# | Status: | Implemented by: | System: | Interlock: | Description: |
---|---|---|---|---|---|
2024-251 Implemented on: 2024-05-15 | Active | Riley Schick-Martin In consultation with: , | Fire Alarm System | SA L1 Smoke detectors SA L1 Smoke detectors | Hot work in SAL1 ISIS area. Sm ... Hot work in SAL1 ISIS area. Smoke detectors 02:007-012, 02:007-017, 02:007-018, 02:007-019, 02:007-027, 02:007-028 disarmed. |
2024-250 Implemented on: 2024-05-15 | Active | Chris Sooley In consultation with: Chris Sooley, Ryan Lovelidge | Fire Alarm System | Detectors 13:075-016 through 0 ... Detectors 13:075-016 through 019 | Concrete cutting in IAMI Concrete cutting in IAMI |
2024-249 Implemented on: 2024-05-14 | Removed | Jas Uppal In consultation with: , | Fire Alarm System | SA L1 Smoke detectors SA L1 Smoke detectors | Hot work in SAL1 ISIS area. Sm ... Hot work in SAL1 ISIS area. Smoke detectors 02:007-012, 02:007-017, 02:007-018, 02:007-019, 02:007-027, 02:007-028 disarmed. |
2024-247 Implemented on: 2024-05-14 | Removed | Riley Schick-Martin In consultation with: , | Safety | IBOP I1424 & I0612 - 1U ASU OK ... IBOP I1424 & I0612 - 1U ASU OK and 1U EMERGENCY NOT TRIPPED | ASU rewiring ASU rewiring |
2024-246 Implemented on: 2024-05-14 | Removed | Chris Sooley In consultation with: Ryan Lovelidge, | Fire Alarm System | Detectors 13:075-016 through 0 ... Detectors 13:075-016 through 019 | Concrete cutting in IAMI Concrete cutting in IAMI |
2024-244 Implemented on: 2024-05-13 | Removed | Travis Kurucz In consultation with: , | Fire Alarm System | Detectors 13:075-016 through 0 ... Detectors 13:075-016 through 019 | Concrete cutting in IAMI Concrete cutting in IAMI |
2024-241 Implemented on: 2024-05-10 | Removed | Travis Kurucz In consultation with: , | Fire Alarm System | Detectors 13:075-016 through 0 ... Detectors 13:075-016 through 019 | Concrete cutting in IAMI Concrete cutting in IAMI |
2024-240 Implemented on: 2024-05-09 | Removed | David Bandiera In consultation with: , | Fire Alarm System | SA L1 Smoke detectors SA L1 Smoke detectors | Hot work in SAL1 ISIS area. Sm ... Hot work in SAL1 ISIS area. Smoke detectors 02:007-012, 02:007-018, 02:007-019, 02:007-027, 02:007-028 disarmed. |
2024-238 Implemented on: 2024-05-09 | Removed | Travis Kurucz In consultation with: , | Fire Alarm System | Detectors 13:075-016 through 0 ... Detectors 13:075-016 through 019 | Concrete cutting in IAMI Concrete cutting in IAMI |
2024-237 Implemented on: 2024-05-08 | Removed | Ryan Anderson In consultation with: , | Fire Alarm System | Detectors 13:075-016 through 0 ... Detectors 13:075-016 through 019 | Concrete cutting in IAMI Concrete cutting in IAMI |
2024-235 Implemented on: 2024-05-07 | Active | Ryan Anderson In consultation with: , | RF | Quadrant 1 Sw2 and Sw3 signals ... Quadrant 1 Sw2 and Sw3 signals bypassed for resonator latching unit | Signal bypassed for latching u ... Signal bypassed for latching unit to work and to provide "resonators latched" signal to enable RF for beam. Originally discovered in Fault 16902, addressed under C2024-05-03-2, future work required. |
2024-233 Implemented on: 2024-05-07 | Removed | Gauhar Hayat In consultation with: , | Fire Alarm System | Detectors 13:075-016 through 0 ... Detectors 13:075-016 through 019 | Concrete cutting in IAMI Concrete cutting in IAMI |
2024-231 Implemented on: 2024-05-06 | Removed | Chris Sooley In consultation with: Chris Sooley, Ryan Lovelidge | Services | AL-ALCW , MM Booster, De-ioniz ... AL-ALCW , MM Booster, De-ionizer pumps, D-10, D-2, H-15, H-16 off | AL-ALCW system shut off for Li ... AL-ALCW system shut off for Lid-down operation |
2024-230 Implemented on: 2024-05-06 | Removed | Chris Sooley In consultation with: Chris Sooley, Ryan Lovelidge | Fire Alarm System | Detectors 13:075-016 through 0 ... Detectors 13:075-016 through 019 | Concrete cutting in IAMI Concrete cutting in IAMI |
2024-229 Implemented on: 2024-05-06 | Active | Ryan Lovelidge In consultation with: , | Targets | STF reservoir level transducer STF reservoir level transducer | STF reservoir level transducer ... STF reservoir level transducer is failing, pinned at BYP-011 in the STF bypass rack. Duration is until it is fixed or replaced. |
2024-226 Implemented on: 2024-05-02 | Removed | Elena Bylinskaia In consultation with: , | Services | AL-ALCW , MM Booster, De-ioniz ... AL-ALCW , MM Booster, De-ionizer pumps, D-10, D-2 off | AL-ALCW system shut off for Li ... AL-ALCW system shut off for Lid-Up operation |
2024-225 Implemented on: 2024-05-02 | Removed | Ryan Anderson In consultation with: , | Fire Alarm System | Detectors 13:075-016 through 0 ... Detectors 13:075-016 through 019 | Concrete cutting in IAMI Concrete cutting in IAMI |
2024-223 Implemented on: 2024-05-01 | Removed | Ryan Anderson In consultation with: , | Fire Alarm System | Detectors 13:075-016 through 0 ... Detectors 13:075-016 through 019 | Concrete cutting in IAMI Concrete cutting in IAMI |
2024-220 Implemented on: 2024-04-30 | Removed | Ryan Anderson In consultation with: , | Fire Alarm System | Detectors 13:075-016 through 0 ... Detectors 13:075-016 through 019 | Concrete cutting in IAMI Concrete cutting in IAMI |
2024-218 Implemented on: 2024-04-29 | Removed | Gauhar Hayat In consultation with: Kathleen Genge, | Fire Alarm System | E-Hall Smoke Detector 02:002-0 ... E-Hall Smoke Detector 02:002-051 disarmed. | Unexpected oil vapor from resi ... Unexpected oil vapor from resistor can assembly work. |
2024-215 Implemented on: 2024-04-29 | Removed | Travis Kurucz In consultation with: , | Fire Alarm System | Detectors 13:075-016 through 0 ... Detectors 13:075-016 through 019 | Concrete cutting in IAMI Concrete cutting in IAMI |
2024-213 Implemented on: 2024-04-26 | Removed | David Bandiera In consultation with: , | Fire Alarm System | SA L1 Smoke detectors SA L1 Smoke detectors | Hot work in SAL1 ISIS area. Sm ... Hot work in SAL1 ISIS area. Smoke detectors 02:007-012, 02:007-018, 02:007-019, 02:007-027, 02:007-028 disarmed. |
2024-212 Implemented on: 2024-04-26 | Removed | David Bandiera In consultation with: , | Fire Alarm System | 02:001-141, 146, 147, 149 02:001-141, 146, 147, 149 | Hot work nearby at M9H through ... Hot work nearby at M9H throughout the day |
2024-211 Implemented on: 2024-04-26 | Removed | Chris Sooley In consultation with: Ryan Lovelidge, | Fire Alarm System | Detectors 13:075-016 through 0 ... Detectors 13:075-016 through 019 | Concrete cutting in IAMI Concrete cutting in IAMI |
2024-209 Implemented on: 2024-04-25 | Removed | Eric Chapman In consultation with: , | Fire Alarm System | ME 141 duct smokes disabled fo ... ME 141 duct smokes disabled for soldering | Soldering in ME141 AHU, repair ... Soldering in ME141 AHU, repair of evaporator coil refrigerant leak. |
2024-208 Implemented on: 2024-04-25 | Removed | Travis Kurucz In consultation with: , | Fire Alarm System | Detectors 13:075-016 through 0 ... Detectors 13:075-016 through 019 | Concrete cutting in IAMI Concrete cutting in IAMI |
2024-204 Implemented on: 2024-04-24 | Removed | Eric Chapman In consultation with: , | Services | Al-ALCW South Heat exchanger H ... Al-ALCW South Heat exchanger H15 and H16 valves closed | Al-ALCW offline with RAW leak ... Al-ALCW offline with RAW leak in South Heat exchanger ME-31. Valves H15 and H16 fully closed to stop leak. |
2024-202 Implemented on: 2024-04-24 | Removed | Gauhar Hayat In consultation with: , | Fire Alarm System | RCA Smoke detectors 03:20-014, ... RCA Smoke detectors 03:20-014, 03:20-015 disarmed. | Floor renovation in RCA buildi ... Floor renovation in RCA building. |
2024-201 Implemented on: 2024-04-24 | Removed | Travis Kurucz In consultation with: , | Fire Alarm System | Detectors 13:075-016 through 0 ... Detectors 13:075-016 through 019 | Concrete cutting in IAMI Concrete cutting in IAMI |
2024-199 Implemented on: 2024-04-23 | Removed | Eric Chapman In consultation with: , | Fire Alarm System | SA L1 Smoke detectors SA L1 Smoke detectors | Hot work in SAL1 ISIS area. Sm ... Hot work in SAL1 ISIS area. Smoke detectors 02:007-012, 02:007-018, 02:007-019, 02:007-027, 02:007-028 disarmed. |
2024-198 Implemented on: 2024-04-23 | Removed | Gauhar Hayat In consultation with: , | Fire Alarm System | RCA Smoke detectors 03:20-014, ... RCA Smoke detectors 03:20-014, 03:20-015 disarmed. | Floor renovation in RCA buildi ... Floor renovation in RCA building. |
2024-197 Implemented on: 2024-04-23 | Removed | Travis Kurucz In consultation with: Elena Bylinskaia, | Fire Alarm System | Detectors 13:075-016 through 0 ... Detectors 13:075-016 through 019 | Concrete cutting in IAMI Concrete cutting in IAMI |
2024-196 Implemented on: 2024-04-22 | Removed | Frank Hosta In consultation with: , | Fire Alarm System | SA L1 Smoke detectors SA L1 Smoke detectors | Hot work in SAL1 ISIS area. Sm ... Hot work in SAL1 ISIS area. Smoke detectors 02:007-012, 02:007-019, 02:007-027, 02:007-028 disarmed. |
2024-195 Implemented on: 2024-04-22 | Removed | Frank Hosta In consultation with: , | Fire Alarm System | 03:20-014, 03:20-015 03:20-014, 03:20-015 | Floor renovation in RCA buildi ... Floor renovation in RCA building. |
2024-192 Implemented on: 2024-04-22 | Removed | Riley Schick-Martin In consultation with: , | Fire Alarm System | Detectors 13:075-016 through 0 ... Detectors 13:075-016 through 019 | Concrete cutting in IAMI Concrete cutting in IAMI |
2024-191 Implemented on: 2024-04-19 | Active | Ryan Lovelidge In consultation with: , | Targets | BL2C4 STF Supply Resistivity BL2C4 STF Supply Resistivity | STF Supply Resistivity reads " ... STF Supply Resistivity reads "PLCDat" error causing cyclotron trip. This is a known problem; see Fault 13917. This signal should be used as a diagnostic readback only, and not as an interlock.
*Do not remove this defeat until supply resistivity signal has been removed as a BL2C4 interlock. |
2024-187 Implemented on: 2024-04-17 | Removed | Ryan Lovelidge In consultation with: , | Fire Alarm System | SA L1 Smoke detectors SA L1 Smoke detectors | Hot work in SAL1 ISIS area. Sm ... Hot work in SAL1 ISIS area. Smoke detectors 02:007-012, 02:007-019, 02:007-027, 02:007-028 disarmed. |
2024-186 Implemented on: 2024-04-16 | Removed | Chris Sooley In consultation with: Ryan Lovelidge, | Fire Alarm System | 13:075-067 IAMI Grnd-Hot Lab S ... 13:075-067 IAMI Grnd-Hot Lab Sprinkler input disabled | Device is causing frequent nui ... Device is causing frequent nuisance alarms on FAS panel. |
2024-185 Implemented on: 2024-04-16 | Removed | Chris Sooley In consultation with: Ryan Lovelidge, | Fire Alarm System | 03:20-014, 03:20-015 03:20-014, 03:20-015 | Floor renovation in RCA buildi ... Floor renovation in RCA building. |
2024-184 Implemented on: 2024-04-15 | Removed | Elena Bylinskaia In consultation with: Elena Bylinskaia, Elena Bylinskaia | Fire Alarm System | SA L1 Smoke detectors SA L1 Smoke detectors | Hot work in SAL1 ISIS area. Sm ... Hot work in SAL1 ISIS area. Smoke detectors 02:007-012, 02:007-019, 02:007-027, 02:007-028 disarmed. |
2024-183 Implemented on: 2024-04-15 | Removed | Elena Bylinskaia In consultation with: , | Fire Alarm System | 03:20-014, 03:20-015 03:20-014, 03:20-015 | Floor renovation in RCA buildi ... Floor renovation in RCA building. |
2024-182 Implemented on: 2024-04-12 | Removed | Elena Bylinskaia In consultation with: Elena Bylinskaia, Elena Bylinskaia | Fire Alarm System | SAL1 Smoke detectors disarmed ... SAL1 Smoke detectors disarmed for grinding in ISIS area. | Grinding work in SAL1 ISIS are ... Grinding work in SAL1 ISIS area. Smoke detectors 02:007-012, 02:007-019, 02:007-027, 02:007-028 disarmed. |
2024-181 Implemented on: 2024-04-11 | Removed | Jas Uppal In consultation with: , | Fire Alarm System | SAL1 smoke detectors disarmed ... SAL1 smoke detectors disarmed for hot work. | Hot work in SAL1 ISIS area. Sm ... Hot work in SAL1 ISIS area. Smoke detectors 02:007-012, 02:007-019, 02:007-027, 02:007-028 disarmed. |
2024-179 Implemented on: 2024-04-10 | Active | Riley Schick-Martin In consultation with: , | Fire Alarm System | Zones 1 & 2 monitoring until 1 ... Zones 1 & 2 monitoring until 17:00 | Construction in IAMI Construction in IAMI |
2024-177 Implemented on: 2024-04-09 | Removed | Jas Uppal In consultation with: , | Fire Alarm System | Meson Hall B2 Smoke Detectors: ... Meson Hall B2 Smoke Detectors: 02:001-146, 147, 149, and 151. | Hot work. Hot work. |
2024-175 Implemented on: 2024-04-08 | Removed | Eric Chapman In consultation with: , | Fire Alarm System | IAMI B1 and B2 sprinkler flow ... IAMI B1 and B2 sprinkler flow switches, Zone 1 and 2 test | Demolish and Remove Sprinkler ... Demolish and Remove Sprinkler Lines in B2 Shell Space in IAMI. |
2024-174 Implemented on: 2024-04-05 | Removed | Kevin Lucow In consultation with: , | Fire Alarm System | Meson Hall B2 Smoke Detectors: ... Meson Hall B2 Smoke Detectors: 02:001-146, 147, 149, and 151. | Hot work. Hot work. |
2024-173 Implemented on: 2024-04-05 | Removed | Kevin Lucow In consultation with: , | Fire Alarm System | IAMI B1 Power Supply Room, Det ... IAMI B1 Power Supply Room, Detectors 13:075-001 and 13:075-003. | Hot work in area. Hot work in area. |
2024-172 Implemented on: 2024-04-05 | Removed | Kevin Lucow In consultation with: , | Fire Alarm System | Chemistry Annex B1 Smoke Detec ... Chemistry Annex B1 Smoke Detectors 03:020-014 and 03:020-015. | Constructions and hot work. Constructions and hot work. |
2024-171 Implemented on: 2024-04-05 | Removed | Kevin Lucow In consultation with: , | Fire Alarm System | Chemistry Annex B1 Smoke Detec ... Chemistry Annex B1 Smoke Detectors 03:020-014 and 03:020-015. | Constructions and hot work. Constructions and hot work. |
2024-169 Implemented on: 2024-04-04 | Removed | Ryan Anderson In consultation with: , | Fire Alarm System | ME-141 Duct smoke detectors ME-141 Duct smoke detectors | Drilling work on SAB2 Drilling work on SAB2 |
2024-168 Implemented on: 2024-04-04 | Removed | Ryan Anderson In consultation with: , | Fire Alarm System | Chemistry Annex B1 Smoke Detec ... Chemistry Annex B1 Smoke Detectors 03:020-014 and 03:020-015. | Hot work. Hot work. |
2024-167 Implemented on: 2024-04-03 | Removed | Ryan Anderson In consultation with: , | Fire Alarm System | Chemistry Annex B1 Smoke Detec ... Chemistry Annex B1 Smoke Detectors 03:020-014 and 03:020-015. | Hot work. Hot work. |
2024-166 Implemented on: 2024-04-02 | Removed | Ryan Anderson In consultation with: , | Fire Alarm System | Chemistry Annex B1 Smoke Detec ... Chemistry Annex B1 Smoke Detectors 03:020-014 and 03:020-015. | Hot work. Hot work. |
2024-160 Implemented on: 2024-03-22 | Removed | Riley Schick-Martin In consultation with: , | Fire Alarm System | ISAC II Accelerator Vault beam ... ISAC II Accelerator Vault beam detectors, 06:065-001,2,&3 | Annual crane inspections Annual crane inspections |
2024-150 Implemented on: 2024-03-13 | Removed | Ryan Lovelidge In consultation with: , | Fire Alarm System | Meson hall smoke detectors Meson hall smoke detectors | 02:001-127/128/129/131/132/133 ... 02:001-127/128/129/131/132/133/135/139/140/141/144/146/147/148/149/150/151/152/154/163 disarmed for grinding around M9. |
2024-144 Implemented on: 2024-03-07 | Removed | Kevin Lucow In consultation with: , | Fire Alarm System | Chemistry Annex B1 Smoke Detec ... Chemistry Annex B1 Smoke Detectors 03:020-014 and 03:020-015. | Hot work. Hot work. |
2024-143 Implemented on: 2024-03-07 | Removed | Brandon Humphries In consultation with: , | Safety | ANM6 and AGM6 (Counts, WARN an ... ANM6 and AGM6 (Counts, WARN and TRIP) | Two radiation monitors (ARIEL ... Two radiation monitors (ARIEL Neutron Monitor #6 and ARIEL Gamma Monitor #6) were physically removed to allow for 284' level shielding blocks to be removed (for BL4N work). |
2024-136 Implemented on: 2024-03-01 | Removed | Gauhar Hayat In consultation with: Eric Chapman, Kevin Lucow | Safety | Breathable Air CO Monitor defe ... Breathable Air CO Monitor defeated (IBOP 1615 "GAS MONITOR 15 NOT TRIPPED"). | ARIEL Carbon Monoxide Monitor ... ARIEL Carbon Monoxide Monitor 2 replacement. |
2024-135 Implemented on: 2024-02-29 | Removed | Chris Sooley In consultation with: Ryan Lovelidge, Dale Nagra | Fire Alarm System | RCA B1 smoke detectors 03:020- ... RCA B1 smoke detectors 03:020-014 and 03:020-015, 04:027-15 | Welding and grinding work in R ... Welding and grinding work in RCA B1 level to be performed in Room 043 (B1 level, RCA3), and Room 017 (B1 level RCA 2). Hot work permit (HWP) #1065 covers work to be completed in areas. |
2024-130 Implemented on: 2024-02-26 | Removed | Chris Sooley In consultation with: Dale Nagra, Ryan Lovelidge | Fire Alarm System | IAMI smoke detectors. IAMI smoke detectors. | Detectors 13:075-001 to 004, 1 ... Detectors 13:075-001 to 004, 13:075-013 to 019, 13:075-22, 13:075-086 to 089, 13:076-23 to 24, 13:076-50 to 53, and 13:076-60 & 61 disabled. |
2024-126 Implemented on: 2024-02-22 | Removed | Travis Kurucz In consultation with: Ryan Lovelidge, | Safety | IBOP 1614 - Gas Monitor 14 IBOP 1614 - Gas Monitor 14 | MSRV replacing CO filters on t ... MSRV replacing CO filters on the breathable air unit 2. Monitor pinned until work is finished. |
2024-123 Implemented on: 2024-02-22 | Removed | Travis Kurucz In consultation with: Ryan Lovelidge, | Fire Alarm System | IAMI smoke detectors. IAMI smoke detectors. | Detectors 13:075-001 to 004, 1 ... Detectors 13:075-001 to 004, 13:075-013 to 019, 13:075-22, 13:075-086 to 089, 13:076-23 to 24, 13:076-50 to 53, and 13:076-60 & 61 disabled. |
2024-120 Implemented on: 2024-02-21 | Removed | Travis Kurucz In consultation with: Eric Chapman, | Fire Alarm System | IAMI smoke detectors. IAMI smoke detectors. | Detectors 13:075-001 to 004, 1 ... Detectors 13:075-001 to 004, 13:075-013 to 019, 13:075-22, 13:075-086 to 089, 13:076-23 to 24, 13:076-50 to 53, and 13:076-60 & 61 disabled. |
2024-118 Implemented on: 2024-02-20 | Removed | Travis Kurucz In consultation with: , | Fire Alarm System | RCA1 L1 smoke detectors disarm ... RCA1 L1 smoke detectors disarmed | Disarmed RCA1 L1 03:020-21 & 2 ... Disarmed RCA1 L1 03:020-21 & 22 for maitenance work. |
2024-117 Implemented on: 2024-02-20 | Removed | Travis Kurucz In consultation with: , | Fire Alarm System | SA G smoke detectors disabled ... SA G smoke detectors disabled temporarily for smoke in lunch room | SA G level detectors 02:008-33 ... SA G level detectors 02:008-33 to 35 disabled for clearing out smoke in the lunch room. |
2024-116 Implemented on: 2024-02-20 | Removed | Travis Kurucz In consultation with: , | Fire Alarm System | RCA1 L1 smoke detectors disarm ... RCA1 L1 smoke detectors disarmed | Disarmed RCA1 L1 3:20-21 & 22 ... Disarmed RCA1 L1 3:20-21 & 22 for maitenance work. |
2024-115 Implemented on: 2024-02-20 | Removed | Travis Kurucz In consultation with: , | Fire Alarm System | IAMI smoke detectors. IAMI smoke detectors. | Detectors 13:075-001 to 004, 1 ... Detectors 13:075-001 to 004, 13:075-013 to 019, 13:075-086 to 089, 13:076-22 to 24, 13:076-50 to 53, and 13:076-60 & 61 disabled. Disabled IAMI bell circuit in addition. |
2024-114 Implemented on: 2024-02-16 | Removed | Riley Schick-Martin In consultation with: , | Fire Alarm System | IAMI smoke detectors. IAMI smoke detectors. | Detectors 13:075-001 to 004, 1 ... Detectors 13:075-001 to 004, 13:075-013 to 019, 13:075-086 to 089, 13:076-23 & 24, 13:076-23 & 24, 13:076-50 to 53, and 13:076-60 & 61 disabled. |
2024-108 Implemented on: 2024-02-15 | Removed | Gauhar Hayat In consultation with: Eric Chapman, Kevin Lucow | Fire Alarm System | SAL1 smoke detectors disarmed ... SAL1 smoke detectors disarmed for hot work. | Hot work in SAL1 ISIS I2 room. ... Hot work in SAL1 ISIS I2 room. Smoke detectors 02:007-012, 02:007-016, 02:007-017, 02:007-018, 02:007-019, 02:007-027, 02:007-028 disarmed. |
2024-107 Implemented on: 2024-02-15 | Removed | Gauhar Hayat In consultation with: Eric Chapman, Kevin Lucow | Fire Alarm System | IAMI smoke detectors. IAMI smoke detectors. | Detectors 13:075-001 to 004, 1 ... Detectors 13:075-001 to 004, 13:075-013 to 019, and 13:075-086 to 089 disabled. |
2024-105 Implemented on: 2024-02-14 | Removed | Eric Chapman In consultation with: , | Fire Alarm System | IAMI smoke detectors and bell ... IAMI smoke detectors and bell circutis. | Detectors 13:075-001 to 004, 1 ... Detectors 13:075-001 to 004, 13:075-013 to 019, and 13:075-086 to 089 disabled. |
2024-104 Implemented on: 2024-02-14 | Removed | Gauhar Hayat In consultation with: Eric Chapman, Kevin Lucow | Fire Alarm System | All zones taken offline with F ... All zones taken offline with FAS Monitoring for annual inspection. | FAS Annual Inspection. FAS Annual Inspection. |
2024-103 Implemented on: 2024-02-13 | Removed | Kevin Lucow In consultation with: , | Fire Alarm System | IAMI smoke detectors and bell ... IAMI smoke detectors and bell circutis. | Detectors 13:075-001 to 004, 1 ... Detectors 13:075-001 to 004, 13:075-013 to 019, and 13:075-086 to 089 disabled. IAMI bell circuit disarmed. |
2024-102 Implemented on: 2024-02-13 | Removed | Gauhar Hayat In consultation with: Eric Chapman, Kevin Lucow | Fire Alarm System | All zones taken offline with F ... All zones taken offline with FAS Monitoring for annual inspection. | FAS Annual Inspection. FAS Annual Inspection. |
2024-101 Implemented on: 2024-02-12 | Removed | David Bandiera In consultation with: , | Fire Alarm System | IAMI B1, B2, and duct smoke de ... IAMI B1, B2, and duct smoke detectors disabled. IAMI bell circuit disarmed. | Smoke detectors 13:075-001 thr ... Smoke detectors 13:075-001 through 004, 13;075-013 through 019, and 13:075-086 through 089 disarmed for the day for cutting and re-welding of nuclear exhaust ducting. Disarmed bell circuit in addition. |
2024-100 Implemented on: 2024-02-12 | Removed | Ryan Anderson In consultation with: , | Fire Alarm System | FAS Zones 1 & 2 offline FAS Zones 1 & 2 offline | Annual Fire Alarm System testi ... Annual Fire Alarm System testing |
2024-98 Implemented on: 2024-02-09 | Removed | David Bandiera In consultation with: , | Fire Alarm System | IAMI B1, B2, and duct smoke de ... IAMI B1, B2, and duct smoke detectors disabled. IAMI bell circuit disarmed. | Smoke detectors 13:075-001 thr ... Smoke detectors 13:075-001 through 004, 13;075-013 through 019, and 13:075-086 through 089 disarmed for the day for cutting and re-welding of nuclear exhaust ducting. Disarmed bell circuit in addition. |
2024-97 Implemented on: 2024-02-09 | Removed | Ryan Anderson In consultation with: , | Fire Alarm System | FAS Zones 1 & 2 offline FAS Zones 1 & 2 offline | Annual Fire Alarm System testi ... Annual Fire Alarm System testing |
2024-95 Implemented on: 2024-02-08 | Removed | Gauhar Hayat In consultation with: Chris Sooley, Ryan Lovelidge | Fire Alarm System | IAMI B1, B2, and duct smoke de ... IAMI B1, B2, and duct smoke detectors disabled. IAMI bell circuit disarmed. | Smoke detectors 13:075-001 thr ... Smoke detectors 13:075-001 through 004, 13;075-013 through 019, and 13:075-086 through 089 disarmed for the day for cutting and re-welding of nuclear exhaust ducting. Disarmed bell circuit in addition. |
2024-94 Implemented on: 2024-02-08 | Removed | Gauhar Hayat In consultation with: Chris Sooley, Ryan Lovelidge | Fire Alarm System | Chemistry Annex (RCA1) B1 hall ... Chemistry Annex (RCA1) B1 hallway smoke detectors, 03:020-014 and 03:020-015. | Renovation work in RCA. Renovation work in RCA. |
2024-93 Implemented on: 2024-02-08 | Removed | Gauhar Hayat In consultation with: Chris Sooley, Ryan Lovelidge | Fire Alarm System | All zones taken offline with F ... All zones taken offline with FAS Monitoring for annual inspection. | FAS Annual Inspection. FAS Annual Inspection. |
2024-92 Implemented on: 2024-02-07 | Removed | Ryan Lovelidge In consultation with: , | Fire Alarm System | PHE smoke detectors 02:002-050 ... PHE smoke detectors 02:002-050/051/063/069/070 disarmed | Welding in the PHE magnet test ... Welding in the PHE magnet test area. |
2024-91 Implemented on: 2024-02-07 | Removed | Chris Sooley In consultation with: , | Fire Alarm System | IAMI B1, B2, and duct smoke de ... IAMI B1, B2, and duct smoke detectors disabled. IAMI bell circuit disarmed. | Smoke detectors 13:075-001 thr ... Smoke detectors 13:075-001 through 004, 13;075-013 through 019, and 13:075-086 through 089 disarmed for the day for cutting and re-welding of nuclear exhaust ducting. Disarmed bell circuit in addition. |
2024-90 Implemented on: 2024-02-07 | Removed | Gauhar Hayat In consultation with: Ryan Lovelidge, Chris Sooley | Fire Alarm System | All zones taken offline with F ... All zones taken offline with FAS Monitoring for annual inspection. | FAS Annual Inspection. FAS Annual Inspection. |
2024-89 Implemented on: 2024-02-07 | Removed | Chris Sooley In consultation with: Ryan Lovelidge, | Fire Alarm System | Chemistry Annex (RCA1) B1 hall ... Chemistry Annex (RCA1) B1 hallway smoke detectors, 03:020-014 and 03:020-015. | Renovation work in RCA. Renovation work in RCA. |
2024-88 Implemented on: 2024-02-06 | Removed | Ryan Lovelidge In consultation with: , | Fire Alarm System | ISAC 2 power supply room smoke ... ISAC 2 power supply room smoke detectors 06:063-002/003 disarmed | Above detectors disarmed for n ... Above detectors disarmed for nearby grinding for 4 hours. |
2024-87 Implemented on: 2024-02-06 | Removed | Ryan Lovelidge In consultation with: , | Fire Alarm System | PHE smoke detectors 02:002-050 ... PHE smoke detectors 02:002-050/051/063/069/070 disarmed | Welding in the PHE magnet test ... Welding in the PHE magnet test area. |
2024-86 Implemented on: 2024-02-06 | Removed | Chris Sooley In consultation with: Gauhar Hayat, | Fire Alarm System | All zones taken offline with F ... All zones taken offline with FAS Monitoring for annual inspection. | FAS Annual Inspection. FAS Annual Inspection. |
2024-85 Implemented on: 2024-02-06 | Removed | Chris Sooley In consultation with: , | Fire Alarm System | IAMI B1, B2, and duct smoke de ... IAMI B1, B2, and duct smoke detectors disabled. IAMI bell circuit disarmed. | Smoke detectors 13:075-001 thr ... Smoke detectors 13:075-001 through 004, 13;075-013 through 019, and 13:075-086 through 089 disarmed for the day for cutting and re-welding of nuclear exhaust ducting. Disarmed bell circuit in addition. |
2024-84 Implemented on: 2024-02-05 | Removed | Travis Kurucz In consultation with: Robert Scheepmaker, | Fire Alarm System | Chemistry Annex (RCA1) B1 hall ... Chemistry Annex (RCA1) B1 hallway smoke detectors, 03:020-014 and 03:020-015. | Renovation work in RCA. Renovation work in RCA. |
2024-83 Implemented on: 2024-02-05 | Removed | Travis Kurucz In consultation with: , | Fire Alarm System | IAMI B1, B2, and duct smoke de ... IAMI B1, B2, and duct smoke detectors disabled. IAMI bell circuit disarmed. | Smoke detectors 13:075-001 thr ... Smoke detectors 13:075-001 through 004, 13;075-013 through 019, and 13:075-086 through 089 disarmed for the day for cutting and re-welding of nuclear exhaust ducting. Disarmed bell circuit in addition. |
2024-82 Implemented on: 2024-02-05 | Removed | Travis Kurucz In consultation with: Robert Scheepmaker, | Fire Alarm System | All zones taken offline with F ... All zones taken offline with FAS Monitoring for annual inspection. | FAS Annual Inspection. FAS Annual Inspection. |
2024-81 Implemented on: 2024-02-05 | Removed | Travis Kurucz In consultation with: Robert Scheepmaker, | Fire Alarm System | FAS zone 1 & 2 offline, bell c ... FAS zone 1 & 2 offline, bell circuits in node 2, 3, 4 offline. | Zone 2 and bell circuits offli ... Zone 2 and bell circuits offline for relocation of a fire alarm bell. Zone 1 taken offline due to fault 16544. |
2024-80 Implemented on: 2024-02-02 | Removed | Travis Kurucz In consultation with: Robert Scheepmaker, | Fire Alarm System | Chemistry Annex (RCA1) B1 hall ... Chemistry Annex (RCA1) B1 hallway smoke detectors, 03:020-014 and 03:020-015. | Renovation work in RCA Renovation work in RCA |
2024-79 Implemented on: 2024-02-02 | Removed | Travis Kurucz In consultation with: Robert Scheepmaker, | Fire Alarm System | IAMI B1, B2, and duct smoke de ... IAMI B1, B2, and duct smoke detectors disabled. IAMI bell circuit disarmed. | Smoke detectors 13:075-001 thr ... Smoke detectors 13:075-001 through 004, 13;075-013 through 019, and 13:075-086 through 089 disarmed for the day for cutting and re-welding of nuclear exhaust ducting. Disarmed bell circuit in addition. |
2024-78 Implemented on: 2024-02-02 | Removed | Travis Kurucz In consultation with: Robert Scheepmaker, | Fire Alarm System | All zones taken offline with F ... All zones taken offline with FAS Monitoring for annual inspection. | FAS Annual Inspection FAS Annual Inspection |
2024-77 Implemented on: 2024-02-01 | Removed | Jas Uppal In consultation with: , | Fire Alarm System | Chemistry Annex (RCA1) B1 hall ... Chemistry Annex (RCA1) B1 hallway smoke detectors, 03:020-014 and 03:020-015. | Renovation work in RCA Renovation work in RCA |
2024-75 Implemented on: 2024-02-01 | Removed | Jas Uppal In consultation with: , | Fire Alarm System | IAMI B1, B2, and duct smoke de ... IAMI B1, B2, and duct smoke detectors disabled | Smoke detectors 13:075-001 thr ... Smoke detectors 13:075-001 through 004, 13;075-013 through 019, and 13:075-086 through 089 disarmed for the day for cutting and re-welding of nuclear exhaust ducting. |
2024-73 Implemented on: 2024-02-01 | Removed | Riley Schick-Martin In consultation with: , | Fire Alarm System | All zones taken offline with F ... All zones taken offline with FAS Monitoring for annual inspection. | FAS Annual Inspection FAS Annual Inspection |
2024-72 Implemented on: 2024-01-31 | Removed | Riley Schick-Martin In consultation with: , | Fire Alarm System | Chemistry Annex (RCA1) B1 hall ... Chemistry Annex (RCA1) B1 hallway smoke detectors, 03:020-014 and 03:020-015. | Renovation work in RCA Renovation work in RCA |
2024-71 Implemented on: 2024-01-31 | Removed | Robin Swanson In consultation with: Riley Schick-Martin, Jas Uppal | Fire Alarm System | All zones taken offline with F ... All zones taken offline with FAS Monitoring for annual inspection. | FAS Annual Inspection FAS Annual Inspection |
2024-70 Implemented on: 2024-01-31 | Removed | Riley Schick-Martin In consultation with: , | Fire Alarm System | IAMI B1, B2, and duct smoke de ... IAMI B1, B2, and duct smoke detectors disabled | Smoke detectors 13:075-001 thr ... Smoke detectors 13:075-001 through 004, 13;075-013 through 019, and 13:075-086 through 089 disarmed for the day for cutting and re-welding of nuclear exhaust ducting. |
2024-69 Implemented on: 2024-01-31 | Active | Brandon Humphries In consultation with: , | Ion sources and injection BL | EGUN BIAS Voltage Auto-Ramp ut ... EGUN BIAS Voltage Auto-Ramp utility Max current limit | At the end of the year in 2023 ... At the end of the year in 2023 while beam was sending to EGUN:FC1, the EGUN:BIAS current read-back (EGUN:BIAS:RDCUR) made a significant jump up to ~1 mA. Since then, this is the normal level the EGUN:BIAS current reaches when ramped up. Because of this EGUN:BIAS current reading increase, the ramping utility wouldn't reach all the way up to 300 kV. The ramping utility needed to have it's Max current limit increased from 1 mA to 1.2 mA. This limit increase was implemented on Tuesday January 30 (WP#A2024-01-30-2). This defeat will be removed once the origin of this EGUN:BIAS current jump is discovered and resolved (being tracked in the issue tracker). |
2024-68 Implemented on: 2024-01-31 | Removed | Jas Uppal In consultation with: , | Fire Alarm System | Zone 1 and 2, Nodes 2-4 off li ... Zone 1 and 2, Nodes 2-4 off line | WP#C2024-01-29-1. Relocation ... WP#C2024-01-29-1. Relocation of bells |
2024-66 Implemented on: 2024-01-30 | Removed | Robin Swanson In consultation with: Riley Schick-Martin, Jas Uppal | Fire Alarm System | Chemistry Annex (RCA1) B1 hall ... Chemistry Annex (RCA1) B1 hallway smoke detectors, 03:020-014 and 03:020-015. | Renovation work in RCA Renovation work in RCA |
2024-63 Implemented on: 2024-01-29 | Removed | Gauhar Hayat In consultation with: Eric Chapman, Kevin Lucow | Fire Alarm System | All zones taken offline with F ... All zones taken offline with FAS Monitoring for annual inspection. | FAS Annual Inspection FAS Annual Inspection |
2024-62 Implemented on: 2024-01-29 | Removed | Gauhar Hayat In consultation with: Eric Chapman, Kevin Lucow | Fire Alarm System | IAMI L1, B1 & B2 smoke detecto ... IAMI L1, B1 & B2 smoke detectors disabled, Zone 2 & 1 offline | Smoke detectors 13:075-001 thr ... Smoke detectors 13:075-001 through 004, 13;075-013 through 019, 13:075-034 through 045 and 13:075-086 through 089 disarmed for the day for cutting and re-welding of nuclear exhaust ducting. Zone 2 & 1 taken offline until 17:30 (Zone 1 due to fault 16544) |
2024-61 Implemented on: 2024-01-29 | Removed | Eric Chapman In consultation with: , | Fire Alarm System | ARIEL North detectors ARIEL North detectors | Coring in tgt hall through to ... Coring in tgt hall through to B1-08. Devices: 09:91-1-3,5-8,19; 09:92-1,2,11,15,18,19; 09:93-1,3-14,16,17,19,35; 09:94-42,45; 09:95-1,2,4; 09:98-1 |
2024-60 Implemented on: 2024-01-29 | Removed | Gauhar Hayat In consultation with: Eric Chapman, Kevin Lucow | Fire Alarm System | Chemistry Annex (RCA1) B1 hall ... Chemistry Annex (RCA1) B1 hallway smoke detectors, 03:020-014 and 03:020-015. | Renovation work in RCA Renovation work in RCA |
2024-59 Implemented on: 2024-01-26 | Removed | Gauhar Hayat In consultation with: , | Fire Alarm System | ARIEL North detectors ARIEL North detectors | Coring in tgt hall through to ... Coring in tgt hall through to B1-08. Devices: 09:91-1-3,5-8,19; 09:92-1,2,11,15,18,19; 09:93-1,3-14,16,17,19,35; 09:94-42,45; 09:95-1,2,4; 09:98-1 |
2024-58 Implemented on: 2024-01-26 | Removed | Gauhar Hayat In consultation with: , | Fire Alarm System | IAMI L1, B1 & B2 smoke detecto ... IAMI L1, B1 & B2 smoke detectors disabled, Zone 2 & 1 offline | Smoke detectors 13:075-001 thr ... Smoke detectors 13:075-001 through 004, 13;075-013 through 019, 13:075-034 through 045 and 13:075-086 through 089 disarmed for the day for cutting and re-welding of nuclear exhaust ducting. Zone 2 & 1 taken offline until 17:30 (Zone 1 due to fault 16544) |
2024-57 Implemented on: 2024-01-25 | Removed | Ryan Anderson In consultation with: , | Fire Alarm System | ARIEL North detectors ARIEL North detectors | Coring in tgt hall through to ... Coring in tgt hall through to B1-08. Devices: 09:91-1-3,5-8,19; 09:92-1,2,11,15,18,19; 09:93-1,3-14,16,17,19,35; 09:94-42,45; 09:95-1,2,4; 09:98-1 |
2024-56 Implemented on: 2024-01-25 | Removed | David Bandiera In consultation with: , | Fire Alarm System | Pull Station 03:020-003 disarm ... Pull Station 03:020-003 disarmed. Bell Circuits for Node 2, Node 3, Node 4 disarmed. | Relocation of Manual Pull Stat ... Relocation of Manual Pull Station 03:020-003 in RCA 1 & 2 B1 |
2024-55 Implemented on: 2024-01-25 | Removed | David Bandiera In consultation with: , | Safety | IBOP 1919 Pinned 'ISAC Summary ... IBOP 1919 Pinned 'ISAC Summary Services OK' | Safety Group replacing failing ... Safety Group replacing failing flammable gas sensor (Flammable gas monitor #3) in DRAGON area in ISAC. |
2024-54 Implemented on: 2024-01-25 | Removed | Ryan Anderson In consultation with: , | Fire Alarm System | IAMI L1, B1 & B2 smoke detecto ... IAMI L1, B1 & B2 smoke detectors disabled, Zone 2 & 1 offline | Smoke detectors 13:075-001 thr ... Smoke detectors 13:075-001 through 004, 13;075-013 through 019, 13:075-034 through 045 and 13:075-086 through 089 disarmed for the day for cutting and re-welding of nuclear exhaust ducting.
Zone 2 & 1 taken offline until 17:30 (Zone 1 due to fault 16544) |
2024-53 Implemented on: 2024-01-25 | Removed | Ryan Anderson In consultation with: , | Fire Alarm System | Chemistry Annex (RCA1) B1 hall ... Chemistry Annex (RCA1) B1 hallway smoke detectors, 03:020-014 and 03:020-015. | Renovation work in RCA Renovation work in RCA |
2024-51 Implemented on: 2024-01-24 | Removed | Ryan Anderson In consultation with: , | Fire Alarm System | IAMI L1, B1 & B2 smoke detecto ... IAMI L1, B1 & B2 smoke detectors disabled, Zone 2 & 1 offline | Smoke detectors 13:075-001 thr ... Smoke detectors 13:075-001 through 004, 13;075-013 through 019, 13:075-034 through 045 and 13:075-086 through 089 disarmed for the day for cutting and re-welding of nuclear exhaust ducting.
Zone 2 & 1 taken offline until 17:30 (Zone 1 due to fault 16544) |
2024-50 Implemented on: 2024-01-24 | Removed | Ryan Anderson In consultation with: , | Fire Alarm System | Chemistry Annex (RCA1) B1 hall ... Chemistry Annex (RCA1) B1 hallway smoke detectors, 03:020-014 and 03:020-015. | Renovation work in RCA Renovation work in RCA |
2024-49 Implemented on: 2024-01-23 | Removed | Ryan Anderson In consultation with: , | Fire Alarm System | ARIEL North detectors ARIEL North detectors | Coring in tgt hall through to ... Coring in tgt hall through to B1-08. Devices: 09:91-1-3,5-8,19; 09:92-1,2,11,15,18,19; 09:93-1,3-14,16,17,19,35; 09:94-42,45; 09:95-1,2,4; 09:98-1 |
2024-47 Implemented on: 2024-01-23 | Removed | Ryan Anderson In consultation with: , | Fire Alarm System | IAMI L1, B1 & B2 smoke detecto ... IAMI L1, B1 & B2 smoke detectors disabled, Zone 2 & 1 offline | Smoke detectors 13:075-001 thr ... Smoke detectors 13:075-001 through 004, 13;075-013 through 019, 13:075-034 through 045 and 13:075-086 through 089 disarmed for the day for cutting and re-welding of nuclear exhaust ducting.
