve | Chain valve has failed and is ... Chain valve has failed and is difficult to operate. Must be left open for Main Magnet cooling. |
2024-159 Implemented on: 2024-03-20 | Active | Eric Chapman In consultation with: , | Other / Misc | 2C ignition key removed for ST ... 2C ignition key removed for STF hot cell maintenance | STF hot cell maintenance under ... STF hot cell maintenance under C2024-03-20-5. |
2024-158 Implemented on: 2024-03-19 | Removed | Kevin Lucow In consultation with: , | Diagnostics | E-Linac Ignition Key E-Linac Ignition Key | ELBT:FC2/EOECM interlocks bypa ... ELBT:FC2/EOECM interlocks bypassed. |
2024-157 Implemented on: 2024-03-18 | Active | David Bandiera In consultation with: Frank Hosta, | Shielding | Cyclotron Ignition Key Cyclotron Ignition Key | E-Hall/BL4N shielding removed. E-Hall/BL4N shielding removed. |
2024-142 Implemented on: 2024-03-06 | Removed | Kevin Lucow In consultation with: , | Safety | E-Linac Ignition Key E-Linac Ignition Key | ERMS and ERSS Safety Component ... ERMS and ERSS Safety Components removed. |
2024-141 Implemented on: 2024-03-06 | Removed | Kevin Lucow In consultation with: , | Safety | E-Linac Ignition Key E-Linac Ignition Key | E-Hall/BL4N shielding removed. E-Hall/BL4N shielding removed. |
2024-138 Implemented on: 2024-03-01 | Active | Kevin Lucow In consultation with: , | Safety | BL1 Ignition Key BL1 Ignition Key | IPF/IPF hot cell are open for ... IPF/IPF hot cell are open for maintenance. |
2024-119 Implemented on: 2024-02-20 | Active | Kathleen Genge In consultation with: , | Services | Cu-ALCW south pump (SA1-15) Cu-ALCW south pump (SA1-15) | Pump has difficult spot on rot ... Pump has difficult spot on rotation. Mechanical services has deemed it unfit to run. |
2024-64 Implemented on: 2024-01-29 | Active | Kevin Lucow In consultation with: , | Shielding | M9A M9A | Uncover M9A Q,3,4,5. Uncover M9A Q,3,4,5. |
2024-14 Implemented on: 2024-01-09 | Active | Eric Chapman In consultation with: , | Shielding | M9B / M9H shielding removal M9B / M9H shielding removal | Uncover M9HQ5 to M9HQ8 for new ... Uncover M9HQ5 to M9HQ8 for new M9H installation/construction. |
2023-564 Implemented on: 2023-10-13 | Removed | Riley Schick-Martin In consultation with: , | Targets | Beamline 2C ignition key remov ... Beamline 2C ignition key removed to lockout cabinet | STF cannot receive beam until ... STF cannot receive beam until approved by experts and RPG |
2023-560 Implemented on: 2023-10-12 | Removed | Gauhar Hayat In consultation with: Ryan Lovelidge, | Safety | BL2C ignition key removed. BL2C ignition key removed. | Suspected STF Target failure. Suspected STF Target failure. |
2023-556 Implemented on: 2023-10-11 | Removed | Ryan Lovelidge In consultation with: , | Safety | BL1 ignition key removed from ... BL1 ignition key removed from above rack H | BSM 44 removed for calibration ... BSM 44 removed for calibration following a failure during weekly testing. |
2023-552 Implemented on: 2023-10-09 | Removed | Eric Chapman In consultation with: , | Services | SAB2 AC #5 SAB2 AC #5 | Water found leaking from unit. Water found leaking from unit. |
2023-545 Implemented on: 2023-10-05 | Removed | Ryan Lovelidge In consultation with: , | Services | AL-ALCW Heat Exchangers H-18 c ... AL-ALCW Heat Exchangers H-18 closed and D-17 throttled | Reduced heat load, main magnet ... Reduced heat load, main magnet is off. |
2023-542 Implemented on: 2023-10-03 | Removed | Chris Sooley In consultation with: David Bandiera, | Services | AL-ALCW Heat Exchangers H-18 c ... AL-ALCW Heat Exchangers H-18 closed and D-17 throttled | Reduced heat load, main magnet ... Reduced heat load, main magnet is off. |
2023-540 Implemented on: 2023-10-03 | Removed | Chris Sooley In consultation with: David Bandiera, | Services | AL-ALCW Heat Exchangers H-18 c ... AL-ALCW Heat Exchangers H-18 closed an D-17 throttled | Reduced heat load, main magnet ... Reduced heat load, main magnet is off. |