Zone 2 & 1 taken offline until 17:30 (Zone 1 due to fault 16544) |
2024-46 Implemented on: 2024-01-23 | Removed | Ryan Anderson In consultation with: , | Fire Alarm System | Chemistry Annex (RCA1) B1 hall ... Chemistry Annex (RCA1) B1 hallway smoke detectors, 03:020-014 and 03:020-015. | Renovation work in RCA Renovation work in RCA |
2024-45 Implemented on: 2024-01-22 | Removed | Ryan Lovelidge In consultation with: , | Fire Alarm System | SA smoke detectors 02:008-028/ ... SA smoke detectors 02:008-028/029/030/031 | Opening up the floor in the SA ... Opening up the floor in the SA above the RF HVPS to install a cellphone signal booster. |
2024-44 Implemented on: 2024-01-22 | Removed | Chris Sooley In consultation with: Dale Nagra, Ryan Lovelidge | Fire Alarm System | ARIEL North detectors ARIEL North detectors | Coring in tgt hall through to ... Coring in tgt hall through to B1-08. Devices: 09:91-1-3,5-8,19; 09:92-1,2,11,15,18,19; 09:93-1,3-14,16,17,19,35; 09:94-42,45; 09:95-1,2,4; 09:98-1 |
2024-43 Implemented on: 2024-01-22 | Removed | Chris Sooley In consultation with: Dale Nagra, | Fire Alarm System | IAMI L1, B1 & B2 smoke detecto ... IAMI L1, B1 & B2 smoke detectors disabled, Zone 2 & 1 offline | Smoke detectors 13:075-001 thr ... Smoke detectors 13:075-001 through 004, 13;075-013 through 019, 13:075-034 through 045 and 13:075-086 through 089 disarmed for the day for cutting and re-welding of nuclear exhaust ducting.
Zone 2 & 1 taken offline until 17:30 (Zone 1 due to fault 16544) |
2024-42 Implemented on: 2024-01-22 | Removed | Dale Nagra In consultation with: , | Fire Alarm System | Chemistry Annex (RCA1) B1 hall ... Chemistry Annex (RCA1) B1 hallway smoke detectors, 03:020-014 and 03:020-015. | Renovation work in RCA Renovation work in RCA |
2024-41 Implemented on: 2024-01-19 | Removed | Chris Sooley In consultation with: , | Fire Alarm System | IAMI L1, B1 & B2 smoke detecto ... IAMI L1, B1 & B2 smoke detectors disabled, Zone 2 & 1 offline | Smoke detectors 13:075-001 thr ... Smoke detectors 13:075-001 through 004, 13;075-013 through 019, 13:075-034 through 045 and 13:075-086 through 089 disarmed for the day for cutting and re-welding of nuclear exhaust ducting.
Zone 2 & 1 taken offline until 17:30 (Zone 1 due to fault 16544) |
2024-40 Implemented on: 2024-01-19 | Removed | Ryan Lovelidge In consultation with: , | Fire Alarm System | ARIEL North detectors ARIEL North detectors | Coring in tgt hall through to ... Coring in tgt hall through to B1-08. Devices: 09:91-1-3,5-8,19; 09:92-1,2,11,15,18,19; 09:93-1,3-14,16,17,19,35; 09:94-42,45; 09:95-1,2,4; 09:98-1 |
2024-39 Implemented on: 2024-01-19 | Removed | Dale Nagra In consultation with: , | Fire Alarm System | RCA1 B1 hallway smoke detector ... RCA1 B1 hallway smoke detectors, 03:020-014 and 03:020-015. | Renovation work in RCA Renovation work in RCA |
2024-38 Implemented on: 2024-01-16 | Removed | Travis Kurucz In consultation with: Elena Bylinskaia, | Fire Alarm System | ARIEL North detectors ARIEL North detectors | Coring in tgt hall through to ... Coring in tgt hall through to B1-08. Devices: 09:91-1-3,5-8,19; 09:92-1,2,11,15,18,19; 09:93-1,3-14,16,17,19,35; 09:94-42,45; 09:95-1,2,4; 09:98-1 |
2024-37 Implemented on: 2024-01-16 | Removed | Travis Kurucz In consultation with: Elena Bylinskaia, | Fire Alarm System | IAMI L1, B1 & B2 smoke detecto ... IAMI L1, B1 & B2 smoke detectors, Zone 2 & 1 in test mode and IAMI bells disabled. | Smoke detectors 13:075-001 thr ... Smoke detectors 13:075-001 through 004, 13;075-013 through 019, 13:075-034 through 045 and 13:075-086 through 089 disarmed for the day for cutting and re-welding of nuclear exhaust ducting.
Zone 2 & 1 placed into test mode until 16:00 (Zone 1 due to fault 16544) and bells disarmed in IAMI building for sprinkler demolition on B2 level. (see comment section of WP) |
2024-36 Implemented on: 2024-01-16 | Removed | Travis Kurucz In consultation with: Elena Bylinskaia, | Fire Alarm System | IAMI L1, B1 & B2 smoke detecto ... IAMI L1, B1 & B2 smoke detectors | Smoke detectors 13:075-001 thr ... Smoke detectors 13:075-001 through 004, 13;075-013 through 019, 13:075-034 through 045 and 13:075-086 through 089 disarmed for the day for cutting and re-welding of nuclear exhaust ducting. |
2024-35 Implemented on: 2024-01-16 | Removed | Travis Kurucz In consultation with: Elena Bylinskaia, | Fire Alarm System | RCA1 B1 hallway smoke detector ... RCA1 B1 hallway smoke detectors, 03:020-014 and 03:020-015. | Renovation work in RCA Renovation work in RCA |
2024-33 Implemented on: 2024-01-15 | Removed | Robin Swanson In consultation with: Riley Schick-Martin, | Fire Alarm System | IAMI L1, B1 & B2 smoke detecto ... IAMI L1, B1 & B2 smoke detectors, Zone 2 & 1 in test mode IAMI bells disabled. | Smoke detectors 13:075-001 thr ... Smoke detectors 13:075-001 through 004, 13;075-013 through 019, 13:075-034 through 045 and 13:075-086 through 089 disarmed for the day for cutting and re-welding of nuclear exhaust ducting.
Zone 2 & 1 placed into test mode for 8hrs (Zone 1 due to fault 16544) and bells disarmed in IAMI building for sprinkler demolition on B2 level. (see comment section of WP) |
2024-32 Implemented on: 2024-01-15 | Removed | Robin Swanson In consultation with: Riley Schick-Martin, | Fire Alarm System | IAMI L1, B1 & B2 smoke detecto ... IAMI L1, B1 & B2 smoke detectors | Smoke detectors 13:075-001 thr ... Smoke detectors 13:075-001 through 004, 13;075-013 through 019, 13:075-034 through 045 and 13:075-086 through 089 disarmed for the day for cutting and re-welding of nuclear exhaust ducting. |
2024-31 Implemented on: 2024-01-15 | Removed | Riley Schick-Martin In consultation with: , | Fire Alarm System | ARIEL North detectors ARIEL North detectors | Coring in tgt hall through to ... Coring in tgt hall through to B1-08. Devices: 09:91-1-3,5-8,19; 09:92-1,2,11,15,18,19; 09:93-1,3-14,16,17,19,35; 09:94-42,45; 09:95-1,2,4; 09:98-1 |
2024-29 Implemented on: 2024-01-12 | Removed | Eric Chapman In consultation with: , | Fire Alarm System | RCA1 B1 hallway smoke detector ... RCA1 B1 hallway smoke detectors, 03:020-014 and 03:020-015. | Renovation work in RCA Renovation work in RCA |
2024-28 Implemented on: 2024-01-12 | Removed | Eric Chapman In consultation with: , | Fire Alarm System | MOB AHU #5 duct smoke, zone 1 ... MOB AHU #5 duct smoke, zone 1 MOB | AHU #5 burner startup, suspect ... AHU #5 burner startup, suspect dust burnoff, system has not run for a while. |
2024-27 Implemented on: 2024-01-12 | Removed | Gauhar Hayat In consultation with: Eric Chapman, | Fire Alarm System | ARIEL Target Hall LBDs and VES ... ARIEL Target Hall LBDs and VESDA Tunnel Smoke Detector disarmed. | ARIEL Target Hall LBDs and VES ... ARIEL Target Hall LBDs and VESDA Tunnel Smoke Detector disarmed for hot work. 09:095-001, 09:095-002, 09:094-045 disarmed. |
2024-24 Implemented on: 2024-01-12 | Removed | Gauhar Hayat In consultation with: Eric Chapman, | Fire Alarm System | IAMI L1, B1 & B2 smoke detecto ... IAMI L1, B1 & B2 smoke detectors | Smoke detectors 13:075-001 thr ... Smoke detectors 13:075-001 through 004, 13;075-013 through 019, 13:075-034 through 045 and 13:075-086 through 089 disarmed for the day for cutting and re-welding of nuclear exhaust ducting. |
2024-23 Implemented on: 2024-01-11 | Removed | Eric Chapman In consultation with: , | Fire Alarm System | Ariel Target Hall Smoke Detect ... Ariel Target Hall Smoke Detectors disabled. | Target Hall Linear Beam Detect ... Target Hall Linear Beam Detectors and VESDA Tunnel Smoke Detector disabled for hot work in target hall. |
2024-22 Implemented on: 2024-01-11 | Removed | Eric Chapman In consultation with: , | Fire Alarm System | RCA1 B1 hallway smoke detector ... RCA1 B1 hallway smoke detectors, 03:020-014 and 03:020-015. | Renovation work. Renovation work. |
2024-21 Implemented on: 2024-01-11 | Removed | Eric Chapman In consultation with: , | Fire Alarm System | IAMI L1, B1 & B2 smoke detecto ... IAMI L1, B1 & B2 smoke detectors | Smoke detectors 13:075-001 thr ... Smoke detectors 13:075-001 through 004, 13;075-013 through 019, 13:075-034 through 045 and 13:075-086 through 089 disarmed for the day for cutting and re-welding of nuclear exhaust ducting. |
2024-20 Implemented on: 2024-01-10 | Removed | Frank Hosta In consultation with: , | Fire Alarm System | 13:075-067 IAMI Grnd Hot lab ... 13:075-067 IAMI Grnd Hot lab Sprink Low Air | Repeated troubles from 13:075- ... Repeated troubles from 13:075-067^2 "Input monitoring: Open line, IAMI Grnd-Hot Lab Sprnk.Low Air". The alarm was going off every 30 seconds. |
2024-19 Implemented on: 2024-01-10 | Removed | Eric Chapman In consultation with: , | Services | SA1-13 MH-LCW pump shut down f ... SA1-13 MH-LCW pump shut down for maintenance | MH-LCW system running on SA1-1 ... MH-LCW system running on SA1-12. |
2024-17 Implemented on: 2024-01-10 | Removed | Travis Kurucz In consultation with: Eric Chapman, | Fire Alarm System | RCA1 B1 hallway smoke detector ... RCA1 B1 hallway smoke detectors, 03:020-014 and 03:020-015. | Renovation work. Renovation work. |
2024-16 Implemented on: 2024-01-10 | Removed | Travis Kurucz In consultation with: , | Fire Alarm System | IAMI L1, B1 & B2 smoke detecto ... IAMI L1, B1 & B2 smoke detectors | Smoke detectors 13:075-001 thr ... Smoke detectors 13:075-001 through 004, 13;075-013 through 019, 13:075-034 through 045 and 13:075-086 through 089 disarmed for the day for cutting and re-welding of nuclear exhaust ducting. |
2024-13 Implemented on: 2024-01-09 | Removed | Travis Kurucz In consultation with: Eric Chapman, | Fire Alarm System | IAMI L1, B1 & B2 smoke detecto ... IAMI L1, B1 & B2 smoke detectors | Smoke detectors 13:075-001 thr ... Smoke detectors 13:075-001 through 004, 13;075-013 through 019, 13:075-034 through 045 and 13:075-086 through 089 disarmed for the day for cutting and re-welding of nuclear exhaust ducting. |
2024-12 Implemented on: 2024-01-09 | Removed | Travis Kurucz In consultation with: Eric Chapman, | Fire Alarm System | RCA1 B1 hallway smoke detector ... RCA1 B1 hallway smoke detectors, 03:020-014 and 03:020-015. | Renovation work. Renovation work. |
2024-10 Implemented on: 2024-01-08 | Removed | Gauhar Hayat In consultation with: Ryan Lovelidge, | Fire Alarm System | Ariel Target Hall Smoke Detect ... Ariel Target Hall Smoke Detectors disabled. | Target Hall Linear Beam Detect ... Target Hall Linear Beam Detectors and VESDA Tunnel Smoke Detector disabled for hot work in target hall. |
2024-9 Implemented on: 2024-01-08 | Removed | Ryan Lovelidge In consultation with: , | Fire Alarm System | IAMI L1, B1 & B2 smoke detecto ... IAMI L1, B1 & B2 smoke detectors | Smoke detectors 13:075-001 thr ... Smoke detectors 13:075-001 through 004, 13;075-013 through 019, 13:075-034 through 045 and 13:075-086 through 089 disarmed for the day for cutting and re-welding of nuclear exhaust ducting. |
2024-8 Implemented on: 2024-01-05 | Removed | Gauhar Hayat In consultation with: Elena Bylinskaia, Ryan Lovelidge | Fire Alarm System | IAMI B2 smoke detectors and du ... IAMI B2 smoke detectors and duct detectors; 13:075-13 thru 19, 86 thru 89 | Leak testing of ventilation fi ... Leak testing of ventilation filter. |
2024-7 Implemented on: 2024-01-04 | Removed | Frank Hosta In consultation with: , | Fire Alarm System | FAS Zone 1 and Zone 2 Offline, ... FAS Zone 1 and Zone 2 Offline, Node 13 bells disarmed. | Zone 1 and Zone 2 taken offlin ... Zone 1 and Zone 2 taken offline via ACME Monitoring until 18:00. IAMI Node 13 bell circuits disarmed also. |
2024-6 Implemented on: 2024-01-03 | Removed | Chris Sooley In consultation with: Chris Sooley, Chris Sooley | Safety | Air Monitors #24, 25, 26 have ... Air Monitors #24, 25, 26 have been un-defeated | Air Monitors 24, 25, 26 have b ... Air Monitors 24, 25, 26 have been de-pinned in the back of Rack A CSS-RMS interface panel. ATG has had a PLC failure and is requesting DCR Ops to monitor the signals for these air monitors overnight and inform ATG Ops if there are any alarms. |
2024-4 Implemented on: 2024-01-03 | Removed | Frank Hosta In consultation with: , | Fire Alarm System | FAS Zone 1 and Zone 2 Offline, ... FAS Zone 1 and Zone 2 Offline, Node 13 bells disarmed. | Zone 1 and Zone 2 taken offlin ... Zone 1 and Zone 2 taken offline via ACME Monitoring until 17:00. IAMI Node 13 bell circuits disarmed also. |
2024-3 Implemented on: 2024-01-03 | Removed | Frank Hosta In consultation with: , | Fire Alarm System | ARIEL Target Hall Linear Beam ... ARIEL Target Hall Linear Beam Detectors 09:095-001/002 and B2 VESDA 09:094-045 | ARIEL Target Hall construction ... ARIEL Target Hall construction. |
2024-2 Implemented on: 2024-01-03 | Removed | Dale Nagra In consultation with: , | Fire Alarm System | 05:054-002, 003, 004. ISAC-1 T ... 05:054-002, 003, 004. ISAC-1 Target Hall Beam Detectors | Fill MPET SC Magnet with Liq. ... Fill MPET SC Magnet with Liq. He |
2023-671 Implemented on: 2023-12-23 | Active | Eric Chapman In consultation with: , | Services | MAB cooling towers, numerous c ... MAB cooling towers, numerous cells switched off, low cooling demand | Low cooling demand, accelerato ... Low cooling demand, accelerators offline for shutdown. Allow for regulation of system temperatures. |
2023-670 Implemented on: 2023-12-22 | Removed | Riley Schick-Martin In consultation with: , | Fire Alarm System | IAMI B2 smoke detectors and du ... IAMI B2 smoke detectors and duct detectors; 13:075-13 thru 19, 86 thru 89 | Leak testing of ventilation fi ... Leak testing of ventilation filter. |
2023-669 Implemented on: 2023-12-22 | Removed | Eric Chapman In consultation with: , | Fire Alarm System | RCA1 B1 hallway smoke detector ... RCA1 B1 hallway smoke detectors, 03:020-014 and 03:020-015. | Renovation work. Renovation work. |
2023-668 Implemented on: 2023-12-22 | Active | Chris Sooley In consultation with: Chris Sooley, Jas Uppal | Services | Al-ALCW Heat Exchangers Valves ... Al-ALCW Heat Exchangers Valves H-18 closed and D-17 throttled | MM and RF off for shutdown. MM and RF off for shutdown. |
2023-667 Implemented on: 2023-12-21 | Removed | Ryan Lovelidge In consultation with: , | Fire Alarm System | RCA1 B1 hallway smoke detector ... RCA1 B1 hallway smoke detectors, 03:020-014 and 03:020-015. | Renovation work. Renovation work. |
2023-666 Implemented on: 2023-12-20 | Removed | Kevin Lucow In consultation with: , | Fire Alarm System | RCA1 B1 hallway smoke detector ... RCA1 B1 hallway smoke detectors, 03:020-014 and 03:020-015. | Renovation work. Renovation work. |
2023-663 Implemented on: 2023-12-19 | Removed | Ryan Lovelidge In consultation with: , | Fire Alarm System | 02:007-003/012/013/016/018/019 02:007-003/012/013/016/018/019 | ISIS area smoke detectors disa ... ISIS area smoke detectors disarmed for nearby coring. |
2023-662 Implemented on: 2023-12-19 | Removed | Kevin Lucow In consultation with: , | Fire Alarm System | RCA1 B1 hallway smoke detector ... RCA1 B1 hallway smoke detectors, 03:020-014 and 03:020-015. | Renovation work. Renovation work. |
2023-661 Implemented on: 2023-12-18 | Removed | Robin Swanson In consultation with: Frank Hosta, | Fire Alarm System | ARIEL Target Hall Linear Beam ... ARIEL Target Hall Linear Beam Detectors 09:095-001/002 and B2 VESDA 09:094-045 | ARIEL Target Hall construction ... ARIEL Target Hall construction. |
2023-660 Implemented on: 2023-12-18 | Removed | Travis Kurucz In consultation with: , | Fire Alarm System | RCA1 B1 hallway smoke detector ... RCA1 B1 hallway smoke detectors, 03:020-014 and 03:020-015. | Renovation work. Renovation work. |
2023-659 Implemented on: 2023-12-15 | Removed | Robin Swanson In consultation with: Kathleen Genge, Dale Nagra | Safety | Air monitor #31 working warn l ... Air monitor #31 working warn limit increased | Air monitor #31 working warn l ... Air monitor #31 working warn limit raised from 50k to 75k counts with permission from RSO (Rock Neveau) and RPG. |
2023-657 Implemented on: 2023-12-15 | Removed | Robin Swanson In consultation with: , | Fire Alarm System | ARIEL Target Hall Linear Beam ... ARIEL Target Hall Linear Beam Detectors 09:095-001, 09:095-002 and B2 VESDA 09:094-045 | ARIEL Target Hall construction ... ARIEL Target Hall construction. |
2023-655 Implemented on: 2023-12-14 | Removed | David Bandiera In consultation with: , | Fire Alarm System | All FAS Zones offline until 16 ... All FAS Zones offline until 16:00 | Fire suppression quarterly ins ... Fire suppression quarterly inspection by OH&S + contractor |
2023-654 Implemented on: 2023-12-14 | Removed | Chris Sooley In consultation with: , | Fire Alarm System | RCA1 B1 hallway smoke detector ... RCA1 B1 hallway smoke detectors, 03:020-014 and 03:020-015. | Renovation work. Renovation work. |
2023-653 Implemented on: 2023-12-13 | Removed | Gauhar Hayat In consultation with: Elena Bylinskaia, Ryan Lovelidge | Fire Alarm System | RCA1 B1 hallway smoke detector ... RCA1 B1 hallway smoke detectors, 03:020-014 and 03:020-015. | Renovation work. Renovation work. |
2023-652 Implemented on: 2023-12-12 | Removed | Chris Sooley In consultation with: , | Fire Alarm System | RCA1 B1 hallway smoke detector ... RCA1 B1 hallway smoke detectors, 03:020-014 and 03:020-015. | Renovation work. Renovation work. |
2023-649 Implemented on: 2023-12-11 | Removed | Kevin Lucow In consultation with: , | Fire Alarm System | RCA1 B1 hallway smoke detector ... RCA1 B1 hallway smoke detectors, 03:020-014 and 03:020-015. | Renovation work. Renovation work. |
2023-648 Implemented on: 2023-12-10 | Removed | Kevin Lucow In consultation with: , | Fire Alarm System | RCA1 B1 hallway smoke detector ... RCA1 B1 hallway smoke detectors, 03:020-014 and 03:020-015. | Renovation work. Renovation work. |
2023-647 Implemented on: 2023-12-09 | Removed | Kevin Lucow In consultation with: , | Fire Alarm System | RCA1 B1 hallway smoke detector ... RCA1 B1 hallway smoke detectors, 03:020-014 and 03:020-015. | Renovation work. Renovation work. |
2023-646 Implemented on: 2023-12-08 | Removed | Kevin Lucow In consultation with: , | Fire Alarm System | ARIEL Target Hall Linear Beam ... ARIEL Target Hall Linear Beam Detectors 09:095-001, 09:095-002. | ARIEL Target Hall crane moveme ... ARIEL Target Hall crane movement and construction. |
2023-645 Implemented on: 2023-12-08 | Removed | Robin Swanson In consultation with: , | Fire Alarm System | RCA1 B1 hallway smoke detector ... RCA1 B1 hallway smoke detectors, 03:20-014 & 15 | Renovation work in area until ... Renovation work in area until 9pm |
2023-644 Implemented on: 2023-12-07 | Removed | Chris Sooley In consultation with: , | Fire Alarm System | RCA1 B1 hallway smoke detector ... RCA1 B1 hallway smoke detectors, 03:20-014 & 15 | Renovation work in area until ... Renovation work in area until end of day |
2023-643 Implemented on: 2023-12-06 | Removed | Travis Kurucz In consultation with: Eric Chapman, Riley Schick-Martin | Fire Alarm System | Zone 1 & 2, IAMI G & L1 detect ... Zone 1 & 2, IAMI G & L1 detectors | Smoke being used for ventilati ... Smoke being used for ventilation tests. |
2023-642 Implemented on: 2023-12-06 | Removed | Riley Schick-Martin In consultation with: , | Fire Alarm System | RCA1 B1 hallway smoke detector ... RCA1 B1 hallway smoke detectors, 03:20-014 & 15 | Renovation work in area until ... Renovation work in area until end of day |
2023-641 Implemented on: 2023-12-05 | Removed | Travis Kurucz In consultation with: Eric Chapman, Riley Schick-Martin | Services | Al-ALCW Heat Exchangers Valves ... Al-ALCW Heat Exchangers Valves H-18 closed and D-17 throttled | MM and RF off for maintenance ... MM and RF off for maintenance day. |
2023-640 Implemented on: 2023-12-05 | Removed | Riley Schick-Martin In consultation with: , | Fire Alarm System | Zone 1 & 2, IAMI G & L1 detect ... Zone 1 & 2, IAMI G & L1 detectors | Smoke being used for ventilati ... Smoke being used for ventilation tests. |
2023-639 Implemented on: 2023-12-05 | Removed | Eric Chapman In consultation with: , | Fire Alarm System | Zone 4 test and numerous ARIEL ... Zone 4 test and numerous ARIEL B2 smoke detectors. | Hot cell ducting smoke test. ... Hot cell ducting smoke test. FAS in Zone 4 test until 18:00. Nearby smoke detectors 09-094-003/4/9/10/13/14, VESDA detector 09-094-045 and Target hall linear beam detectors 09-095-001/002 disarmed for duration of testing. |
2023-638 Implemented on: 2023-12-04 | Active | Gauhar Hayat In consultation with: Ryan Lovelidge, | Targets | T2CS:FGTGT TRIP LOW lowered fr ... T2CS:FGTGT TRIP LOW lowered from 2.8 GPM to 2.5 GPM. | Lowered on suggestion by Alber ... Lowered on suggestion by Albert from Remote Handling. Value is stable, but at threshold currently. |
2023-637 Implemented on: 2023-12-04 | Removed | Ryan Lovelidge In consultation with: , | Fire Alarm System | FAS Zone 1 and Zone 2 Offline, ... FAS Zone 1 and Zone 2 Offline, Node 13 bells disarmed. | Zone 1 and Zone 2 taken offlin ... Zone 1 and Zone 2 taken offline via ACME Monitoring until 18:00. IAMI Node 13 bell circuits disarmed also. |
2023-636 Implemented on: 2023-12-02 | Removed | Frank Hosta In consultation with: , | Targets | STF byp-008 ion exchanger retu ... STF byp-008 ion exchanger return flow | BYP-006 STF target cooling wat ... BYP-006 STF target cooling water flow signal noisy, dropping below trip warn sometimes. Approved by Steve Sapriken and Yetvart Hosepyan. |
2023-635 Implemented on: 2023-12-01 | Removed | Ryan Lovelidge In consultation with: , | Fire Alarm System | FAS Zone 1 and Zone 2 Offline, ... FAS Zone 1 and Zone 2 Offline, Node 13 bells disarmed. | Zone 1 and Zone 2 taken offlin ... Zone 1 and Zone 2 taken offline via ACME Monitoring until 18:00. IAMI Node 13 bell circuits disarmed also. |
2023-634 Implemented on: 2023-11-30 | Removed | Robin Swanson In consultation with: Frank Hosta, | Fire Alarm System | Smoke detectors ARIEL L2 09-09 ... Smoke detectors ARIEL L2 09-093-008/009/010 disabled | VFD capacitor reforming of NV: ... VFD capacitor reforming of NV:EFL203 in ARIEL L2 |
2023-633 Implemented on: 2023-11-30 | Removed | Frank Hosta In consultation with: , | Fire Alarm System | FAS Zone 1 and Zone 2 Offline, ... FAS Zone 1 and Zone 2 Offline, Node 13 bells disarmed. | Zone 1 and Zone 2 taken offlin ... Zone 1 and Zone 2 taken offline via ACME Monitoring until 18:00. IAMI Node 13 bell circuits disarmed also. |
2023-631 Implemented on: 2023-11-29 | Removed | Chris Sooley In consultation with: David Bandiera, | Fire Alarm System | FAS Zone 1 and Zone 2 Offline FAS Zone 1 and Zone 2 Offline | Zone 1 and Zone 2 taken offlin ... Zone 1 and Zone 2 taken offline via ACME Monitoring until 17:30. |
2023-629 Implemented on: 2023-11-29 | Removed | Frank Hosta In consultation with: , | Fire Alarm System | FAS Zone 2 Offline and Node 13 ... FAS Zone 2 Offline and Node 13 bell circuits disarmed. | Zone 2 taken offline via ACME ... Zone 2 taken offline via ACME Monitoring until 16:00. Installation of new relay in AHU. |
2023-622 Implemented on: 2023-11-24 | Removed | Chris Sooley In consultation with: , | Fire Alarm System | FAS Zone 4 Offline FAS Zone 4 Offline | Maintenance on ARIEL VESDA sys ... Maintenance on ARIEL VESDA system. |
2023-621 Implemented on: 2023-11-23 | Active | Eric Chapman In consultation with: , | Ion sources and injection BL | ISIS beam loss trip level lowe ... ISIS beam loss trip level lowered to 10uA | Losses reading up to -10uA aft ... Losses reading up to -10uA after vacuum improvements in ISIS. IB 461 trip threshold (ISIS beamloss) lowered from nominal of 20uA to 10uA at request of Yuri Bylinsky as a precautionary measure until losses can be recalibrated. |
2023-620 Implemented on: 2023-11-23 | Removed | Ryan Anderson In consultation with: , | Fire Alarm System | ARIEL Target Hall Linear Beam ... ARIEL Target Hall Linear Beam Detectors 09:095-001 and B2 VESDA 09:094-045 | ARIEL Target Hall construction ... ARIEL Target Hall construction. |
2023-619 Implemented on: 2023-11-22 | Removed | Eric Chapman In consultation with: , | Optics | Temporary 1AQ16 power supply r ... Temporary 1AQ16 power supply running with no interlocks | One of the 1AQ16 power supplie ... One of the 1AQ16 power supplies failed and has been replaced by a temporary replacement. This replacement 1AQ16 power supply is currently running with no interlocks. |
2023-613 Implemented on: 2023-11-19 | Removed | Eric Chapman In consultation with: , | Ion sources and injection BL | Cryo 165 gate valve temperatur ... Cryo 165 gate valve temperature interlock | Cryo 165 cold head above trip ... Cryo 165 cold head above trip threshold auto closing gate valve. Cryo effectively pumping on the beamline despite being over temperature interlock value improving vacuum from 9e-7T to 3e-7T on IG155. |
2023-612 Implemented on: 2023-11-18 | Removed | Ryan Lovelidge In consultation with: , | Safety | Air monitor #31 working warn l ... Air monitor #31 working warn limit | Air monitor #31 working warn l ... Air monitor #31 working warn limit raised from 40k to 45k counts with permission from Brad Noakes. |
2023-609 Implemented on: 2023-11-17 | Removed | Eric Chapman In consultation with: , | Ion sources and injection BL | ISIS beam loss trip limit incr ... ISIS beam loss trip limit increased to 30uA | ISIS beam loss trip limit incr ... ISIS beam loss trip limit increased to 30uA. Increased spills in ISIS due to suspected vacuum issues. Nominal trip point 20uA. |
2023-608 Implemented on: 2023-11-17 | Removed | Eric Chapman In consultation with: , | Ion sources and injection BL | Cryo 165 gate valve temperatur ... Cryo 165 gate valve temperature interlock | Poor ISIS vacuum trips machine ... Poor ISIS vacuum trips machine on ISIS beam loss, pumping required to maintain beam delivery. Cryo 165 cold head above trip threshold auto closing gate valve. |
2023-607 Implemented on: 2023-11-17 | Removed | David Bandiera In consultation with: Frank Hosta, | Vacuum | B2A:IG3 'forced' ON in the byp ... B2A:IG3 'forced' ON in the bypass/force menu 2A EPICS EDM | B2A:IG3 forced ON in EPICS aft ... B2A:IG3 forced ON in EPICS after consulting with Edi. The ion gauge reading is noisy and causing the vacuum valves 2AVVA3 and 2AVVA4 to close. |
2023-604 Implemented on: 2023-11-16 | Removed | Gauhar Hayat In consultation with: Ryan Lovelidge, | Fire Alarm System | Smoke detectors 05:052-029 to ... Smoke detectors 05:052-029 to 033 in ISAC Penthouse disarmed for Filter Work. | ISAC1 HEPA Filter testing in I ... ISAC1 HEPA Filter testing in ISAC Penthouse. |
2023-602 Implemented on: 2023-11-16 | Removed | Ryan Lovelidge In consultation with: , | Fire Alarm System | 09:095-002 ARIEL target hall E ... 09:095-002 ARIEL target hall East linear beam detector | Device faulty, goes into alarm ... Device faulty, goes into alarm state when rearmed. |
2023-601 Implemented on: 2023-11-16 | Removed | Gauhar Hayat In consultation with: Ryan Lovelidge, | Fire Alarm System | ARIEL Target Hall Linear Beam ... ARIEL Target Hall Linear Beam Detectors 09:095-001 and B2 VESDA 09:094-045 | ARIEL Target Hall construction ... ARIEL Target Hall construction. |
2023-600 Implemented on: 2023-11-16 | Removed | Kevin Lucow In consultation with: , | Ion sources and injection BL | ISIS beam loss limit increased ... ISIS beam loss limit increased to 25 uA. | ISIS beam loss limit increased ... ISIS beam loss limit increased from 20 to 25 uA.
With beam off, ISIS beam loss has an offset of up to 5 uA. |
2023-597 Implemented on: 2023-11-14 | Removed | Gauhar Hayat In consultation with: Ryan Lovelidge, Elena Bylinskaia | Fire Alarm System | ARIEL Target Hall Linear Beam ... ARIEL Target Hall Linear Beam Detectors 09:095-001, 09:095-002 and B2 VESDA 09:094-045 | ARIEL Target Hall construction ... ARIEL Target Hall construction. |
2023-596 Implemented on: 2023-11-11 | Removed | Travis Kurucz In consultation with: Eric Chapman, Riley Schick-Martin | Services | Cu-ALCW and Al-ALCW surge tank ... Cu-ALCW and Al-ALCW surge tanks valved closed. | Tanks valved closed due to pow ... Tanks valved closed due to power outage as to not overfill them. |
2023-595 Implemented on: 2023-11-10 | Removed | Riley Schick-Martin In consultation with: , | Safety | IBOP 0102, 0106, 0124, 1510, 1 ... IBOP 0102, 0106, 0124, 1510, 1511, 1615, 1621, 1622 | Power is out. Silencing nuisan ... Power is out. Silencing nuisance alarms until devices can be restored. |
2023-594 Implemented on: 2023-11-10 | Removed | David Bandiera In consultation with: , | Services | Al-ALCW Heat Exchangers Valves ... Al-ALCW Heat Exchangers Valves H-18 closed and D-17 throttled | Main Magnet and RF Off due to ... Main Magnet and RF Off due to power outage |
2023-592 Implemented on: 2023-11-10 | Removed | Frank Hosta In consultation with: , | Fire Alarm System | ARIEL Target Hall Linear Beam ... ARIEL Target Hall Linear Beam Detectors 09:095-001, 09:095-002 and B2 VESDA 09:094-045 | ARIEL Target Hall construction ... ARIEL Target Hall construction. |
2023-591 Implemented on: 2023-11-09 | Removed | Chris Sooley In consultation with: , | Fire Alarm System | ARIEL Target Hall Linear Beam ... ARIEL Target Hall Linear Beam Detectors 09:095-001, 09:095-002 and B2 VESDA 09:094-045 | ARIEL Target Hall construction ... ARIEL Target Hall construction. |
2023-590 Implemented on: 2023-11-08 | Removed | Chris Sooley In consultation with: , | Fire Alarm System | ARIEL Target Hall Linear Beam ... ARIEL Target Hall Linear Beam Detectors 09:095-001, 09:095-002 and B2 VESDA 09:094-045 | ARIEL Target Hall construction ... ARIEL Target Hall construction. |
2023-588 Implemented on: 2023-11-07 | Removed | Chris Sooley In consultation with: , | Fire Alarm System | ARIEL Target Hall Linear Beam ... ARIEL Target Hall Linear Beam Detectors 09:095-001, 09:095-002 and B2 VESDA 09:094-045 | ARIEL Target Hall construction ... ARIEL Target Hall construction. |
2023-586 Implemented on: 2023-11-06 | Removed | Ryan Anderson In consultation with: , | Safety | IL1A scan deactivated IL1A scan deactivated | IL1A scans are tripping cyclot ... IL1A scans are tripping cyclotron while BL1A is defined off for addressing CAMAC issues |
2023-585 Implemented on: 2023-11-06 | Removed | Ryan Anderson In consultation with: , | Fire Alarm System | ARIEL Target Hall Linear Beam ... ARIEL Target Hall Linear Beam Detectors 09:095-001, 09:095-002 and B2 VESDA 09:094-045 | ARIEL Target Hall construction ... ARIEL Target Hall construction. |
2023-584 Implemented on: 2023-11-01 | Removed | Riley Schick-Martin In consultation with: , | Fire Alarm System | 01:035-040 MOB G Elevator Lobb ... 01:035-040 MOB G Elevator Lobby; 01:035-009 MOB AHU #1 duct | Grinding work in MOB Grinding work in MOB |
2023-582 Implemented on: 2023-10-31 | Removed | Riley Schick-Martin In consultation with: , | Fire Alarm System | 01:035-040 MOB G Elevator Lobb ... 01:035-040 MOB G Elevator Lobby; 01:035-009 MOB AHU #1 duct | Grinding work in MOB Grinding work in MOB |
2023-581 Implemented on: 2023-10-31 | Removed | Eric Chapman In consultation with: , | Fire Alarm System | ARIEL target hall and Vesda de ... ARIEL target hall and Vesda detectors | Concrete pour in ARIEL target ... Concrete pour in ARIEL target hall with pumper truck. |
2023-579 Implemented on: 2023-10-27 | Removed | Gauhar Hayat In consultation with: , | Fire Alarm System | MHESA L1 Filter Room Detector ... MHESA L1 Filter Room Detector 02:001-033 disarmed. | MHESA L1 Filter Room Detector ... MHESA L1 Filter Room Detector 02:001-033 disarmed for fume hood filter testing. |
2023-577 Implemented on: 2023-10-27 | Removed | Gauhar Hayat In consultation with: Elena Bylinskaia, Ryan Lovelidge | Fire Alarm System | ARIEL Target Hall LBDs disarme ... ARIEL Target Hall LBDs disarmed for ARIEL Crane Work | Overhead Crane work being done ... Overhead Crane work being done in target hall. |
2023-576 Implemented on: 2023-10-24 | Removed | Brandon Humphries In consultation with: , | Ion sources and injection BL | EGUN:BIAS interlock defeated, ... EGUN:BIAS interlock defeated, EGUN:CATHB signal forced and vacuum interlock changed | To allow for EGUN:BIAS HV cond ... To allow for EGUN:BIAS HV conditioning without tripping at the usual vacuum trip point or needing the EGUN:CATHB running. To prevent trips and allow for conditioning, the EGUN:BIAS vacuum interlock was changed from 1e-7 Torr (interlock was "EGUN:IG1 < 100nTorr") to 1e-6 Torr ("EGUN:IG1 < 1uTorr"). For EGUN:BIAS HV conditioning, the HV cabling is configured in such a way that the EGUN:CATHB and EGUN:CHT are disconnected. To allow for the EGUN:BIAS to turned on for conditioning, the "EGUN:CATHB>50V" interlock has been forced to be okay. This allows for protection from the other EGUN:BIAS interlocks (instead of bypassing the EGUN:BIAS through EPICS as described in the procedure). Defeat was approved by Friedhelm and implemented by Gelo (of Controls group). |
2023-575 Implemented on: 2023-10-24 | Removed | Robin Swanson In consultation with: Frank Hosta, | Services | Al-ALCW Heat Exchangers Valves ... Al-ALCW Heat Exchangers Valves H-18 closed and D-17 throttled | Main magnet OFF for UCN measur ... Main magnet OFF for UCN measurements |
2023-574 Implemented on: 2023-10-24 | Removed | Frank Hosta In consultation with: , | Fire Alarm System | ARIEL Target Hall Linear Beam ... ARIEL Target Hall Linear Beam Detectors 09:095-001, 09:095-002 and B2 VESDA 09:094-045 | ARIEL Target Hall construction ... ARIEL Target Hall construction. |
2023-572 Implemented on: 2023-10-20 | Removed | David Bandiera In consultation with: , | Fire Alarm System | IAMI B2 Smoke Detectors 13:075 ... IAMI B2 Smoke Detectors 13:075-013 through 13:075-019 & 13:075-086 | Welding and Cutting on B2 leve ... Welding and Cutting on B2 level of IAMI building. |
2023-571 Implemented on: 2023-10-19 | Removed | Kevin Lucow In consultation with: , | Safety | BSM 63 warning increased. BSM 63 warning increased. | BSM 63 warning level increased ... BSM 63 warning level increased from 30% to 40% for thorium irradiation at IPF. |
2023-570 Implemented on: 2023-10-19 | Removed | Jas Uppal In consultation with: , | Fire Alarm System | 2:001-023 - 26, 034 2:001-023 - 26, 034 | Construction work in clean roo ... Construction work in clean room (remove window to facilitate gantry removal) |
2023-569 Implemented on: 2023-10-18 | Removed | Brandon Humphries In consultation with: , | Vacuum | EHGMS:SV01, EHMC:SV01, EHRPC:S ... EHGMS:SV01, EHMC:SV01, EHRPC:SV01, EHCD:FPV01, EHCD:FPV04, EHCD:FPV06, EINJ:FPVCD, EACA:FPVCD interlocks bypassed | Cryogenics group is scrubbing ... Cryogenics group is scrubbing the helium system in preparation for cool down. |
2023-565 Implemented on: 2023-10-13 | Removed | Travis Kurucz In consultation with: Riley Schick-Martin, | Targets | BYP-003 STF Water Jacket HIGH ... BYP-003 STF Water Jacket HIGH level Pinned | Target water doesn't settle co ... Target water doesn't settle correctly without a target, so this is pinned as per Steve S requesting ops to keep the pump running. |
2023-563 Implemented on: 2023-10-12 | Removed | Kevin Lucow In consultation with: , | Targets | BL2C4 STF Supply Resistivity BL2C4 STF Supply Resistivity | STF Supply Resistivity reads " ... STF Supply Resistivity reads "PLCDat" error causing cyclotron trip. This is a known problem; see Fault 13917. This signal should be used as a diagnostic readback only, and not as an interlock.