2023-484 Implemented on: 2023-08-25 | Removed | Kathleen Genge In consultation with: , | Safety | M9A channel M9A channel | M9A ASU commissioning tests fa ... M9A ASU commissioning tests failed; no beam permitted until tests pass. |
2023-479 Implemented on: 2023-08-24 | Removed | Travis Kurucz In consultation with: Eric Chapman, | Safety | BL1A Ignition Key BL1A Ignition Key | ATG working on the IPF flask p ... ATG working on the IPF flask plug motor system. |
2023-477 Implemented on: 2023-08-23 | Active | Riley Schick-Martin In consultation with: , | Safety | M11 beamline ignition key remo ... M11 beamline ignition key removed and M11 B1 locked out | Neutron Monitor #11 removed fr ... Neutron Monitor #11 removed from M11 area. |
2023-470 Implemented on: 2023-08-17 | Removed | Gauhar Hayat In consultation with: , | Safety | BL1A Ignition Key BL1A Ignition Key | IPF ventilation system comissi ... IPF ventilation system comissioning is incomplete. |
2023-465 Implemented on: 2023-08-16 | Removed | Chris Sooley In consultation with: David Bandiera, | Safety | BL1 Ignition Key BL1 Ignition Key | IPF ventilation system comissi ... IPF ventilation system comissioning is incomplete. |
2023-460 Implemented on: 2023-08-14 | Removed | Ryan Anderson In consultation with: , | Safety | BL1A ignition key BL1A ignition key | BL1A shielding over T2 removed BL1A shielding over T2 removed |
2023-423 Implemented on: 2023-07-27 | Removed | David Bandiera In consultation with: , | Vacuum | ELNS SV01 ELNS SV01 | Nitrogen valve inspection duri ... Nitrogen valve inspection during E-Linac shutdown |
2023-323 Implemented on: 2023-06-15 | Active | Eric Chapman In consultation with: , | RF | RF Booster RF Booster | RF booster transmission line d ... RF booster transmission line disconnected at feed-through to tank as part of temporary RFB coupler repair. Water lines for coupling loop disconnected and open to air. |
2023-285 Implemented on: 2023-05-31 | Removed | Kevin Lucow In consultation with: , | Shielding | BL1 Ignition Key BL1 Ignition Key | BL1A shielding removed to repa ... BL1A shielding removed to repair 1AM9. |
2023-267 Implemented on: 2023-05-24 | Removed | Eric Chapman In consultation with: , | Other / Misc | 520MeV Cyclotron 520MeV Cyclotron | Fast Target stuck in retracted ... Fast Target stuck in retracted position. |
2023-259 Implemented on: 2023-05-17 | Removed | David Bandiera In consultation with: Robert Scheepmaker, | Safety | BL1 Ignition Key removed to Op ... BL1 Ignition Key removed to Ops key cabinet | Shielding blocks removed over ... Shielding blocks removed over Meson Hall targets storage pit |
2023-257 Implemented on: 2023-05-12 | Active | Brandon Humphries In consultation with: , | Optics | EMBD:MB0 P/S EMBD:MB0 P/S | E-LINAC commissioning license ... E-LINAC commissioning license does not allow for sending beam to FLASH experiment at the end of EMBD. |
2023-254 Implemented on: 2023-05-11 | Removed | Travis Kurucz In consultation with: Eric Chapman, | Shielding | BL1 BL1 | BL1 disabled for moving shield ... BL1 disabled for moving shielding blocks to troubleshoot stuck T1 ladder. |
2023-252 Implemented on: 2023-05-09 | Removed | Gauhar Hayat In consultation with: , | Diagnostics | 1B cage locked to prevent swit ... 1B cage locked to prevent switch to 1A. | IPF nuclear exhaust duct work ... IPF nuclear exhaust duct work ongoing. |
2023-250 Implemented on: 2023-05-08 | Removed | Gauhar Hayat In consultation with: , | Shielding | Beamline 1 defined off and ign ... Beamline 1 defined off and ignition key removed, placed in OPS cabinet. | Shielding removal for access t ... Shielding removal for access to TNF Resin Cans. |
2023-202 Implemented on: 2023-04-18 | Active | Elena Bylinskaia In consultation with: Elena Bylinskaia, | Diagnostics | Extraction 4 Control Cable Extraction 4 Control Cable | BL4 not in use till September, ... BL4 not in use till September, 2023. Installation project ongoing. |
2023-21 Implemented on: 2023-01-10 | Active | Riley Schick-Martin In consultation with: , | Other / Misc | ISAC II HV transformer (12B1-T ... ISAC II HV transformer (12B1-T-005) tap changer | Tap changer disabled to preven ... Tap changer disabled to prevent equipment damage |