*Do not remove this defeat until supply resistivity signal has been removed as a BL2C4 interlock. |
2023-562 Implemented on: 2023-10-12 | Removed | Elena Bylinskaia In consultation with: Elena Bylinskaia, Elena Bylinskaia | Ion sources and injection BL | Cryo #147 temperature I/L bypa ... Cryo #147 temperature I/L bypassed. | Temperature is at warning leve ... Temperature is at warning level. |
2023-561 Implemented on: 2023-10-12 | Removed | Gauhar Hayat In consultation with: Elena Bylinskaia, Ryan Lovelidge | Fire Alarm System | Ariel Target Hall LBDs and Ves ... Ariel Target Hall LBDs and Vesda Smoke Detectors Disarmed | Ariel Target Hall LBDs and VES ... Ariel Target Hall LBDs and VESDA Smoke Detectors 09:094-045 and 09:094-047 disarmed for soldering work in Ariel Target Hall. |
2023-555 Implemented on: 2023-10-10 | Removed | Frank Hosta In consultation with: , | Safety | STF 7 : Target return resistiv ... STF 7 : Target return resistivity. | Resistivity not recovering wit ... Resistivity not recovering without beam on. Message reader being flooded with messages. |
2023-550 Implemented on: 2023-10-06 | Removed | David Bandiera In consultation with: , | Fire Alarm System | ARIEL Target Hall Linear Beam ... ARIEL Target Hall Linear Beam Detectors 09:095-001, 09:095-002 and B2 VESDA 09:094-045 | ARIEL Target Hall construction ... ARIEL Target Hall construction. |
2023-549 Implemented on: 2023-10-06 | Removed | Travis Kurucz In consultation with: Eric Chapman, Riley Schick-Martin | Fire Alarm System | FAS All zones offline for Bell ... FAS All zones offline for Bell testing | Testing FAS bells around site. ... Testing FAS bells around site. |
2023-546 Implemented on: 2023-10-05 | Removed | Chris Sooley In consultation with: , | Fire Alarm System | ARIEL Target Hall Linear Beam ... ARIEL Target Hall Linear Beam Detectors 09:095-001, 09:095-002 and B2 VESDA 09:094-045 | ARIEL Target Hall construction ... ARIEL Target Hall construction. |
2023-543 Implemented on: 2023-10-04 | Removed | Chris Sooley In consultation with: , | Fire Alarm System | ARIEL Target Hall Linear Beam ... ARIEL Target Hall Linear Beam Detectors 09:095-001, 09:095-002 and B2 VESDA 09:094-045 | ARIEL Target Hall construction ... ARIEL Target Hall construction. |
2023-539 Implemented on: 2023-10-03 | Removed | Chris Sooley In consultation with: , | Fire Alarm System | ARIEL Target Hall Linear Beam ... ARIEL Target Hall Linear Beam Detectors 09:095-001, 09:095-002 and B2 VESDA 09:094-045 | ARIEL Target Hall construction ... ARIEL Target Hall construction. |
2023-538 Implemented on: 2023-10-03 | Removed | Ryan Lovelidge In consultation with: , | Safety | I1507 pinned at IBOP I1507 pinned at IBOP | MHESA B1 RCR1 RM6 WARN alarm p ... MHESA B1 RCR1 RM6 WARN alarm pinned at I1507 following power bump. |
2023-535 Implemented on: 2023-09-29 | Removed | Kevin Lucow In consultation with: , | Fire Alarm System | RCA1 B1 smoke detectors 03:020 ... RCA1 B1 smoke detectors 03:020-014 and 03:020-015 | Construction. Construction. |
2023-534 Implemented on: 2023-09-29 | Removed | Ryan Anderson In consultation with: , | Fire Alarm System | ARIEL Target Hall Linear Beam ... ARIEL Target Hall Linear Beam Detectors 09:095-001, 09:095-002 and B2 VESDA 09:094-045 | ARIEL Target Hall construction ... ARIEL Target Hall construction. |
2023-533 Implemented on: 2023-09-28 | Removed | Travis Kurucz In consultation with: Eric Chapman, Riley Schick-Martin | Fire Alarm System | RCA1 B1 smoke detectors 03:020 ... RCA1 B1 smoke detectors 03:020-014/015 | Floor replacement, removal of ... Floor replacement, removal of old tiles will generate some dust. |
2023-532 Implemented on: 2023-09-28 | Removed | Travis Kurucz In consultation with: Eric Chapman, Riley Schick-Martin | Fire Alarm System | ARIEL Target Hall Linear Beam ... ARIEL Target Hall Linear Beam Detectors 09:095-001, 09:095-002 and B2 VESDA 09:094-045 | ARIEL Target Hall construction ... ARIEL Target Hall construction. |
2023-531 Implemented on: 2023-09-27 | Removed | Travis Kurucz In consultation with: Eric Chapman, Riley Schick-Martin | Fire Alarm System | RCA1 B1 smoke detectors 03:020 ... RCA1 B1 smoke detectors 03:020-014/015 | Floor replacement, removal of ... Floor replacement, removal of old tiles will generate some dust. |
2023-530 Implemented on: 2023-09-27 | Removed | Travis Kurucz In consultation with: Eric Chapman, Riley Schick-Martin | Fire Alarm System | ARIEL Target Hall Linear Beam ... ARIEL Target Hall Linear Beam Detectors 09:095-001, 09:095-002 and B2 VESDA 09:094-045 | ARIEL Target Hall construction ... ARIEL Target Hall construction. |
2023-528 Implemented on: 2023-09-26 | Removed | Eric Chapman In consultation with: , | Fire Alarm System | RCA1 B1 smoke detectors 03:020 ... RCA1 B1 smoke detectors 03:020-014/015 | Floor replacement, removal of ... Floor replacement, removal of old tiles will generate some dust. |
2023-527 Implemented on: 2023-09-26 | Removed | Travis Kurucz In consultation with: , | Fire Alarm System | ARIEL Target Hall Linear Beam ... ARIEL Target Hall Linear Beam Detectors 09:095-001, 09:095-002 and B2 VESDA 09:094-045 | ARIEL Target Hall construction ... ARIEL Target Hall construction. |
2023-525 Implemented on: 2023-09-25 | Removed | Ryan Lovelidge In consultation with: , | Fire Alarm System | RCA1 B1 smoke detectors 03:020 ... RCA1 B1 smoke detectors 03:020-014/015 | Floor replacement, removal of ... Floor replacement, removal of old tiles will generate some dust. |
2023-524 Implemented on: 2023-09-25 | Removed | Gauhar Hayat In consultation with: Elena Bylinskaia, Ryan Lovelidge | Fire Alarm System | ARIEL Target Hall Linear Beam ... ARIEL Target Hall Linear Beam Detectors 09:095-001, 09:095-002 and B2 VESDA 09:094-045 | ARIEL Target Hall construction ... ARIEL Target Hall construction. |
2023-522 Implemented on: 2023-09-22 | Removed | Gauhar Hayat In consultation with: Elena Bylinskaia, Ryan Lovelidge | Safety | IBOP I1507 and I1508 pinned du ... IBOP I1507 and I1508 pinned due to MHESA RCR1 Fume Hood work. | MHESA B1 RCR1 Fume Hood work b ... MHESA B1 RCR1 Fume Hood work being done. |
2023-521 Implemented on: 2023-09-22 | Removed | Gauhar Hayat In consultation with: Elena Bylinskaia, Ryan Lovelidge | Fire Alarm System | ARIEL Fan Room Smoke Detectors ... ARIEL Fan Room Smoke Detectors 09:093-008, 009 and 010 disarmed. | Disarmed for Nuclear Ventilati ... Disarmed for Nuclear Ventilation Fan Stack work. |
2023-520 Implemented on: 2023-09-22 | Removed | Gauhar Hayat In consultation with: Elena Bylinskaia, Ryan Lovelidge | Fire Alarm System | ARIEL Target Hall Linear Beam ... ARIEL Target Hall Linear Beam Detectors 09:095-001, 09:095-002 and B2 VESDA 09:094-045 | ARIEL Target Hall construction ... ARIEL Target Hall construction. |
2023-519 Implemented on: 2023-09-21 | Removed | Robin Swanson In consultation with: Dale Nagra, | Fire Alarm System | ARIEL Target Hall Linear Beam ... ARIEL Target Hall Linear Beam Detectors 09:095-001, 09:095-002 and B2 VESDA 09:094-045 | ARIEL Target Hall construction ... ARIEL Target Hall construction. |
2023-518 Implemented on: 2023-09-20 | Removed | Brandon Humphries In consultation with: , | Vacuum | EHGMS:SV01, EHCDFPV01, EHCD:FP ... EHGMS:SV01, EHCDFPV01, EHCD:FPV04, EHCD:FPV06, EINJ:FPVCD, EACA:FPVCD interlocks bypassed | Cryogenics group is scrubbing ... Cryogenics group is scrubbing the helium system in preparation for cool down. |
2023-517 Implemented on: 2023-09-20 | Removed | Robin Swanson In consultation with: Dale Nagra, | Fire Alarm System | ARIEL Target Hall Linear Beam ... ARIEL Target Hall Linear Beam Detectors 09:095-001, 09:095-002 and B2 VESDA 09:094-045 | ARIEL Target Hall construction ... ARIEL Target Hall construction. |
2023-516 Implemented on: 2023-09-19 | Removed | Frank Hosta In consultation with: , | Fire Alarm System | FAS Zone 2 offline FAS Zone 2 offline | Investigating multiple issues ... Investigating multiple issues with FAS system. |
2023-515 Implemented on: 2023-09-19 | Removed | Frank Hosta In consultation with: , | Fire Alarm System | ARIEL Target Hall Linear Beam ... ARIEL Target Hall Linear Beam Detectors 09:095-001, 09:095-002 and B2 VESDA 09:094-045 | ARIEL Target Hall construction ... ARIEL Target Hall construction. |
2023-514 Implemented on: 2023-09-18 | Removed | David Bandiera In consultation with: , | Fire Alarm System | RCA1 B1 South Smoke Detector 0 ... RCA1 B1 South Smoke Detector 03:020-014 | Job requiring cutting will gen ... Job requiring cutting will generate dust in the local area. No hot work to be performed. |
2023-513 Implemented on: 2023-09-18 | Removed | David Bandiera In consultation with: , | Fire Alarm System | FAS All zones offline until 15 ... FAS All zones offline until 1500 | Winterization of fire suppress ... Winterization of fire suppression glycol systems |
2023-512 Implemented on: 2023-09-18 | Removed | Chris Sooley In consultation with: , | Fire Alarm System | ARIEL Target Hall Linear Beam ... ARIEL Target Hall Linear Beam Detectors 09:095-001, 09:095-002 and B2 VESDA 09:094-045 | ARIEL Target Hall construction ... ARIEL Target Hall construction. |
2023-511 Implemented on: 2023-09-15 | Removed | Kevin Lucow In consultation with: , | Fire Alarm System | ARIEL Target Hall Linear Beam ... ARIEL Target Hall Linear Beam Detectors 09:095-001, 09:095-002 and B2 VESDA 09:094-045 | ARIEL Target Hall construction ... ARIEL Target Hall construction. |
2023-510 Implemented on: 2023-09-14 | Removed | Ryan Anderson In consultation with: , | Fire Alarm System | Ariel Smoke Detectors 09:095-0 ... Ariel Smoke Detectors 09:095-001, 09:095-002, 09:094-045 | ARIEL Target Hall construction ... ARIEL Target Hall construction work involving cutting, grinding and welding |
2023-509 Implemented on: 2023-09-13 | Removed | Eric Chapman In consultation with: , | Ion sources and injection BL | Cryo 165 gate valve temperatur ... Cryo 165 gate valve temperature interlock | Poor ISIS vacuum trips machine ... Poor ISIS vacuum trips machine on ISIS beam loss, pumping required to maintain beam delivery. Cryo 165 cold head above trip threshold auto closing gate valve. |
2023-508 Implemented on: 2023-09-13 | Removed | Eric Chapman In consultation with: , | Ion sources and injection BL | Cryo 147 gate valve temperatur ... Cryo 147 gate valve temperature interlock | Poor ISIS vacuum trips machine ... Poor ISIS vacuum trips machine on ISIS beam loss, pumping required to maintain beam delivery. Cryo 147 cold head above trip threshold auto closing gate valve. |
2023-507 Implemented on: 2023-09-12 | Removed | Ryan Anderson In consultation with: , | Safety | STF Ion exchanger supply flow ... STF Ion exchanger supply flow pinned | Flow level is continuing to ge ... Flow level is continuing to get worse, is toggling at trip limit. |
2023-505 Implemented on: 2023-09-12 | Removed | Ryan Anderson In consultation with: , | Fire Alarm System | Ariel Smoke Detectors 09:095-0 ... Ariel Smoke Detectors 09:095-001, 09:095-002, 09:094-045 | ARIEL Target Hall construction ... ARIEL Target Hall construction work involving cutting, grinding and welding |
2023-504 Implemented on: 2023-09-12 | Removed | Ryan Anderson In consultation with: , | Fire Alarm System | RCA2 B1 room 11 detectors offl ... RCA2 B1 room 11 detectors offline | Hot work in room 11 for ductin ... Hot work in room 11 for ducting installation |
2023-503 Implemented on: 2023-09-11 | Removed | Travis Kurucz In consultation with: Riley Schick-Martin, | Fire Alarm System | FAS All zones offline until 15 ... FAS All zones offline until 1500 | Work on fire suppression water ... Work on fire suppression water system gauges to be performed all around site. |
2023-502 Implemented on: 2023-09-11 | Removed | Travis Kurucz In consultation with: Riley Schick-Martin, | Fire Alarm System | Ariel Smoke Detectors 09:095-0 ... Ariel Smoke Detectors 09:095-001, 09:095-002, 09:094-045 | ARIEL Target Hall construction ... ARIEL Target Hall construction work involving cutting, grinding and welding |
2023-500 Implemented on: 2023-09-08 | Removed | Travis Kurucz In consultation with: Riley Schick-Martin, Eric Chapman | Fire Alarm System | FAS devices 002-096, 002-089, ... FAS devices 002-096, 002-089, 002-088 | Work in trailer GG. Work in trailer GG. |
2023-498 Implemented on: 2023-09-06 | Removed | Gauhar Hayat In consultation with: Ryan Lovelidge, | Fire Alarm System | RCA AHU and dumb waiter smoke ... RCA AHU and dumb waiter smoke detectors | Brazing in room 011 on ground ... Brazing in room 011 on ground level of RCA. RCA AHU #4 and #5 duct smokes Devices 03-019-040 and 041 disarmed. Dumb waiter shaft smoke detector 03-019-028 also disarmed. |
2023-496 Implemented on: 2023-09-01 | Removed | Robin Swanson In consultation with: Frank Hosta, | Fire Alarm System | FAS Zone 1 offline FAS Zone 1 offline | Investigating an issue with a ... Investigating an issue with a Tamper switch under the MOB auditorium East Stairwell. |
2023-494 Implemented on: 2023-08-31 | Removed | Eric Chapman In consultation with: , | Ion sources and injection BL | Cryo 147 Gate valve temperatur ... Cryo 147 Gate valve temperature interlock | Failure of neighbouring cryopu ... Failure of neighbouring cryopump 128 caused degradation of ISIS beamline vacuum, limiting injected current due to elevated losses on skimmer 4. Discussion with Tim S weeks ago was that cryo 147 could be bypassed if required to regain vacuum in ISIS due to poor performance of cryo 165. |
2023-489 Implemented on: 2023-08-29 | Removed | David Bandiera In consultation with: , | Fire Alarm System | FAS Zone 3 offline and Node 5 ... FAS Zone 3 offline and Node 5 & Node 6 Bell Circuits Disarmed | Fire Suppression system inspec ... Fire Suppression system inspection and testing by outside contractors. |
2023-485 Implemented on: 2023-08-28 | Removed | Ryan Anderson In consultation with: , | Fire Alarm System | All zones disabled All zones disabled | Semi-annual fire supression sy ... Semi-annual fire supression system inspection and testing |
2023-483 Implemented on: 2023-08-25 | Removed | Eric Chapman In consultation with: , | Safety | BSM 63 working level raised fr ... BSM 63 working level raised from 30 to 35 | Thorium targets at installed a ... Thorium targets at installed at IPF. Temporary approval granted to irradiate thorium until Sept 30, 2023. |
2023-482 Implemented on: 2023-08-25 | Removed | Eric Chapman In consultation with: , | Fire Alarm System | RCA AHU and dumb waiter smoke ... RCA AHU and dumb waiter smoke detectors | Brazing in room 011 on ground ... Brazing in room 011 on ground level of RCA. RCA AHU #4 and #5 duct smokes Devices 03-019-040 and 041 disarmed. Dumb waiter shaft smoke detector 03-019-028 also disarmed. |
2023-481 Implemented on: 2023-08-24 | Removed | Gauhar Hayat In consultation with: Jas Uppal, Kathleen Genge | Safety | Air Monitor #31 warn limit low ... Air Monitor #31 warn limit lowered to 40 KCPM. | As instructed by Head of RPG. As instructed by Head of RPG. |
2023-480 Implemented on: 2023-08-24 | Removed | Eric Chapman In consultation with: Riley Schick-Martin, | Fire Alarm System | RCA B1 smoke detectors RCA B1 smoke detectors | Outside contractor grinding in ... Outside contractor grinding in area, installation of new card access system in RCA room 07 |
2023-476 Implemented on: 2023-08-22 | Removed | Riley Schick-Martin In consultation with: , | Fire Alarm System | MOB AHU duct smoke detectors 0 ... MOB AHU duct smoke detectors 01:035-035 & 01:035-009 | Brazing in the walk-in freezer ... Brazing in the walk-in freezer. |
2023-474 Implemented on: 2023-08-18 | Removed | Gauhar Hayat In consultation with: Ryan Lovelidge, Elena Bylinskaia | Fire Alarm System | Smoke detectors in MHESA B1 La ... Smoke detectors in MHESA B1 Lab disarmed for fume hood calibration. | 02:001-005 and 02:001-006 smok ... 02:001-005 and 02:001-006 smoke detectors disarmed to allow for smoke testing of Fume Hood. |
2023-473 Implemented on: 2023-08-18 | Removed | Gauhar Hayat In consultation with: Ryan Lovelidge, Elena Bylinskaia | Fire Alarm System | Ariel Smoke Detectors 09:095-0 ... Ariel Smoke Detectors 09:095-001, 09:095-002, 09:094-045 | ARIEL Target Hall construction ... ARIEL Target Hall construction work involving cutting, grinding and welding |
2023-471 Implemented on: 2023-08-17 | Removed | Gauhar Hayat In consultation with: , | Fire Alarm System | MHESA Smoke Detectors Disabled ... MHESA Smoke Detectors Disabled for Hot work. | Hot Work being done in MHESA G ... Hot Work being done in MHESA G Floor. |
2023-469 Implemented on: 2023-08-17 | Removed | Dale Nagra In consultation with: , | Targets | STF Ion Exchanger Return Resis ... STF Ion Exchanger Return Resistivity pinned at STF BYP 010 | PLCData error coming through a ... PLCData error coming through after meter replacement yesterday. Requested to pin the signal to run beam. Present readback is below 6 Mohm and in trip mode. |
2023-468 Implemented on: 2023-08-17 | Removed | Gauhar Hayat In consultation with: , | Fire Alarm System | Zone 2 offline until 17:00; Be ... Zone 2 offline until 17:00; Bells disarmed in Zone 2. | FAS bell fault investigation FAS bell fault investigation |
2023-467 Implemented on: 2023-08-17 | Removed | Gauhar Hayat In consultation with: , | Fire Alarm System | Ariel Smoke Detectors 09:095-0 ... Ariel Smoke Detectors 09:095-001, 09:095-002, 09:094-045 | ARIEL Target Hall construction ... ARIEL Target Hall construction work involving cutting, grinding and welding |
2023-466 Implemented on: 2023-08-17 | Removed | Eric Chapman In consultation with: , | Targets | STF Ion Exchanger Return Resis ... STF Ion Exchanger Return Resistivity pinned at STF BYP 010 | PLCData error coming through a ... PLCData error coming through after meter replacement yesterday. Requested to pin the signal to run beam. |
2023-464 Implemented on: 2023-08-16 | Removed | Riley Schick-Martin In consultation with: , | Fire Alarm System | 09:095-001, 09:095-002, 09:094 ... 09:095-001, 09:095-002, 09:094-045 | ARIEL Target Hall construction ... ARIEL Target Hall construction work involving cutting, grinding and welding |
2023-463 Implemented on: 2023-08-15 | Removed | Riley Schick-Martin In consultation with: , | Fire Alarm System | Zone 2 offline until 17:00 Zone 2 offline until 17:00 | FAS bell fault investigation FAS bell fault investigation |
2023-462 Implemented on: 2023-08-15 | Removed | Riley Schick-Martin In consultation with: , | Services | Al-ALCW Heat Exchangers Valves ... Al-ALCW Heat Exchangers Valves H-18 closed and D-17 throttled | Main magnet OFF for UCN measur ... Main magnet OFF for UCN measurements |
2023-461 Implemented on: 2023-08-15 | Removed | Riley Schick-Martin In consultation with: , | Fire Alarm System | 09:095-001, 09:095-002, 09:094 ... 09:095-001, 09:095-002, 09:094-045 | ARIEL Target Hall construction ... ARIEL Target Hall construction work involving cutting, grinding and welding |
2023-459 Implemented on: 2023-08-14 | Removed | Chris Sooley In consultation with: Chris Sooley, | Fire Alarm System | 09:095-001, 09:095-002, 09:094 ... 09:095-001, 09:095-002, 09:094-045 | ARIEL Target Hall construction ... ARIEL Target Hall construction work involving cutting, grinding and welding |
2023-457 Implemented on: 2023-08-11 | Removed | Chris Sooley In consultation with: Ryan Lovelidge, | Fire Alarm System | 09:095-001, 09:095-002, 09:094 ... 09:095-001, 09:095-002, 09:094-045 | ARIEL Target Hall construction ... ARIEL Target Hall construction work involving cutting, grinding and welding |
2023-455 Implemented on: 2023-08-10 | Removed | Ryan Anderson In consultation with: , | Safety | MHESA flammable gas alarms and ... MHESA flammable gas alarms and ISAC services alarm pinned | Gas alarm calibration Gas alarm calibration |
2023-454 Implemented on: 2023-08-10 | Removed | Ryan Anderson In consultation with: , | Fire Alarm System | 09:095-001, 09:095-002, 09:094 ... 09:095-001, 09:095-002, 09:094-045 | ARIEL Target Hall construction ... ARIEL Target Hall construction work involving cutting, grinding and welding |
2023-453 Implemented on: 2023-08-09 | Removed | Ryan Anderson In consultation with: , | Safety | M9A beamblocker IN limit pinne ... M9A beamblocker IN limit pinned | Work being done testing and co ... Work being done testing and commissioning beamline |
2023-452 Implemented on: 2023-08-09 | Removed | Ryan Anderson In consultation with: , | Fire Alarm System | 09:095-001, 09:095-002, 09:094 ... 09:095-001, 09:095-002, 09:094-045 | ARIEL Target Hall construction ... ARIEL Target Hall construction work involving cutting, grinding and welding |
2023-450 Implemented on: 2023-08-08 | Removed | Ryan Anderson In consultation with: , | Fire Alarm System | FAS all zones put into test mo ... FAS all zones put into test mode | FAS all zones put into test mo ... FAS all zones put into test mode for faulty bell replacement. |
2023-449 Implemented on: 2023-08-08 | Removed | Ryan Anderson In consultation with: , | Fire Alarm System | 09:095-001, 09:095-002, 09:094 ... 09:095-001, 09:095-002, 09:094-045 | ARIEL Target Hall construction ... ARIEL Target Hall construction work involving cutting, grinding and welding |
2023-447 Implemented on: 2023-08-04 | Active | Riley Schick-Martin In consultation with: , | Optics | BL2A Q9, Q12, Q15, B3, B4 flow ... BL2A Q9, Q12, Q15, B3, B4 flow switch interlock limits | Less flow through magnet circu ... Less flow through magnet circuit since pumps tripped in power bump. |
2023-445 Implemented on: 2023-08-04 | Removed | Travis Kurucz In consultation with: Eric Chapman, Riley Schick-Martin | Fire Alarm System | 09:095-001, 09:095-002, 09:094 ... 09:095-001, 09:095-002, 09:094-045 | ARIEL Target Hall construction ... ARIEL Target Hall construction work involving cutting, grinding and welding |
2023-444 Implemented on: 2023-08-04 | Removed | Eric Chapman In consultation with: , | Fire Alarm System | RCA B1 hallway smoke detector RCA B1 hallway smoke detector | Floor installation in RCA B1 r ... Floor installation in RCA B1 room 11 nearby. Contractor requesting smoke be disabled. Contact Kevin Edwards (BWXT) 778-370-3355 |
2023-443 Implemented on: 2023-08-04 | Removed | Riley Schick-Martin In consultation with: , | Fire Alarm System | FAS monitoring Zone 2 & output ... FAS monitoring Zone 2 & output devices disarmed in Node 8 | FAS device relocation. Zone 2 ... FAS device relocation. Zone 2 offline until 16:00 |
2023-442 Implemented on: 2023-08-03 | Removed | Ryan Lovelidge In consultation with: , | Fire Alarm System | 09:095-001, 09:095-002, 09:094 ... 09:095-001, 09:095-002, 09:094-045 | ARIEL Target Hall construction ... ARIEL Target Hall construction work involving cutting, grinding and welding |
2023-441 Implemented on: 2023-08-03 | Removed | Gauhar Hayat In consultation with: , | Fire Alarm System | Smoke Detector 8:42-005 disarm ... Smoke Detector 8:42-005 disarmed, Zone 2 offline for FAS Work | FAS system work. FAS system work. |
2023-438 Implemented on: 2023-08-02 | Removed | Ryan Lovelidge In consultation with: , | Fire Alarm System | 09:095-001, 09:095-002, 09:094 ... 09:095-001, 09:095-002, 09:094-045 | ARIEL Target Hall construction ... ARIEL Target Hall construction work involving cutting, grinding and welding |
2023-435 Implemented on: 2023-08-01 | Removed | Ryan Lovelidge In consultation with: , | Fire Alarm System | FAS all zones put into test mo ... FAS all zones put into test mode | FAS all zones put into test mo ... FAS all zones put into test mode for faulty bell replacement. |
2023-434 Implemented on: 2023-08-01 | Removed | Ryan Lovelidge In consultation with: , | Fire Alarm System | 09:095-001, 09:095-002, 09:094 ... 09:095-001, 09:095-002, 09:094-045 | ARIEL Target Hall construction ... ARIEL Target Hall construction work involving cutting, grinding and welding |
2023-433 Implemented on: 2023-07-31 | Removed | David Bandiera In consultation with: , | Fire Alarm System | 05:054-002, 003, 004. ISAC-1 T ... 05:054-002, 003, 004. ISAC-1 Target Hall Beam Detectors | ISAC-1 Target Hall crane work ... ISAC-1 Target Hall crane work by R.H. group |
2023-432 Implemented on: 2023-07-31 | Removed | Dale Nagra In consultation with: , | Fire Alarm System | FAS all zones put into test mo ... FAS all zones put into test mode | FAS all zones put into test mo ... FAS all zones put into test mode |
2023-431 Implemented on: 2023-07-31 | Removed | David Bandiera In consultation with: , | Fire Alarm System | 09:095-001, 09:095-002, 09:094 ... 09:095-001, 09:095-002, 09:094-045 | ARIEL Target Hall construction ... ARIEL Target Hall construction work involving cutting, grinding and welding |
2023-430 Implemented on: 2023-07-30 | Removed | Robin Swanson In consultation with: Frank Hosta, Dale Nagra | Fire Alarm System | FAS all zones put into test mo ... FAS all zones put into test mode | FAS all zones put into test mo ... FAS all zones put into test mode |
2023-427 Implemented on: 2023-07-29 | Removed | Robin Swanson In consultation with: Dale Nagra, Frank Hosta | Fire Alarm System | FAS all zones put into test mo ... FAS all zones put into test mode | FAS all zones put into test mo ... FAS all zones put into test mode |
2023-426 Implemented on: 2023-07-28 | Removed | Dale Nagra In consultation with: , | Fire Alarm System | FAS Zone 2 Offline for IAMI wo ... FAS Zone 2 Offline for IAMI work | Zone 2 taken offline via ACME ... Zone 2 taken offline via ACME Monitoring until 14:00. |
2023-425 Implemented on: 2023-07-28 | Removed | Robin Swanson In consultation with: Dale Nagra, | Fire Alarm System | Zone 4 Ariel building in test ... Zone 4 Ariel building in test mode, bells off. | Siemens tech investigating fau ... Siemens tech investigating faults reported in the building. |
2023-424 Implemented on: 2023-07-28 | Removed | Travis Kurucz In consultation with: , | Fire Alarm System | Smoke Detectors 03:020-014 and ... Smoke Detectors 03:020-014 and 03:020-015 disabled in RCA1 B1. | BWXT Renovation Work being don ... BWXT Renovation Work being done in area. |
2023-422 Implemented on: 2023-07-27 | Removed | Chris Sooley In consultation with: , | Fire Alarm System | ARIEL Target Hall Linear Beam ... ARIEL Target Hall Linear Beam Detectors 09:095-001 & 002 | Welding in target hall Welding in target hall |
2023-421 Implemented on: 2023-07-27 | Removed | David Bandiera In consultation with: , | Fire Alarm System | All Zones offline for site-wid ... All Zones offline for site-wide Fire Drill | Site wide Fire Drill at 09:00. ... Site wide Fire Drill at 09:00. All zones offline as a precaution. |
2023-420 Implemented on: 2023-07-27 | Removed | David Bandiera In consultation with: , | Fire Alarm System | Smoke Detectors 03:020-014 and ... Smoke Detectors 03:020-014 and 03:020-015 disabled in RCA1 B1. | BWXT Renovation Work being don ... BWXT Renovation Work being done in area. |
2023-419 Implemented on: 2023-07-26 | Removed | David Bandiera In consultation with: , | Fire Alarm System | ARIEL Target Hall Linear Beam ... ARIEL Target Hall Linear Beam Detectors 09:095-001 & 002 | Welding in target hall Welding in target hall |
2023-418 Implemented on: 2023-07-26 | Removed | David Bandiera In consultation with: , | Fire Alarm System | ARIEL Target Hall Linear Beam ... ARIEL Target Hall Linear Beam Detectors 09:095-001 & 002 | Fix cameras on ARIEL Target Ha ... Fix cameras on ARIEL Target Hall Crane by R.H. Group |
2023-417 Implemented on: 2023-07-26 | Removed | Chris Sooley In consultation with: , | Fire Alarm System | FAS Zone 2 Offline for FAS wor ... FAS Zone 2 Offline for FAS work. | Zone 2 taken offline via ACME ... Zone 2 taken offline via ACME Monitoring until 17:00. |
2023-415 Implemented on: 2023-07-26 | Removed | Chris Sooley In consultation with: , | Fire Alarm System | Smoke Detectors 03:020-014 and ... Smoke Detectors 03:020-014 and 03:020-015 disabled in RCA1 B1. | BWXT Renovation Work being don ... BWXT Renovation Work being done in area. |
2023-411 Implemented on: 2023-07-25 | Removed | David Bandiera In consultation with: , | Fire Alarm System | FAS Zone 2 Offline, Node 2 Bel ... FAS Zone 2 Offline, Node 2 Bell Circuits disarmed for FAS work. | Zone 2 taken offline via ACME ... Zone 2 taken offline via ACME Monitoring; Node 2 Bell Circuits disarmed for FAS Ground Fault troubleshooting. Until 17:00. |
2023-410 Implemented on: 2023-07-25 | Removed | David Bandiera In consultation with: , | Fire Alarm System | Smoke Detectors 03:020-014 and ... Smoke Detectors 03:020-014 and 03:020-015 disabled in RCA1 B1. | BWXT Renovation Work being don ... BWXT Renovation Work being done in area. |
2023-409 Implemented on: 2023-07-24 | Removed | Kevin Lucow In consultation with: , | Fire Alarm System | FAS Zone 2 in test and PIF CR ... FAS Zone 2 in test and PIF CR smoke detector disarmed. | Relocating smoke detector. Relocating smoke detector. |
2023-408 Implemented on: 2023-07-24 | Removed | Ryan Anderson In consultation with: , | Fire Alarm System | Smoke Detectors 03:020-014 and ... Smoke Detectors 03:020-014 and 03:020-015 disabled in RCA1 B1. | BWXT Renovation Work being don ... BWXT Renovation Work being done in area. |
2023-406 Implemented on: 2023-07-21 | Removed | Ryan Anderson In consultation with: , | Fire Alarm System | ARIEL L2 filter room smoke det ... ARIEL L2 filter room smoke detectors 09:093-008,9,10 | Hot work in area Hot work in area |
2023-405 Implemented on: 2023-07-21 | Removed | Ryan Anderson In consultation with: , | Fire Alarm System | Smoke Detectors 03:020-014 and ... Smoke Detectors 03:020-014 and 03:020-015 disabled in RCA1 B1. | BWXT Renovation Work being don ... BWXT Renovation Work being done in area. |
2023-404 Implemented on: 2023-07-20 | Removed | Riley Schick-Martin In consultation with: , | Fire Alarm System | ARIEL L2 filter room smoke det ... ARIEL L2 filter room smoke detectors 09:093-008,9,10 | Hot work in area Hot work in area |
2023-402 Implemented on: 2023-07-20 | Removed | David Bandiera In consultation with: , | Fire Alarm System | Smoke Detectors 03:020-014 and ... Smoke Detectors 03:020-014 and 03:020-015 disabled in RCA1 B1. | BWXT Renovation Work being don ... BWXT Renovation Work being done in area. |
2023-398 Implemented on: 2023-07-19 | Removed | Travis Kurucz In consultation with: Riley Schick-Martin, | Fire Alarm System | Smoke Detectors 03:020-014 and ... Smoke Detectors 03:020-014 and 03:020-015 disabled in RCA1 B1. | BWXT Renovation Work being don ... BWXT Renovation Work being done in area. |
2023-397 Implemented on: 2023-07-18 | Removed | Ryan Lovelidge In consultation with: , | RF | Dee gap water line E in TC tem ... Dee gap water line E in TC temp warning | Warn only taken off scan, TC i ... Warn only taken off scan, TC is ~4C warmer than usual but is stable. Trip element is still on scan. |
2023-395 Implemented on: 2023-07-18 | Removed | Travis Kurucz In consultation with: Riley Schick-Martin, | Fire Alarm System | Smoke detectors 02:008-24,25,2 ... Smoke detectors 02:008-24,25,26,27,30,31 Defeated | Relocation of some Thermocoupl ... Relocation of some Thermocouples in the SA computer room. |
2023-393 Implemented on: 2023-07-18 | Removed | Travis Kurucz In consultation with: Riley Schick-Martin, | Fire Alarm System | Smoke Detectors 03:020-014 and ... Smoke Detectors 03:020-014 and 03:020-015 disabled in RCA1 B1. | BWXT Renovation Work being don ... BWXT Renovation Work being done in area. |
2023-392 Implemented on: 2023-07-17 | Removed | Gauhar Hayat In consultation with: , | Fire Alarm System | Ariel Target Hall Smoke Detect ... Ariel Target Hall Smoke Detectors (09:095-001 and 09:095-002) disabled | Welding work being done in Tar ... Welding work being done in Target Hall. |
2023-391 Implemented on: 2023-07-17 | Removed | Gauhar Hayat In consultation with: Ryan Lovelidge, | Fire Alarm System | IAMI L1 and L2 Smoke Detectors ... IAMI L1 and L2 Smoke Detectors (13:075-42 to 45; 13:076-050) disarmed for IAMI Repair Work | Cutting work being done in IAM ... Cutting work being done in IAMI building. |
2023-390 Implemented on: 2023-07-17 | Removed | Gauhar Hayat In consultation with: , | Fire Alarm System | FAS Zone 2 Offline, Node 2 dis ... FAS Zone 2 Offline, Node 2 disarmed for FAS work. | Zone 2 taken offline via ACME ... Zone 2 taken offline via ACME Monitoring; Node 2 disarmed for Meson Hall smoke detector work. |
2023-389 Implemented on: 2023-07-17 | Removed | Gauhar Hayat In consultation with: , | Fire Alarm System | Smoke Detectors 03:020-014 and ... Smoke Detectors 03:020-014 and 03:020-015 disabled in RCA1 B1. | BWXT Renovation Work being don ... BWXT Renovation Work being done in area. |
2023-388 Implemented on: 2023-07-13 | Removed | Robin Swanson In consultation with: Dale Nagra, | Fire Alarm System | Chemistry Annex B1 Smoke detec ... Chemistry Annex B1 Smoke detectors 03:020-014 and 03:020-015. | Construction work. Construction work. |
2023-387 Implemented on: 2023-07-12 | Removed | Robin Swanson In consultation with: Dale Nagra, | Fire Alarm System | 09:093-009 ARIEL L2-305 Filter ... 09:093-009 ARIEL L2-305 Filter room cntr detector disarmed | 09:093-009 ARIEL L2-305 Filter ... 09:093-009 ARIEL L2-305 Filter room cntr detector disarmed, workers soldering in the area. |
2023-386 Implemented on: 2023-07-12 | Removed | Robin Swanson In consultation with: , | Vacuum | EACA:VV0A interlock bypassed f ... EACA:VV0A interlock bypassed for leak check. | EACA:VV0A interlock bypassed f ... EACA:VV0A interlock bypassed for leak check of EACA isolation vacuum. Leak checker connected downstream of EACA:VV0A. |
2023-385 Implemented on: 2023-07-12 | Removed | Dale Nagra In consultation with: , | Fire Alarm System | Zone 4 offline Zone 4 offline | Relocating a smoke detector aw ... Relocating a smoke detector away from a crane rail. Zone 4 Node 9. Smoke detector 09:091-031 Ariel node 9 bells off as well.