2022-379 Implemented on: 2022-12-28 | Active | Riley Schick-Martin In consultation with: , | Other / Misc | RF transformer High Voltage Co ... RF transformer High Voltage Compartment Locked | Previous lock replaced by ops ... Previous lock replaced by ops lock at electrical services group's request |
2022-329 Implemented on: 2022-11-22 | Active | Kathleen Genge In consultation with: , | Safety | M9B beamblocker M9BBB M9B beamblocker M9BBB | M9B decommissioned & area bein ... M9B decommissioned & area being converted to M9H channel. No beam permitted to M9B. |
2022-316 Implemented on: 2022-11-09 | Active | Brandon Humphries In consultation with: , | Optics | EMBD:MB0 P/S EMBD:MB0 P/S | Cooling water has been shut of ... Cooling water has been shut off to EMBD:DUMP to prevent erosion of the target. Locking out this dipole will remove the possibility of sending beam down the EMBD. This is added protection on top of the beam mode interlock. |
2022-228 Implemented on: 2022-08-08 | Active | Brandon Humphries In consultation with: , | Targets | DarkLight target ladder DarkLight target ladder | Need to prevent target ladder ... Need to prevent target ladder from driving into beamline during high power tests. |
2022-23 Implemented on: 2022-02-07 | Active | Frank Hosta In consultation with: , | Services | BL1 LCW South Heat Exchanger BL1 LCW South Heat Exchanger | The heat exchanger has a small ... The heat exchanger has a small leak. |
2021-134 Implemented on: 2021-04-26 | Active | Riley Schick-Martin In consultation with: , | Optics | EHDT:Q6 Power Supply power cor ... EHDT:Q6 Power Supply power cord | Insufficient beam position pro ... Insufficient beam position protection at EHD:DUMP. Requested by Thomas Planche. |
2021-120 Implemented on: 2021-04-16 | Active | David Bandiera In consultation with: Brandon Humphries, | Vacuum | ELBD:IV0 locked out ELBD:IV0 locked out | ELBD:IV0 is no longer connecte ... ELBD:IV0 is no longer connected to the ELBT vacuum section (ELBD:MB0 removed to allow for ACCT installation) |
2021-115 Implemented on: 2021-04-14 | Active | Elena Bylinskaia In consultation with: Elena Bylinskaia, | Safety | BL1U BB ( Beam Blocker) Locked ... BL1U BB ( Beam Blocker) Locked out, I 1416 pinned at IBOB | Re-configuration of BL 1U excl ... Re-configuration of BL 1U exclusion area.
BL1U key is locked in DCR Lock out Box #1 with personal K. Ardron lock. IBOB I1416 pinned in order to run 1A. |
2021-37 Implemented on: 2021-01-26 | Active | Kevin Lucow In consultation with: , | Safety | BL1U Ignition Key BL1U Ignition Key | BL1U disabled for 2021. Beamli ... BL1U disabled for 2021. Beamlines group have disabled BL1U Beam Blocker. Safety group have disabled BL1U ASU. |
2020-48 Implemented on: 2020-01-21 | Active | Jason Wait In consultation with: , | Optics | EHAT:MB4 polarity switch locke ... EHAT:MB4 polarity switch locked out | EHAT:MB4 polarity switch locke ... EHAT:MB4 polarity switch locked out until beam path to tunnel is ready |
2018-784 Implemented on: 2018-12-24 | Active | Jas Uppal In consultation with: , | Optics | M20 Helmholtz power supply M20 Helmholtz power supply | Water leak in plumbing externa ... Water leak in plumbing external to cabinet. |
2017-3 Implemented on: 2017-08-24 | Active | Micheal Donohoe In consultation with: , | Diagnostics | 1AM8 1AM8 | Magnetic coupling failure. Magnetic coupling failure. |
2016-692 Implemented on: 2016-03-11 | Active | Jason Wait In consultation with: , | Services | E-Hall crane A/C disconnect an ... E-Hall crane A/C disconnect and pendant locked out to all unauthorized personnel | E-Hall crane A/C disconnect an ... E-Hall crane A/C disconnect and pendant locked out (Key # E-LINAC OPS #2) to all personnel whose JPM & Training on E-Hall Crane bypass has yet to be completed |
2012-2 Implemented on: 2012-10-25 | Active | Micheal Donohoe In consultation with: , | Optics | M9 Q1, Q2, and B1 P/S M9 Q1, Q2, and B1 P/S | M9 blanked off and not operati ... M9 blanked off and not operational |