|
2023-384 Implemented on: 2023-07-12 | Removed | Dale Nagra In consultation with: , | Fire Alarm System | Zone 3 offline Zone 3 offline | ISAC2 AC10 Replacement. Some s ... ISAC2 AC10 Replacement. Some soldering required as well. |
2023-383 Implemented on: 2023-07-12 | Removed | Travis Kurucz In consultation with: Riley Schick-Martin, | Fire Alarm System | Chemistry Annex B1 Smoke detec ... Chemistry Annex B1 Smoke detectors 03:020-014 and 03:020-015. | Construction work. Construction work. |
2023-382 Implemented on: 2023-07-11 | Removed | Dale Nagra In consultation with: , | Fire Alarm System | Zone 3 offline Zone 3 offline | ISAC2 AC10 Replacement. Some s ... ISAC2 AC10 Replacement. Some soldering required as well. |
2023-381 Implemented on: 2023-07-10 | Removed | David Bandiera In consultation with: , | Fire Alarm System | 02:001-094 SA B2 East Manual P ... 02:001-094 SA B2 East Manual Pull Station removed | Manual pull station was "Not R ... Manual pull station was "Not Responding" and generating frequent troubles on the FAS. Preliminary troubleshooting was not effective so the pull station was removed. |
2023-380 Implemented on: 2023-07-10 | Removed | Chris Sooley In consultation with: , | Fire Alarm System | Chemistry Annex B1 Smoke detec ... Chemistry Annex B1 Smoke detectors 03:020-014 and 03:020-015. | Construction work. Construction work. |
2023-379 Implemented on: 2023-07-10 | Removed | David Bandiera In consultation with: , | Fire Alarm System | ARIEL L2 Filter Room Smoke Det ... ARIEL L2 Filter Room Smoke Detectors 09:093-008 & -009. | Installation of the Nuclear Ve ... Installation of the Nuclear Ventilation Fan in ARIEL Penthouse. No cutting/grinding but possibility to kick up dust during work. |
2023-378 Implemented on: 2023-07-07 | Removed | Chris Sooley In consultation with: David Bandiera, | Fire Alarm System | Duct Smoke detector 02:002-051 ... Duct Smoke detector 02:002-051 input disabled | Ehall Exhaust Fan Speed Change ... Ehall Exhaust Fan Speed Change work. |
2023-376 Implemented on: 2023-07-07 | Removed | David Bandiera In consultation with: , | Fire Alarm System | Zone 2 offline and Node 2 Bell ... Zone 2 offline and Node 2 Bell Circuits disarmed | Troubleshooting faulty manual ... Troubleshooting faulty manual pull station 02:001-094 |
2023-375 Implemented on: 2023-07-07 | Removed | Chris Sooley In consultation with: , | Fire Alarm System | 13:075-001 and 003 smoke detec ... 13:075-001 and 003 smoke detectors | Work being done in IAMI power ... Work being done in IAMI power supply room. |
2023-374 Implemented on: 2023-07-06 | Removed | Kevin Lucow In consultation with: , | Fire Alarm System | All Zones in Test Mode for 4 h ... All Zones in Test Mode for 4 hours. | FAS testing and verification. FAS testing and verification. |
2023-373 Implemented on: 2023-07-06 | Removed | Kevin Lucow In consultation with: , | Fire Alarm System | Chemistry Annex B1 Smoke detec ... Chemistry Annex B1 Smoke detectors 03:020-014 and 03:020-015. | Construction work. Construction work. |
2023-372 Implemented on: 2023-07-05 | Removed | Kevin Lucow In consultation with: , | Fire Alarm System | All Zones in Test Mode. All Zones in Test Mode. | FAS testing and verification. FAS testing and verification. |
2023-371 Implemented on: 2023-07-05 | Removed | Kevin Lucow In consultation with: , | Fire Alarm System | Chemistry Annex B1 Smoke detec ... Chemistry Annex B1 Smoke detectors 03:020-014 and 03:020-015. | Construction work. Construction work. |
2023-370 Implemented on: 2023-07-04 | Removed | Jas Uppal In consultation with: , | Fire Alarm System | 13-07-001 and 003 smoke detect ... 13-07-001 and 003 smoke detectors | Work being done in IAMI power ... Work being done in IAMI power supply room. |
2023-369 Implemented on: 2023-07-04 | Removed | Ryan Anderson In consultation with: , | Fire Alarm System | All FAS Zones in test mode All FAS Zones in test mode | FAS testing FAS testing |
2023-368 Implemented on: 2023-07-04 | Removed | Ryan Anderson In consultation with: , | Fire Alarm System | Chemistry Annex B1 Smoke dete ... Chemistry Annex B1 Smoke detectors 03:020-014 and 03:020-015 disarmed. | Construction work. Construction work. |
2023-367 Implemented on: 2023-06-30 | Removed | Brandon Humphries In consultation with: , | Safety | Beam Loss HV signal in the MPS ... Beam Loss HV signal in the MPS FSD | The logic for the BLM_OK signa ... The logic for the BLM_OK signal (labelled "Beam Loss HV" on FSD page) had a condition that monitored the EGUN:BIAS HV signal. If this signal was NOT OK, it would ignore the BLM settings and just show as OKAY. This resulted in confusion and an E-Fault today. |
2023-366 Implemented on: 2023-06-30 | Removed | Travis Kurucz In consultation with: Riley Schick-Martin, | Fire Alarm System | Chemistry Annex B1 Smoke dete ... Chemistry Annex B1 Smoke detectors 03:020-014 and 03:020-015 disarmed. | Construction work. Construction work. |
2023-365 Implemented on: 2023-06-29 | Removed | Ryan Lovelidge In consultation with: , | Fire Alarm System | Chemistry Annex B1 Smoke dete ... Chemistry Annex B1 Smoke detectors 03:020-014 and 03:020-015 disarmed. | Construction work. Construction work. |
2023-364 Implemented on: 2023-06-29 | Removed | Elena Bylinskaia In consultation with: Elena Bylinskaia, Elena Bylinskaia | Fire Alarm System | Zone 4 offline, Node 9 disarme ... Zone 4 offline, Node 9 disarmed. | Work on FAS upgrade in the ARI ... Work on FAS upgrade in the ARIEL area. |
2023-363 Implemented on: 2023-06-28 | Removed | Ryan Lovelidge In consultation with: , | Fire Alarm System | Chemistry Annex B1 Smoke dete ... Chemistry Annex B1 Smoke detectors 03:020-014 and 03:020-015 disarmed. | Construction work. Construction work. |
2023-361 Implemented on: 2023-06-27 | Removed | Ryan Lovelidge In consultation with: , | Fire Alarm System | Chemistry Annex B1 Smoke dete ... Chemistry Annex B1 Smoke detectors 03:020-014 and 03:020-015 disarmed. | Construction work. Construction work. |
2023-360 Implemented on: 2023-06-27 | Removed | Gauhar Hayat In consultation with: , | Fire Alarm System | 06:064-001 ISAC Penthouse Smok ... 06:064-001 ISAC Penthouse Smoke Detector Disarmed | Hot work in ISAC Penthouse. Hot work in ISAC Penthouse. |
2023-359 Implemented on: 2023-06-27 | Removed | Gauhar Hayat In consultation with: , | Fire Alarm System | FAS Zone 2 and 3 offline for F ... FAS Zone 2 and 3 offline for Fire Alarm System work | Zones 2 and 3 offline for FIre ... Zones 2 and 3 offline for FIre Alarm system work. |
2023-358 Implemented on: 2023-06-27 | Removed | Gauhar Hayat In consultation with: , | Fire Alarm System | Zone 4 Offline for FAS Work Zone 4 Offline for FAS Work | Work being done on FAS system. Work being done on FAS system. |
2023-356 Implemented on: 2023-06-26 | Removed | Frank Hosta In consultation with: , | Fire Alarm System | Chemistry Annex B1 Smoke dete ... Chemistry Annex B1 Smoke detectors 03:020-014 and 03:020-015 disarmed. | Construction work. Construction work. |
2023-355 Implemented on: 2023-06-26 | Removed | Dale Nagra In consultation with: , | Fire Alarm System | FAS Zone 1,2, 3, 4 offline FAS Zone 1,2, 3, 4 offline | Quarterly Fire Suppression Sys ... Quarterly Fire Suppression System Inspection. Bells are defeated for all zones as well as requested by Tejinder Sanghera. Defeated until 16:00 today. |
2023-354 Implemented on: 2023-06-26 | Removed | Frank Hosta In consultation with: , | Fire Alarm System | FAS Zone 4 offline and Node 9 ... FAS Zone 4 offline and Node 9 bells disabled | Replacing Fire Alarm devices a ... Replacing Fire Alarm devices as per FAS upgrades |
2023-352 Implemented on: 2023-06-24 | Removed | Eric Chapman In consultation with: , | Targets | 2A3DSP-TC2 and TC3 trip limits ... 2A3DSP-TC2 and TC3 trip limits lowered from default | 2A3DSP-WFS2 water flow togglin ... 2A3DSP-WFS2 water flow toggling not OK and bypassed. 2A3DSP-TC2 and TC3 trip limits lowered from default of 120C to 95C and 90C respectively, 2A3DSP-TC1 lowered from 50C to 36C. Requested by Carla Babcock via elog. This was the best way I could think to ensure we satisfy her request. |
2023-351 Implemented on: 2023-06-24 | Removed | Chris Sooley In consultation with: David Bandiera, Robert Scheepmaker | Targets | 2A3DSP-WFS2 Shield Plug Water ... 2A3DSP-WFS2 Shield Plug Water Flow | 2A3DSP-WFS2 keeps toggling NOT ... 2A3DSP-WFS2 keeps toggling NOT OK signal and tripping the beam off. |
2023-350 Implemented on: 2023-06-24 | Removed | Travis Kurucz In consultation with: Eric Chapman, Riley Schick-Martin | Targets | 2C4 Ion Exchanger Flow (bypass ... 2C4 Ion Exchanger Flow (bypass #8) pinned. | Signal is noisy and causing tr ... Signal is noisy and causing trips. Issue to be resolved next maitenance period. Pinned on advisement by Louis M. |
2023-349 Implemented on: 2023-06-23 | Removed | Dale Nagra In consultation with: , | Fire Alarm System | Chemistry Annex B1 Smoke dete ... Chemistry Annex B1 Smoke detectors 03:020-014 and 03:020-015 disarmed. | Construction work. Construction work. |
2023-348 Implemented on: 2023-06-23 | Removed | Frank Hosta In consultation with: , | Fire Alarm System | FAS Zone 4 offline and Node 9 ... FAS Zone 4 offline and Node 9 bells disabled | Replacing Fire Alarm devices a ... Replacing Fire Alarm devices as per FAS upgrades |
2023-347 Implemented on: 2023-06-22 | Removed | David Bandiera In consultation with: , | Fire Alarm System | FAS Zone 1 offline until 14:00 FAS Zone 1 offline until 14:00 | New fire alarm bell installati ... New fire alarm bell installation in MOB North |
2023-346 Implemented on: 2023-06-22 | Removed | Chris Sooley In consultation with: David Bandiera, Robert Scheepmaker | Fire Alarm System | AHU #9 Duct smoke detector: 01 ... AHU #9 Duct smoke detector: 01:035-035 | MOB-AHU9 AC unit- repair with ... MOB-AHU9 AC unit- repair with new parts. Brazing will be taking place. Hot work permit authorized by Terry. |
2023-345 Implemented on: 2023-06-22 | Removed | Chris Sooley In consultation with: , | Fire Alarm System | RCA1 B1 Smoke detectors 03:020 ... RCA1 B1 Smoke detectors 03:020-014 and 03:020-015 disarmed. | Construction work. Construction work. |
2023-344 Implemented on: 2023-06-22 | Removed | Chris Sooley In consultation with: , | Fire Alarm System | FAS Zone 4 offline and Node 9 ... FAS Zone 4 offline and Node 9 bells disabled | Replacing Fire Alarm devices a ... Replacing Fire Alarm devices as per FAS upgrades |
2023-341 Implemented on: 2023-06-21 | Removed | David Bandiera In consultation with: Robert Scheepmaker, | Fire Alarm System | FAS Zone 1 offline until 12:00 FAS Zone 1 offline until 12:00 | New fire alarm bell installati ... New fire alarm bell installation in MOB North |
2023-339 Implemented on: 2023-06-21 | Removed | David Bandiera In consultation with: , | Fire Alarm System | FAS Zone 4 offline and Node 9 ... FAS Zone 4 offline and Node 9 bells disabled | Replacing Fire Alarm devices a ... Replacing Fire Alarm devices as per FAS upgrades |
2023-337 Implemented on: 2023-06-20 | Removed | Chris Sooley In consultation with: , | Safety | MHESA RCR1 RM 6 Warn and Alarm ... MHESA RCR1 RM 6 Warn and Alarm pinned in IBOP cabinet | RCR1 Fume Hood and Hot Cell 6 ... RCR1 Fume Hood and Hot Cell 6 Monthly Blower Maintenance
|
2023-335 Implemented on: 2023-06-20 | Removed | David Bandiera In consultation with: , | Fire Alarm System | FAS Zone 4 offline and Node 9 ... FAS Zone 4 offline and Node 9 bells disabled | Replacing Fire Alarm devices a ... Replacing Fire Alarm devices as per FAS upgrades |
2023-334 Implemented on: 2023-06-19 | Removed | Travis Kurucz In consultation with: Eric Chapman, Riley Schick-Martin | Safety | Air monitor #16 Air monitor #16 | Working limit changed from 20 ... Working limit changed from 20 to 22 KCPM until end of target (scheduled during beam development June 20). See email from B Noakes at RPG. |
2023-333 Implemented on: 2023-06-19 | Removed | Ryan Anderson In consultation with: , | Fire Alarm System | Node 9 alarms Node 9 alarms | FAS system upgrades in ARIEL FAS system upgrades in ARIEL |
2023-332 Implemented on: 2023-06-19 | Removed | Ryan Anderson In consultation with: , | Fire Alarm System | 13:075-001 and 13:075-003 13:075-001 and 13:075-003 | IAMI welding work. IAMI welding work. |
2023-331 Implemented on: 2023-06-19 | Removed | Ryan Anderson In consultation with: , | Fire Alarm System | FAS Zone 4 offline and Node 9 ... FAS Zone 4 offline and Node 9 bells disabled | Replacing Fire Alarm devices a ... Replacing Fire Alarm devices as per FAS upgrades |
2023-329 Implemented on: 2023-06-16 | Removed | Ryan Anderson In consultation with: , | Fire Alarm System | Service Annex L1/L2 ISIS area ... Service Annex L1/L2 ISIS area smoke detectors | Saudering work Saudering work |
2023-328 Implemented on: 2023-06-16 | Removed | Kevin Lucow In consultation with: , | Fire Alarm System | IAMI B1 smoke detectors 13:075 ... IAMI B1 smoke detectors 13:075-001 and 13:075-003 | IAMI welding work. IAMI welding work. |
2023-327 Implemented on: 2023-06-16 | Removed | Frank Hosta In consultation with: , | Fire Alarm System | RCA1 B1 Smoke detectors 03:020 ... RCA1 B1 Smoke detectors 03:020-014 and 03:020-015 disarmed. | Construction work. Construction work. |
2023-326 Implemented on: 2023-06-15 | Removed | Ryan Lovelidge In consultation with: , | Vacuum | B2A:IG4 'forced' in the bypass ... B2A:IG4 'forced' in the bypass/force menu 2A EPICS EDM | B2A:IG4 is off and times out w ... B2A:IG4 is off and times out when we try to turn it on. After speaking with Edi and Dimo we suspect a faulty ion gauge since the backing pressure for this section's turbopump is comparable to the rest of the beamline. Element defeated so we can open 2AVA4 and deliver beam to 2A. |
2023-324 Implemented on: 2023-06-15 | Removed | Travis Kurucz In consultation with: Riley Schick-Martin, Eric Chapman | Safety | MHESA RCR1 RM 6 Warn and Alarm ... MHESA RCR1 RM 6 Warn and Alarm pinned in IBOP cabinet | RCR Lab Static Pressure Transm ... RCR Lab Static Pressure Transmitters yearly calibration. |
2023-322 Implemented on: 2023-06-15 | Removed | Eric Chapman In consultation with: , | Fire Alarm System | Service Annex L1 smoke detecto ... Service Annex L1 smoke detectors | Smoke detectors disarmed on L1 ... Smoke detectors disarmed on L1 level of service annex near ISIS for domestic water plumbing work/pipe sweating. |
2023-321 Implemented on: 2023-06-15 | Removed | Travis Kurucz In consultation with: Eric Chapman, Riley Schick-Martin | Fire Alarm System | 13:075-001 and 13:075-003 13:075-001 and 13:075-003 | IAMI welding work. IAMI welding work. |
2023-320 Implemented on: 2023-06-15 | Removed | David Bandiera In consultation with: , | Fire Alarm System | RCA1 B1 Smoke detectors 03:020 ... RCA1 B1 Smoke detectors 03:020-014 and 03:020-015 disarmed. | Construction work. Construction work. |
2023-318 Implemented on: 2023-06-14 | Removed | Brandon Humphries In consultation with: , | Safety | High energy section BLMs High energy section BLMs | Performing beam spill measurem ... Performing beam spill measurements in the high energy section for confirming calibrations. Need to see full measurements of losses without BLMs tripping. |
2023-317 Implemented on: 2023-06-14 | Removed | Travis Kurucz In consultation with: Eric Chapman, Riley Schick-Martin | Fire Alarm System | 13:075-001 and 13:075-003 13:075-001 and 13:075-003 | IAMI welding work. IAMI welding work. |
2023-316 Implemented on: 2023-06-14 | Removed | Riley Schick-Martin In consultation with: , | Fire Alarm System | Zone 4 offline with ACME until ... Zone 4 offline with ACME until 1500h | VESDA system reset VESDA system reset |
2023-315 Implemented on: 2023-06-14 | Removed | Travis Kurucz In consultation with: Eric Chapman, Riley Schick-Martin | Fire Alarm System | RCA B1 Smoke detectors 03:020- ... RCA B1 Smoke detectors 03:020-14 and 03:-20-15 disarmed. | Construction work. Construction work. |
2023-314 Implemented on: 2023-06-13 | Removed | Travis Kurucz In consultation with: Eric Chapman, Riley Schick-Martin | Services | Al-ALCW Heat Exchangers Valves ... Al-ALCW Heat Exchangers Valves H-18 closed and D-17 throttled | Main magnet OFF Main magnet OFF |
2023-312 Implemented on: 2023-06-13 | Removed | Travis Kurucz In consultation with: Eric Chapman, Riley Schick-Martin | Safety | MHESA RCR1 RM 6 Warn and Alarm ... MHESA RCR1 RM 6 Warn and Alarm pinned in IBOP cabinet | RCR Lab Static Pressure Transm ... RCR Lab Static Pressure Transmitters yearly calibration. |
2023-311 Implemented on: 2023-06-13 | Removed | Riley Schick-Martin In consultation with: , | Fire Alarm System | 05:054-002,3,&4 ISAC EXP Hall ... 05:054-002,3,&4 ISAC EXP Hall detectors | Liquid Helium fill at TITAN pl ... Liquid Helium fill at TITAN platform. |
2023-310 Implemented on: 2023-06-13 | Removed | Riley Schick-Martin In consultation with: , | Fire Alarm System | RCA B1 Smoke detectors 03:020- ... RCA B1 Smoke detectors 03:020-14 and 03:-20-15 disarmed. | Construction work. Construction work. |
2023-309 Implemented on: 2023-06-13 | Removed | Chris Sooley In consultation with: David Bandiera, | Services | Al-ALCW Heat Exchangers Valves ... Al-ALCW Heat Exchangers Valves H-18 closed and D-17 throttled | Main magnet OFF Main magnet OFF |
2023-308 Implemented on: 2023-06-12 | Removed | Elena Bylinskaia In consultation with: Elena Bylinskaia, Elena Bylinskaia | Fire Alarm System | 13:075-001 and 13:075-003 13:075-001 and 13:075-003 | IAMI welding work. IAMI welding work. |
2023-307 Implemented on: 2023-06-12 | Removed | Gauhar Hayat In consultation with: , | Fire Alarm System | Node 2 offline, Node 8 disarme ... Node 2 offline, Node 8 disarmed. | Fire Alarm System work as part ... Fire Alarm System work as part of Phase 3 Fire Alarm System upgrades. |
2023-305 Implemented on: 2023-06-09 | Removed | Elena Bylinskaia In consultation with: Elena Bylinskaia, Elena Bylinskaia | Fire Alarm System | IAMI B1 smoke detectors 13:075 ... IAMI B1 smoke detectors 13:075-001 and 13:075-003 | IAMI welding work. IAMI welding work. |
2023-304 Implemented on: 2023-06-09 | Removed | Elena Bylinskaia In consultation with: Elena Bylinskaia, Elena Bylinskaia | Fire Alarm System | RCA B1 Smoke detectors 03:020- ... RCA B1 Smoke detectors 03:020-14 and 03:-20-15 disarmed. | Construction work. Construction work. |
2023-303 Implemented on: 2023-06-09 | Removed | Ryan Lovelidge In consultation with: , | Fire Alarm System | 02:001-009/10/11/12 MHESA B1 ... 02:001-009/10/11/12 MHESA B1 smoke detectors | MHESA B1 smoke detectors disar ... MHESA B1 smoke detectors disarmed for floor replacement, duration is 8 hours |
2023-301 Implemented on: 2023-06-08 | Removed | Robin Swanson In consultation with: Frank Hosta, | Fire Alarm System | Zone 2 Offline via ACME Monito ... Zone 2 Offline via ACME Monitoring; Bell circuits disabled in Nodes 7 | Fire alarm devices in stores a ... Fire alarm devices in stores and design office being upgraded. |
2023-300 Implemented on: 2023-06-08 | Removed | Travis Kurucz In consultation with: Riley Schick-Martin, Eric Chapman | Fire Alarm System | RCA B1 Smoke Detectors 03:020- ... RCA B1 Smoke Detectors 03:020-014 and 03:020-015 | Construction work. Construction work. |
2023-297 Implemented on: 2023-06-07 | Removed | Robin Swanson In consultation with: Dale Nagra, Frank Hosta | Fire Alarm System | Trailer GG zones 02:002-088, 0 ... Trailer GG zones 02:002-088, 089 and 001 | Removal of existing waterlines ... Removal of existing waterlines in janitor closet of Trailer GG. Old pipes to be desolder and reworked to new location. |
2023-296 Implemented on: 2023-06-07 | Removed | Dale Nagra In consultation with: , | Fire Alarm System | FAS Smoke on IAMI B2, 13:075.0 ... FAS Smoke on IAMI B2, 13:075.001 and 13:075.003 | IAMI welding work. Hot work p ... IAMI welding work. Hot work permit completed. |
2023-295 Implemented on: 2023-06-07 | Removed | Dale Nagra In consultation with: , | Fire Alarm System | Zone 2 Offline via ACME Monito ... Zone 2 Offline via ACME Monitoring; Bell circuits disabled in Nodes 7 | Fire alarm devices in stores a ... Fire alarm devices in stores and design office being upgraded. |
2023-294 Implemented on: 2023-06-07 | Removed | Dale Nagra In consultation with: , | Fire Alarm System | RCA B1 Smoke Detectors 03:020- ... RCA B1 Smoke Detectors 03:020-014 and 03:020-015 | Construction work. Construction work. |
2023-293 Implemented on: 2023-06-06 | Removed | Dale Nagra In consultation with: , | Fire Alarm System | FAS Smoke on IAMI B2, 13:075.0 ... FAS Smoke on IAMI B2, 13:075.001 and 13:075.003 | IAMI welding work. Hot work p ... IAMI welding work. Hot work permit completed. |
2023-292 Implemented on: 2023-06-06 | Removed | Dale Nagra In consultation with: , | Fire Alarm System | RCA B1 Smoke Detectors 03:020- ... RCA B1 Smoke Detectors 03:020-014 and 03:020-015 | Construction work. Construction work. |
2023-291 Implemented on: 2023-06-06 | Removed | Dale Nagra In consultation with: , | Fire Alarm System | Zone 2 Offline via ACME Monito ... Zone 2 Offline via ACME Monitoring; Bell circuits disabled in Nodes 3 and 4 | Fire alarm devices in stores a ... Fire alarm devices in stores and design office being upgraded. |
2023-290 Implemented on: 2023-06-05 | Removed | David Bandiera In consultation with: , | Fire Alarm System | RCA B1 Smoke Detectors 03:020- ... RCA B1 Smoke Detectors 03:020-014 and 03:020-015 | Construction work. Construction work. |
2023-289 Implemented on: 2023-06-05 | Removed | Chris Sooley In consultation with: David Bandiera, Robert Scheepmaker | Fire Alarm System | Zone 2 Offline via ACME Monito ... Zone 2 Offline via ACME Monitoring; Bell circuits disabled in Nodes 3 and 4 | Fire alarm devices in RCA bein ... Fire alarm devices in RCA being upgraded. |
2023-288 Implemented on: 2023-06-02 | Removed | Chris Sooley In consultation with: David Bandiera, | Fire Alarm System | Zone 2 Offline via ACME Monito ... Zone 2 Offline via ACME Monitoring; Bell circuits disabled in Nodes 3 and 4 | Fire alarm devices in RCA bein ... Fire alarm devices in RCA being upgraded. |
2023-287 Implemented on: 2023-06-01 | Removed | Ryan Anderson In consultation with: , | Fire Alarm System | RCA1 B1 Smoke Detectors 03:020 ... RCA1 B1 Smoke Detectors 03:020-014, 03:020-015 disarmed for Renovation Work | Disabled smoke detectors for B ... Disabled smoke detectors for BWXT renovation work. |
2023-286 Implemented on: 2023-06-01 | Removed | Ryan Anderson In consultation with: , | Fire Alarm System | Zone 2 Offline via ACME Monito ... Zone 2 Offline via ACME Monitoring; Bell circuits disabled in Nodes 3 and 4 | Fire alarm devices in RCA bein ... Fire alarm devices in RCA being upgraded. |
2023-284 Implemented on: 2023-05-31 | Removed | Kevin Lucow In consultation with: , | Fire Alarm System | RCA B1 Smoke Detectors 03:020- ... RCA B1 Smoke Detectors 03:020-014 and 03:020-015 | Construction work. Construction work. |
2023-283 Implemented on: 2023-05-31 | Removed | Ryan Anderson In consultation with: , | Fire Alarm System | Zone 2 Offline via ACME Monito ... Zone 2 Offline via ACME Monitoring; Bell circuits disabled in Nodes 3 and 4 | Fire alarm devices in RCA bein ... Fire alarm devices in RCA being upgraded. |
2023-282 Implemented on: 2023-05-30 | Removed | Travis Kurucz In consultation with: Eric Chapman, Riley Schick-Martin | Fire Alarm System | Smoke detectors 008-024, 008-2 ... Smoke detectors 008-024, 008-25, 008-26, 008-27, 008-030, 008-031 | For running ethernet cabling u ... For running ethernet cabling under the floor in the computer room. |
2023-281 Implemented on: 2023-05-30 | Removed | Ryan Anderson In consultation with: , | Fire Alarm System | Zone 2 Offline via ACME Monito ... Zone 2 Offline via ACME Monitoring; Bell circuits disabled in Nodes 3 and 4 | Fire alarm devices in RCA bein ... Fire alarm devices in RCA being upgraded. |
2023-280 Implemented on: 2023-05-29 | Removed | Gauhar Hayat In consultation with: , | Fire Alarm System | Node 4 Fire Alarm Devices not ... Node 4 Fire Alarm Devices not responding (04:027 and 04:028) | Old Fire Alarm devices in RCA3 ... Old Fire Alarm devices in RCA3 currently being replaced as part of Phase 2 Fire Alarm system upgrades.
|
2023-279 Implemented on: 2023-05-29 | Removed | Brandon Humphries In consultation with: , | Vacuum | EACA:IG1E interlocks bypassed EACA:IG1E interlocks bypassed | EACA:IP1E must be run in local ... EACA:IP1E must be run in local mode due to a faulty cable (E-Fault 15848). So to allow the ion gauge in the same section (EACA:IG1E) to remain running, it must be bypassed. |
2023-278 Implemented on: 2023-05-29 | Removed | Travis Kurucz In consultation with: Riley Schick-Martin, | Fire Alarm System | MHESA B1 02:001-007 defeated MHESA B1 02:001-007 defeated | Disabled smoke detector for MH ... Disabled smoke detector for MHESA Fume hood testing. |
2023-277 Implemented on: 2023-05-29 | Removed | Travis Kurucz In consultation with: , | Fire Alarm System | Zone 2 Offline via ACME Monito ... Zone 2 Offline via ACME Monitoring; Bell circuits disabled in Nodes 3 and 4 | Fire alarm devices in RCA bein ... Fire alarm devices in RCA being upgraded. |
2023-275 Implemented on: 2023-05-26 | Active | Travis Kurucz In consultation with: Riley Schick-Martin, | Safety | Gas Monitor 2 Bypassed Gas Monitor 2 Bypassed | Monitor was a summary readback ... Monitor was a summary readback for the superconducting solenoid in M9B that has been physically removed, and tripped when a wire was pulled. Pinned at Doug Preddy's advisement. |
2023-272 Implemented on: 2023-05-25 | Removed | Riley Schick-Martin In consultation with: , | Fire Alarm System | DCR & computer room smoke dete ... DCR & computer room smoke detectors (floor & ceiling) 02:008-20,21,22,23,24,27,28,29,30,31,32,33 | Cable pull requires movement o ... Cable pull requires movement of ceiling tiles. Detectors disarmed for dust. |
2023-270 Implemented on: 2023-05-25 | Removed | Riley Schick-Martin In consultation with: , | Fire Alarm System | RCA1 B1 Smoke Detectors 03:020 ... RCA1 B1 Smoke Detectors 03:020-014, 03:020-015 disarmed for Renovation Work | Disabled smoke detectors for B ... Disabled smoke detectors for BWXT renovation work. |
2023-269 Implemented on: 2023-05-24 | Removed | Gauhar Hayat In consultation with: , | Fire Alarm System | Zone 3 Offline via ACME Monito ... Zone 3 Offline via ACME Monitoring; 06:062-004 disarmed for work in ISAC-II EH | Braising work being done in IS ... Braising work being done in ISAC-II EH. |
2023-268 Implemented on: 2023-05-24 | Removed | Gauhar Hayat In consultation with: , | Fire Alarm System | RCA1 B1 Smoke Detectors 03:020 ... RCA1 B1 Smoke Detectors 03:020-014, 03:020-015 disarmed for Renovation Work | Disabled smoke detectors for B ... Disabled smoke detectors for BWXT renovation work. |
2023-265 Implemented on: 2023-05-23 | Removed | Gauhar Hayat In consultation with: , | Fire Alarm System | RCA1 B1 Smoke Detectors 03:020 ... RCA1 B1 Smoke Detectors 03:020-014, 03:020-015 disarmed for Renovation Work | Disabled smoke detectors for B ... Disabled smoke detectors for BWXT renovation work. |
2023-264 Implemented on: 2023-05-23 | Removed | Gauhar Hayat In consultation with: , | Fire Alarm System | ISAC-II Accelerator Vault LBD ... ISAC-II Accelerator Vault LBD disarmed for Overhead Crane inspections | Annual overhead crane PM inspe ... Annual overhead crane PM inspections. |
2023-263 Implemented on: 2023-05-19 | Removed | Dale Nagra In consultation with: , | Fire Alarm System | 03:020-014 / 03:020-015 RCA1 ... 03:020-014 / 03:020-015 RCA1 B1 South Smoke Detector | Construction / renovation invo ... Construction / renovation involving cutting of steel in RCA1 B1. Device in question set off Fire Alarm about an hour ago. |
2023-262 Implemented on: 2023-05-18 | Removed | David Bandiera In consultation with: Robert Scheepmaker, | Fire Alarm System | 03:020-015 RCA1 B1 South Smoke ... 03:020-015 RCA1 B1 South Smoke Detector | Construction / renovation invo ... Construction / renovation involving cutting of steel in RCA1 B1. Device in question set off Fire Alarm about an hour ago. |
2023-261 Implemented on: 2023-05-18 | Removed | David Bandiera In consultation with: , | Fire Alarm System | 09:095-001/002 ARIEL target h ... 09:095-001/002 ARIEL target hall linear beam detectors | cutting rebar protruding from ... cutting rebar protruding from recent concrete pour |
2023-260 Implemented on: 2023-05-17 | Removed | David Bandiera In consultation with: , | Fire Alarm System | 09:095-001/002 ARIEL target h ... 09:095-001/002 ARIEL target hall linear beam detectors | cutting rebar protruding from ... cutting rebar protruding from recent concrete pour |
2023-258 Implemented on: 2023-05-16 | Active | Eric Chapman In consultation with: , | Targets | 2C Beam Stop TC 2C Beam Stop TC | Temperature readback is noisy. Temperature readback is noisy. |
2023-256 Implemented on: 2023-05-11 | Removed | Brandon Humphries In consultation with: , | Safety | High energy section BLMs High energy section BLMs | Performing beam spill measurem ... Performing beam spill measurements in the high energy section for confirming calibrations. Need to see full measurements of losses without BLMs tripping. |
2023-255 Implemented on: 2023-05-11 | Active | Eric Chapman In consultation with: , | Targets | BL1A T1 target flow trip and w ... BL1A T1 target flow trip and warn | T1 target flows running a bit ... T1 target flows running a bit low despite MRO over maintenance. Warning and trip limits lowered ~10% to avoid nuisance trips/messages. OK'd with Adam Newsome. |
2023-253 Implemented on: 2023-05-11 | Removed | Eric Chapman In consultation with: , | Fire Alarm System | Detector 5-051-046 ISAC TMB B1 ... Detector 5-051-046 ISAC TMB B1 COLD LAB | Annual calibration (smoke test ... Annual calibration (smoke test) of Fume hood in ISAC I cold lab. |
2023-249 Implemented on: 2023-05-04 | Removed | Chris Sooley In consultation with: David Bandiera, | Targets | STF Ion Exchanger Return Resis ... STF Ion Exchanger Return Resistivity pinned at STF BYP 010 | Low resistivity. Steve request ... Low resistivity. Steve requested to pin the signal to run beam. |
2023-248 Implemented on: 2023-05-04 | Removed | Chris Sooley In consultation with: Chris Sooley, David Bandiera | Targets | STF Water jacket water level ( ... STF Water jacket water level (BYP-005) defeated | Data readback not representing ... Data readback not representing the correct value. Steve approved pinning the water jacket level readback. |
2023-218 Implemented on: 2023-04-29 | Removed | Kevin Lucow In consultation with: , | RF | IBOP 0213: RF Resonators Latch ... IBOP 0213: RF Resonators Latched | CSS lost resonator latching si ... CSS lost resonator latching signal. CSS reads "Resonators: Some Unlatched" |
2023-215 Implemented on: 2023-04-26 | Removed | Ryan Anderson In consultation with: , | Fire Alarm System | ARIEL Target Hall Linear Beam ... ARIEL Target Hall Linear Beam Detectors | Crane movement in ARIEL target ... Crane movement in ARIEL target hall |
2023-214 Implemented on: 2023-04-26 | Removed | Ryan Anderson In consultation with: , | Fire Alarm System | ISAC2 penthouse smoke detector ... ISAC2 penthouse smoke detector 06:064-001 | For Hot Work For Hot Work |
2023-212 Implemented on: 2023-04-25 | Removed | Ryan Anderson In consultation with: , | Other / Misc | EOXY:SV01 and EOXY:SV02 EOXY:SV01 and EOXY:SV02 | ODMS calibrations will be perf ... ODMS calibrations will be performed for EOXY:OM4, which will cause EOXY:SV01 and EOXY:SV02 to close. But the E-LINAC cryogenics system is cold, so this valve needs to stay open. So EOXY:SV01 and EOXY:SV02 interlocks need to be bypassed. |
2023-211 Implemented on: 2023-04-25 | Removed | Brandon Humphries In consultation with: , | Other / Misc | ELNS:SV01 ELNS:SV01 | ODMS calibrations will be perf ... ODMS calibrations will be performed for EOXY:OM2 and EOXY:OM6, which will cause ELNS:SV01 to close. But the E-LINAC cryogenics system is cold, so this valve needs to stay open. So ELNS:SV01 interlocks need to be bypassed. |
2023-209 Implemented on: 2023-04-21 | Removed | Eric Chapman In consultation with: , | Fire Alarm System | Vault exhaust duct smokes Vault exhaust duct smokes | Soldering in vault BL4 area, M ... Soldering in vault BL4 area, Mike Vogel. |
2023-208 Implemented on: 2023-04-21 | Removed | Eric Chapman In consultation with: , | Fire Alarm System | Smoke detectors in Probes lab Smoke detectors in Probes lab | Welding in probes lab area. S ... Welding in probes lab area. SAE ground level detectors in area and stairwell disarmed. |
2023-207 Implemented on: 2023-04-21 | Removed | Travis Kurucz In consultation with: Eric Chapman, Dale Nagra | Fire Alarm System | 09:095-001/002 ARIEL target h ... 09:095-001/002 ARIEL target hall linear beam detectors | Welding to be done in target p ... Welding to be done in target pit. |
2023-205 Implemented on: 2023-04-20 | Removed | Ryan Lovelidge In consultation with: , | Fire Alarm System | 02:007-012/018/019 02:007-012/018/019 | ISIS clean room smoke detector ... ISIS clean room smoke detectors disarmed for nearby soldering. |
2023-199 Implemented on: 2023-04-17 | Removed | Robin Swanson In consultation with: Frank Hosta, | Fire Alarm System | 09:095-001/002 ARIEL target h ... 09:095-001/002 ARIEL target hall linear beam detectors | Cutting and grinding to remove ... Cutting and grinding to remove steel structure brace APTW. |
2023-196 Implemented on: 2023-04-15 | Removed | Robin Swanson In consultation with: Frank Hosta, | Fire Alarm System | Smoke detectors 02:001-135 & 0 ... Smoke detectors 02:001-135 & 02:001-137 disarmed on MH B2 level | Installation of new shielding ... Installation of new shielding blocks and anchoring blocks. Drilling work with dust expected |
2023-193 Implemented on: 2023-04-14 | Removed | Frank Hosta In consultation with: , | Fire Alarm System | Smoke detectors 02:001-135 & 0 ... Smoke detectors 02:001-135 & 02:001-137 disarmed on MH B2 level | Installation of new shielding ... Installation of new shielding blocks and anchoring blocks. Drilling work with dust expected |
2023-192 Implemented on: 2023-04-14 | Removed | Brandon Humphries In consultation with: , | Vacuum | EMBT:IV0 and EMBT:GV5 interloc ... EMBT:IV0 and EMBT:GV5 interlocks bypassed | EINJ thermal cycle scheduled f ... EINJ thermal cycle scheduled for today. This will create outgassing. Pumping will be done via a TPC connected to Port 9. But because EMBT:IV0 is open, the EMBT:GV5 interlocks must be bypassed. During the thermal cycle, vacuum levels will rise, so EMBT:IV0 interlocks must be bypassed to ensure pumping can continue once the IG's reach the vacuum not OK threshold. |
2023-191 Implemented on: 2023-04-13 | Removed | David Bandiera In consultation with: , | Fire Alarm System | Smoke detectors 02:001-135 & 0 ... Smoke detectors 02:001-135 & 02:001-137 disarmed on MH B2 level | Installation of new shielding ... Installation of new shielding blocks and anchoring blocks. Drilling work with dust expected |
2023-189 Implemented on: 2023-04-12 | Removed | David Bandiera In consultation with: , | Fire Alarm System | Smoke detectors 02:001-135 & 0 ... Smoke detectors 02:001-135 & 02:001-137 disarmed on MH B2 level | Installation of new shielding ... Installation of new shielding blocks and anchoring blocks. Drilling work with dust expected |
2023-188 Implemented on: 2023-04-12 | Removed | David Bandiera In consultation with: , | Safety | EOXY:SV01, EOXY:SV02, ELNS:SV0 ... EOXY:SV01, EOXY:SV02, ELNS:SV01 bypassed in EPICS | Oxygen monitor testing and cal ... Oxygen monitor testing and calibration |
2023-184 Implemented on: 2023-04-11 | Removed | Riley Schick-Martin In consultation with: , | Safety | BSM #51 BSM #51 | BSM #51 got wet and is pinned ... BSM #51 got wet and is pinned at maximum. Trip and warn defeated to stop constant alarm in the DCR. |
2023-183 Implemented on: 2023-04-06 | Removed | Brandon Humphries In consultation with: , | Vacuum | EMBT:IV0 and EMBT:GV5 interloc ... EMBT:IV0 and EMBT:GV5 interlocks bypassed | EINJ thermal cycle scheduled f ... EINJ thermal cycle scheduled for today. This will create outgassing. Pumping will be done via a TPC connected to Port 9. But because EMBT:IV0 is open, the EMBT:GV5 interlocks must be bypassed. During the thermal cycle, vacuum levels will rise, so EMBT:IV0 interlocks must be bypassed to ensure pumping can continue once the IG's reach the vacuum not OK threshold. |
2023-179 Implemented on: 2023-04-04 | Removed | Eric Chapman In consultation with: , | Fire Alarm System | ISAC II experimentall hall det ... ISAC II experimentall hall detectors | 6-066-001/002/003 linear beam ... 6-066-001/002/003 linear beam detectors disarmed for HVAC brazing in ISAC II experimental hall TIGRESS electronics shack. |
2023-178 Implemented on: 2023-04-04 | Removed | Travis Kurucz In consultation with: , | Fire Alarm System | Zone 2 in Test mode, Detectors ... Zone 2 in Test mode, Detectors 03-20-014, 03-20-015, 03-20-021 also disabled | Hot work in RCA. Hot work in RCA. |
2023-177 Implemented on: 2023-03-31 | Removed | Gauhar Hayat In consultation with: , | RF | RF resonators latched. RF resonators latched. | Resonators confirmed "latched" ... Resonators confirmed "latched" by RF personnel. |
2023-176 Implemented on: 2023-03-31 | Removed | Gauhar Hayat In consultation with: , | RF | I0213 RF resonators latched. I0213 RF resonators latched. | The IL signal lost. Resonators ... The IL signal lost. Resonators confirmed "latched" by RF personnel. |
2023-174 Implemented on: 2023-03-31 | Removed | Elena Bylinskaia In consultation with: , | Fire Alarm System | Smoke detectores 02:007-027 na ... Smoke detectores 02:007-027 nad 02:007-028 | Disabled for the cable tray cu ... Disabled for the cable tray cut in the ISIS area. |
2023-173 Implemented on: 2023-03-31 | Removed | Ryan Lovelidge In consultation with: , | Fire Alarm System | 09:095-001/002 ARIEL target h ... 09:095-001/002 ARIEL target hall linear beam detectors | Scaffolding removal near the d ... Scaffolding removal near the detectors |
2023-171 Implemented on: 2023-03-30 | Removed | Chris Sooley In consultation with: David Bandiera, | Safety | IBOP 1507 and 1508 RCR Lab War ... IBOP 1507 and 1508 RCR Lab Warning and Alarm. | RCR1 Fume Hood and Hot Cell An ... RCR1 Fume Hood and Hot Cell Annual Blower Maintenance
|
2023-170 Implemented on: 2023-03-30 | Removed | Gauhar Hayat In consultation with: , | Fire Alarm System | Ariel Penthouse Filter Room Sm ... Ariel Penthouse Filter Room Smoke Detectors | Hot work being done in ARIEL R ... Hot work being done in ARIEL Roof. |
2023-169 Implemented on: 2023-03-30 | Removed | Brandon Humphries In consultation with: , | Vacuum | EMBT:IV0 and EMBT:GV5 interloc ... EMBT:IV0 and EMBT:GV5 interlocks bypassed | EINJ thermal cycle scheduled f ... EINJ thermal cycle scheduled for today. This will create outgassing. Pumping will be done via a TPC connected to Port 9. But because EMBT:IV0 is open, the EMBT:GV5 interlocks must be bypassed. During the thermal cycle, vacuum levels will rise, so EMBT:IV0 interlocks must be bypassed to ensure pumping can continue once the IG's reach the vacuum not OK threshold. |
2023-168 Implemented on: 2023-03-29 | Removed | Kevin Lucow In consultation with: , | Fire Alarm System | Service Annex L1 and L2 smoke ... Service Annex L1 and L2 smoke detector in ISIS area. | Construction. Construction. |
2023-164 Implemented on: 2023-03-27 | Removed | Chris Sooley In consultation with: , | Fire Alarm System | ARIEL Beam detectors 09:095-00 ... ARIEL Beam detectors 09:095-001 and 002 | Continuation of work associate ... Continuation of work associated with WP# A2023-03-20-2. |
2023-163 Implemented on: 2023-03-24 | Removed | Chris Sooley In consultation with: , | Fire Alarm System | ARIEL Beam detectors 09-095-00 ... ARIEL Beam detectors 09-095-001 and 002 | Continuation of work associate ... Continuation of work associated with WP# A2023-03-20-2. |
2023-160 Implemented on: 2023-03-24 | Removed | David Bandiera In consultation with: , | Fire Alarm System | FAS devices in ISIS area: 02:0 ... FAS devices in ISIS area: 02:007-12, 13, 16, 18, 19 | FAS Devices in ISIS area for g ... FAS Devices in ISIS area for grinding in area: 02:007-12, 13, 16, 18, 19 |
2023-159 Implemented on: 2023-03-22 | Removed | Eric Chapman In consultation with: , | Services | Cooling tower cells turned on/ ... Cooling tower cells turned on/off as required. | Cooling towers CTG01 and CTG02 ... Cooling towers CTG01 and CTG02 down for maintenance. West tower having trouble regulating during the day with EINJ on and elevated spring temps. |
2023-158 Implemented on: 2023-03-22 | Removed | Brandon Humphries In consultation with: , | Vacuum | EMBT:IV0 interlocks EMBT:IV0 interlocks | EINJ Helium conditioning is sc ... EINJ Helium conditioning is scheduled for today, followed by a thermal cycle tomorrow. Helium conditioning requires leaking helium through the cavity to be pumped out in the EMBT section. The vacuum level from the helium leak does not agree with the interlocks for EMBT:IV0, so it needs to be bypassed. During the thermal cycle that follows, the frozen helium gas will evaporate and be pumped out via a downstream TPC. The vacuum levels are expected to rise, so EMBT:IV0 needs to stay open to allow for continued pumping (thus bypass required). |
2023-157 Implemented on: 2023-03-22 | Removed | Jas Uppal In consultation with: , | Fire Alarm System | FAS smoke detectors 02-001-005 ... FAS smoke detectors 02-001-005 and 006 | Hot work being done Hot work being done |
2023-156 Implemented on: 2023-03-22 | Removed | Kevin Lucow In consultation with: , | Safety | I1 H2, I3/I4 H2, BST 127, BST ... I1 H2, I3/I4 H2, BST 127, BST 165, ISIS Skimmer Alarm. | MCC-F electrical work. MCC-F electrical work. |
2023-155 Implemented on: 2023-03-22 | Removed | Kevin Lucow In consultation with: , | Services | Cu-ALCW north pump (SA1-14) sh ... Cu-ALCW north pump (SA1-14) shut down, discharge valve closed. | MCC-F electrical work. MCC-F electrical work. |
2023-154 Implemented on: 2023-03-22 | Removed | Jas Uppal In consultation with: , | Fire Alarm System | ARIEL Beam detectors 09-095-00 ... ARIEL Beam detectors 09-095-001 and 002 | Continuation of work associate ... Continuation of work associated with WP# A2023-03-20-2. |
2023-153 Implemented on: 2023-03-21 | Removed | Travis Kurucz In consultation with: Eric Chapman, Riley Schick-Martin | Ion sources and injection BL | Xscan ILSLOW Element 2 Xscan ILSLOW Element 2 | Work in progress in ISIS, scan ... Work in progress in ISIS, scan is flooding the message reader. Scan will need to be re-enabled after work is complete. |
2023-152 Implemented on: 2023-03-21 | Removed | Kathleen Genge In consultation with: , | Fire Alarm System | FAS devices in ISIS area: 02:0 ... FAS devices in ISIS area: 02:007-18, 19, 12, 16, 13 | FAS Devices in ISIS area for g ... FAS Devices in ISIS area for grinding in area: 02:007-18, 19, 12, 16, 13, |
2023-151 Implemented on: 2023-03-21 | Removed | Brandon Humphries In consultation with: , | RF | EINJ:RFB1cavity vacuum interlo ... EINJ:RFB1cavity vacuum interlock | While performing Helium condit ... While performing Helium conditioning of EINJ, the vacuum level in the cavity is worse than normal running conditions (as Helium is being leaked through). So the interlock needed to be bypassed to allow for running the EINJ RF. |
2023-150 Implemented on: 2023-03-21 | Removed | Brandon Humphries In consultation with: , | Vacuum | ELBT:GV3 and EMBT:GV5 interloc ... ELBT:GV3 and EMBT:GV5 interlocks | Helium conditioning is schedul ... Helium conditioning is scheduled for the next two days. This requires leaking helium through the cavity to be pumped out in the EMBT section. Having multiple isolation valves open does not agree with the interlocks for ELBT:GV3 and EMBT:GV5, so they need to be bypassed. |
2023-149 Implemented on: 2023-03-21 | Removed | Ryan Anderson In consultation with: , | Fire Alarm System | Ariel Target Hall Linear Beam ... Ariel Target Hall Linear Beam Detectors | Construction work in ARIEL tar ... Construction work in ARIEL target hall
|
2023-148 Implemented on: 2023-03-20 | Removed | Eric Chapman In consultation with: , | Fire Alarm System | ARIEL target hall beam detecto ... ARIEL target hall beam detectors | Grinding in ARIEL target hall ... Grinding in ARIEL target hall by M Vogel. |
2023-147 Implemented on: 2023-03-19 | Removed | Travis Kurucz In consultation with: Eric Chapman, Riley Schick-Martin | Fire Alarm System | FAS Zone 1 Offline FAS Zone 1 Offline | Zone offline at request of Pet ... Zone offline at request of Pete Bratt |
2023-146 Implemented on: 2023-03-18 | Active | Eric Chapman In consultation with: , | Other / Misc | 2C7 faraday cup water flow byp ... 2C7 faraday cup water flow bypassed | 2C7 water flow interlock bypas ... 2C7 water flow interlock bypassed since May 25 2015. Flow read back poor with current configuration, flow meter requires upgrade. Discussed with Steve Sapriken and bypass is still valid. |
2023-142 Implemented on: 2023-03-15 | Removed | Gauhar Hayat In consultation with: , | Fire Alarm System | Meson Hall B1 Heat Detectors 0 ... Meson Hall B1 Heat Detectors 02:001-123 and 02:001-125 disarmed. | Hot Work being done in rooms. Hot Work being done in rooms. |
2023-140 Implemented on: 2023-03-14 | Removed | Kevin Lucow In consultation with: , | Fire Alarm System | ARIEL Traget Hall Linear Beam ... ARIEL Traget Hall Linear Beam detectors 09:095-001 and 09:095-002. | Craning work in ARIEL target h ... Craning work in ARIEL target hall. |
2023-136 Implemented on: 2023-03-06 | Removed | Jas Uppal In consultation with: , | Fire Alarm System | 02-001-005 and 006 02-001-005 and 006 | Fume hood work. Fume hood work. |
2023-135 Implemented on: 2023-03-06 | Removed | Jas Uppal In consultation with: , | Fire Alarm System | IAMI detectors 13:075-001 to 0 ... IAMI detectors 13:075-001 to 006 | Hot work in area Hot work in area |
2023-134 Implemented on: 2023-03-01 | Removed | Brandon Humphries In consultation with: , | RF | EINJ:RFB1 cavity vacuum interl ... EINJ:RFB1 cavity vacuum interlock | While performing Helium condit ... While performing Helium conditioning of EINJ, the vacuum level in the cavity is worse than normal running conditions (as Helium is being leaked through). So the interlock needed to be bypassed to allow for running the EINJ RF. |
2023-133 Implemented on: 2023-03-01 | Removed | Brandon Humphries In consultation with: , | Vacuum | ELBT:GV3 and EMBT:GV5 interloc ... ELBT:GV3 and EMBT:GV5 interlocks | Helium conditioning is schedul ... Helium conditioning is scheduled for the next two days. This requires leaking helium through the cavity to be pumped out in the EMBT section. Having multiple isolation valves open does not agree with the interlocks for ELBT:GV3 and EMBT:GV5, so they need to be bypassed. |
2023-131 Implemented on: 2023-02-28 | Removed | Gauhar Hayat In consultation with: , | Fire Alarm System | FAS Zone 2 Offline FAS Zone 2 Offline | Work being done on fire alarm ... Work being done on fire alarm system in MHESA B1. |
2023-126 Implemented on: 2023-02-27 | Removed | Ryan Lovelidge In consultation with: , | Fire Alarm System | 02:095-001/002 ARIEL target ha ... 02:095-001/002 ARIEL target hall linear beam detectors | Grinding in the ARIEL target h ... Grinding in the ARIEL target hall |
2023-124 Implemented on: 2023-02-27 | Removed | Gauhar Hayat In consultation with: , | Fire Alarm System | FAS Zone 2 Offline FAS Zone 2 Offline | Working on moving smoke detect ... Working on moving smoke detectors in MHESA B1. |
2023-123 Implemented on: 2023-02-24 | Removed | Ryan Lovelidge In consultation with: , | Safety | I0124 Vault exhaust differenti ... I0124 Vault exhaust differential pressure system ok | North and South Vault exhaust ... North and South Vault exhaust fans are off over the weekend for fan and duct work. Element pinned at IBOP I0124 at the rear of rack A. |
2023-121 Implemented on: 2023-02-23 | Removed | Frank Hosta In consultation with: , | Fire Alarm System | F.A.S. MHESA B1 Smoke Detector ... F.A.S. MHESA B1 Smoke Detectors. | F.A.S. smoke detectors 02:011 ... F.A.S. smoke detectors 02:011 disarmed while drilling some holes in MHESA (Level B1) floor. |
2023-120 Implemented on: 2023-02-23 | Removed | Dale Nagra In consultation with: , | Fire Alarm System | FAS Zone 2 Offline FAS Zone 2 Offline | Relocating smoke detectors in ... Relocating smoke detectors in MHESA B1 |
2023-118 Implemented on: 2023-02-22 | Removed | Frank Hosta In consultation with: , | Fire Alarm System | FAS Zone 2 Offline FAS Zone 2 Offline | Relocating smoke detectors in ... Relocating smoke detectors in MHESA B1 |
2023-116 Implemented on: 2023-02-21 | Removed | Robin Swanson In consultation with: , | Fire Alarm System | All FAS Zones offline All FAS Zones offline | 5 Year Fire Suppression System ... 5 Year Fire Suppression System Maintenance |
2023-115 Implemented on: 2023-02-21 | Removed | Dale Nagra In consultation with: , | Fire Alarm System | Ariel Target Hall Linear Beam ... Ariel Target Hall Linear Beam Detectors 09:095-001 & 002 | Linear Beam Detectors disabled ... Linear Beam Detectors disabled for grinding work in ARIEL Target Hall. (09:095-001, 09:095-002) |
2023-114 Implemented on: 2023-02-17 | Removed | David Bandiera In consultation with: , | Fire Alarm System | Ariel Target Hall Linear Beam ... Ariel Target Hall Linear Beam Detectors 09:095-001 & 002 | Linear Beam Detectors disabled ... Linear Beam Detectors disabled for grinding work in ARIEL Target Hall. (09:095-001, 09:095-002) |
2023-109 Implemented on: 2023-02-15 | Removed | Robin Swanson In consultation with: Jas Uppal, | Fire Alarm System | All FAS Zones offline All FAS Zones offline | Regular Fire Alarm System insp ... Regular Fire Alarm System inspection, Siemens techs on site. FAS bell tests for today. |
2023-106 Implemented on: 2023-02-14 | Removed | Jas Uppal In consultation with: , | Vacuum | ELBT GV3 ELBT GV3 | ELBT GV5 bypassed to allow for ... ELBT GV5 bypassed to allow for He conditioning. |
2023-105 Implemented on: 2023-02-14 | Removed | Jas Uppal In consultation with: , | Vacuum | EMBT GV5 EMBT GV5 | EMBT GV5 bypassed to allow for ... EMBT GV5 bypassed to allow for He conditioning. |
2023-104 Implemented on: 2023-02-14 | Removed | Brandon Humphries In consultation with: , | RF | EINJ:RFB1 cavity vacuum interl ... EINJ:RFB1 cavity vacuum interlock | While performing Helium condit ... While performing Helium conditioning of EINJ, the vacuum level in the cavity is worse than normal running conditions (as Helium is being leaked through). So the interlock needed to be bypassed to allow for running the EINJ RF. |
2023-103 Implemented on: 2023-02-14 | Active | Brandon Humphries In consultation with: , | Vacuum | EHDT:IMG6 interlocks bypassed EHDT:IMG6 interlocks bypassed | The vacuum in the EHDT:DB6B va ... The vacuum in the EHDT:DB6B vacuum section is too good with EHDT:IP6 and EHDT:NP6 running for EHDT:IMG6 to read. So IP6 is turned off and the EHDT:IMG6 interlocks are bypassed to allow it to run. |
2023-102 Implemented on: 2023-02-14 | Removed | Robin Swanson In consultation with: Jas Uppal, | Fire Alarm System | FAS Zone 2 Offline FAS Zone 2 Offline | Regular Fire Alarm System insp ... Regular Fire Alarm System inspection, Siemens techs on site. |
2023-101 Implemented on: 2023-02-13 | Removed | Gauhar Hayat In consultation with: , | Fire Alarm System | Chemistry Annex Fire Panels d ... Chemistry Annex Fire Panels disarmed due to not responding. | RCA Fire Panels 03:020-017, 03 ... RCA Fire Panels 03:020-017, 03:020-018, 03:020-023 disarmed. |
2023-100 Implemented on: 2023-02-13 | Removed | Travis Kurucz In consultation with: Eric Chapman, Riley Schick-Martin | Fire Alarm System | Ariel Target Hall Linear Beam ... Ariel Target Hall Linear Beam Detectors | Linear Beam Detectors disabled ... Linear Beam Detectors disabled for grinding work in ARIEL Target Hall. (09:095-001, 09:095-002) |
2023-98 Implemented on: 2023-02-13 | Removed | Eric Chapman In consultation with: Eric Chapman, | Fire Alarm System | Chemistry Annex hallway detect ... Chemistry Annex hallway detectors | Smoke detectors 03-020-017/018 ... Smoke detectors 03-020-017/018/022/023 disarmed for ceiling tile installation in the chemistry annex Ground and L1 hallways. Detectors being disconnected temporarily for ceiling tile installation. |
2023-97 Implemented on: 2023-02-13 | Removed | Travis Kurucz In consultation with: Eric Chapman, Riley Schick-Martin | Fire Alarm System | FAS Zone 2 Offline FAS Zone 2 Offline | Regular Fire Alarm System insp ... Regular Fire Alarm System inspection, Siemens techs on site. |
2023-96 Implemented on: 2023-02-10 | Removed | Robin Swanson In consultation with: , | Fire Alarm System | Under floor smoke detectors in ... Under floor smoke detectors in SA 102 and SA 103 | Network cable pull from SA 103 ... Network cable pull from SA 103 Rack 4A to SA 102 Rack E. All cables are routed in the floor. |
2023-94 Implemented on: 2023-02-10 | Removed | Travis Kurucz In consultation with: Riley Schick-Martin, Eric Chapman | Fire Alarm System | All FAS Zones offline All FAS Zones offline | Regular Fire Alarm System insp ... Regular Fire Alarm System inspection, Siemens techs on site. |
2023-93 Implemented on: 2023-02-09 | Removed | Gauhar Hayat In consultation with: , | Fire Alarm System | SA Server Room Floor Smoke Det ... SA Server Room Floor Smoke Detectors Disabled | Work being done under floor ti ... Work being done under floor tiles. |
2023-91 Implemented on: 2023-02-09 | Removed | Gauhar Hayat In consultation with: , | Fire Alarm System | FAS Zones 1 and 2 Offline FAS Zones 1 and 2 Offline | Regular Fire Alarm System Insp ... Regular Fire Alarm System Inspection. |
2023-90 Implemented on: 2023-02-09 | Removed | Gauhar Hayat In consultation with: , | Fire Alarm System | Ariel Target Hall Linear Beam ... Ariel Target Hall Linear Beam Detectors | Linear Beam Detectors disabled ... Linear Beam Detectors disabled for grinding work in ARIEL Target Hall. (09:095-001, 09:095-002) |
2023-85 Implemented on: 2023-02-08 | Removed | Gauhar Hayat In consultation with: , | Fire Alarm System | Smoke Detectors in RCA G and L ... Smoke Detectors in RCA G and L1 disabled. | Welding work in RCA. Disabled ... Welding work in RCA. Disabled 03:020-017, 018, 022, 023. |
2023-84 Implemented on: 2023-02-08 | Removed | Gauhar Hayat In consultation with: , | Fire Alarm System | FAS Zone 2, 3, 4 offline FAS Zone 2, 3, 4 offline | Annual FAS device testing by S ... Annual FAS device testing by Siemens. Defeated until 16:00 today. |
2023-83 Implemented on: 2023-02-08 | Removed | Gauhar Hayat In consultation with: , | Fire Alarm System | F.A.S. MHESA B1 Smoke Detector ... F.A.S. MHESA B1 Smoke Detectors. | F.A.S. smoke detectors 02:001- ... F.A.S. smoke detectors 02:001-003/004/005/006/007/009/010/011/012 disarmed for installation of new ceiling system in MHESA (Level B1). |
2023-82 Implemented on: 2023-02-07 | Removed | Elena Bylinskaia In consultation with: Elena Bylinskaia, Elena Bylinskaia | Fire Alarm System | F.A.S. MHESA B1 smoke detector ... F.A.S. MHESA B1 smoke detectors. | F.A.S. smoke detectors 02-001- ... F.A.S. smoke detectors 02-001-001/003/004/005/006/007/011/012 disarmed for installation of new ceiling system in MHESA (Level B1). |
2023-81 Implemented on: 2023-02-07 | Removed | Ryan Lovelidge In consultation with: , | Fire Alarm System | FAS Zone 3 offline FAS Zone 3 offline | Annual FAS device testing by S ... Annual FAS device testing by Siemens. Defeated until 16:00 today. |
2023-80 Implemented on: 2023-02-06 | Removed | Frank Hosta In consultation with: , | Fire Alarm System | FAS Zone 3 offline FAS Zone 3 offline | Annual FAS device testing by S ... Annual FAS device testing by Siemens. Defeated until 16:00 today. |
2023-79 Implemented on: 2023-02-06 | Removed | Frank Hosta In consultation with: , | Fire Alarm System | MHESA B1 Smoke Detectors MHESA B1 Smoke Detectors | MHESA B1 smoke detectors 02:00 ... MHESA B1 smoke detectors 02:001-001/003/004/005/006/007/011/012 disarmed for 8 hours for ceiling tile replacement. |
2023-78 Implemented on: 2023-02-03 | Removed | David Bandiera In consultation with: Blair Stringer, | Fire Alarm System | RCA1 smoke detectors 03:019-04 ... RCA1 smoke detectors 03:019-040/041/042/043/044 & 03:020-014/017/021/022 | Sealing vinyl flooring in RCA1 ... Sealing vinyl flooring in RCA1 north stairwell |
2023-77 Implemented on: 2023-02-03 | Removed | David Bandiera In consultation with: , | Fire Alarm System | FAS Zone 2 offline FAS Zone 2 offline | Annual FAS device testing by S ... Annual FAS device testing by Siemens. Defeated until 16:00 today. |
2023-76 Implemented on: 2023-02-02 | Removed | David Bandiera In consultation with: , | Fire Alarm System | ISAC-1 Smoke Detectors 05:052- ... ISAC-1 Smoke Detectors 05:052-057/058/059, 05:053-001/002/03, 05:054-001 | Nuclear ventilation testing in ... Nuclear ventilation testing in ISAC-1. Smoke test to check for air leakage between areas. |
2023-75 Implemented on: 2023-02-02 | Removed | Chris Sooley In consultation with: David Bandiera, | Fire Alarm System | FAS Zone 1 and Zone 2 offline FAS Zone 1 and Zone 2 offline | Annual FAS device testing by S ... Annual FAS device testing by Siemens. Defeated until 16:00 today. |
2023-72 Implemented on: 2023-02-01 | Removed | David Bandiera In consultation with: , | Fire Alarm System | FAS Zone 2 and Zone 4 offline FAS Zone 2 and Zone 4 offline | Annual FAS device testing by S ... Annual FAS device testing by Siemens. |
2023-71 Implemented on: 2023-02-01 | Removed | David Bandiera In consultation with: , | Fire Alarm System | MHESA B1 Smoke Detectors MHESA B1 Smoke Detectors | MHESA B1 smoke detectors 02:00 ... MHESA B1 smoke detectors 02:001-001/003/004/005/006/007/011/012 disarmed for 8 hours for ceiling tile replacement. |
2023-70 Implemented on: 2023-02-01 | Removed | David Bandiera In consultation with: , | Fire Alarm System | FAS Zone 2 offline. SDF Buildi ... FAS Zone 2 offline. SDF Building Sprinkler Flow Switches 07:013-023/025/027 disarmed | Backflow preventer tie-in to S ... Backflow preventer tie-in to Stores Building water lines |
2023-69 Implemented on: 2023-01-31 | Removed | David Bandiera In consultation with: , | Fire Alarm System | RCA1 smoke detectors 03:019-04 ... RCA1 smoke detectors 03:019-040/041/042/043/044 & 03:020-014/017/021/022 | Sealing vinyl flooring in RCA1 ... Sealing vinyl flooring in RCA1 north stairwell |
2023-67 Implemented on: 2023-01-31 | Removed | David Bandiera In consultation with: , | Fire Alarm System | ARIEL Target Hall LBD's 09:095 ... ARIEL Target Hall LBD's 09:095-001 & 002 | Craning items into ARIEL Targe ... Craning items into ARIEL Target Hall from outside |
2023-66 Implemented on: 2023-01-31 | Removed | David Bandiera In consultation with: , | Fire Alarm System | Zone 2 offline until 17:00 Zone 2 offline until 17:00 | Annual FAS device testing by S ... Annual FAS device testing by Siemens |
2023-65 Implemented on: 2023-01-30 | Removed | Robin Swanson In consultation with: Kevin Lucow, | Safety | IBOP 1507 and 1508 RCR Lab War ... IBOP 1507 and 1508 RCR Lab Warning and Alarm. | Troubleshooting system and rep ... Troubleshooting system and replacing UPS battery |
2023-64 Implemented on: 2023-01-30 | Removed | Robin Swanson In consultation with: Kevin Lucow, | Fire Alarm System | All FAS zones taken offline fo ... All FAS zones taken offline for 8hrs | All 4 FAS zones taken offline ... All 4 FAS zones taken offline until 17:00 with the monitoring company for annual Fire Alarm System deficiency repairs & Fire Suppression System 5 year inspection. |
2023-63 Implemented on: 2023-01-30 | Removed | Robin Swanson In consultation with: Kevin Lucow, | Fire Alarm System | MHESA B1 Smoke Detectors. MHESA B1 Smoke Detectors. | Installing the new ceiling sys ... Installing the new ceiling system in the MHESA basement (level B1) |
2023-59 Implemented on: 2023-01-27 | Removed | Robin Swanson In consultation with: , | Fire Alarm System | MHESA B1 Smoke Detectors. MHESA B1 Smoke Detectors. | Installing the new ceiling sys ... Installing the new ceiling system in the MHESA basement (level B1) |
2023-58 Implemented on: 2023-01-26 | Removed | Eric Chapman In consultation with: Ed Parton, | Fire Alarm System | Smoke detector in MHESA elevat ... Smoke detector in MHESA elevator machine room | Installation of new ceiling Installation of new ceiling |
2023-56 Implemented on: 2023-01-26 | Removed | Travis Kurucz In consultation with: Eric Chapman, Kevin Lucow | Fire Alarm System | FAS Zone 2 offline, MHESA spri ... FAS Zone 2 offline, MHESA sprinkler flow switch bypassed | MHESA basement sprinkler modif ... MHESA basement sprinkler modification. |
2023-54 Implemented on: 2023-01-26 | Removed | Travis Kurucz In consultation with: Kevin Lucow, Eric Chapman | Fire Alarm System | MHESA B1 Smoke Detectors. MHESA B1 Smoke Detectors. | Construction work. Construction work. |
2023-53 Implemented on: 2023-01-25 | Removed | Kevin Lucow In consultation with: , | Fire Alarm System | MHESA B1 Smoke Detectors. MHESA B1 Smoke Detectors. | Construction work. Construction work. |
2023-49 Implemented on: 2023-01-22 | Removed | Robin Swanson In consultation with: Jas Uppal, | Fire Alarm System | Under floor smoke detectors in ... Under floor smoke detectors in SA 102 and SA 103 | Network cable pull from SA 103 ... Network cable pull from SA 103 Rack 4A to SA 102 Rack E. All cables are routed in the floor. |
2023-44 Implemented on: 2023-01-19 | Removed | Elena Bylinskaia In consultation with: Elena Bylinskaia, | Safety | IBOP I1507, I1508 IBOP I1507, I1508 | Ventilation Fan in RCR tripped ... Ventilation Fan in RCR tripped due to DG5 testing (power glitch). |
2023-42 Implemented on: 2023-01-18 | Removed | Gauhar Hayat In consultation with: , | Fire Alarm System | Smoke Detectors 03:20-018 and ... Smoke Detectors 03:20-018 and 03:20-017 disarmed; Zone 2 taken offline. | Hot Welding work in RCA1. Hot Welding work in RCA1. |
2023-38 Implemented on: 2023-01-17 | Removed | Elena Bylinskaia In consultation with: Elena Bylinskaia, | Fire Alarm System | Smoke detector #03-20-017 Smoke detector #03-20-017 | Welding work in RCA 2 Ground F ... Welding work in RCA 2 Ground Floor (WP# C2022-12-06-9), Welding Work Permit already completed by Terry Sanghera. |
2023-35 Implemented on: 2023-01-17 | Removed | Gauhar Hayat In consultation with: , | Fire Alarm System | MHESA B1 Smoke Detectors MHESA B1 Smoke Detectors | MHESA B1 smoke detectors 02:00 ... MHESA B1 smoke detectors 02:001-003/004/005/006/007/009/010/011/012 disarmed for 8 hours for ceiling tile replacement. |
2023-34 Implemented on: 2023-01-16 | Removed | Robin Swanson In consultation with: Jas Uppal, | Fire Alarm System | Under floor smoke detectors in ... Under floor smoke detectors in SA 102 and SA 103 | Network cable pull from SA 103 ... Network cable pull from SA 103 Rack 4A to SA 102 Rack E. All cables are routed in the floor. |
2023-31 Implemented on: 2023-01-16 | Removed | David Bandiera In consultation with: , | Fire Alarm System | Smk Det 02-007-12/19/27/28 Smk Det 02-007-12/19/27/28 | Ceiling Tile replacement in IS ... Ceiling Tile replacement in ISIS |
2023-30 Implemented on: 2023-01-13 | Removed | Robin Swanson In consultation with: Jas Uppal, | Fire Alarm System | Zone 2 in test mode till 22:00 Zone 2 in test mode till 22:00 | Welding in RCA2 l1 level Welding in RCA2 l1 level |
2023-28 Implemented on: 2023-01-13 | Removed | Robert Scheepmaker In consultation with: , | Fire Alarm System | Smk Det 02-007-12/19/27/28 Smk Det 02-007-12/19/27/28 | Ceiling Tile replacement ISIS Ceiling Tile replacement ISIS |
2023-27 Implemented on: 2023-01-12 | Removed | Riley Schick-Martin In consultation with: , | Fire Alarm System | ISIS smoke detectors ISIS smoke detectors | ISIS smoke detectors 02:007-01 ... ISIS smoke detectors 02:007-012/19/27/28 disarmed for 8 hours for ceiling tile replacement. |
2023-26 Implemented on: 2023-01-12 | Removed | Riley Schick-Martin In consultation with: , | Fire Alarm System | MHESA B1 smoke detectors MHESA B1 smoke detectors | MHESA B1 smoke detectors 02:00 ... MHESA B1 smoke detectors 02:001-003/004/005/006/007/009/010/011/012 disarmed for 8 hours for ceiling tile replacement. |
2023-24 Implemented on: 2023-01-11 | Removed | Riley Schick-Martin In consultation with: , | Ion sources and injection BL | Xscans IB, IBSPARK, I1, I1SPAR ... Xscans IB, IBSPARK, I1, I1SPARK deactivated | ISIS controls offline. Too man ... ISIS controls offline. Too many individual scans disarmed for xscan utility to print a complete list. Scans should be reactivated before beam production resumes. |
2023-22 Implemented on: 2023-01-11 | Removed | Jas Uppal In consultation with: , | Fire Alarm System | MHESA B1 smoke detectors MHESA B1 smoke detectors | MHESA B1 smoke detectors 02:00 ... MHESA B1 smoke detectors 02:001-003/004/005/006/007/009/010/011/012 disarmed for 8 hours for ceiling tile replacement. |
2023-19 Implemented on: 2023-01-09 | Removed | Travis Kurucz In consultation with: David Bandiera, Kevin Lucow | Fire Alarm System | FAS Zone 3 offline FAS Zone 3 offline | Repairing ISAC Trinat room det ... Repairing ISAC Trinat room detector, number 05:052:057. |
2023-18 Implemented on: 2023-01-09 | Removed | Travis Kurucz In consultation with: Kevin Lucow, David Bandiera | Fire Alarm System | MHESA B1 smoke detectors MHESA B1 smoke detectors | MHESA B1 smoke detectors 02:00 ... MHESA B1 smoke detectors 02:001-003/004/005/006/007/009/010/011/012 disarmed for 8 hours for ceiling tile replacement. |
2023-17 Implemented on: 2023-01-06 | Removed | Ryan Lovelidge In consultation with: , | Fire Alarm System | BWXT smoke detectors BWXT smoke detectors | BWXT hallway, stairwell and AH ... BWXT hallway, stairwell and AHU smoke detectors 03:019-039/040/041/042/043/044, 03:020-017/018/019/020/021/022/023/024/025/026/027/028/029/031 disarmed for 4 hours for some welding. |
2023-16 Implemented on: 2023-01-06 | Removed | David Bandiera In consultation with: , | Fire Alarm System | IAMI L2 smoke and heat detecto ... IAMI L2 smoke and heat detectors 13:076-050/051/052/053/054/055/056 | Hot work in IAMI Friday Jan 6 Hot work in IAMI Friday Jan 6 |
2023-15 Implemented on: 2023-01-06 | Removed | David Bandiera In consultation with: , | Fire Alarm System | MHESA B1 smoke detectors MHESA B1 smoke detectors | MHESA B1 smoke detectors 02:00 ... MHESA B1 smoke detectors 02:001-003/004/005/006/007/009/010/011/012 disarmed for 8 hours for ceiling tile replacement. |
2023-14 Implemented on: 2023-01-06 | Removed | Travis Kurucz In consultation with: , | Fire Alarm System | ARIEL Target Hall Linear Beam ... ARIEL Target Hall Linear Beam Detectors 09:095-001 and 09:095-002. | Construction work in ARIEL tar ... Construction work in ARIEL target hall. |
2023-13 Implemented on: 2023-01-05 | Removed | Chris Sooley In consultation with: Ryan Lovelidge, | Fire Alarm System | ARIEL Target Hall Linear Beam ... ARIEL Target Hall Linear Beam Detectors 09:095-001 and 09:095-002. | Construction work in ARIEL tar ... Construction work in ARIEL target hall. |
2023-12 Implemented on: 2023-01-05 | Removed | Ryan Lovelidge In consultation with: , | Fire Alarm System | MHESA B1 smoke detectors MHESA B1 smoke detectors | MHESA B1 smoke detectors 02:00 ... MHESA B1 smoke detectors 02:001-003/004/005/006/007/009/010/011/012 disarmed for 8 hours for ceiling tile replacement. |
2023-9 Implemented on: 2023-01-04 | Removed | Riley Schick-Martin In consultation with: , | Fire Alarm System | MHESA B1 smoke detectors 02:00 ... MHESA B1 smoke detectors 02:001-003,4,5,6,7,9,10,11,12 | Construction work in area. Construction work in area. |
2023-8 Implemented on: 2023-01-04 | Removed | Riley Schick-Martin In consultation with: , | Fire Alarm System | ARIEL Target Hall Linear Beam ... ARIEL Target Hall Linear Beam Detectors 09:095-001 and 09:095-002. | Construction work in ARIEL tar ... Construction work in ARIEL target hall. |
2023-7 Implemented on: 2023-01-03 | Removed | Ryan Lovelidge In consultation with: , | Fire Alarm System | FAS zone 3 FAS zone 3 | Electrical sevices are resetti ... Electrical sevices are resetting some smoke detectors in ISAC I. |
2023-6 Implemented on: 2023-01-03 | Removed | Ryan Lovelidge In consultation with: , | Fire Alarm System | FAS zone 4 offline FAS zone 4 offline | Electrical services are resett ... Electrical services are resetting some smoke detectors. |
2023-2 Implemented on: 2023-01-03 | Removed | Chris Sooley In consultation with: , | Fire Alarm System | ARIEL Target Hall Linear Beam ... ARIEL Target Hall Linear Beam Detectors 09:095-001 and 09:095-002. | Construction work in ARIEL tar ... Construction work in ARIEL target hall. |
2023-1 Implemented on: 2023-01-01 | Removed | Eric Chapman In consultation with: , | Services | ME-140 chiller commanded on ME-140 chiller commanded on | Poor temperature regulation on ... Poor temperature regulation on Service Annex ground floor. Free cooling mode drops mixed air temp too low resulting in excessive energy usage and general poor performance. |
2022-378 Implemented on: 2022-12-28 | Removed | Eric Chapman In consultation with: Robin Swanson, | Safety | Numerous safety bits for Power ... Numerous safety bits for Power outage | 12kV 5 year MRO by ESRV. Lost ... 12kV 5 year MRO by ESRV. Lost safety system status of BST 165, 127 and I1, I3 hydrogen alarms. Cyc vault exhaust, 2C hot cell, BL1A exhaust, ARIEL breathable air off. ISIS skimmer alarm persistent with power out. |
2022-377 Implemented on: 2022-12-28 | Removed | Robin Swanson In consultation with: Eric Chapman, | Services | MH-LCW discharge and surge tan ... MH-LCW discharge and surge tank valves | General site power shutdown fo ... General site power shutdown for 5 year maintenance. Surge tank valve closed to prevent backflow. |
2022-376 Implemented on: 2022-12-28 | Removed | Robin Swanson In consultation with: Eric Chapman, | Services | Cu-LCW (RF floor) discharge an ... Cu-LCW (RF floor) discharge and surge tank valves | General site power shutdown fo ... General site power shutdown for 5 year maintenance. Surge tank valve closed to prevent backflow. |
2022-371 Implemented on: 2022-12-22 | Removed | Kevin Lucow In consultation with: , | Safety | IBOP 1507 and 1508 RCR Lab War ... IBOP 1507 and 1508 RCR Lab Warning and Alarm. | Generator test disrupted fume ... Generator test disrupted fume hoods. No one on site over break to restart them. |
2022-370 Implemented on: 2022-12-22 | Removed | David Bandiera In consultation with: , | Fire Alarm System | MH B1 & B2 smoke detectors 02: ... MH B1 & B2 smoke detectors 02:001-129/131/132/141/144/147 | Nearby hot work on MH stairs B ... Nearby hot work on MH stairs B1/B2 level |
2022-369 Implemented on: 2022-12-21 | Removed | Ryan Lovelidge In consultation with: , | Services | South Cu-LCW supply valve clos ... South Cu-LCW supply valve closed | Pump shut off to repair a leak ... Pump shut off to repair a leak, valve closed at the request of MSRV. |
2022-368 Implemented on: 2022-12-21 | Removed | Chris Sooley In consultation with: Ryan Lovelidge, | Services | Al-ALCW Heat Exchangers Valves ... Al-ALCW Heat Exchangers Valves H-18 closed and D-17 throttled | RF, Main Magnet and most heat ... RF, Main Magnet and most heat loads off for winter shutdown |
2022-367 Implemented on: 2022-12-21 | Removed | Chris Sooley In consultation with: Ryan Lovelidge, | Safety | IBOP 1006 CSS Defeat timer IBOP 1006 CSS Defeat timer | IBOP 1006 unplugged for 2023 ... IBOP 1006 unplugged for 2023 winter shutdown. |
2022-363 Implemented on: 2022-12-21 | Removed | Eric Chapman In consultation with: , | Safety | BSM #20 working trip limit rai ... BSM #20 working trip limit raised | Poor tank vacuum causing BSM # ... Poor tank vacuum causing BSM #20 warnings. Required to permit operation of BL1 at 50uA for thorium irradiations. |
2022-362 Implemented on: 2022-12-21 | Removed | Robin Swanson In consultation with: Eric Chapman, | Targets | Increase current limit of T2 P ... Increase current limit of T2 Position 0 from 10uA to 60uA | T2 ladder currently stuck in p ... T2 ladder currently stuck in position zero. Default trip limit set to 10uA to protect the profile, 1AMT2, monitor from being damaged if inserted into the beamline. |
2022-358 Implemented on: 2022-12-19 | Removed | Ryan Lovelidge In consultation with: , | Fire Alarm System | MH smoke detectors 02:001-129/ ... MH smoke detectors 02:001-129/131/132/141 | Nearby hot work Nearby hot work |
2022-357 Implemented on: 2022-12-19 | Removed | Ryan Lovelidge In consultation with: , | Fire Alarm System | ARIEL Target Hall Linear Beam ... ARIEL Target Hall Linear Beam Detectors 09:095-001 and 09:095-002. | Construction work in ARIEL tar ... Construction work in ARIEL target hall. |
2022-356 Implemented on: 2022-12-16 | Removed | Gauhar Hayat In consultation with: , | Safety | Air Monitor #4 Warn Limit Rais ... Air Monitor #4 Warn Limit Raised by 10%. | Air Monitor #4 has been high b ... Air Monitor #4 has been high but level around 40 KCPM for the duration of BL1A's runtime this year. It has now peaked above 50 KCPM briefly but repeatedly, before falling below the warn limit again. |
2022-355 Implemented on: 2022-12-16 | Removed | Ryan Lovelidge In consultation with: , | Fire Alarm System | 02:007-027/028 02:007-027/028 | ISIS smoke detectors disarmed ... ISIS smoke detectors disarmed for nearby hot work. |
2022-354 Implemented on: 2022-12-16 | Removed | Kathleen Genge In consultation with: , | Fire Alarm System | ARIEL Target Hall Linear Beam ... ARIEL Target Hall Linear Beam Detectors 09:095-001 and 09:095-002. | Construction work in ARIEL tar ... Construction work in ARIEL target hall. |
2022-352 Implemented on: 2022-12-15 | Removed | Gauhar Hayat In consultation with: , | Fire Alarm System | ARIEL Target Hall Linear Beam ... ARIEL Target Hall Linear Beam Detectors 09:095-001 and 09:095-002. | Construction work in ARIEL tar ... Construction work in ARIEL target hall. |
2022-350 Implemented on: 2022-12-14 | Removed | Jas Uppal In consultation with: , | Safety | BSM 63 BSM 63 | BSM #63 working level raised f ... BSM #63 working level raised from 30 to 32. IPF loaded with Thorium targets producing slightly higher than normal spills at BSM 63 causing nuisance warning alarms under normal operating conditions in 1A. |
2022-349 Implemented on: 2022-12-14 | Removed | Gauhar Hayat In consultation with: , | Fire Alarm System | ARIEL Target Hall Linear Beam ... ARIEL Target Hall Linear Beam Detectors 09:095-001 and 09:095-002. | Construction work in ARIEL tar ... Construction work in ARIEL target hall. |
2022-347 Implemented on: 2022-12-13 | Removed | Gauhar Hayat In consultation with: , | Fire Alarm System | ARIEL Target Hall Linear Beam ... ARIEL Target Hall Linear Beam Detectors 09:095-001 and 09:095-002. | Construction work in ARIEL tar ... Construction work in ARIEL target hall. |
2022-346 Implemented on: 2022-12-09 | Removed | David Bandiera In consultation with: Robert Scheepmaker, | Safety | IBOP 1507 RCR1 Warn Signal pin ... IBOP 1507 RCR1 Warn Signal pinned | Work on backflow prevention de ... Work on backflow prevention device in RCR1 until Dec 13 end of day. |
2022-345 Implemented on: 2022-12-09 | Removed | David Bandiera In consultation with: , | Fire Alarm System | RCA2 L2 Penthouse North Duct S ... RCA2 L2 Penthouse North Duct Smoke Detectors 03:019-042, -043, -044 | Hot work to be performed on AH ... Hot work to be performed on AHU-2 in RCA2 L2 North Penthouse |
2022-344 Implemented on: 2022-12-09 | Removed | David Bandiera In consultation with: , | Fire Alarm System | ARIEL Target Hall Linear Beam ... ARIEL Target Hall Linear Beam detectors 09:095-001 and 09:095-002. | Construction work in ARIEL tar ... Construction work in ARIEL target hall. |
2022-343 Implemented on: 2022-12-08 | Removed | Travis Kurucz In consultation with: Jas Uppal, Riley Schick-Martin | Fire Alarm System | ARIEL Target Hall Linear Beam ... ARIEL Target Hall Linear Beam detectors 09:095-001 and 09:095-002. | Construction work in ARIEL tar ... Construction work in ARIEL target hall. |
2022-342 Implemented on: 2022-12-07 | Removed | David Bandiera In consultation with: , | Fire Alarm System | RCA 1 & 2 G Floor Smoke and He ... RCA 1 & 2 G Floor Smoke and Heat Detectors. 03:019-{028,037,038}, 03:020-{011,012,017,018,019,020} | Installation of vinyl flooring ... Installation of vinyl flooring in RCA 1 & 2 |
2022-341 Implemented on: 2022-12-07 | Removed | Riley Schick-Martin In consultation with: , | Fire Alarm System | ARIEL Target Hall Linear Beam ... ARIEL Target Hall Linear Beam detectors 09:095-001 and 09:095-002. | Construction work in ARIEL tar ... Construction work in ARIEL target hall. |
2022-340 Implemented on: 2022-12-06 | Removed | Brandon Humphries In consultation with: , | Safety | High energy section BLMs High energy section BLMs | Performing beam spill measurem ... Performing beam spill measurements in the high energy section for Fiber development. Need to see full measurements of losses without BLMs tripping. |
2022-339 Implemented on: 2022-12-06 | Removed | Travis Kurucz In consultation with: Riley Schick-Martin, Jas Uppal | Fire Alarm System | ARIEL Target Hall Linear Beam ... ARIEL Target Hall Linear Beam detectors 09:095-001 and 09:095-002. | Construction work in ARIEL tar ... Construction work in ARIEL target hall. |
2022-338 Implemented on: 2022-12-05 | Removed | Riley Schick-Martin In consultation with: , | Fire Alarm System | ARIEL Target Hall Linear Beam ... ARIEL Target Hall Linear Beam detectors 09:095-001 and 09:095-002. | Construction work in ARIEL tar ... Construction work in ARIEL target hall. |
2022-336 Implemented on: 2022-11-29 | Removed | David Bandiera In consultation with: , | Fire Alarm System | ARIEL Target Hall Linear Beam ... ARIEL Target Hall Linear Beam detectors 09:095-001 and 09:095-002. | Construction work in ARIEL tar ... Construction work in ARIEL target hall. |
2022-335 Implemented on: 2022-11-28 | Removed | Robin Swanson In consultation with: Dale Nagra, | Fire Alarm System | ARIEL Target Hall Linear Beam ... ARIEL Target Hall Linear Beam detectors 09:095-001 and 09:095-002. | Construction work in ARIEL tar ... Construction work in ARIEL target hall. |
2022-334 Implemented on: 2022-11-25 | Removed | Robin Swanson In consultation with: Dale Nagra, | Fire Alarm System | FAS detectors on IAMI B2, G FAS detectors on IAMI B2, G | IAMI construction work. IAMI construction work. |
2022-333 Implemented on: 2022-11-25 | Removed | Robin Swanson In consultation with: Dale Nagra, | Fire Alarm System | ARIEL Target Hall Linear Beam ... ARIEL Target Hall Linear Beam detectors 09:095-001 and 09:095-002. | Construction work in ARIEL tar ... Construction work in ARIEL target hall. |
2022-332 Implemented on: 2022-11-24 | Removed | Eric Chapman In consultation with: , | Fire Alarm System | ISAC I exp hall linear beam de ... ISAC I exp hall linear beam detectors | ISAC I exp hall linear beam de ... ISAC I exp hall linear beam detectors 05-054-002/003/004 disabled for filling of superconducting magnet. |
2022-331 Implemented on: 2022-11-23 | Removed | Brandon Humphries In consultation with: , | Safety | High energy section BLMs High energy section BLMs | Performing beam spill measurem ... Performing beam spill measurements in the high energy section. Need to see full measurements of losses without BLMs tripping. |
2022-330 Implemented on: 2022-11-23 | Removed | Robin Swanson In consultation with: Eric Chapman, | Fire Alarm System | ARIEL Target Hall Linear Beam ... ARIEL Target Hall Linear Beam detectors 09:095-001 and 09:095-002. | Construction work in ARIEL tar ... Construction work in ARIEL target hall. |
2022-328 Implemented on: 2022-11-22 | Removed | Robin Swanson In consultation with: Robert Scheepmaker, | Fire Alarm System | ARIEL Target Hall Linear Beam ... ARIEL Target Hall Linear Beam detectors 09:095-001 and 09:095-002. | Construction work in ARIEL tar ... Construction work in ARIEL target hall. |
2022-327 Implemented on: 2022-11-21 | Removed | Jas Uppal In consultation with: , | Fire Alarm System | ARIEL Target Hall Linear Beam ... ARIEL Target Hall Linear Beam detectors 09:095-001 and 09:095-002. | Construction work in ARIEL tar ... Construction work in ARIEL target hall. |
2022-326 Implemented on: 2022-11-18 | Removed | David Bandiera In consultation with: , | Fire Alarm System | Zone 1 Offline Zone 1 Offline | Work on Air Handling Unit in M ... Work on Air Handling Unit in MOB Auditorium. |
2022-325 Implemented on: 2022-11-17 | Removed | David Bandiera In consultation with: , | Fire Alarm System | ARIEL Target Hall Linear Beam ... ARIEL Target Hall Linear Beam detectors 09:095-001 and 09:095-002. | Construction work in ARIEL tar ... Construction work in ARIEL target hall. |
2022-324 Implemented on: 2022-11-16 | Removed | Gauhar Hayat In consultation with: , | Fire Alarm System | Zone 1 Offline Zone 1 Offline | Work on Air Handling Unit in M ... Work on Air Handling Unit in MOB Auditorium. |
2022-323 Implemented on: 2022-11-16 | Removed | David Bandiera In consultation with: , | Fire Alarm System | ARIEL Target Hall Linear Beam ... ARIEL Target Hall Linear Beam detectors 09:095-001 and 09:095-002. | Construction work in ARIEL tar ... Construction work in ARIEL target hall. |
2022-322 Implemented on: 2022-11-15 | Removed | David Bandiera In consultation with: , | Fire Alarm System | Smoke detectors - MOB L2 01:03 ... Smoke detectors - MOB L2 01:035-025 and 01:035-026 | Troubleshooting in MOB -AHU-3 ... Troubleshooting in MOB -AHU-3 (auditorium) not working |
2022-321 Implemented on: 2022-11-15 | Removed | Kevin Lucow In consultation with: , | Fire Alarm System | ARIEL Traget Hall Linear Beam ... ARIEL Traget Hall Linear Beam detectors 09:095-001 and 09:095-002. | Construction work in ARIEL tar ... Construction work in ARIEL target hall. |
2022-320 Implemented on: 2022-11-14 | Removed | Ryan Lovelidge In consultation with: , | Fire Alarm System | FAS Linear Beam Detectors - AR ... FAS Linear Beam Detectors - ARIEL Target Hall (09:095-001/002) | Craning work to take place Craning work to take place |
2022-319 Implemented on: 2022-11-10 | Removed | Jason Wait In consultation with: , | Fire Alarm System | FAS devices - MOB 01:035-025 ... FAS devices - MOB 01:035-025 and 01:035-026 | Troubleshooting in MOB -AHU-3 ... Troubleshooting in MOB -AHU-3 (auditorium) not working |
2022-318 Implemented on: 2022-11-10 | Removed | Jason Wait In consultation with: , | Fire Alarm System | FAS Linear Beam Detectors - AR ... FAS Linear Beam Detectors - ARIEL Target Hall (09:095-001/002) | Craning work to take place Craning work to take place |
2022-317 Implemented on: 2022-11-09 | Removed | Jason Wait In consultation with: , | Fire Alarm System | FAS devices - MOB 01:035-025 ... FAS devices - MOB 01:035-025 and 01:035-026 | Troubleshooting in MOB -AHU-3 ... Troubleshooting in MOB -AHU-3 (auditorium) not working |
2022-315 Implemented on: 2022-11-09 | Removed | Elena Bylinskaia In consultation with: Elena Bylinskaia, | Safety | Residual Monitor #6 (Upper Vau ... Residual Monitor #6 (Upper Vault S.E.) | To access the Lower vault in o ... To access the Lower vault in order to survey , than asses and fix RF water leak in Capacitor station #2. |
2022-314 Implemented on: 2022-11-09 | Removed | Jason Wait In consultation with: , | Fire Alarm System | FAS Linear Beam Detectors - AR ... FAS Linear Beam Detectors - ARIEL Target Hall (09:095-001/002) | Craning work to take place Craning work to take place |
2022-313 Implemented on: 2022-11-08 | Removed | Jason Wait In consultation with: , | Fire Alarm System | FAS Linear Beam Detectors - AR ... FAS Linear Beam Detectors - ARIEL Target Hall (09:095-001/002) | Craning work to take place Craning work to take place |
2022-312 Implemented on: 2022-11-07 | Removed | Eric Chapman In consultation with: , | Fire Alarm System | ARIEL Target hall beam detecto ... ARIEL Target hall beam detectors | Welding in target hall. Welding in target hall. |
2022-311 Implemented on: 2022-11-06 | Removed | Riley Schick-Martin In consultation with: , | Targets | STF Supply Resistivity STF Supply Resistivity | STF Target Cooling Supply Resi ... STF Target Cooling Supply Resistivity (B2 224) is at trip level. |
2022-310 Implemented on: 2022-11-03 | Removed | Kevin Lucow In consultation with: , | Ion sources and injection BL | VIB-TNIM-022 and 023 readings ... VIB-TNIM-022 and 023 readings swapped. | Cables have been returned to t ... Cables have been returned to their default historical (swapped) positions, until the corrections can be made in software. All VIB-TNIM-023 readings are presently coming from the VIB-TNIM-022 hardware and vice versa. |
2022-309 Implemented on: 2022-11-03 | Removed | Kevin Lucow In consultation with: , | Ion sources and injection BL | ISIS Beam Loss calculation now ... ISIS Beam Loss calculation now uses VIB-TNIM-012. | VIB-TNIM-022/023 readbacks cau ... VIB-TNIM-022/023 readbacks cause large negative offset of ISIS Beam Loss reading. Defeat approved by Y. Bylinskii. |
2022-308 Implemented on: 2022-11-03 | Removed | Gauhar Hayat In consultation with: , | Fire Alarm System | FAS System MOB Auditorium Duct ... FAS System MOB Auditorium Duct Detectors Disabled | Work being done on AHU-3. Work being done on AHU-3. |
2022-307 Implemented on: 2022-11-02 | Removed | Gauhar Hayat In consultation with: , | Fire Alarm System | FAS All Zones Offline FAS All Zones Offline | Work on VESDA Smoke Detector i ... Work on VESDA Smoke Detector in ARIEL South B2. |
2022-306 Implemented on: 2022-11-02 | Removed | Gauhar Hayat In consultation with: , | Fire Alarm System | FAS 09:095-001 and 09:095-002 ... FAS 09:095-001 and 09:095-002 Ariel Target Hall LBDs | Work in the area. Work in the area. |
2022-305 Implemented on: 2022-11-01 | Removed | Kevin Lucow In consultation with: , | Targets | STF Supply Resistivity STF Supply Resistivity | STF Supply Resistivity (B2 224 ... STF Supply Resistivity (B2 224) is at trip level. |
2022-304 Implemented on: 2022-11-01 | Removed | Kevin Lucow In consultation with: , | Ion sources and injection BL | ISIS Beam Loss Trip Limit set ... ISIS Beam Loss Trip Limit set to 1 uA. | ISIS Beam Loss is reading ~-20 ... ISIS Beam Loss is reading ~-20 uA. ISIS Beam Loss trip limit reduced from 30 uA to 1 uA to increase protection. |
2022-303 Implemented on: 2022-11-01 | Removed | Gauhar Hayat In consultation with: , | Fire Alarm System | FAS 09:095-001 and 09:095-002 ... FAS 09:095-001 and 09:095-002 Ariel Target Hall LBDs | Work in the area. Work in the area. |
2022-302 Implemented on: 2022-10-31 | Removed | Gauhar Hayat In consultation with: , | Safety | IBOP I1508 and I1508; MHESA B1 ... IBOP I1508 and I1508; MHESA B1 RCR1 RM6 Warn and Alarm | Problem with Hot Cell Flow in ... Problem with Hot Cell Flow in lab. |
2022-301 Implemented on: 2022-10-31 | Removed | Gauhar Hayat In consultation with: , | Fire Alarm System | FAS All Zones Offline FAS All Zones Offline | Quarterly Fire Suppression Sys ... Quarterly Fire Suppression System Inspection |
2022-300 Implemented on: 2022-10-28 | Removed | Gauhar Hayat In consultation with: , | Fire Alarm System | FAS 09:095-001 and 09:095-002 ... FAS 09:095-001 and 09:095-002 Ariel Target Hall LBDs | Work in the area. Work in the area. |
2022-299 Implemented on: 2022-10-27 | Removed | Ryan Lovelidge In consultation with: , | Fire Alarm System | 09:095-001 & 002 ARIEL tgt Hal ... 09:095-001 & 002 ARIEL tgt Hall LBD's | Cutting in the area. Cutting in the area. |
2022-298 Implemented on: 2022-10-25 | Removed | Eric Chapman In consultation with: , | Ion sources and injection BL | ISIS beam loss trip IB 461 rai ... ISIS beam loss trip IB 461 raised from 20 to 30uA | ISIS beam loss trip, IB 461, r ... ISIS beam loss trip, IB 461, raised from 20 to 30uA. New electronics on ISIS TNIMs requires calibration, not enough time today. Losses reading slightly high at certain pulser settings. |
2022-297 Implemented on: 2022-10-25 | Removed | Ryan Lovelidge In consultation with: , | Fire Alarm System | 09:095-001 & 002 ARIEL tgt Hal ... 09:095-001 & 002 ARIEL tgt Hall LBD's | Cutting in the area. Cutting in the area. |
2022-296 Implemented on: 2022-10-25 | Removed | Ryan Lovelidge In consultation with: , | Fire Alarm System | 13:075-001/2/3/4 IAMI B1 smoke ... 13:075-001/2/3/4 IAMI B1 smoke detectors | SMoke detectors disarmed for n ... SMoke detectors disarmed for nearby hot work. |
2022-295 Implemented on: 2022-10-25 | Removed | Riley Schick-Martin In consultation with: , | Targets | B1A:T2CS:FGSEC:RDFLOW alarm li ... B1A:T2CS:FGSEC:RDFLOW alarm limit reduced from 6.0 to 5.5gpm. | Flow is marginal and generatin ... Flow is marginal and generating frequent alarms. |
2022-294 Implemented on: 2022-10-24 | Removed | Eric Chapman In consultation with: , | Safety | BSM 63 BSM 63 | BSM #63 working level raised f ... BSM #63 working level raised from 30 to 32. IPF loaded with Thorium targets producing slightly higher than normal spills at BSM 63 causing nuisance warning alarms under normal operating conditions in 1A. Flux rate on 1AM10 is normal at 70uA with 100uA extracted down BL1A. |
2022-293 Implemented on: 2022-10-24 | Removed | Jason Wait In consultation with: , | Fire Alarm System | IAMI B2 detectors. IAMI B2 detectors. | Construction. Construction. |
2022-292 Implemented on: 2022-10-24 | Removed | Jason Wait In consultation with: , | Fire Alarm System | 09:095-001 & 002 ARIEL tgt Hal ... 09:095-001 & 002 ARIEL tgt Hall LBD's | Grinding work is taking place ... Grinding work is taking place in the area |
2022-291 Implemented on: 2022-10-18 | Removed | Robin Swanson In consultation with: Robert Scheepmaker, | Fire Alarm System | IAMI B2, and L1 detectors. IAMI B2, and L1 detectors. | Construction. Construction. |
2022-290 Implemented on: 2022-10-17 | Removed | Riley Schick-Martin In consultation with: , | Fire Alarm System | IAMI B2, and L1 detectors. IAMI B2, and L1 detectors. | Construction. Construction. |
2022-288 Implemented on: 2022-10-14 | Removed | Kevin Lucow In consultation with: , | Fire Alarm System | IAMI B2, G, and L1 detectors. IAMI B2, G, and L1 detectors. | Construction. Construction. |
2022-286 Implemented on: 2022-10-13 | Removed | Gauhar Hayat In consultation with: , | Fire Alarm System | FAS Smoke and Heat Detectors o ... FAS Smoke and Heat Detectors on IAMI B2, G and L1 Levels | IAMI construction work. IAMI construction work. |
2022-285 Implemented on: 2022-10-13 | Removed | Kevin Lucow In consultation with: , | Fire Alarm System | ARIEL B2 South and Target Hall ... ARIEL B2 South and Target Hall Detectors. | Construction of hot cell. Construction of hot cell. |
2022-284 Implemented on: 2022-10-12 | Removed | David Bandiera In consultation with: , | Fire Alarm System | FAS Zone 2 offline FAS Zone 2 offline | Troubleshooting fault in Haz M ... Troubleshooting fault in Haz Mat building communications. |
2022-282 Implemented on: 2022-10-11 | Removed | Kevin Lucow In consultation with: , | Fire Alarm System | ARIEL B2 South Smoke Detectors ARIEL B2 South Smoke Detectors | Construction of hot cell. Construction of hot cell. |
2022-281 Implemented on: 2022-10-07 | Removed | Frank Hosta In consultation with: , | Fire Alarm System | FAS Zone 2 to be taken offline ... FAS Zone 2 to be taken offline with the monitoring company | Troubleshooting fault in Haz M ... Troubleshooting fault in Haz Mat building communications. |
2022-280 Implemented on: 2022-10-07 | Removed | Frank Hosta In consultation with: , | Fire Alarm System | Zone 4 test and numerous ARIEL ... Zone 4 test and numerous ARIEL B2 smoke detectors. | Checking fume hood for leaks b ... Checking fume hood for leaks by blowing smoke into the ducting. Along with putting us into Zone 4 test, I also took 9-094-003, 4, 7, 9, 10, 13, 14 and 15. |
2022-279 Implemented on: 2022-10-07 | Removed | Ryan Lovelidge In consultation with: , | Fire Alarm System | FAS zone 1 FAS zone 1 | FAS zone 1 offline for the day ... FAS zone 1 offline for the day to replace a flow switch. |
2022-278 Implemented on: 2022-10-06 | Removed | Jason Wait In consultation with: , | Fire Alarm System | FAS Linear Beam Detectors - AR ... FAS Linear Beam Detectors - ARIEL Target Hall (09:095-001/002) | Craning work to take place Craning work to take place |
2022-277 Implemented on: 2022-10-06 | Removed | Jason Wait In consultation with: , | Fire Alarm System | FAS Zone 2 to be taken offline ... FAS Zone 2 to be taken offline with the monitoring company | Removal of FAS device 02:001-0 ... Removal of FAS device 02:001-001 to take place. |
2022-276 Implemented on: 2022-10-06 | Removed | Jason Wait In consultation with: , | Fire Alarm System | FAS smoke detectors on IAMI B2 ... FAS smoke detectors on IAMI B2, G, and L1 levels. | IAMI construction work. IAMI construction work. |
2022-275 Implemented on: 2022-10-05 | Removed | Jason Wait In consultation with: , | Fire Alarm System | FAS smoke detectors on IAMI B2 ... FAS smoke detectors on IAMI B2, G, and L1 levels. | IAMI construction work. IAMI construction work. |
2022-274 Implemented on: 2022-10-03 | Removed | Robin Swanson In consultation with: Robert Scheepmaker, | Fire Alarm System | FAS smoke detector 02:001-001 FAS smoke detector 02:001-001 | Smoke detector removed for ins ... Smoke detector removed for installation of new ceiling |
2022-273 Implemented on: 2022-10-03 | Removed | Robin Swanson In consultation with: Robert Scheepmaker, | Fire Alarm System | FAS Zone 2 offline for 8hrs FAS Zone 2 offline for 8hrs | Removal of smoke detector 02:0 ... Removal of smoke detector 02:001-001 in MHESA B1 elevator machine room. |
2022-272 Implemented on: 2022-10-03 | Removed | Robin Swanson In consultation with: Robert Scheepmaker, | Services | Al-ALCW heat exchanger valves ... Al-ALCW heat exchanger valves closed/throttled. | Main magnet and RF off. Main magnet and RF off. |
2022-271 Implemented on: 2022-09-30 | Removed | David Bandiera In consultation with: Jas Uppal, | Safety | BSM #63 Trip Limit raised from ... BSM #63 Trip Limit raised from 30% to 33% | BSM #63 has been trending upwa ... BSM #63 has been trending upwards since Sept 27 due to Thorium targets present at IPF. Warnings are persistent at default trip value of this BSM. |
2022-270 Implemented on: 2022-09-29 | Removed | Kathleen Genge In consultation with: Jas Uppal, | Fire Alarm System | All FAS zones offline with mon ... All FAS zones offline with monitoring company | site wide fire alarm bell test site wide fire alarm bell test |
2022-260 Implemented on: 2022-09-25 | Removed | Eric Chapman In consultation with: Robin Swanson, Robin Swanson | Services | Cooling tower cell A1 shut dow ... Cooling tower cell A1 shut down | Bad bearing. Shut down to avo ... Bad bearing. Shut down to avoid shaft damage. |
2022-259 Implemented on: 2022-09-24 | Removed | David Bandiera In consultation with: , | Safety | BSM 63 Trip Level BSM 63 Trip Level | Parked Thorium target causing ... Parked Thorium target causing repeated BSM 63 warnings. Trip level changed from 30 to 33%. |
2022-257 Implemented on: 2022-09-23 | Removed | Gauhar Hayat In consultation with: , | Fire Alarm System | FAS Zone 2 put offline with mo ... FAS Zone 2 put offline with monitoring company | Zone 2 offline for fire alarm ... Zone 2 offline for fire alarm system work. |
2022-256 Implemented on: 2022-09-21 | Removed | Frank Hosta In consultation with: , | Fire Alarm System | FAS All Zones Offline until 17 ... FAS All Zones Offline until 17:00 | Troubleshooting of bell system ... Troubleshooting of bell system. |
2022-255 Implemented on: 2022-09-15 | Removed | Eric Chapman In consultation with: Robert Scheepmaker, | Fire Alarm System | All zones in test mode for one ... All zones in test mode for one hour | Site wide fire drill. Defeat ... Site wide fire drill. Defeat should not be required, but is precautionary to avoid VF&RS call out when bells are activated. |
2022-254 Implemented on: 2022-09-14 | Removed | Frank Hosta In consultation with: , | Targets | STF Ion Exchanger Return Resis ... STF Ion Exchanger Return Resistivity pinned at STF BYP 010 | Signal keeps dropping out and ... Signal keeps dropping out and tripping the cyclotron. |
2022-253 Implemented on: 2022-09-13 | Removed | Robin Swanson In consultation with: Robert Scheepmaker, | Fire Alarm System | 09:095-001 & 002 ARIEL tgt Hal ... 09:095-001 & 002 ARIEL tgt Hall LBD's | Welding in area until end of d ... Welding in area until end of day. |
2022-252 Implemented on: 2022-09-12 | Removed | Jas Uppal In consultation with: , | Fire Alarm System | 09:095-001 & 002 ARIEL tgt Hal ... 09:095-001 & 002 ARIEL tgt Hall LBD's | Welding in area until end of d ... Welding in area until end of day. |
2022-251 Implemented on: 2022-09-10 | Removed | Gauhar Hayat In consultation with: , | Safety | BSM 63 Trip Level BSM 63 Trip Level | Parked Thorium target causing ... Parked Thorium target causing repeated BSM 63 warnings. Trip level changed from 30 to 33%. |
2022-250 Implemented on: 2022-08-25 | Removed | Jason Wait In consultation with: , | Other / Misc | MHESA B1 RCR1 RM6 Warn and Ala ... MHESA B1 RCR1 RM6 Warn and Alarm pinned in DCR IBOP - 1507 and 1508 | MHESA AHU1 6 monthly maintenan ... MHESA AHU1 6 monthly maintenance to take place. Warn and Alarm signals expected in DCR. Pinned IBOP 1507 and 1508 after alarms occurred. |
2022-249 Implemented on: 2022-08-24 | Removed | Brandon Humphries In consultation with: , | Diagnostics | ELBD:BPM0 FSD trip daisy chain ... ELBD:BPM0 FSD trip daisy chain spliced | ELBD:BPM0 module has failed an ... ELBD:BPM0 module has failed and was causing the FSD daisy chain to be broken (causing FSD trip). Splicing this daisy chain connection through the failed module allowed for the FSD to be enabled. |
2022-248 Implemented on: 2022-08-24 | Removed | Jason Wait In consultation with: , | Fire Alarm System | FAS All Zones Offline with the ... FAS All Zones Offline with the monitoring company for 6 Hours | FAS Sprinkler semi-annual insp ... FAS Sprinkler semi-annual inspection with contractors |
2022-247 Implemented on: 2022-08-23 | Removed | Jason Wait In consultation with: , | Fire Alarm System | FAS Zone 2 put into off mode w ... FAS Zone 2 put into off mode with monitoring company | FAS zone 2 into off mode for t ... FAS zone 2 into off mode for trailer GG FAS device reset |
2022-246 Implemented on: 2022-08-23 | Removed | Riley Schick-Martin In consultation with: , | Fire Alarm System | 09:095-001 & 002 ARIEL tgt Hal ... 09:095-001 & 002 ARIEL tgt Hall LBD's | Welding in area until end of d ... Welding in area until end of day. |
2022-245 Implemented on: 2022-08-22 | Removed | Gauhar Hayat In consultation with: , | Fire Alarm System | FAS All Zones Offline for 8 Ho ... FAS All Zones Offline for 8 Hours | FAS Sprinkler semi-annual insp ... FAS Sprinkler semi-annual inspection. |
2022-244 Implemented on: 2022-08-18 | Removed | Kyle Mollard In consultation with: , | Safety | MHESA B1 RCR1 RM6 WARN Signal ... MHESA B1 RCR1 RM6 WARN Signal - IBOP I1507 | MHESA Holding Tank Full warn c ... MHESA Holding Tank Full warn cannot be cleared at HMI. Lab manager and RH are aware and will deal with it tomorrow.
|
2022-242 Implemented on: 2022-08-17 | Removed | Ryan Lovelidge In consultation with: , | Fire Alarm System | FAS smoke detectors on IAMI B2 ... FAS smoke detectors on IAMI B2, G, and L1 levels. | IAMI construction hot work. IAMI construction hot work. |
2022-241 Implemented on: 2022-08-15 | Removed | Kyle Mollard In consultation with: , | Fire Alarm System | FAS Linear Beam Detectors - AR ... FAS Linear Beam Detectors - ARIEL Target Hall (09:095-001/002) | Replace burnt out high bay lig ... Replace burnt out high bay light bulbs in the Ariel building ceiling
|
2022-240 Implemented on: 2022-08-15 | Removed | Gauhar Hayat In consultation with: , | Fire Alarm System | FAS smoke detectors on IAMI B2 ... FAS smoke detectors on IAMI B2, G, and L1 levels. | IAMI construction hot work. IAMI construction hot work. |
2022-239 Implemented on: 2022-08-14 | Removed | Robin Swanson In consultation with: Eric Chapman, Eric Chapman | RF | T/C RF 554 Lower RFB beam scra ... T/C RF 554 Lower RFB beam scraper entrance | Thermocouple has become noisy ... Thermocouple has become noisy resulting in beam trips. |
2022-237 Implemented on: 2022-08-12 | Removed | Frank Hosta In consultation with: , | Fire Alarm System | FAS Zone 2 taken offline for 8 ... FAS Zone 2 taken offline for 8hrs | FAS troubleshooting work in Tr ... FAS troubleshooting work in Trailer Gg. Node 2 bells and strobes disarmed for Nav's troubleshooting work in Trailer Gg. |
2022-236 Implemented on: 2022-08-12 | Removed | David Bandiera In consultation with: , | Fire Alarm System | Smoke detectors 02-001-141 & 0 ... Smoke detectors 02-001-141 & 02-001-147 on the MH B2 level and 02-001-131 & 02-001-132 on the MH B1 level | Welding in Meson Hall B2 North ... Welding in Meson Hall B2 North area |
2022-235 Implemented on: 2022-08-11 | Removed | Eric Chapman In consultation with: Eric Chapman, Eric Chapman | Fire Alarm System | FAS smoke detectors on IAMI B2 ... FAS smoke detectors on IAMI B2, G, and L1 levels. | IAMI construction hot work. IAMI construction hot work. |
2022-234 Implemented on: 2022-08-11 | Removed | Robin Swanson In consultation with: Eric Chapman, | Fire Alarm System | FAS Zone 2 taken offline for 8 ... FAS Zone 2 taken offline for 8hrs | FAS troubleshooting work in Tr ... FAS troubleshooting work in Trailer Gg. |
2022-233 Implemented on: 2022-08-10 | Removed | Eric Chapman In consultation with: Eric Chapman, Eric Chapman | Fire Alarm System | FAS smoke detectors on IAMI B2 ... FAS smoke detectors on IAMI B2, G, and L1 levels. | IAMI construction hot work. IAMI construction hot work. |
2022-232 Implemented on: 2022-08-10 | Removed | Robin Swanson In consultation with: , | Fire Alarm System | FAS Zone 2 taken offline for 8 ... FAS Zone 2 taken offline for 8hrs | FAS troubleshooting work in Tr ... FAS troubleshooting work in Trailer Gg. |
2022-231 Implemented on: 2022-08-10 | Removed | David Bandiera In consultation with: , | Ion sources and injection BL | ISIS Skimmer 3 - Cable 61/0842 ... ISIS Skimmer 3 - Cable 61/0842 Grounded | ISIS Skimmer 3 charging with n ... ISIS Skimmer 3 charging with no beam and causing alarms. |
2022-230 Implemented on: 2022-08-09 | Removed | Robin Swanson In consultation with: Eric Chapman, | Services | Gas monitor 14 ( Breathable Ai ... Gas monitor 14 ( Breathable Air 2, SAB1) | Work on Ariel-L2 Copco compres ... Work on Ariel-L2 Copco compressor and breathable air system. |
2022-229 Implemented on: 2022-08-09 | Removed | Eric Chapman In consultation with: Robin Swanson, | Fire Alarm System | FAS detectors on IAMI B2, G, a ... FAS detectors on IAMI B2, G, and L1 levels. | IAMI construction work. IAMI construction work. |
2022-227 Implemented on: 2022-08-08 | Removed | Jason Wait In consultation with: , | Fire Alarm System | FAS Zone 2 taken offline with ... FAS Zone 2 taken offline with the monitoring company | FAS troubleshooting work to ta ... FAS troubleshooting work to take place in Trailer Gg. |
2022-226 Implemented on: 2022-08-08 | Removed | Jason Wait In consultation with: , | Fire Alarm System | FAS devices on IAMI B2: 13:077 ... FAS devices on IAMI B2: 13:077-001, 13:075-013 to 13:075-019, and 13:075-086. | IAMI construction work. IAMI construction work. |
2022-225 Implemented on: 2022-08-08 | Removed | Jason Wait In consultation with: , | Fire Alarm System | FAS detectors on IAMI G and L1 ... FAS detectors on IAMI G and L1 levels inputs disabled | IAMI construction work / hot w ... IAMI construction work / hot work taking place. |
2022-224 Implemented on: 2022-08-04 | Removed | Gauhar Hayat In consultation with: , | Fire Alarm System | FAS Zone 2 FAS Zone 2 | FAS work in Trailer Gg. FAS work in Trailer Gg. |
2022-223 Implemented on: 2022-08-04 | Removed | Gauhar Hayat In consultation with: , | Fire Alarm System | FAS detectors on IAMI B2, G, a ... FAS detectors on IAMI B2, G, and L1 levels. | IAMI construction work. IAMI construction work. |
2022-222 Implemented on: 2022-08-03 | Removed | Kyle Mollard In consultation with: , | Ion sources and injection BL | ISIS Skimmer 2 - Cable 61/0378 ... ISIS Skimmer 2 - Cable 61/0378 Grounded | ISIS Skimmer 2 charging with n ... ISIS Skimmer 2 charging with no beam and causing alarms. |
2022-221 Implemented on: 2022-08-03 | Removed | Gauhar Hayat In consultation with: , | Fire Alarm System | FAS Zone 2 FAS Zone 2 | FAS work in Trailer Gg. FAS work in Trailer Gg. |
2022-220 Implemented on: 2022-08-03 | Removed | Kevin Lucow In consultation with: , | Fire Alarm System | FAS detectors on IAMI B2, G, a ... FAS detectors on IAMI B2, G, and L1 levels. | IAMI construction work. IAMI construction work. |
2022-219 Implemented on: 2022-08-03 | Removed | David Bandiera In consultation with: , | Fire Alarm System | F.A.S. 02:001-001/011/014/015/ ... F.A.S. 02:001-001/011/014/015/016/017 MHESA B1 | Renovating the Washroom in Gro ... Renovating the Washroom in Ground Floor and constructing a new washroom and shower in basement level (B1) of MHESA building. |
2022-218 Implemented on: 2022-08-03 | Active | Eric Chapman In consultation with: , | Targets | 2A2DSP-TC1 shield plug water t ... 2A2DSP-TC1 shield plug water temp bypassed | Shield plug water temp signal ... Shield plug water temp signal noisy tripping beam. Not real |
2022-216 Implemented on: 2022-08-02 | Removed | Jason Wait In consultation with: , | Fire Alarm System | F.A.S. 02:001-001/011/014/015/ ... F.A.S. 02:001-001/011/014/015/016/017 MHESA B1 | Renovating the Washroom in Gro ... Renovating the Washroom in Ground Floor and constructing a new washroom and shower in basement level (B1) of MHESA building. |
2022-215 Implemented on: 2022-08-02 | Removed | Jason Wait In consultation with: , | Fire Alarm System | FAS devices on IAMI B2: 13:077 ... FAS devices on IAMI B2: 13:077-001, 13:075-013 to 13:075-019, and 13:075-086. | IAMI construction work. IAMI construction work. |
2022-214 Implemented on: 2022-08-02 | Removed | Jason Wait In consultation with: , | Fire Alarm System | FAS detectors on IAMI G and L1 ... FAS detectors on IAMI G and L1 levels inputs disabled | IAMI construction work / hot w ... IAMI construction work / hot work taking place. |
2022-213 Implemented on: 2022-07-29 | Removed | Ryan Lovelidge In consultation with: , | Fire Alarm System | FAS detectors on IAMI G and L1 ... FAS detectors on IAMI G and L1 levels. | IAMI construction work. IAMI construction work. |
2022-211 Implemented on: 2022-07-28 | Removed | Eric Chapman In consultation with: , | Fire Alarm System | Zone 2 in test, node 2 bells a ... Zone 2 in test, node 2 bells and strobes disarmed | Replacement of faulty module i ... Replacement of faulty module in Trailer Gg, update FAS system maps. |
2022-210 Implemented on: 2022-07-28 | Removed | Kevin Lucow In consultation with: , | Fire Alarm System | FAS detectors on IAMI G and L1 ... FAS detectors on IAMI G and L1 levels. | IAMI construction work. IAMI construction work. |
2022-209 Implemented on: 2022-07-28 | Removed | Kevin Lucow In consultation with: , | Fire Alarm System | FAS devices on IAMI B2: 13:077 ... FAS devices on IAMI B2: 13:077-001, 13:075-013 to 13:075-019, and 13:075-086. | IAMI construction work. IAMI construction work. |
2022-208 Implemented on: 2022-07-27 | Removed | Elena Bylinskaia In consultation with: Elena Bylinskaia, Elena Bylinskaia | Fire Alarm System | F.A.S. 02:001-001/011/014/015/ ... F.A.S. 02:001-001/011/014/015/016/017 MHESA B1 | Renovating the Washroom in Gro ... Renovating the Washroom in Ground Floor and constructing a new washroom and shower in basement level (B1) of MHESA building. |
2022-207 Implemented on: 2022-07-26 | Removed | Elena Bylinskaia In consultation with: Elena Bylinskaia, Elena Bylinskaia | Services | STF Water jacket water level ( ... STF Water jacket water level (BYP-005) defeated | Experts who completed work und ... Experts who completed work under WP C2022-07-26-2 have requested that Operations defeat BYP-005 in order to deliver beam due to data readback not representing the correct value. |
2022-206 Implemented on: 2022-07-26 | Removed | Eric Chapman In consultation with: Elena Bylinskaia, | Fire Alarm System | F.A.S. 02:001-001/011/014/015/ ... F.A.S. 02:001-001/011/014/015/016/017 MHESA B1 | Renovating the Washroom in Gro ... Renovating the Washroom in Ground Floor and constructing a new washroom and shower in basement level (B1) of MHESA building. |
2022-205 Implemented on: 2022-07-26 | Removed | Kevin Lucow In consultation with: , | Fire Alarm System | FAS devices on IAMI B2: 13:077 ... FAS devices on IAMI B2: 13:077-001, 13:075-013 to 13:075-019, and 13:075-086. | IAMI construction work. IAMI construction work. |
2022-203 Implemented on: 2022-07-25 | Removed | Robin Swanson In consultation with: Robert Scheepmaker, | Fire Alarm System | F.A.S. 02:001-001/011/014/015/ ... F.A.S. 02:001-001/011/014/015/016/017 MHESA B1 | Renovating the Washroom in Gro ... Renovating the Washroom in Ground Floor and constructing a new washroom and shower in basement level (B1) of MHESA building. |
2022-202 Implemented on: 2022-07-25 | Removed | Robin Swanson In consultation with: Robert Scheepmaker, | Fire Alarm System | FAS Device 13:077-001 - IAMI B ... FAS Device 13:077-001 - IAMI B2 | IAMI construction work taking ... IAMI construction work taking place. Detectors 13:077-001, 13:075-013 to 13:075-019, and 13:075-086. 13:075-20 and 075-21 disarmed at request Quasars Lin for hot work. |
2022-200 Implemented on: 2022-07-22 | Removed | Eric Chapman In consultation with: , | Fire Alarm System | FAS Device 13:077-001 - IAMI B ... FAS Device 13:077-001 - IAMI B2 | IAMI construction work taking ... IAMI construction work taking place. Detectors 13:077-001, 13:075-013 to 13:075-019, and 13:075-086. 13:075-20 and 075-21 disarmed at request Quasars Lin for hot work. |
2022-199 Implemented on: 2022-07-22 | Removed | Robin Swanson In consultation with: Eric Chapman, Eric Chapman | Fire Alarm System | F.A.S. 02:001-001/011/014/015/ ... F.A.S. 02:001-001/011/014/015/016/017 MHESA B1 | Renovating the Washroom in Gro ... Renovating the Washroom in Ground Floor and constructing a new washroom and shower in basement level (B1) of MHESA building. |
2022-197 Implemented on: 2022-07-21 | Removed | Jason Wait In consultation with: , | Fire Alarm System | FAS Devices inputs disabled - ... FAS Devices inputs disabled - 13:075-013 to 13:075-019, 13:075-086, and 13:077-001 | IAMI construction work taking ... IAMI construction work taking place, including hot work. |
2022-196 Implemented on: 2022-07-21 | Removed | Jason Wait In consultation with: , | Fire Alarm System | F.A.S. 02:001-001/011/014/015/ ... F.A.S. 02:001-001/011/014/015/016/017 MHESA B1 | Renovating the Washroom in Gro ... Renovating the Washroom in Ground Floor and constructing a new washroom and shower in basement level (B1) of MHESA building. |
2022-194 Implemented on: 2022-07-20 | Removed | Jason Wait In consultation with: , | Fire Alarm System | FAS Device 13:077-001 - IAMI B ... FAS Device 13:077-001 - IAMI B2 CYCLOTRON ROOM | IAMI construction work taking ... IAMI construction work taking place. Work causing alarms in DCR. IAMI alarms are not going through to the monitoring company as intended |
2022-193 Implemented on: 2022-07-19 | Removed | Kathleen Genge In consultation with: , | Safety | IBOP I0124 cyc vault exhaust j ... IBOP I0124 cyc vault exhaust jumpered | IBOP I0124 cyc vault exhaust j ... IBOP I0124 cyc vault exhaust jumpered for ventilation fan maintenance during maintenance day. Work permit C2022-07-19-102 |
2022-192 Implemented on: 2022-07-19 | Removed | Jason Wait In consultation with: , | Fire Alarm System | F.A.S. 02:001-001/011/014/015/ ... F.A.S. 02:001-001/011/014/015/016/017 MHESA B1 | Renovating the Washroom in Gro ... Renovating the Washroom in Ground Floor and constructing a new washroom and shower in basement level (B1) of MHESA building. |
2022-191 Implemented on: 2022-07-17 | Removed | Ryan Lovelidge In consultation with: , | Targets | 2A3DSP-WFS2 Shield plug water ... 2A3DSP-WFS2 Shield plug water flow | The above interlock has been p ... The above interlock has been pinned in rack 5B in the ISAC electrical room, machine keeps tripping on the above interlock toggling OK/NOT OK. |
2022-189 Implemented on: 2022-07-13 | Removed | Kyle Mollard In consultation with: , | Fire Alarm System | F.A.S. 02:001-001/011/014/015/ ... F.A.S. 02:001-001/011/014/015/016/017 MHESA B1 | Renovating the Washroom in Gro ... Renovating the Washroom in Ground Floor and constructing a new washroom and shower in basement level (B1) of MHESA building. |
2022-188 Implemented on: 2022-07-13 | Removed | Kyle Mollard In consultation with: , | Fire Alarm System | 09:093-006/008/009/010 ARIEL p ... 09:093-006/008/009/010 ARIEL penthouse smoke detectors | Concrete pour in the ARIEL pen ... Concrete pour in the ARIEL penthouse fan room. |
2022-187 Implemented on: 2022-07-13 | Removed | Jason Wait In consultation with: , | RF | DIS ILRF,105 - "LE beamstop Q1 ... DIS ILRF,105 - "LE beamstop Q1 lower TC R=122 over temp xt=2v" taken off scan and defeated with permission from Y.B. | RF tripping on TC over temp. D ... RF tripping on TC over temp. Discussed with RF experts who deferred to advice of Y.B. Taken off scan and defeated at Y.B's request in order to continue running beam. |
2022-186 Implemented on: 2022-07-12 | Removed | Ryan Lovelidge In consultation with: , | Fire Alarm System | 09:093-006/008/009/010 ARIEL p ... 09:093-006/008/009/010 ARIEL penthouse smoke detectors | Concrete pour in the ARIEL pen ... Concrete pour in the ARIEL penthouse fan room. |
2022-185 Implemented on: 2022-07-12 | Removed | Ryan Lovelidge In consultation with: , | Fire Alarm System | F.A.S. 02:001-001/011/014/015/ ... F.A.S. 02:001-001/011/014/015/016/017 MHESA B1 | Renovating the Washroom in Gro ... Renovating the Washroom in Ground Floor and constructing a new washroom and shower in basement level (B1) of MHESA building. |
2022-184 Implemented on: 2022-07-08 | Removed | Elena Bylinskaia In consultation with: Elena Bylinskaia, Elena Bylinskaia | Targets | STF Water Jacket level STF Water Jacket level | Approved by Luis Moskven. Wate ... Approved by Luis Moskven. Water level checked ok. To avoid MP on water level. |
2022-183 Implemented on: 2022-07-08 | Removed | Kathleen Genge In consultation with: , | Fire Alarm System | All FAS Zones Offline until 15 ... All FAS Zones Offline until 15:00 | F.A.S testing in IAMI. IAMI do ... F.A.S testing in IAMI. IAMI doesn't have its own zone yet. |
2022-182 Implemented on: 2022-07-06 | Removed | Eric Chapman In consultation with: , | Diagnostics | 2A3 L-R/Halo and U-D/Halo 2A3 L-R/Halo and U-D/Halo | Rastering on BL2A3. Rastering on BL2A3. |
2022-181 Implemented on: 2022-07-04 | Removed | Jason Wait In consultation with: , | Fire Alarm System | FAS Devices 02:001-001, 011, 0 ... FAS Devices 02:001-001, 011, 014, 015, 016, 017 | Renovating the Washroom in Gro ... Renovating the Washroom in Ground Floor and constructing a new washroom and shower in basement level (B1) of MHESA building
|
2022-180 Implemented on: 2022-07-01 | Removed | Elena Bylinskaia In consultation with: Elena Bylinskaia, | RF | I0213 RF resonators latched. I0213 RF resonators latched. | The IL signal lost. Resonators ... The IL signal lost. Resonators confirmed "latched" by RF personnel. |
2022-179 Implemented on: 2022-06-30 | Removed | David Bandiera In consultation with: , | Fire Alarm System | SA G Men's Washroom Smoke Dete ... SA G Men's Washroom Smoke Detector 02:008-041 disarmed | Smoke detector disarmed for so ... Smoke detector disarmed for soldering in light panel in SA G Men's Washroom |
2022-178 Implemented on: 2022-06-30 | Removed | David Bandiera In consultation with: , | Fire Alarm System | FAS Zone 2 offline for 1 hour FAS Zone 2 offline for 1 hour | Bell testing in RCA3 Bell testing in RCA3 |
2022-177 Implemented on: 2022-06-28 | Removed | Gauhar Hayat In consultation with: , | Fire Alarm System | All FAS Zones Offline All FAS Zones Offline | Connecting IAMI FAS system. Connecting IAMI FAS system. |
2022-176 Implemented on: 2022-06-23 | Removed | Eric Chapman In consultation with: , | Targets | BL1A T1 cooling system pressur ... BL1A T1 cooling system pressure and T2 TGT flow warnings dropped | BL1A:T1CS:PGIN:RDPRESS warning ... BL1A:T1CS:PGIN:RDPRESS warning threshold dropped to 42psi from 45psi. BL1A:T2CS:FGTGT:RDFLOW warning threshold dropped from 3.0 to 2.8. Both parameters at warning levels. T2CS:FGTGT:RDFLOW trip value also lowered from 2.8 to 2.5 (Same as T1 flow trip). |
2022-175 Implemented on: 2022-06-23 | Removed | Kathleen Genge In consultation with: , | Targets | STF byp-008 ion exchanger retu ... STF byp-008 ion exchanger return flow | STF byp-008 ion exchanger retu ... STF byp-008 ion exchanger return flow signal noisy, dropping below trip warn sometimes. Approved by Steve Sapriken. |
2022-174 Implemented on: 2022-06-22 | Removed | David Bandiera In consultation with: , | Fire Alarm System | ARIEL Target Hall Linear Beam ... ARIEL Target Hall Linear Beam Detectors 09:095-001 & 002 disarmed | Craning Hot Cell materials int ... Craning Hot Cell materials into ARIEL Target Hall |
2022-173 Implemented on: 2022-06-20 | Removed | Jason Wait In consultation with: , | Fire Alarm System | FAS Service Annex Node 2 bells ... FAS Service Annex Node 2 bells and strobes disarmed, and FAS zone 2 put into test mode with the monitoring company | Troubleshooting, inspection an ... Troubleshooting, inspection and repair of fire alarm system in Trailer Gg. FAS Service Annex Node 2 bells and strobes disarmed, and FAS zone 2 put into test mode with the monitoring company. |
2022-171 Implemented on: 2022-06-17 | Removed | Jason Wait In consultation with: , | Fire Alarm System | F.A.S. devices - 05-054-002, 0 ... F.A.S. devices - 05-054-002, 003 and 004. | Smoke detectors disarmed for w ... Smoke detectors disarmed for work taking place in ISAC-1 Experimental hall |
2022-170 Implemented on: 2022-06-14 | Removed | David Bandiera In consultation with: , | Fire Alarm System | Trailer Gg Extension Collectiv ... Trailer Gg Extension Collective Zone 02:002-089 | Device went into alarm twice t ... Device went into alarm twice the evening of June 14 2022. VFRS attended, found no fire or other problem, and advised defeating the device until it can be repaired |
2022-169 Implemented on: 2022-06-14 | Removed | Jason Wait In consultation with: , | Fire Alarm System | FAS zone 2 offline for 2 hours FAS zone 2 offline for 2 hours | Zone 2 offline with the monito ... Zone 2 offline with the monitoring company for FAS work under WP C2022-06-14-14 |
2022-168 Implemented on: 2022-06-14 | Removed | Jason Wait In consultation with: , | Fire Alarm System | F.A.S. 02:001-001/011/014/015/ ... F.A.S. 02:001-001/011/014/015/016/017 MHESA B1 | Smoke detectors disarmed for w ... Smoke detectors disarmed for washroom renovations in the MHESA building. |
2022-167 Implemented on: 2022-06-10 | Removed | David Bandiera In consultation with: , | Fire Alarm System | F.A.S. 02:001-001/011/014/015/ ... F.A.S. 02:001-001/011/014/015/016/017 MHESA B1 | Smoke detectors disarmed for w ... Smoke detectors disarmed for washroom renovations in the MHESA building. |
2022-166 Implemented on: 2022-06-10 | Removed | Eric Chapman In consultation with: , | Safety | BSM #20 working trip limit rai ... BSM #20 working trip limit raised | High current in BL2A causing B ... High current in BL2A causing BSM #20 warnings. |
2022-165 Implemented on: 2022-06-09 | Removed | Ryan Lovelidge In consultation with: , | Fire Alarm System | F.A.S. 02:001-001/011/014/015/ ... F.A.S. 02:001-001/011/014/015/016/017 MHESA B1 | Smoke detectors disarmed for w ... Smoke detectors disarmed for washroom renovations in the MHESA building. |
2022-164 Implemented on: 2022-06-09 | Removed | Ryan Lovelidge In consultation with: , | Fire Alarm System | FAS zone 2 offline for 8 hours FAS zone 2 offline for 8 hours | To accommodate addition and re ... To accommodate addition and reloaction of FAS devices in ISIS. |
2022-163 Implemented on: 2022-06-08 | Removed | Elena Bylinskaia In consultation with: Elena Bylinskaia, | Ion sources and injection BL | ISIS Skimmer #3 ISIS Skimmer #3 | To increase the circulating be ... To increase the circulating beam in the cyclotron. |
2022-162 Implemented on: 2022-06-08 | Removed | Ryan Lovelidge In consultation with: , | Fire Alarm System | 02:008-028/033 02:008-028/033 | SA smoke detectors disarmed fo ... SA smoke detectors disarmed for a cable pull in the SA computer room. |
2022-161 Implemented on: 2022-06-08 | Removed | Ryan Lovelidge In consultation with: , | Fire Alarm System | F.A.S. 02:001-001/011/014/015/ ... F.A.S. 02:001-001/011/014/015/016/017 MHESA B1 | Renovating the Washroom in Gro ... Renovating the Washroom in Ground Floor and constructing a new washroom and shower in basement level (B1) of MHESA building. |
2022-160 Implemented on: 2022-06-07 | Removed | Jason Wait In consultation with: , | Safety | IBOP I1619 - GAS Monitor # 19 ... IBOP I1619 - GAS Monitor # 19 - ISAC O2 (RIB OPS) CSS signal defeated | The area is locked and secured ... The area is locked and secured - RIB Ops has instructed the DCR that there is no ability to access the area and that the alarm will persist until further notice. O2 monitor reading 19.7% O2 resulting in alarm. |
2022-159 Implemented on: 2022-06-07 | Removed | Frank Hosta In consultation with: , | Diagnostics | 2A3M20 L-R/Halo & U-D/Halo sig ... 2A3M20 L-R/Halo & U-D/Halo signals pinned in ISAC Electrical Room | Halo too small with 4.0mm beam ... Halo too small with 4.0mm beam spot causing excessive trips. This bypass is for P2N target only. |
2022-158 Implemented on: 2022-06-07 | Removed | Ryan Lovelidge In consultation with: , | Fire Alarm System | F.A.S. 02:001-001/011/014/015/ ... F.A.S. 02:001-001/011/014/015/016/017 MHESA B1 | Renovating the Washroom in Gro ... Renovating the Washroom in Ground Floor and constructing a new washroom and shower in basement level (B1) of MHESA building. |
2022-157 Implemented on: 2022-06-07 | Removed | Ryan Lovelidge In consultation with: , | Fire Alarm System | FAS zone 2 offline FAS zone 2 offline | In conjunction with defeat 202 ... In conjunction with defeat 2022-152 to accommodate reloaction of ISIS smoke detectors. |
2022-156 Implemented on: 2022-06-07 | Removed | Frank Hosta In consultation with: , | Safety | EOXY:SV01 and EOXY:SV02 and EL ... EOXY:SV01 and EOXY:SV02 and ELNS:SV01 bypassed. | Oxygen monitoring system calib ... Oxygen monitoring system calibration today. |
2022-155 Implemented on: 2022-06-05 | Removed | Robin Swanson In consultation with: , | Fire Alarm System | MHESA RCR1 B1 02-001-013 sprin ... MHESA RCR1 B1 02-001-013 sprinkler | Flow/tamper switch has become ... Flow/tamper switch has become faulty and is toggleing every 30seconds - minute. |
2022-154 Implemented on: 2022-06-03 | Removed | Dale Nagra In consultation with: , | Fire Alarm System | All FAS zones offline All FAS zones offline | All 4 FAS zones taken offline ... All 4 FAS zones taken offline until 17:00 with the monitoring company for annual Fire Alarm System deficiency repairs & Fire Suppression System 5 year inspection. |
2022-153 Implemented on: 2022-06-03 | Removed | Dale Nagra In consultation with: , | Fire Alarm System | F.A.S. 02:001-001/011/014/015/ ... F.A.S. 02:001-001/011/014/015/016/017 MHESA B1 | Renovating the Washroom in Gro ... Renovating the Washroom in Ground Floor and constructing a new washroom and shower in basement level (B1) of MHESA building. |
2022-152 Implemented on: 2022-06-02 | Removed | Robin Swanson In consultation with: , | Fire Alarm System | F.A.S. 02:007-028 smoke detect ... F.A.S. 02:007-028 smoke detector | Isolate circuit breakers in P- ... Isolate circuit breakers in P-149 for the receptacles and remove to the new location. |
2022-149 Implemented on: 2022-06-02 | Removed | Robin Swanson In consultation with: , | Fire Alarm System | All FAS zones offline All FAS zones offline | All 4 FAS zones taken offline ... All 4 FAS zones taken offline until 16:00 with the monitoring company for annual Fire Alarm System deficiency repairs & Fire Suppression System 5 year inspection. |
2022-148 Implemented on: 2022-06-01 | Removed | Ryan Lovelidge In consultation with: , | Fire Alarm System | ARIEL Target Hall Linear Beam ... ARIEL Target Hall Linear Beam detectors 09:095-001 and 09:095-002. | Construction work in ARIEL tar ... Construction work in ARIEL target hall. |
2022-147 Implemented on: 2022-05-31 | Active | Jason Wait In consultation with: , | Safety | Air Monitor #5 "ISAC Total Sta ... Air Monitor #5 "ISAC Total Stack Exhaust AlphaTEL1" CSS signal defeated (Pinned in Rack A in DCR) | Air Monitor #5 "ISAC Total Sta ... Air Monitor #5 "ISAC Total Stack Exhaust AlphaTEL1" signal has been moved to Air Monitor #32 "spare" until further notice. |
2022-146 Implemented on: 2022-05-31 | Removed | Brandon Humphries In consultation with: , | Optics | EABD:MB0 signal in MPS Optics ... EABD:MB0 signal in MPS Optics OK summary | EABD:MB0 P/S was locked out (D ... EABD:MB0 P/S was locked out (Disable 2022-124), so this signal needs to be ignored to allow for a beam path through EABD:MB0 to be granted. |
2022-145 Implemented on: 2022-05-31 | Removed | Ryan Lovelidge In consultation with: , | Fire Alarm System | F.A.S. 02:001-001/011/014/015/ ... F.A.S. 02:001-001/011/014/015/016/017 MHESA B1 | Renovating the Washroom in Gro ... Renovating the Washroom in Ground Floor and constructing a new washroom and shower in basement level (B1) of MHESA building. |
2022-143 Implemented on: 2022-05-30 | Removed | Jason Wait In consultation with: , | Fire Alarm System | ARIEL Target Hall Linear Beam ... ARIEL Target Hall Linear Beam detectors 09:095-001 and 09:095-002. | Construction work in ARIEL tar ... Construction work in ARIEL target hall. |
2022-142 Implemented on: 2022-05-30 | Removed | Jason Wait In consultation with: , | Fire Alarm System | FAS devices 9-093-006 / 008 / ... FAS devices 9-093-006 / 008 / 009 / 010 | Building a concrete housekeepi ... Building a concrete housekeeping pad in ARIEL II Penthouse (Level L2) for nuclear ventilation back-up exhaust fan |
2022-141 Implemented on: 2022-05-30 | Removed | Jason Wait In consultation with: , | Fire Alarm System | F.A.S. 02:001-001/011/014/015/ ... F.A.S. 02:001-001/011/014/015/016/017 MHESA B1 | Renovating the Washroom in Gro ... Renovating the Washroom in Ground Floor and constructing a new washroom and shower in basement level (B1) of MHESA building. |
2022-140 Implemented on: 2022-05-27 | Removed | Jason Wait In consultation with: , | Safety | EOXY:SV01 and EOXY:SV02 bypass ... EOXY:SV01 and EOXY:SV02 bypassed. | Oxygen monitoring system calib ... Oxygen monitoring system calibration today. |
2022-139 Implemented on: 2022-05-27 | Removed | Riley Schick-Martin In consultation with: , | Fire Alarm System | F.A.S. 02:001-001/011/014/015/ ... F.A.S. 02:001-001/011/014/015/016/017 MHESA B1 | Renovating the Washroom in Gro ... Renovating the Washroom in Ground Floor and constructing a new washroom and shower in basement level (B1) of MHESA building. |
2022-138 Implemented on: 2022-05-26 | Removed | Kevin Lucow In consultation with: , | Fire Alarm System | ARIEL G North FAS detectors 09 ... ARIEL G North FAS detectors 09:091-019, 09:091-021, 09:091-022, and 09:098-001. | Construction in area. Construction in area. |
2022-137 Implemented on: 2022-05-26 | Removed | Eric Chapman In consultation with: , | Services | ME140 control in 'manual' on D ... ME140 control in 'manual' on DDC again. | Poor DDC control when in 'auto ... Poor DDC control when in 'automatic', risk of coil freeze up during cold weather and overheating of hot deck. Zone mixing and outside air dampers set manually, chiller commanded on. |
2022-136 Implemented on: 2022-05-25 | Removed | Kevin Lucow In consultation with: , | Fire Alarm System | FAS devices 02:008-028 and 02: ... FAS devices 02:008-028 and 02:008-033 SA G underfloor smoke detectors. | Underfloor cable pull. Underfloor cable pull. |
2022-135 Implemented on: 2022-05-25 | Removed | Gauhar Hayat In consultation with: , | Fire Alarm System | F.A.S. 02:-001-001/011/014/015 ... F.A.S. 02:-001-001/011/014/015/016/017 | Renovating the Washroom in Gro ... Renovating the Washroom in Ground Floor and constructing a new washroom and shower in basement level (B1) of MHESA building. |
2022-134 Implemented on: 2022-05-25 | Removed | Gauhar Hayat In consultation with: , | Fire Alarm System | ARIEL Target Hall Linear Beam ... ARIEL Target Hall Linear Beam detectors 09:095-001 and 09:095-002. | Construction work in ARIEL tar ... Construction work in ARIEL target hall. |
2022-133 Implemented on: 2022-05-24 | Removed | Kevin Lucow In consultation with: , | Fire Alarm System | All FAS zones in test mode. All FAS zones in test mode. | Quarterly fire suppression sys ... Quarterly fire suppression system inspection and testing. |
2022-132 Implemented on: 2022-05-24 | Removed | Kevin Lucow In consultation with: , | Safety | EOXY:SV01 and EOXY:SV02 bypass ... EOXY:SV01 and EOXY:SV02 bypassed. | Oxygen monitoring system calib ... Oxygen monitoring system calibration today. |
2022-131 Implemented on: 2022-05-24 | Removed | David Bandiera In consultation with: , | Fire Alarm System | ARIEL Target Hall Linear Beam ... ARIEL Target Hall Linear Beam detectors 09:095-001 and 09:095-002. | Construction work in ARIEL tar ... Construction work in ARIEL target hall. |
2022-130 Implemented on: 2022-05-20 | Removed | Ryan Lovelidge In consultation with: , | Fire Alarm System | ARIEL Target Hall Linear Beam ... ARIEL Target Hall Linear Beam detectors 09:095-001 and 09:095-002. | Construction work in ARIEL tar ... Construction work in ARIEL target hall. |
2022-129 Implemented on: 2022-05-20 | Removed | Frank Hosta In consultation with: , | Fire Alarm System | Zone 4 Test Zone 4 Test | Siemens troubleshooting VESDA ... Siemens troubleshooting VESDA smoke detector. |
2022-127 Implemented on: 2022-05-20 | Removed | Jason Wait In consultation with: , | Fire Alarm System | F.A.S. 02:-001-001/011/014/015 ... F.A.S. 02:-001-001/011/014/015/016/017 | Renovating the Washroom in Gro ... Renovating the Washroom in Ground Floor and constructing a new washroom and shower in basement level (B1) of MHESA building |
2022-126 Implemented on: 2022-05-19 | Removed | Elena Bylinskaia In consultation with: Elena Bylinskaia, | Fire Alarm System | F.A.S. 02:-001-001/011/014/015 ... F.A.S. 02:-001-001/011/014/015/016/017 | Renovating the Washroom in Gro ... Renovating the Washroom in Ground Floor and constructing a new washroom and shower in basement level (B1) of MHESA building |
2022-125 Implemented on: 2022-05-18 | Removed | Kyle Mollard In consultation with: , | Fire Alarm System | F.A.S. 02:-001-001/011/014/015 ... F.A.S. 02:-001-001/011/014/015/016/017 | Renovating the Washroom in Gro ... Renovating the Washroom in Ground Floor and constructing a new washroom and shower in basement level (B1) of MHESA building |
2022-123 Implemented on: 2022-05-17 | Removed | Elena Bylinskaia In consultation with: Elena Bylinskaia, | Fire Alarm System | 02:-001/011/014/015/016 02:-001/011/014/015/016 | Construction work in MHESA, WP ... Construction work in MHESA, WP # C2022-02-23-5 |
2022-121 Implemented on: 2022-05-16 | Removed | Robin Swanson In consultation with: , | Fire Alarm System | F.A.S. 02:-001-001/011/014/015 ... F.A.S. 02:-001-001/011/014/015/016/017 | Renovating the Washroom in Gro ... Renovating the Washroom in Ground Floor and constructing a new washroom and shower in basement level (B1) of MHESA building |
2022-120 Implemented on: 2022-05-13 | Removed | Robert Scheepmaker In consultation with: , | Fire Alarm System | Heat Det 02-001-064 Heat Det 02-001-064 | Device caused false alarm Device caused false alarm |
2022-119 Implemented on: 2022-05-13 | Removed | Robin Swanson In consultation with: , | Fire Alarm System | F.A.S. 02:-001-001/011/014/015 ... F.A.S. 02:-001-001/011/014/015/016/017 | Renovating the Washroom in Gro ... Renovating the Washroom in Ground Floor and constructing a new washroom and shower in basement level (B1) of MHESA building |
2022-116 Implemented on: 2022-05-12 | Removed | Riley Schick-Martin In consultation with: , | Fire Alarm System | F.A.S. 02:-001-001/011/014/015 ... F.A.S. 02:-001-001/011/014/015/016/017 | Renovating the Washroom in Gro ... Renovating the Washroom in Ground Floor and constructing a new washroom and shower in basement level (B1) of MHESA building |
2022-115 Implemented on: 2022-05-11 | Removed | Riley Schick-Martin In consultation with: , | Fire Alarm System | F.A.S. 02:-001-001/011/014/015 ... F.A.S. 02:-001-001/011/014/015/016/017 | Renovating the Washroom in Gro ... Renovating the Washroom in Ground Floor and constructing a new washroom and shower in basement level (B1) of MHESA building |
2022-114 Implemented on: 2022-05-11 | Removed | Jason Wait In consultation with: , | Fire Alarm System | ARIEL Target Hall Linear Beam ... ARIEL Target Hall Linear Beam detectors 09:095-001 and 09:095-002. | Construction work in ARIEL tar ... Construction work in ARIEL target hall. |
2022-113 Implemented on: 2022-05-10 | Removed | Riley Schick-Martin In consultation with: , | Fire Alarm System | ARIEL Target Hall Linear Beam ... ARIEL Target Hall Linear Beam detectors 09:095-001 and 09:095-002. | Construction work in ARIEL tar ... Construction work in ARIEL target hall. |
2022-112 Implemented on: 2022-05-09 | Removed | David Bandiera In consultation with: , | Safety | IBOP 1507 and 1508 pinned. RCR ... IBOP 1507 and 1508 pinned. RCR Lab Warn and ALARM signals | DG-5 power transfer caused the ... DG-5 power transfer caused the RCR Lab Fume Hood Fans to stop and will not reset from HMI |
2022-111 Implemented on: 2022-05-09 | Removed | David Bandiera In consultation with: , | Fire Alarm System | ARIEL Target Hall Linear Beam ... ARIEL Target Hall Linear Beam detectors 09:095-001 and 09:095-002. | Construction work in ARIEL tar ... Construction work in ARIEL target hall. |
2022-110 Implemented on: 2022-05-09 | Removed | David Bandiera In consultation with: , | Fire Alarm System | F.A.S. 02:001-001/011/014/015/ ... F.A.S. 02:001-001/011/014/015/016/017 | Renovating the Washroom in Gro ... Renovating the Washroom in Ground Floor and constructing a new washroom and shower in basement level (B1) of MHESA building
|
2022-109 Implemented on: 2022-05-06 | Removed | Gordon Roy In consultation with: , | Fire Alarm System | ARIEL Target Hall Linear Beam ... ARIEL Target Hall Linear Beam detectors 09:095-001 and 09:095-002. | Construction work in ARIEL tar ... Construction work in ARIEL target hall. |
2022-108 Implemented on: 2022-05-06 | Removed | Gordon Roy In consultation with: , | Fire Alarm System | F.A.S. 02:-001-001/011/014/015 ... F.A.S. 02:-001-001/011/014/015/016/017 | Renovating the Washroom in Gro ... Renovating the Washroom in Ground Floor and constructing a new washroom and shower in basement level (B1) of MHESA building
|
2022-107 Implemented on: 2022-05-05 | Removed | Frank Hosta In consultation with: , | Safety | MHESA RCR1 RM6 ALARM MHESA RCR1 RM6 ALARM | RCR Fan1 VFD Commissioning
... RCR Fan1 VFD Commissioning |
2022-106 Implemented on: 2022-05-05 | Removed | Ryan Lovelidge In consultation with: , | Fire Alarm System | F.A.S. 02:-001-001/011/014/015 ... F.A.S. 02:-001-001/011/014/015/016/017 | Renovating the Washroom in Gro ... Renovating the Washroom in Ground Floor and constructing a new washroom and shower in basement level (B1) of MHESA building
|
2022-105 Implemented on: 2022-05-05 | Removed | Jason Wait In consultation with: , | Fire Alarm System | ARIEL Target Hall Linear Beam ... ARIEL Target Hall Linear Beam detectors 09:095-001 and 09:095-002. | Construction work in ARIEL tar ... Construction work in ARIEL target hall. |
2022-104 Implemented on: 2022-05-04 | Removed | Ryan Lovelidge In consultation with: , | Fire Alarm System | 05:052-031 05:052-031 | ISAC I Penthouse AHU1 smoke de ... ISAC I Penthouse AHU1 smoke detector disarmed for 4 hours for AHU maintenance. |
2022-103 Implemented on: 2022-05-04 | Removed | Ryan Lovelidge In consultation with: , | Fire Alarm System | F.A.S. 02:-001-001/011/014/015 ... F.A.S. 02:-001-001/011/014/015/016/017 | Renovating the Washroom in Gro ... Renovating the Washroom in Ground Floor and constructing a new washroom and shower in basement level (B1) of MHESA building
|
2022-102 Implemented on: 2022-05-03 | Removed | Ryan Lovelidge In consultation with: , | Fire Alarm System | F.A.S. 02:-001-001/011/014/015 ... F.A.S. 02:-001-001/011/014/015/016/017 | Renovating the Washroom in Gro ... Renovating the Washroom in Ground Floor and constructing a new washroom and shower in basement level (B1) of MHESA building
|
2022-101 Implemented on: 2022-05-03 | Removed | Ryan Lovelidge In consultation with: , | Fire Alarm System | ARIEL Target Hall Linear Beam ... ARIEL Target Hall Linear Beam detectors 09:095-001 and 09:095-002. | Construction work in ARIEL tar ... Construction work in ARIEL target hall. |
2022-100 Implemented on: 2022-05-02 | Removed | Elena Bylinskaia In consultation with: Elena Bylinskaia, | Fire Alarm System | ISAC II BD 06:065-001/002/003 ... ISAC II BD 06:065-001/002/003 disarmed. | For for transporting the VECC ... For for transporting the VECC Cryomodule out of the vault. |
2022-99 Implemented on: 2022-05-02 | Removed | Elena Bylinskaia In consultation with: Elena Bylinskaia, | Fire Alarm System | F.A.S. smoke detector 02:001-0 ... F.A.S. smoke detector 02:001-005 disarmed | To install mechanical services ... To install mechanical services (ventilation lines) as part of cell lab renovation project (P412). |
2022-98 Implemented on: 2022-05-02 | Removed | Elena Bylinskaia In consultation with: Elena Bylinskaia, | Fire Alarm System | F.A.S. 02:-001-001/011/014/015 ... F.A.S. 02:-001-001/011/014/015/016/017 | Renovating the Washroom in Gro ... Renovating the Washroom in Ground Floor and constructing a new washroom and shower in basement level (B1) of MHESA building
|
2022-97 Implemented on: 2022-05-02 | Removed | Dale Nagra In consultation with: , | Fire Alarm System | All FAS zones in test mode. All FAS zones in test mode. | FAS system upgrade: Replacing ... FAS system upgrade: Replacing four smoke detectors and uploading new addresses in panels throughout site
|
2022-96 Implemented on: 2022-05-02 | Removed | Elena Bylinskaia In consultation with: Elena Bylinskaia, | Fire Alarm System | BD 09:095-001/002 BD 09:095-001/002 | Welding in the ARIEL Target Ha ... Welding in the ARIEL Target Hall. WP# A2022-04-19-1 |
2022-95 Implemented on: 2022-04-30 | Removed | Kevin Lucow In consultation with: , | Services | Cyclotron Water Systems Config ... Cyclotron Water Systems Configured for Bakeout. | Preparing for cyclotron bakeou ... Preparing for cyclotron bakeout. |
2022-94 Implemented on: 2022-04-29 | Removed | Eric Chapman In consultation with: , | Safety | ISAC Oxygen deficiency alarm p ... ISAC Oxygen deficiency alarm pinnned | IBOP 1619 pinned ok for oxygen ... IBOP 1619 pinned ok for oxygen deficiency calibrations. Nuisance alarms in control room during calibrations/testing. |
2022-93 Implemented on: 2022-04-28 | Removed | Eric Chapman In consultation with: , | Safety | Oxygen dificiency alarm pinnne ... Oxygen dificiency alarm pinnned, EOXY:SV02 bypassed | IBOP 1616 pinned ok for oxygen ... IBOP 1616 pinned ok for oxygen deficiency calibrations. EOXY:SV02 bypassed to permit cyclotron venting during calibrations. |
2022-92 Implemented on: 2022-04-28 | Removed | Eric Chapman In consultation with: , | Fire Alarm System | MHESA 02-001-005 collective MHESA 02-001-005 collective | Contractor installing ventiall ... Contractor installing ventiallation lines as part of "cell lab" renovations, Project 412, WP C2022-04-28-1 |
2022-91 Implemented on: 2022-04-27 | Removed | Kyle Mollard In consultation with: , | Fire Alarm System | FAS Devices 02:001-001, 011, 0 ... FAS Devices 02:001-001, 011, 014, 015, 016, 017 | Renovating the Washroom in Gro ... Renovating the Washroom in Ground Floor and constructing a new washroom and shower in basement level (B1) of MHESA building
|
2022-90 Implemented on: 2022-04-26 | Active | Riley Schick-Martin In consultation with: , | Services | Gas monitor 13 ( Breathable Ai ... Gas monitor 13 ( Breathable Air 1, SAB1) | Monox detector requires servic ... Monox detector requires servicing. |
2022-89 Implemented on: 2022-04-26 | Removed | Robert Scheepmaker In consultation with: , | Services | Gas monitor 13 ( Breathable Ai ... Gas monitor 13 ( Breathable Air 1, SAB1) | Monox detector requires servic ... Monox detector requires servicing. |
2022-88 Implemented on: 2022-04-26 | Removed | Robert Scheepmaker In consultation with: , | Fire Alarm System | MESA Detectors 02-001-001,011, ... MESA Detectors 02-001-001,011,014,015 | Ongoing renovations Ongoing renovations |
2022-87 Implemented on: 2022-04-25 | Removed | Jason Wait In consultation with: , | Fire Alarm System | ARIEL Target Hall Linear Beam ... ARIEL Target Hall Linear Beam detectors 09:095-001 and 09:095-002. | Construction work in ARIEL tar ... Construction work in ARIEL target hall. |
2022-85 Implemented on: 2022-04-21 | Removed | David Bandiera In consultation with: , | Fire Alarm System | 02:001-005 MHESA B1 Rm 01 Smok ... 02:001-005 MHESA B1 Rm 01 Smoke Detector disarmed | Ventilation line installation ... Ventilation line installation in Cell Lab Rm 01 MHESA B1. |
2022-84 Implemented on: 2022-04-20 | Removed | David Bandiera In consultation with: , | Fire Alarm System | 02:001-005 MHESA B1 Rm 01 Smok ... 02:001-005 MHESA B1 Rm 01 Smoke Detector disarmed | Ventilation line installation ... Ventilation line installation in Cell Lab Rm 01 MHESA B1. |
2022-83 Implemented on: 2022-04-19 | Removed | Gordon Roy In consultation with: , | Fire Alarm System | ARIEL FAS Smoke detectors ARIEL FAS Smoke detectors | Each day for week April 19 - 2 ... Each day for week April 19 - 22, the following FAS addresses have to be disarmed for welding in the ARIEL RH Hot Cells area. ARIEL NODE 9: devices: 094-002 , 094-003 , 094-004 , 094-009 , 094-010 , 094-013 , 094-014 , 094-015 , along with the ARIEL Target Hall Beam Detectors: 095-001 , 095-002 |
2022-82 Implemented on: 2022-04-08 | Removed | Kyle Mollard In consultation with: , | Fire Alarm System | FAS Devices 02:001-001, 011, 0 ... FAS Devices 02:001-001, 011, 014, 015, 016, 017 | Renovating the Washroom in Gro ... Renovating the Washroom in Ground Floor and constructing a new washroom and shower in basement level (B1) of MHESA building
|
2022-81 Implemented on: 2022-04-07 | Removed | Jason Wait In consultation with: , | Fire Alarm System | FAS Devices 02:001-001, 011, 0 ... FAS Devices 02:001-001, 011, 014, 015, 016, 017 | Renovating the Washroom in Gro ... Renovating the Washroom in Ground Floor and constructing a new washroom and shower in basement level (B1) of MHESA building
|
2022-80 Implemented on: 2022-04-06 | Removed | Jason Wait In consultation with: , | Fire Alarm System | ARIEL FAS detectors off for li ... ARIEL FAS detectors off for liner installation by welding / construction work in ARIEL B2 | Installation of liner by weldi ... Installation of liner by welding in ARIEL B2 hot cell area - Devices inputs disabled at FAS Graphics terminal: Devices: 09-094-002,003,004,009,010,013,014 and devices 09:095-001, 002. |
2022-79 Implemented on: 2022-04-06 | Removed | Jason Wait In consultation with: , | Fire Alarm System | FAS - Smoke detectors off in S ... FAS - Smoke detectors off in SAE L1 for ceiling tile removal/install | Removal and installation of ce ... Removal and installation of ceiling tiles under WP C2022-04-01--3- "Removal of ACM floor tiles and replacement of flooring along SAE L1 corridor" |
2022-78 Implemented on: 2022-04-05 | Removed | Jas Uppal In consultation with: , | Fire Alarm System | 02:001-001, 011, 014, 015 02:001-001, 011, 014, 015 | Renovating the Washroom in Gro ... Renovating the Washroom in Ground Floor and constructing a new washroom and shower in basement level (B1) of MHESA building
|
2022-77 Implemented on: 2022-04-05 | Removed | Jason Wait In consultation with: , | Fire Alarm System | FAS - Smoke detectors off in S ... FAS - Smoke detectors off in SAE L1 for ceiling tile removal/install | Removal and installation of ce ... Removal and installation of ceiling tiles under WP C2022-04-01--3- "Removal of ACM floor tiles and replacement of flooring along SAE L1 corridor" |
2022-76 Implemented on: 2022-04-04 | Removed | Gordon Roy In consultation with: , | Fire Alarm System | Smoke Detectors: 2:001-014 , - ... Smoke Detectors: 2:001-014 , -015, -016, -017 | Demolition and reconstruction ... Demolition and reconstruction of washroom on MHESA G Level. |
2022-75 Implemented on: 2022-04-04 | Removed | Kevin Lucow In consultation with: , | Fire Alarm System | ARIEL Traget Hall Linear Beam ... ARIEL Traget Hall Linear Beam detectors 09:095-001 and 09:095-002. | Construction work in ARIEL tar ... Construction work in ARIEL target hall. |
2022-74 Implemented on: 2022-03-31 | Removed | David Bandiera In consultation with: , | Fire Alarm System | MHESA B1 Smoke Detectors 02:00 ... MHESA B1 Smoke Detectors 02:001-003, 004, 005, 006, 007, 011, 012 | Installation of keypad on door ... Installation of keypad on door of prototype lab |
2022-73 Implemented on: 2022-03-31 | Removed | Ryan Lovelidge In consultation with: , | Safety | IBOP 1507 IBOP 1507 | MESA B1 RCR1 warn alarm pinned ... MESA B1 RCR1 warn alarm pinned for 2 days for hot cell #2 fan VFD replacement. |
2022-72 Implemented on: 2022-03-30 | Removed | Ryan Lovelidge In consultation with: , | Fire Alarm System | MHESA L1 & B1 smoke detectors ... MHESA L1 & B1 smoke detectors disarmed | 02:001-014/015/016/017 and 02: ... 02:001-014/015/016/017 and 02:001-011/012 disarmed for MHESA washroom renovation. |
2022-70 Implemented on: 2022-03-29 | Removed | Kyle Mollard In consultation with: , | Fire Alarm System | MHESA B1 Rm 01B Smoke Detector ... MHESA B1 Rm 01B Smoke Detector (02:001-005) | Plumbing of the new sink in MH ... Plumbing of the new sink in MHESA basement cell lab. |
2022-69 Implemented on: 2022-03-28 | Removed | Elena Bylinskaia In consultation with: Dale Nagra, | Fire Alarm System | F.A.S. Zone 1,2,3 and 4 in tes ... F.A.S. Zone 1,2,3 and 4 in tests mode. | F.A.S. upgrades. Connection ne ... F.A.S. upgrades. Connection new fire alarm system Panel N12(Service Building) with existing main system as per WP#C2022-03-23-2 |
2022-66 Implemented on: 2022-03-25 | Removed | Elena Bylinskaia In consultation with: Dale Nagra, | Fire Alarm System | 09:095-001, 09:095-002 09:095-001, 09:095-002 | Craning work in the ARIEL Targ ... Craning work in the ARIEL Target Hall. |
2022-64 Implemented on: 2022-03-24 | Removed | Robert Scheepmaker In consultation with: , | Fire Alarm System | MHESA Detectors 02-001-001,014 MHESA Detectors 02-001-001,014 | Construction in the area Construction in the area |
2022-62 Implemented on: 2022-03-23 | Removed | Robin Swanson In consultation with: , | Fire Alarm System | All FAS zones in test mode. All FAS zones in test mode. | FAS system upgrade: Connection ... FAS system upgrade: Connection of new fire alarm system Panel N12(Service Building) with existing main system. |
2022-60 Implemented on: 2022-03-21 | Removed | Riley Schick-Martin In consultation with: , | Fire Alarm System | 02:001-139,140,141 smoke detec ... 02:001-139,140,141 smoke detectors | Cutting and grinding nearby (W ... Cutting and grinding nearby (WP #C2022-03-21-3) |
2022-59 Implemented on: 2022-03-17 | Removed | David Bandiera In consultation with: , | Fire Alarm System | MHESA G smoke detectors 02:001 ... MHESA G smoke detectors 02:001-014, 02:001-015, 02:001-016, 02:001-017, and B1 02:001-011, 02:001-012. | Construction/renovation of MHE ... Construction/renovation of MHESA G/B1 washrooms. |
2022-57 Implemented on: 2022-03-16 | Removed | Robin Swanson In consultation with: , | Fire Alarm System | MHESA G smoke detectors 02:001 ... MHESA G smoke detectors 02:001-014, 02-001-015, 02-001-017, and B1 02:001-011, 02:001-012. | Construction/renovation of MHE ... Construction/renovation of MHESA G/B1 washrooms. |
2022-56 Implemented on: 2022-03-15 | Removed | David Bandiera In consultation with: , | Fire Alarm System | 09:095-001 & 09:095-002 ARIEL ... 09:095-001 & 09:095-002 ARIEL Target Hall LBDs | Crane VFD installation in ARIE ... Crane VFD installation in ARIEL Target Hall |
2022-55 Implemented on: 2022-03-14 | Removed | Ryan Lovelidge In consultation with: , | Fire Alarm System | 02:008-033 02:008-033 | SA L1 smoke detector disarmed ... SA L1 smoke detector disarmed for network cable installation. |
2022-54 Implemented on: 2022-03-11 | Removed | Kyle Mollard In consultation with: , | Fire Alarm System | ISAC II Strobe (06:068-003) ISAC II Strobe (06:068-003) | Strobe was flashing while node ... Strobe was flashing while node was Normal. Looking to troubleshoot tomorrow. Might be a fault. |
2022-53 Implemented on: 2022-03-11 | Removed | Kyle Mollard In consultation with: , | Fire Alarm System | ISAC I B1 Cold Lab Smoke Detec ... ISAC I B1 Cold Lab Smoke Detectors (05-051-045/46/47) | Use of Smoke Tester - Commissi ... Use of Smoke Tester - Commissioning of E-Spinner Glove Box |
2022-52 Implemented on: 2022-03-11 | Removed | Ryan Lovelidge In consultation with: , | Fire Alarm System | ISAC II accelerator vault LBD' ... ISAC II accelerator vault LBD's | 06:065-001/002/003 disarmed fo ... 06:065-001/002/003 disarmed for 8 hours for annual crane inspection. |
2022-51 Implemented on: 2022-03-10 | Removed | Kevin Lucow In consultation with: , | Fire Alarm System | All FAS zones in test mode. All FAS zones in test mode. | FAS Bell Testing. FAS Bell Testing. |
2022-50 Implemented on: 2022-03-09 | Removed | Robin Swanson In consultation with: , | Fire Alarm System | Radiochemistry Annex basement ... Radiochemistry Annex basement Lab 007 detectors and ducts. | Hot work in Radiochemistry Ann ... Hot work in Radiochemistry Annex basement Lab 007. |
2022-49 Implemented on: 2022-03-09 | Removed | Brandon Humphries In consultation with: , | Ion sources and injection BL | EGUN:BIAS interlock defeated, ... EGUN:BIAS interlock defeated, EGUN:CATHB signal forced and vacuum interlock changed | To allow for EGUN:BIAS HV cond ... To allow for EGUN:BIAS HV conditioning without tripping at the usual vacuum trip point or needing the EGUN:CATHB running.
To prevent trips and allow for conditioning, the EGUN:BIAS vacuum interlock was changed from 1e-7 Torr (interlock was "EGUN:IG1 < 100nTorr") to 1e-6 Torr ("EGUN:IG1 < 1uTorr"). For EGUN:BIAS HV conditioning, the HV cabling is configured in such a way that the EGUN:CATHB and EGUN:CHT are disconnected. To allow for the EGUN:BIAS to turned on for conditioning, the "EGUN:CATHB>50V" interlock has been forced to be okay. This allows for protection from the other EGUN:BIAS interlocks (instead of bypassing the EGUN:BIAS through EPICS as described in the procedure). Defeat was approved by Friedhelm and implemented by Julie (of Controls group). |
2022-48 Implemented on: 2022-03-09 | Removed | Eric Chapman In consultation with: , | Safety | MHESA B1 RCR1 RM6 warn/alarm MHESA B1 RCR1 RM6 warn/alarm | MSRV replacing faulty belt on ... MSRV replacing faulty belt on fume hood fan. |
2022-47 Implemented on: 2022-03-09 | Removed | Kevin Lucow In consultation with: , | Fire Alarm System | MHESA G smoke detectors 02:001 ... MHESA G smoke detectors 02:001-014, 02-001-015, 02-001-017, and B1 02:001-011, 02:001-012. | Construction/renovation of MHE ... Construction/renovation of MHESA G/B1 washrooms. |
2022-46 Implemented on: 2022-03-09 | Removed | Kevin Lucow In consultation with: , | Fire Alarm System | MHESA G smoke detectors 02:001 ... MHESA G smoke detectors 02:001-014, 02-001-015, 02-001-017, and B1 02:001-011, 02:001-012. | Construction/renovation of MHE ... Construction/renovation of MHESA G/B1 washrooms. |
2022-45 Implemented on: 2022-03-08 | Removed | Kevin Lucow In consultation with: , | Fire Alarm System | MHESA G smoke detectors 02:001 ... MHESA G smoke detectors 02:001-014, 02-001-015, and 02-001-017. | Construction/renovation of MHE ... Construction/renovation of MHESA G washrooms. |
2022-44 Implemented on: 2022-03-07 | Removed | Jas Uppal In consultation with: , | Safety | MHESA B1 RCR1 RM6 warn/alarm MHESA B1 RCR1 RM6 warn/alarm | Hotcell fan 1 has been down fo ... Hotcell fan 1 has been down for awhile. Hotcell fan 2 is now off due to failing belt on the fan. |
2022-43 Implemented on: 2022-03-03 | Removed | Jason Wait In consultation with: , | Fire Alarm System | FAS Zone 2 offline with the mo ... FAS Zone 2 offline with the monitoring company until 16:00 - Zone 2 disarmed at FAS Graphics terminal | Replacing TRI-Modules under WP ... Replacing TRI-Modules under WP C2022-02-24-2 - FAS zone 2 offline with the monitoring company until 16:00, and zone 2 disarmed at FAS Graphics terminal |
2022-42 Implemented on: 2022-03-03 | Removed | Jason Wait In consultation with: , | Fire Alarm System | ARIEL Target Hall Linear Beam ... ARIEL Target Hall Linear Beam detectors 09:095-001 and 09:095-002. | Craning hot cell build materia ... Craning hot cell build materials through ARIEL building roof hatch -
|
2022-40 Implemented on: 2022-03-01 | Removed | Jason Wait In consultation with: , | Fire Alarm System | FAS - Smoke detectors off in S ... FAS - Smoke detectors off in SAE L1 | Floor replacement under WP C20 ... Floor replacement under WP C2022-02-22-1 - "Removal of ACM floor tiles and replacement of flooring along SAE L1 corridor" |
2022-38 Implemented on: 2022-02-24 | Removed | Ryan Lovelidge In consultation with: , | Fire Alarm System | FAS zone 4 FAS zone 4 | FAS zone 4 offline for 3 hours ... FAS zone 4 offline for 3 hours for sprinkler system work in ARIEL. |
2022-37 Implemented on: 2022-02-24 | Removed | Ryan Lovelidge In consultation with: , | Fire Alarm System | FAS Zone 2 FAS Zone 2 | FAS zone 2 offline until 1600H ... FAS zone 2 offline until 1600H for module replacement in the RH building and MCR. |
2022-31 Implemented on: 2022-02-14 | Removed | Jason Wait In consultation with: , | Fire Alarm System | All FAS zones offline All FAS zones offline | All 4 FAS zones taken offline ... All 4 FAS zones taken offline until 16:00 with the monitoring company for work relating to WP C2022-02-14--2 |
2022-29 Implemented on: 2022-02-11 | Removed | Jason Wait In consultation with: , | Fire Alarm System | FAS Zone 4 FAS Zone 4 | FAS Zone 4 taken offline until ... FAS Zone 4 taken offline until 15:00 with the monitoring company - Connecting New Vesda F/A equipment to the existing Fire Alarm system in the ARIEL B2 South Lobby and commission.
|
2022-27 Implemented on: 2022-02-10 | Removed | Eric Chapman In consultation with: , | Fire Alarm System | RCR flow switch RCR flow switch | 02-001-013 RCR sprinkler flow ... 02-001-013 RCR sprinkler flow switch troubles coming in persistently on graphics panel. |
2022-26 Implemented on: 2022-02-09 | Removed | David Bandiera In consultation with: , | Fire Alarm System | All FAS zones offline All FAS zones offline | All 4 FAS zones taken offline ... All 4 FAS zones taken offline until 16:00 with the monitoring company for annual Fire Alarm System verification. |
2022-25 Implemented on: 2022-02-08 | Removed | David Bandiera In consultation with: , | Fire Alarm System | 02:001-005 02:001-005 | Ventilation work in RCR Lab Rm ... Ventilation work in RCR Lab Rm01 MHESA B1. WP #C2022-02-08-2 |
2022-24 Implemented on: 2022-02-08 | Removed | David Bandiera In consultation with: , | Fire Alarm System | All FAS zones offline All FAS zones offline | All 4 FAS zones taken offline ... All 4 FAS zones taken offline until 15:00 with the monitoring company for annual Fire Alarm System verification. See WP #C2022-01-25-1. |
2022-22 Implemented on: 2022-02-07 | Removed | Ryan Lovelidge In consultation with: , | Fire Alarm System | All FAS zones offline All FAS zones offline | All 4 FAS zones taken offline ... All 4 FAS zones taken offline until 16:00 with the monitoring company for annual Fire Alarm System verification. See WP #C2022-01-25-1. |
2022-21 Implemented on: 2022-02-04 | Removed | Kyle Mollard In consultation with: , | Fire Alarm System | All FAS zones offline All FAS zones offline | All 4 FAS zones taken offline ... All 4 FAS zones taken offline until 16:00 with the monitoring company for annual Fire Alarm System verification |
2022-20 Implemented on: 2022-02-03 | Removed | Elena Bylinskaia In consultation with: Elena Bylinskaia, | Fire Alarm System | 02:001-005 02:001-005 | Plumbing work in RCRL MHESA. W ... Plumbing work in RCRL MHESA. WP #C2022-02-03-2 |
2022-19 Implemented on: 2022-02-03 | Removed | Dale Nagra In consultation with: , | Fire Alarm System | All FAS zones offline All FAS zones offline | All 4 FAS zones taken offline ... All 4 FAS zones taken offline until 16:00 with the monitoring company for annual Fire Alarm System verification |
2022-18 Implemented on: 2022-02-02 | Removed | Brandon Humphries In consultation with: , | Ion sources and injection BL | EGUN:BIAS interlock defeated, ... EGUN:BIAS interlock defeated, EGUN:CATHB signal forced and vacuum interlock changed | To allow for EGUN:BIAS HV cond ... To allow for EGUN:BIAS HV conditioning without tripping at the usual vacuum trip point or needing the EGUN:CATHB running.
To prevent trips and allow for conditioning, the EGUN:BIAS vacuum interlock was changed from 1e-7 Torr (interlock was "EGUN:IG1 < 100nTorr") to 1e-6 Torr ("EGUN:IG1 < 1uTorr"). For EGUN:BIAS HV conditioning, the HV cabling is configured in such a way that the EGUN:CATHB and EGUN:CHT are disconnected. To allow for the EGUN:BIAS to turned on for conditioning, the "EGUN:CATHB>50V" interlock has been forced to be okay. This allows for protection from the other EGUN:BIAS interlocks (instead of bypassing the EGUN:BIAS through EPICS as described in the procedure). Defeat was approved by Friedhelm and implemented by Julie (of Controls group). |
2022-17 Implemented on: 2022-02-02 | Removed | Dale Nagra In consultation with: , | Fire Alarm System | All FAS zones offline All FAS zones offline | All 4 FAS zones taken offline ... All 4 FAS zones taken offline until 15:00 with the monitoring company for annual Fire Alarm System verification |
2022-16 Implemented on: 2022-02-01 | Removed | Dale Nagra In consultation with: , | Fire Alarm System | All FAS zones offline All FAS zones offline | All 4 FAS zones taken offline ... All 4 FAS zones taken offline until 15:00 with the monitoring company for annual Fire Alarm System verification |
2022-15 Implemented on: 2022-01-31 | Removed | Eric Chapman In consultation with: , | Fire Alarm System | All FAS zones offline All FAS zones offline | All 4 FAS zones taken offline ... All 4 FAS zones taken offline until 16:00 with the monitoring company for annual Fire Alarm System verification |
2022-13 Implemented on: 2022-01-28 | Removed | Eric Chapman In consultation with: , | Fire Alarm System | All FAS zones offline All FAS zones offline | All 4 FAS zones taken offline ... All 4 FAS zones taken offline until 16:00 with the monitoring company for annual Fire Alarm System verification |
2022-12 Implemented on: 2022-01-27 | Removed | Jason Wait In consultation with: , | Fire Alarm System | All FAS zones offline All FAS zones offline | All 4 FAS zones taken offline ... All 4 FAS zones taken offline until 15:00 with the monitoring company for annual Fire Alarm System verification |
2022-11 Implemented on: 2022-01-26 | Removed | Jason Wait In consultation with: , | Fire Alarm System | All FAS zones offline All FAS zones offline | All 4 FAS zones taken offline ... All 4 FAS zones taken offline until 16:00 with the monitoring company for annual Fire Alarm System verification |
2022-10 Implemented on: 2022-01-25 | Removed | Riley Schick-Martin In consultation with: , | Safety | IBOP 1614 (Breathable Air CO m ... IBOP 1614 (Breathable Air CO monitor #2) pinned | Monitor is being replaced as p ... Monitor is being replaced as per WP # C2022-01-25-3. |
2022-9 Implemented on: 2022-01-25 | Removed | Jason Wait In consultation with: , | Fire Alarm System | All FAS zones offline All FAS zones offline | All 4 FAS zones taken offline ... All 4 FAS zones taken offline until 16:00 with the monitoring company for annual Fire Alarm System verification |
2022-8 Implemented on: 2022-01-18 | Removed | Ryan Lovelidge In consultation with: , | Fire Alarm System | ARIEL Target Hall Linear Beam ... ARIEL Target Hall Linear Beam detectors 09:095-001 and 09:095-002. | Construction work in ARIEL tar ... Construction work in ARIEL target hall. |
2022-7 Implemented on: 2022-01-13 | Removed | Eric Chapman In consultation with: , | Fire Alarm System | MOB AHU7 and 8 duct smokes MOB AHU7 and 8 duct smokes | Grinding of concrete in CRM la ... Grinding of concrete in CRM lab RM 149. 01-035-032/033/034 AHU #7 and #8 duct smokes disabled. |
2022-6 Implemented on: 2022-01-10 | Removed | Eric Chapman In consultation with: , | Services | Cu-LCW pumps slowed down. Cu-LCW pumps slowed down. | MMPS supply and return valves ... MMPS supply and return valves closed by Arthur for shutdown maintenance. Pumps slowed down to maintain 100psi on Cu-LCW. |
2022-4 Implemented on: 2022-01-05 | Removed | Eric Chapman In consultation with: , | Fire Alarm System | ARIEL Target Hall Linear Beam ... ARIEL Target Hall Linear Beam detectors 09:095-001 and 09:095-002. | Construction work in ARIEL tar ... Construction work in ARIEL target hall. |
2022-2 Implemented on: 2022-01-03 | Removed | Eric Chapman In consultation with: , | Services | MAB cooling towers, numerous c ... MAB cooling towers, numerous cells switched off, low cooling demand | Low cooling demand, accelerato ... Low cooling demand, accelerators offline for shutdown. Allow for regulation of system temperatures. |
2022-1 Implemented on: 2022-01-02 | Removed | Eric Chapman In consultation with: , | Services | ME140 via DDC, numerous parame ... ME140 via DDC, numerous parameters in 'manual' | Poor DDC control when in 'auto ... Poor DDC control when in 'automatic', risk of coil freeze up during cold weather and overheating of hot deck. Zone mixing dampers oscillating resulting in poor temperature regulation, overheating Server room. OAD closed to 10% as requested by Pete. |
2021-427 Implemented on: 2021-12-30 | Removed | Riley Schick-Martin In consultation with: , | Fire Alarm System | 02:002-052 & 02:007-051 disarm ... 02:002-052 & 02:007-051 disarmed | Water leak in area. Detectors ... Water leak in area. Detectors may fault. |
2021-426 Implemented on: 2021-12-27 | Removed | Micheal Donohoe In consultation with: , | Fire Alarm System | 02:001-013 MHESA B1 RCRLAB SPR ... 02:001-013 MHESA B1 RCRLAB SPRINKLER | Device is toggling in/out of t ... Device is toggling in/out of trouble every 5 or 10 minutes. |
2021-425 Implemented on: 2021-12-23 | Removed | Kyle Mollard In consultation with: , | Fire Alarm System | ARIEL Target Hall Linear Beam ... ARIEL Target Hall Linear Beam detectors 09:095-001 and 09:095-002. | Construction work in ARIEL tar ... Construction work in ARIEL target hall. |
2021-422 Implemented on: 2021-12-22 | Removed | Kyle Mollard In consultation with: , | Fire Alarm System | ARIEL Target Hall Linear Beam ... ARIEL Target Hall Linear Beam detectors 09:095-001 and 09:095-002. | Construction work in ARIEL tar ... Construction work in ARIEL target hall. |
2021-421 Implemented on: 2021-12-22 | Removed | Kevin Lucow In consultation with: , | Safety | CSS Defeat Timer. IBOP 1006 un ... CSS Defeat Timer. IBOP 1006 unplugged. | 2021 Winter Shutdown. 2021 Winter Shutdown. |
2021-420 Implemented on: 2021-12-21 | Removed | David Bandiera In consultation with: , | Services | Al-ALCW Heat Exchangers Valves ... Al-ALCW Heat Exchangers Valves H-18 closed and D-17 throttled | RF, Main Magnet and most heat ... RF, Main Magnet and most heat loads off for winter shutdown |
2021-419 Implemented on: 2021-12-21 | Removed | Kyle Mollard In consultation with: , | Safety | BSM 30,31,32, and 34 trip limi ... BSM 30,31,32, and 34 trip limits raised | Approval by Yuri and Joe as BS ... Approval by Yuri and Joe as BSM(s) trip as new 2A wirescanner is run. Trips last for less than a second. |
2021-418 Implemented on: 2021-12-21 | Removed | Kyle Mollard In consultation with: , | Fire Alarm System | Zone 2 offline Zone 2 offline | FAS work concerning TRI Module ... FAS work concerning TRI Module 80, Flow switch and Tamper switch 002-055, Pull Station 002-081. Zone 2 will be offline until 16:00 |
2021-417 Implemented on: 2021-12-21 | Removed | Kyle Mollard In consultation with: , | Fire Alarm System | ARIEL Target Hall Linear Beam ... ARIEL Target Hall Linear Beam detectors 09:095-001 and 09:095-002. | Construction work in ARIEL tar ... Construction work in ARIEL target hall. |
2021-416 Implemented on: 2021-12-20 | Removed | Jason Wait In consultation with: , | Fire Alarm System | ARIEL Target Hall Linear Beam ... ARIEL Target Hall Linear Beam detectors 09:095-001 and 09:095-002. | Construction work in ARIEL tar ... Construction work in ARIEL target hall. |
2021-415 Implemented on: 2021-12-17 | Removed | Jason Wait In consultation with: , | Fire Alarm System | ARIEL Target Hall Linear Beam ... ARIEL Target Hall Linear Beam detectors 09:095-001 and 09:095-002. | Construction work in ARIEL tar ... Construction work in ARIEL target hall. |
2021-414 Implemented on: 2021-12-16 | Removed | David Bandiera In consultation with: , | Safety | Air Monitor #9 Meson Hall, TNF ... Air Monitor #9 Meson Hall, TNF Area Warn limit raised from 5kCPM to 6kCPM | Air Monitor #9 Warn limit rais ... Air Monitor #9 Warn limit raised from 5kCPM to 6kCPM for >110uA 1A extracted current. Approved by Joe Mildenberger. |
2021-413 Implemented on: 2021-12-16 | Removed | Micheal Donohoe In consultation with: , | Safety | Air Monitor #2 Warn limit rais ... Air Monitor #2 Warn limit raised from 30kCPM to 32kCPM | Air Monitor #2 Warn limit rais ... Air Monitor #2 Warn limit raised from 30kCPM to 32kCPM for >110uA 1A extracted current. Approved by Joe Mildenberger. |
2021-412 Implemented on: 2021-12-16 | Removed | Micheal Donohoe In consultation with: , | Fire Alarm System | ARIEL Traget Hall Linear Beam ... ARIEL Traget Hall Linear Beam detectors 09:095-001 and 09:095-002. | Construction work in ARIEL tar ... Construction work in ARIEL target hall. |
2021-411 Implemented on: 2021-12-15 | Removed | Eric Chapman In consultation with: , | Safety | BSM #63 raised from 30 to 33 BSM #63 raised from 30 to 33 | Increased proton flux at IPF f ... Increased proton flux at IPF for thorium target irradiaton (L124) causing warning alarms on BSM #63. BL1A current increased from 100uA to >110uA to meet desired charge on thorium target (Ac-225) by Tuesday. |
2021-410 Implemented on: 2021-12-15 | Removed | David Bandiera In consultation with: , | Fire Alarm System | ARIEL Traget Hall Linear Beam ... ARIEL Traget Hall Linear Beam detectors 09:095-001 and 09:095-002. | Construction work in ARIEL tar ... Construction work in ARIEL target hall. |
2021-409 Implemented on: 2021-12-14 | Removed | Micheal Donohoe In consultation with: , | Fire Alarm System | ARIEL Traget Hall Linear Beam ... ARIEL Traget Hall Linear Beam detectors 09:095-001 and 09:095-002. | Construction work in ARIEL tar ... Construction work in ARIEL target hall. |
2021-408 Implemented on: 2021-12-13 | Removed | Dale Nagra In consultation with: , | Fire Alarm System | ARIEL Traget Hall Linear Beam ... ARIEL Traget Hall Linear Beam detectors 09:095-001 and 09:095-002. | Construction work in ARIEL tar ... Construction work in ARIEL target hall. |
2021-407 Implemented on: 2021-12-12 | Removed | Eric Chapman In consultation with: , | Targets | BL1A T2 cooling flow trip redu ... BL1A T2 cooling flow trip reduced | T2 target water flow below war ... T2 target water flow below warning threshold of at ~3.2GPM. Noise on signal causing water package trips. T2CS:FGTGT warning lowered to 3.0GPM from 3.5GPM and Trip threshold lowered from 2.8 GPM to 2.5GPM as done in the past. |
2021-406 Implemented on: 2021-12-11 | Removed | Robert Scheepmaker In consultation with: , | Safety | BSM #32 trip raised from 10 -- ... BSM #32 trip raised from 10 --> 30 | Excessive beam trips caused by ... Excessive beam trips caused by this BSM due to as yet unidentified tuning or component issues. |
2021-405 Implemented on: 2021-12-10 | Removed | Eric Chapman In consultation with: , | Fire Alarm System | ARIEL Traget Hall Linear Beam ... ARIEL Traget Hall Linear Beam detectors 09:095-001 and 09:095-002. | Construction work in ARIEL tar ... Construction work in ARIEL target hall. |
2021-404 Implemented on: 2021-12-09 | Removed | Frank Hosta In consultation with: , | Safety | IBOP 1507 and 1508 RCR1 warn ... IBOP 1507 and 1508 RCR1 warn and alarm | The fume hood fan is undergoin ... The fume hood fan is undergoing maintenance and possibly repair. Vicki has roped off the area and there is no entry to the RCR room. Peter Bratt will notify us when work is complete. |
2021-403 Implemented on: 2021-12-07 | Removed | Frank Hosta In consultation with: , | Fire Alarm System | ARIEL Traget Hall Linear Beam ... ARIEL Traget Hall Linear Beam detectors 09:095-001 and 09:095-002. | Construction work in ARIEL tar ... Construction work in ARIEL target hall. |
2021-402 Implemented on: 2021-12-06 | Removed | Kyle Mollard In consultation with: , | Fire Alarm System | ARIEL Traget Hall Linear Beam ... ARIEL Traget Hall Linear Beam detectors 09:095-001 and 09:095-002. | Construction work in ARIEL tar ... Construction work in ARIEL target hall. |
2021-400 Implemented on: 2021-12-03 | Removed | Kevin Lucow In consultation with: , | Fire Alarm System | ARIEL Traget Hall Linear Beam ... ARIEL Traget Hall Linear Beam detectors 09:095-001 and 09:095-002. | Construction work in ARIEL tar ... Construction work in ARIEL target hall. |
2021-399 Implemented on: 2021-12-02 | Removed | Jason Wait In consultation with: , | Fire Alarm System | ISAC I Experimental hall smoke ... ISAC I Experimental hall smoke detectors - 05:054-002, 003, 004 | Superconducting magnet to be f ... Superconducting magnet to be filled with liquid Helium |
2021-398 Implemented on: 2021-12-01 | Removed | Gordon Roy In consultation with: , | Fire Alarm System | All four Zones off-line with m ... All four Zones off-line with monitoring station | Quarterly sprinkler testing. Quarterly sprinkler testing. |
2021-397 Implemented on: 2021-12-01 | Removed | Jason Wait In consultation with: , | Fire Alarm System | ARIEL Target Hall Linear Beam ... ARIEL Target Hall Linear Beam detectors - 09:095-001 and 09:095-002. | Construction work in ARIEL tar ... Construction work in ARIEL target hall. |
2021-396 Implemented on: 2021-11-30 | Removed | Jason Wait In consultation with: , | Fire Alarm System | ARIEL Target Hall Linear Beam ... ARIEL Target Hall Linear Beam detectors - 09:095-001 and 09:095-002. | Construction work in ARIEL tar ... Construction work in ARIEL target hall. |
2021-395 Implemented on: 2021-11-29 | Removed | David Bandiera In consultation with: , | Fire Alarm System | Zone 4 offline Zone 4 offline | Conduit installation for smoke ... Conduit installation for smoke alarm module |
2021-394 Implemented on: 2021-11-29 | Removed | Micheal Donohoe In consultation with: , | Fire Alarm System | ARIEL Traget Hall Linear Beam ... ARIEL Traget Hall Linear Beam detectors 09:095-001 and 09:095-002. | Construction work in ARIEL tar ... Construction work in ARIEL target hall. |
2021-393 Implemented on: 2021-11-25 | Removed | Kevin Lucow In consultation with: , | Fire Alarm System | ARIEL Traget Hall Linear Beam ... ARIEL Traget Hall Linear Beam detectors 09:095-001 and 09:095-002. | Construction work in ARIEL tar ... Construction work in ARIEL target hall. |
2021-392 Implemented on: 2021-11-24 | Removed | Kevin Lucow In consultation with: , | Fire Alarm System | ARIEL Traget Hall Linear Beam ... ARIEL Traget Hall Linear Beam detectors 09:095-001 and 09:095-002. | Construction work in ARIEL tar ... Construction work in ARIEL target hall. |
2021-391 Implemented on: 2021-11-23 | Removed | Kevin Lucow In consultation with: , | Fire Alarm System | ARIEL Traget Hall Linear Beam ... ARIEL Traget Hall Linear Beam detectors 09:095-001 and 09:095-002. | Construction work in ARIEL tar ... Construction work in ARIEL target hall. |
2021-390 Implemented on: 2021-11-22 | Removed | Riley Schick-Martin In consultation with: , | Fire Alarm System | MHESA B1 devices and zone 2 of ... MHESA B1 devices and zone 2 offline until 1700H | FAS changes in MHESA B1 as per ... FAS changes in MHESA B1 as per WP #C2021-11-22-1. |
2021-389 Implemented on: 2021-11-22 | Removed | Riley Schick-Martin In consultation with: , | Fire Alarm System | 09:095-001/002 09:095-001/002 | Install piping, welding, crane ... Install piping, welding, crane services, grinding cutting. |
2021-388 Implemented on: 2021-11-20 | Removed | David Bandiera In consultation with: , | Targets | STF water jacket low-high and ... STF water jacket low-high and high-low level sensors, BYP-001 and BYP-003 | STF water jacket high-low leve ... STF water jacket high-low level sensor interlock is not satisfied. Bypass required to run beam to STF |
2021-387 Implemented on: 2021-11-18 | Removed | Elena Bylinskaia In consultation with: Elena Bylinskaia, | Fire Alarm System | F.A.S. zones 2 and 4 in test m ... F.A.S. zones 2 and 4 in test mode with ACME. | Sprinklers testing, WP # C2021 ... Sprinklers testing, WP # C2021-11-17-1 |
2021-386 Implemented on: 2021-11-18 | Removed | Riley Schick-Martin In consultation with: , | Fire Alarm System | 09:095-001/002 09:095-001/002 | Install piping, welding, crane ... Install piping, welding, crane services, grinding cutting.
|
2021-385 Implemented on: 2021-11-17 | Removed | Frank Hosta In consultation with: , | Safety | Air Monitor Warn limit raised ... Air Monitor Warn limit raised from 20 to 30k counts/min | Air Monitor #2 warn limit rais ... Air Monitor #2 warn limit raised from 20 to 30k during the high current run. Authorized by Iouri after he talked to Joe Mildenberg. |
2021-384 Implemented on: 2021-11-17 | Removed | Elena Bylinskaia In consultation with: Elena Bylinskaia, | Fire Alarm System | F.A.S. Zone 4 test mode. Bells ... F.A.S. Zone 4 test mode. Bells and strobes disarmed. | Sprinklers testing in ARIEL B ... Sprinklers testing in ARIEL Building. |
2021-383 Implemented on: 2021-11-17 | Removed | Elena Bylinskaia In consultation with: Elena Bylinskaia, | Fire Alarm System | 09:095-001/002 09:095-001/002 | Install piping, welding, crane ... Install piping, welding, crane services, grinding cutting.
|
2021-382 Implemented on: 2021-11-16 | Removed | Kyle Mollard In consultation with: , | Fire Alarm System | 09:095-001 and 09:095-002 line ... 09:095-001 and 09:095-002 linear beam detectors | Install piping, welding, crane ... Install piping, welding, crane services, grinding cutting |
2021-381 Implemented on: 2021-11-16 | Active | Kyle Mollard In consultation with: , | Safety | Air Monitor #17 - ISAC B2 Air ... Air Monitor #17 - ISAC B2 Air Sampling Rm 4 bkgrnd | False alarms despite attempts ... False alarms despite attempts of repair by Safety Systems Group. Defeat approved by J.Mildenberger until 2022.
|
2021-380 Implemented on: 2021-11-16 | Removed | Kyle Mollard In consultation with: , | Fire Alarm System | Zone 2 offline Zone 2 offline | Welding work by a heat gun for ... Welding work by a heat gun for vinyl flooring in the RCA3 Room 122. |
2021-378 Implemented on: 2021-11-15 | Removed | Jason Wait In consultation with: , | Fire Alarm System | 09:095-001 and 09:095-002 line ... 09:095-001 and 09:095-002 linear beam detectors | Install piping, welding, crane ... Install piping, welding, crane services, grinding cutting |
2021-377 Implemented on: 2021-11-12 | Active | Dale Nagra In consultation with: , | Other / Misc | STF PLC bypass 034/035 STF PLC bypass 034/035 | STF stack valve removed from w ... STF stack valve removed from water package. Note: 034/035 are the limit switches for the stack valve. |
2021-374 Implemented on: 2021-11-12 | Removed | Jason Wait In consultation with: , | Fire Alarm System | 09:095-001/002 09:095-001/002 | Cut out old pipe with zip disk ... Cut out old pipe with zip disk in ARIEL Target Hall |
2021-373 Implemented on: 2021-11-10 | Removed | David Bandiera In consultation with: , | Fire Alarm System | 02:001-001, 005, 006 MHESA B1 ... 02:001-001, 005, 006 MHESA B1 Collective Zone, Rm 01A, Rm 01B Smoke Detectors | Construction work in MHESA B1 ... Construction work in MHESA B1 Rm 01 |
2021-372 Implemented on: 2021-11-10 | Removed | Kyle Mollard In consultation with: , | Fire Alarm System | 09:095-001/002 09:095-001/002 | Contractors will be Cutting, g ... Contractors will be Cutting, grinding, welding and installing pipe in ARIEL target pit. |
2021-371 Implemented on: 2021-11-09 | Removed | Kevin Lucow In consultation with: , | Services | Al-ALCW heat exchanger valves ... Al-ALCW heat exchanger valves closed/throttled. | Main magnet and RF off. Main magnet and RF off. |
2021-369 Implemented on: 2021-11-09 | Removed | Micheal Donohoe In consultation with: , | Fire Alarm System | 05:051-046 05:051-046 | Hot work in area. Hot work in area. |
2021-367 Implemented on: 2021-11-09 | Removed | Micheal Donohoe In consultation with: , | Fire Alarm System | 09:095-001/002 09:095-001/002 | Cut out old pipe with zip disk ... Cut out old pipe with zip disk in ARIEL Target Hall |
2021-366 Implemented on: 2021-11-08 | Removed | Eric Chapman In consultation with: , | Fire Alarm System | FAS in zone 2 test until 18:30 FAS in zone 2 test until 18:30 | RCR fume hood testing underway ... RCR fume hood testing underway by Rob Walker |
2021-365 Implemented on: 2021-11-08 | Removed | Eric Chapman In consultation with: , | Fire Alarm System | 09:095-001/002 09:095-001/002 | Cut out old pipe with zip disk ... Cut out old pipe with zip disk in ARIEL Target Hall |
2021-363 Implemented on: 2021-11-05 | Removed | Eric Chapman In consultation with: , | Fire Alarm System | 09:095-001/002 09:095-001/002 | Cut out old pipe with zip disk ... Cut out old pipe with zip disk in ARIEL Target Hall |
2021-362 Implemented on: 2021-11-04 | Removed | Riley Schick-Martin In consultation with: , | Fire Alarm System | 09:095-001/002 09:095-001/002 | Cut out old pipe with zip disk ... Cut out old pipe with zip disk in ARIEL Target Hall |
2021-361 Implemented on: 2021-11-02 | Removed | Riley Schick-Martin In consultation with: , | Fire Alarm System | 09:095-001/002 09:095-001/002 | Cut out old pipe with zip disk ... Cut out old pipe with zip disk in ARIEL Target Hall |
2021-360 Implemented on: 2021-11-01 | Removed | Kyle Mollard In consultation with: , | Fire Alarm System | 09:095-001/002 09:095-001/002 | Cut out old pipe with zip disk ... Cut out old pipe with zip disk in ARIEL Target Hall |
2021-359 Implemented on: 2021-10-29 | Removed | Elena Bylinskaia In consultation with: Elena Bylinskaia, | Fire Alarm System | 09:095-001/002 09:095-001/002 | Cut out old pipe with zip disk ... Cut out old pipe with zip disk in ARIEL Target Hall |
2021-358 Implemented on: 2021-10-29 | Removed | Kyle Mollard In consultation with: , | Fire Alarm System | ISIS L1 & L2 smoke detectors ISIS L1 & L2 smoke detectors | Welding on ISIS mezzanine requ ... Welding on ISIS mezzanine requires the following five smoke detectors to be disarmed:
2-007: -017, -018*, -019, -027, -028 |
2021-357 Implemented on: 2021-10-28 | Removed | David Bandiera In consultation with: , | Fire Alarm System | 02:007-018 SA L1 ISIS I3/I4 Co ... 02:007-018 SA L1 ISIS I3/I4 Console Smoke Detector disarmed | Smoke detector is in work path ... Smoke detector is in work path of ISIS welding / construction work. Cap has been removed. The smoke detector will be re-located by ESRV after construction job has been completed. |
2021-356 Implemented on: 2021-10-28 | Removed | Gordon Roy In consultation with: , | Fire Alarm System | Numerous FAS smoke detectors - ... Numerous FAS smoke detectors - ISIS L1 & L2 | Welding on ISIS mezzanine requ ... Welding on ISIS mezzanine requires the following five smoke detectors to be disarmed:
2-007: -017, -018, -019, -027, -028 |
2021-355 Implemented on: 2021-10-28 | Removed | Jason Wait In consultation with: , | Fire Alarm System | ARIEL Traget Hall Linear Beam ... ARIEL Traget Hall Linear Beam detectors 09:095-001 and 09:095-002. | Construction work in ARIEL tar ... Construction work in ARIEL target hall. |
2021-354 Implemented on: 2021-10-28 | Removed | Gordon Roy In consultation with: , | Fire Alarm System | Smoke Detectors ARIEL B2 South Smoke Detectors ARIEL B2 South | Welding in ARIEL B2 South. The ... Welding in ARIEL B2 South. The following Smoke detectors Inputs were Disabled:
Node 9, Loop 94, Addresses: 02, 03, 04, 07, 09, 10, 13, 14, 15 |
2021-352 Implemented on: 2021-10-27 | Removed | Gordon Roy In consultation with: , | Fire Alarm System | Smoke detectors ARIEL B2 South Smoke detectors ARIEL B2 South | Welding in ARIEL B2 South. The ... Welding in ARIEL B2 South. The following Smoke detectors Inputs were Disabled:
Node 9, Loop 94, Addresses" 02, 03, 04, 07, 09, 10, 13, 14, 15 |
2021-351 Implemented on: 2021-10-26 | Removed | Jason Wait In consultation with: , | Fire Alarm System | ARIEL Traget Hall Linear Beam ... ARIEL Traget Hall Linear Beam detectors 09:095-001 and 09:095-002. | Construction work in ARIEL tar ... Construction work in ARIEL target hall under work permit A2021-10-25--3 |
2021-349 Implemented on: 2021-10-25 | Removed | David Bandiera In consultation with: , | Fire Alarm System | ARIEL B2 Tunnel Heat Detectors ... ARIEL B2 Tunnel Heat Detectors 09:095-003 & Target Hall Linear Beam detectors 09:095-001 and 09:095-002. | Construction work in ARIEL B2 ... Construction work in ARIEL B2 Tunnel |
2021-348 Implemented on: 2021-10-22 | Removed | David Bandiera In consultation with: , | Fire Alarm System | ARIEL B2 Tunnel Heat Detectors ... ARIEL B2 Tunnel Heat Detectors 09:095-003 & Target Hall Linear Beam detectors 09:095-001 and 09:095-002. | Construction work in ARIEL B2 ... Construction work in ARIEL B2 Tunnel |
2021-347 Implemented on: 2021-10-21 | Removed | Kevin Lucow In consultation with: , | Fire Alarm System | Radiochemistry Annex basement ... Radiochemistry Annex basement Lab 007 detectors and ducts. | Hot work in Radiochemistry Ann ... Hot work in Radiochemistry Annex basement Lab 007. |
2021-346 Implemented on: 2021-10-21 | Removed | Jason Wait In consultation with: , | Fire Alarm System | FAS Zone 4 taken offline with ... FAS Zone 4 taken offline with the monitoring company | Alarm bell test as per work pe ... Alarm bell test as per work permit C2021-10-21-1 |
2021-345 Implemented on: 2021-10-20 | Removed | Kevin Lucow In consultation with: , | Fire Alarm System | ARIEL Traget Hall Linear Beam ... ARIEL Traget Hall Linear Beam detectors 09:095-001 and 09:095-002. | Construction work in ARIEL tar ... Construction work in ARIEL target hall. |
2021-344 Implemented on: 2021-10-19 | Removed | Kevin Lucow In consultation with: , | Fire Alarm System | FAS zone 3 in test mode. FAS zone 3 in test mode. | Emergency Response Drill sched ... Emergency Response Drill scheduled for 11:00. |
2021-343 Implemented on: 2021-10-19 | Removed | Kevin Lucow In consultation with: , | Fire Alarm System | Detector 01:035-014 MOB G W.EL ... Detector 01:035-014 MOB G W.ELEC SHOP RM 39 | Soldering. Soldering. |
2021-342 Implemented on: 2021-10-18 | Removed | Riley Schick-Martin In consultation with: , | Fire Alarm System | ARIEL smoke detectors & Zone 4 ARIEL smoke detectors & Zone 4 | Removing stairs in Ariel tgt h ... Removing stairs in Ariel tgt hall. Cutting & grinding until end of day. |
2021-341 Implemented on: 2021-10-16 | Removed | Robert Scheepmaker In consultation with: , | Other / Misc | IBOP 1616 IBOP 1616 | Gas monitor 16 failed. (Oxygen ... Gas monitor 16 failed. (Oxygen Deficiency Monitor E-Hall west) |
2021-340 Implemented on: 2021-10-15 | Removed | Jas Uppal In consultation with: , | Fire Alarm System | 02-001-01, 10, 11, 20, 21 02-001-01, 10, 11, 20, 21 | Test to see if hotcell doors c ... Test to see if hotcell doors can be safely opened with the RCR1 hotcell fan in manual mode. As door opens, use smoke generator to confirm flow is inwards to the HC. |
2021-339 Implemented on: 2021-10-15 | Removed | Riley Schick-Martin In consultation with: , | Fire Alarm System | 02:007-012/013/014/015/016/018 ... 02:007-012/013/014/015/016/018/019 | Grinding and welding work in I ... Grinding and welding work in ISIS area. |
2021-338 Implemented on: 2021-10-15 | Removed | Riley Schick-Martin In consultation with: , | Safety | BSM's # 31,32,33 BSM's # 31,32,33 | To avoid trips while testing p ... To avoid trips while testing prototype wirescanner |
2021-337 Implemented on: 2021-10-14 | Removed | Jas Uppal In consultation with: , | Fire Alarm System | FAS Zone 4 FAS Zone 4 | Disable Zone 4 FA system for t ... Disable Zone 4 FA system for the Ariel Tunnel to allow FA Bell tie in to system. |
2021-336 Implemented on: 2021-10-13 | Removed | David Bandiera In consultation with: , | Fire Alarm System | 09:095-001, 002, 003. ARIEL Ta ... 09:095-001, 002, 003. ARIEL Target Hall Beam Detectors & ARIEL B2 Tunnel Heat Detectors | Cutting, welding, and grinding ... Cutting, welding, and grinding in Target Hall area |
2021-334 Implemented on: 2021-10-07 | Removed | David Bandiera In consultation with: , | Fire Alarm System | 02:001-001 & 02:001-021 MHESA ... 02:001-001 & 02:001-021 MHESA B1 Smoke Detectors | Casework installation in Cell ... Casework installation in Cell Lab in MHESA basement |
2021-333 Implemented on: 2021-10-05 | Removed | David Bandiera In consultation with: , | Fire Alarm System | 02:007-004, 012, 013, 014, 015 ... 02:007-004, 012, 013, 014, 015, 056, 057, 058, 059 | Hot work for ME-141 repairs Hot work for ME-141 repairs |
2021-332 Implemented on: 2021-10-05 | Removed | David Bandiera In consultation with: , | Fire Alarm System | FAS Zone 2 in test mode. FAS Zone 2 in test mode. | FAS work in SAB3 FAS work in SAB3 |
2021-331 Implemented on: 2021-10-04 | Removed | Kevin Lucow In consultation with: , | Fire Alarm System | FAS Zone 2 in test mode. FAS Zone 2 in test mode. | Ventilation smoke test in E tu ... Ventilation smoke test in E tunnel. |
2021-329 Implemented on: 2021-10-04 | Removed | Kevin Lucow In consultation with: , | Fire Alarm System | FAS devices 02:008-030 and 02: ... FAS devices 02:008-030 and 02:008-031 (ELCR floor detectors) | Floor tiles removed for cable ... Floor tiles removed for cable work in old ELCR. |
2021-327 Implemented on: 2021-10-02 | Removed | Robert Scheepmaker In consultation with: , | Safety | IBOP 1507,1508 IBOP 1507,1508 | Alarm sounding in MCR Alarm sounding in MCR |
2021-326 Implemented on: 2021-10-02 | Removed | Kevin Lucow In consultation with: , | Safety | IBOP 0124, 1507, 1508, 1518, 1 ... IBOP 0124, 1507, 1508, 1518, 1519, 1520, 1521, 1613, 1614 | Various safety signals pinned ... Various safety signals pinned during planned power outage. |
2021-324 Implemented on: 2021-09-28 | Removed | Frank Hosta In consultation with: , | Safety | MCR IBOP 1507, 1511, 0124, 151 ... MCR IBOP 1507, 1511, 0124, 1510, 1615, 1621, 1622 | With the planned power outage, ... With the planned power outage, these elements were in constant alarm. They are the vault, STF and 1A exhaust, the RCR1 warn, (also exhaust), and the ARIEL and ISIS gas monitors. |
2021-320 Implemented on: 2021-09-27 | Removed | Kathleen Genge In consultation with: , | Services | Al-ALCW heat exchanger valves ... Al-ALCW heat exchanger valves closed/throttled | Main magnet and RF off for min ... Main magnet and RF off for mini shutdown |
2021-319 Implemented on: 2021-09-24 | Removed | Kyle Mollard In consultation with: , | Fire Alarm System | 02:007-012/013/014/015/016/018 ... 02:007-012/013/014/015/016/018/019 | Grinding and welding work in I ... Grinding and welding work in ISIS area. |
2021-318 Implemented on: 2021-09-23 | Removed | Jason Wait In consultation with: Gordon Roy, | Fire Alarm System | RCA 1 2 and 3 offline for serv ... RCA 1 2 and 3 offline for service work, and zone 2 offline with the monitoring company | FAS Service work to take place ... FAS Service work to take place - RCA 1 2 and 3 offline with the FAS system, and Zone 2 offline with the monitoring company for 8 hours |
2021-317 Implemented on: 2021-09-23 | Removed | Gordon Roy In consultation with: , | Fire Alarm System | Numerous smoke detectors - see ... Numerous smoke detectors - see Comments for list | welding in ARIEL B2 South area ... welding in ARIEL B2 South area (RH Hot Cells) |
2021-316 Implemented on: 2021-09-22 | Removed | Gordon Roy In consultation with: , | Fire Alarm System | Numerous smoke deetectors - se ... Numerous smoke deetectors - see Comments for list | Welding in ARIEL B2 South (Hot ... Welding in ARIEL B2 South (Hot Cell) area. |
2021-315 Implemented on: 2021-09-20 | Removed | Elena Bylinskaia In consultation with: Elena Bylinskaia, | Fire Alarm System | F.A.S. Beam detectors 09-095-0 ... F.A.S. Beam detectors 09-095-001/002 | Welding and grinding in ARIEL ... Welding and grinding in ARIEL Target Hall. WP#A2021-09-20-1 |
2021-314 Implemented on: 2021-09-19 | Active | Eric Chapman In consultation with: , | Targets | 2A3COL-TC2 2A3COL-TC2 | 2A3COL-TC2 readback suddenly d ... 2A3COL-TC2 readback suddenly dropped to -95C at 08:39 15 Sept 2021. TC2 bypassed for this run. |
2021-313 Implemented on: 2021-09-16 | Removed | Eric Chapman In consultation with: , | Fire Alarm System | 02:007-012/013/014/015/016/018 ... 02:007-012/013/014/015/016/018/019 | Grinding and welding work in I ... Grinding and welding work in ISIS area. |
2021-312 Implemented on: 2021-09-16 | Removed | Kevin Lucow In consultation with: , | Fire Alarm System | ISAC 1 Experimental Hall Linea ... ISAC 1 Experimental Hall Linear Beam Detectors: 05:054-002, 05:054-003, and 05:054-004. | Super-Conducting magnet ramp d ... Super-Conducting magnet ramp down, TITAN platform. |
2021-309 Implemented on: 2021-09-10 | Removed | Robert Scheepmaker In consultation with: , | Fire Alarm System | Smk Det 09-094-011,012 Smk Det 09-094-011,012 | Coring in the area. Coring in the area. |
2021-308 Implemented on: 2021-09-10 | Removed | Frank Hosta In consultation with: , | Fire Alarm System | Zone 2 and 3 offline. Zone 2 and 3 offline. | Semi Annual Fire Suppression S ... Semi Annual Fire Suppression System Inspection |
2021-307 Implemented on: 2021-09-10 | Removed | Frank Hosta In consultation with: , | Fire Alarm System | ARIEL Target Hall LBD 09:095-0 ... ARIEL Target Hall LBD 09:095-001 & 002 | Construction / concrete coring ... Construction / concrete coring work in Target Hall |
2021-306 Implemented on: 2021-09-09 | Removed | Kyle Mollard In consultation with: , | Fire Alarm System | All FAS Zones Offline All FAS Zones Offline | Semi Annual Fire Suppression S ... Semi Annual Fire Suppression System Inspection |
2021-305 Implemented on: 2021-09-09 | Removed | Kyle Mollard In consultation with: , | Fire Alarm System | ARIEL Target Hall LBD 09:095-0 ... ARIEL Target Hall LBD 09:095-001 & 002 | Construction / concrete coring ... Construction / concrete coring work in Target Hall |
2021-304 Implemented on: 2021-09-08 | Removed | Kyle Mollard In consultation with: , | Fire Alarm System | ARIEL Target Hall LBD 09:095-0 ... ARIEL Target Hall LBD 09:095-001 & 002 | Construction / concrete coring ... Construction / concrete coring work in Target Hall |
2021-303 Implemented on: 2021-09-07 | Removed | Kyle Mollard In consultation with: , | Fire Alarm System | ISIS smoke detectors - 02:007- ... ISIS smoke detectors - 02:007-003/012/013/014/015/016/018/019/027/028 | Grinding and welding work in I ... Grinding and welding work in ISIS area. |
2021-302 Implemented on: 2021-09-07 | Removed | Jas Uppal In consultation with: , | Fire Alarm System | ISAC 1 Exp Hall beam detectors ... ISAC 1 Exp Hall beam detectors 05-054-002, 003, 004 | Liq. He Partial Fill of CPET S ... Liq. He Partial Fill of CPET SC Magnet
|
2021-301 Implemented on: 2021-09-07 | Removed | Eric Chapman In consultation with: , | Fire Alarm System | ARIEL Target Hall LBD 09:095-0 ... ARIEL Target Hall LBD 09:095-001 & 002 | Construction / concrete coring ... Construction / concrete coring work in Target Hall |
2021-300 Implemented on: 2021-09-03 | Removed | Jason Wait In consultation with: , | Fire Alarm System | Zone 2 offline with the monito ... Zone 2 offline with the monitoring company | FAS upgrade work, Investigate ... FAS upgrade work, Investigate an issue with a smoke detector |
2021-299 Implemented on: 2021-09-03 | Removed | Jason Wait In consultation with: , | Fire Alarm System | ARIEL Target Hall LBD 09:095-0 ... ARIEL Target Hall LBD 09:095-001 & 002 | Construction work in Target Ha ... Construction work in Target Hall |
2021-298 Implemented on: 2021-09-02 | Removed | Micheal Donohoe In consultation with: , | Fire Alarm System | 02:007-003/012/013/014/015/016 ... 02:007-003/012/013/014/015/016/018/019/027/028 | Grinding and welding work in I ... Grinding and welding work in ISIS area. |
2021-297 Implemented on: 2021-09-02 | Removed | Micheal Donohoe In consultation with: , | Fire Alarm System | "Service Annex Node 2" Bells D ... "Service Annex Node 2" Bells Disarmed. | Upgrade work that may trigger ... Upgrade work that may trigger false alarm bells. |
2021-296 Implemented on: 2021-09-02 | Removed | Micheal Donohoe In consultation with: , | Fire Alarm System | Zone 2 offline Zone 2 offline | FAS upgrade work. FAS upgrade work. |
2021-295 Implemented on: 2021-09-02 | Removed | Micheal Donohoe In consultation with: , | Fire Alarm System | ARIEL LBD 09:095-001 / 002 ARIEL LBD 09:095-001 / 002 | Coring cement in the ARIEL Tar ... Coring cement in the ARIEL Target Hall. |
2021-294 Implemented on: 2021-09-01 | Removed | Eric Chapman In consultation with: , | Targets | T2 target water flow low warni ... T2 target water flow low warning/trip lowered | Numerous warnings tonight on T ... Numerous warnings tonight on T2 water flow. Warning value lowered to 3.0GPM from 3.2, Trip dropped to 2.8 from 3.0 in epics. |
2021-293 Implemented on: 2021-09-01 | Removed | Elena Bylinskaia In consultation with: , | Fire Alarm System | ARIEL LBD 09:095-01 & 02 ARIEL LBD 09:095-01 & 02 | Coring cement in the ARIEL Tar ... Coring cement in the ARIEL Target Hall. |
2021-292 Implemented on: 2021-09-01 | Removed | Micheal Donohoe In consultation with: , | Fire Alarm System | Zone 2 offline Zone 2 offline | FAS upgrade work. FAS upgrade work. |
2021-291 Implemented on: 2021-08-31 | Removed | Micheal Donohoe In consultation with: , | Fire Alarm System | 02:001-005 MHESA B1 Area 02:001-005 MHESA B1 Area | Relocation of smoke detector. Relocation of smoke detector. |
2021-290 Implemented on: 2021-08-31 | Removed | Micheal Donohoe In consultation with: , | Fire Alarm System | Zone 2 offline Zone 2 offline | FAS upgrade work. FAS upgrade work. |
2021-289 Implemented on: 2021-08-30 | Removed | Dale Nagra In consultation with: Dale Nagra, | Fire Alarm System | Zone 2 offline Zone 2 offline | Ongoing FAS upgrading Ongoing FAS upgrading |
2021-288 Implemented on: 2021-08-26 | Removed | Robert Scheepmaker In consultation with: , | Fire Alarm System | Zone 2 offline Zone 2 offline | Ongoing FAS upgrading Ongoing FAS upgrading |
2021-287 Implemented on: 2021-08-24 | Removed | Riley Schick-Martin In consultation with: , | Fire Alarm System | Zone 2 offline Zone 2 offline | Ongoing FAS upgrades. Zone 2 o ... Ongoing FAS upgrades. Zone 2 offline until 15:00. |
2021-286 Implemented on: 2021-08-24 | Removed | Riley Schick-Martin In consultation with: , | Fire Alarm System | ARIEL Target Hall LBD 09:095-0 ... ARIEL Target Hall LBD 09:095-001 & 002 | Construction work in Target Ha ... Construction work in Target Hall |
2021-285 Implemented on: 2021-08-23 | Removed | Frank Hosta In consultation with: , | Fire Alarm System | FAS Zone 2 offline until 17:00 FAS Zone 2 offline until 17:00 | Upgrade work being done on the ... Upgrade work being done on the FAS. |
2021-284 Implemented on: 2021-08-23 | Removed | Jas Uppal In consultation with: , | Fire Alarm System | ARIEL Target Hall LBD 09:095-0 ... ARIEL Target Hall LBD 09:095-001 & 002 | Construction work in Target Ha ... Construction work in Target Hall |
2021-283 Implemented on: 2021-08-19 | Removed | Jason Wait In consultation with: , | Fire Alarm System | FAS Zone 2 offline until 16:30 FAS Zone 2 offline until 16:30 | RCA AHU interaction (Installin ... RCA AHU interaction (Installing a new duct smoke on AHU-5) taking place under C2021-08-19--3 - zone 2 taken offline for 6 hours |
2021-282 Implemented on: 2021-08-18 | Removed | Dale Nagra In consultation with: , | Fire Alarm System | FAS Zone 2 offline FAS Zone 2 offline | Ongoing FAS upgrade work Ongoing FAS upgrade work |
2021-280 Implemented on: 2021-08-17 | Removed | Eric Chapman In consultation with: , | Fire Alarm System | FAS Zone 2 offline FAS Zone 2 offline | Ongoing FAS upgrade work Ongoing FAS upgrade work |
2021-279 Implemented on: 2021-08-15 | Removed | Eric Chapman In consultation with: , | Other / Misc | STF Low-Low water jacket level ... STF Low-Low water jacket level pinned | STF water column running on th ... STF water column running on the low side with new resin and water. Bypassed to permit conditioning of the water in STF, as requested by Steve Sapriken on Friday. |
2021-278 Implemented on: 2021-08-13 | Removed | Micheal Donohoe In consultation with: , | Fire Alarm System | ARIEL Target Hall LBD 09:095-0 ... ARIEL Target Hall LBD 09:095-001 & 002 | Construction work in Target Ha ... Construction work in Target Hall |
2021-277 Implemented on: 2021-08-12 | Removed | Eric Chapman In consultation with: , | Optics | 2CVB1 power supply flow meter 2CVB1 power supply flow meter | 2CVB1 Power supply flow meter ... 2CVB1 Power supply flow meter failed, bypassed via alligator clips in the power supply rack. As instructed by Dan Louie. |
2021-276 Implemented on: 2021-08-11 | Removed | Dale Nagra In consultation with: , | Fire Alarm System | ISAC I Target hall linear beam ... ISAC I Target hall linear beam detectors. 05:054-001 | Work being done in isac one ta ... Work being done in isac one target hall by Adam Newsome |
2021-275 Implemented on: 2021-08-11 | Removed | Dale Nagra In consultation with: , | Fire Alarm System | FAS Zone 2 offline FAS Zone 2 offline | Ongoing FAS upgrade work Ongoing FAS upgrade work |
2021-274 Implemented on: 2021-08-11 | Removed | David Bandiera In consultation with: Ryan Lovelidge, | Safety | I0208 (Tank Vac Good), I0214 ( ... I0208 (Tank Vac Good), I0214 (RF 80kV & Driven), I0720 (Tank HV ON) pinned OK in IBOP | To clear Machine Protects pres ... To clear Machine Protects present and enable BST 127 and BST 165 and remove them from ISIS beamline to perform ISIS wirescans |
2021-273 Implemented on: 2021-08-10 | Removed | Eric Chapman In consultation with: , | Fire Alarm System | ARIEL Target Hall LBD 09:095-0 ... ARIEL Target Hall LBD 09:095-001 & 002 and Mass sep smoke detectors -004 | Construction work in Target Ha ... Construction work in Target Hall, concrete pour |
2021-272 Implemented on: 2021-08-09 | Removed | Frank Hosta In consultation with: , | Fire Alarm System | ARIEL Target Hall LBD 09:095-0 ... ARIEL Target Hall LBD 09:095-001 & 002 and Mass sep smoke detectors -004 | Construction work in Target Ha ... Construction work in Target Hall |
2021-271 Implemented on: 2021-08-09 | Removed | Frank Hosta In consultation with: , | Fire Alarm System | FAS Zone 2 offline FAS Zone 2 offline | Ongoing FAS upgrade work Ongoing FAS upgrade work |
2021-270 Implemented on: 2021-08-06 | Removed | Frank Hosta In consultation with: , | Fire Alarm System | FAS Zone 2 offline FAS Zone 2 offline | Ongoing FAS upgrade work Ongoing FAS upgrade work |
2021-269 Implemented on: 2021-08-05 | Removed | Kyle Mollard In consultation with: , | Fire Alarm System | ARIEL Target Hall LBD 09:095-0 ... ARIEL Target Hall LBD 09:095-001 & 002 | Construction work in Target Ha ... Construction work in Target Hall |
2021-268 Implemented on: 2021-08-05 | Removed | Kyle Mollard In consultation with: , | Fire Alarm System | FAS Zone 2 offline FAS Zone 2 offline | Ongoing FAS upgrade work Ongoing FAS upgrade work |
2021-267 Implemented on: 2021-08-04 | Removed | Kyle Mollard In consultation with: , | Fire Alarm System | FAS Zone 2 offline FAS Zone 2 offline | Ongoing FAS upgrade work Ongoing FAS upgrade work |
2021-266 Implemented on: 2021-08-03 | Removed | Kyle Mollard In consultation with: Jas Uppal, | Fire Alarm System | ARIEL Target Hall LBD 09:095-0 ... ARIEL Target Hall LBD 09:095-001 & 002 | Construction work in Target Ha ... Construction work in Target Hall |
2021-265 Implemented on: 2021-08-03 | Removed | Kyle Mollard In consultation with: , | Fire Alarm System | FAS Zone 2 offline FAS Zone 2 offline | Ongoing FAS upgrade work Ongoing FAS upgrade work |
2021-264 Implemented on: 2021-07-30 | Removed | Jason Wait In consultation with: , | Fire Alarm System | Zone 2 offline Zone 2 offline | FAS upgrade work in RCA FAS upgrade work in RCA |
2021-263 Implemented on: 2021-07-30 | Removed | Ryan Lovelidge In consultation with: , | Fire Alarm System | ARIEL Target Hall LBD 09:095-0 ... ARIEL Target Hall LBD 09:095-001 & 002 | Construction work in Target Ha ... Construction work in Target Hall |
2021-262 Implemented on: 2021-07-29 | Removed | Jason Wait In consultation with: , | Fire Alarm System | Zone 2 offline Zone 2 offline | FAS upgrade work in RCA FAS upgrade work in RCA |
2021-261 Implemented on: 2021-07-29 | Removed | Jason Wait In consultation with: , | Fire Alarm System | ARIEL Target Hall LBD 09:095-0 ... ARIEL Target Hall LBD 09:095-001 & 002 | Construction work in Target Ha ... Construction work in Target Hall |
2021-260 Implemented on: 2021-07-28 | Removed | David Bandiera In consultation with: , | Fire Alarm System | ARIELD B2 Rm 8 Collective Zone ... ARIELD B2 Rm 8 Collective Zone Smoke Detectors 09:095-004 disarmed | Welding job in Mass Separator ... Welding job in Mass Separator Room ARIEL B2 Rm 8 |
2021-259 Implemented on: 2021-07-28 | Removed | David Bandiera In consultation with: , | Fire Alarm System | Zone 2 offline Zone 2 offline | FAS upgrade work in RCA FAS upgrade work in RCA |
2021-258 Implemented on: 2021-07-28 | Removed | David Bandiera In consultation with: , | Fire Alarm System | ARIEL Target Hall LBD 09:095-0 ... ARIEL Target Hall LBD 09:095-001 & 002 | Construction work in Target Ha ... Construction work in Target Hall |
2021-256 Implemented on: 2021-07-27 | Removed | David Bandiera In consultation with: , | Fire Alarm System | Zone 2 offline Zone 2 offline | FAS upgrade work in RCA FAS upgrade work in RCA |
2021-255 Implemented on: 2021-07-27 | Removed | David Bandiera In consultation with: , | Fire Alarm System | ARIEL Target Hall LBD 09:095-0 ... ARIEL Target Hall LBD 09:095-001 & 002 | Construction work in Target Ha ... Construction work in Target Hall |
2021-254 Implemented on: 2021-07-26 | Removed | David Bandiera In consultation with: , | Fire Alarm System | ARIEL Target Hall LBD 09:095-0 ... ARIEL Target Hall LBD 09:095-001 & 002 | Construction work in Target Ha ... Construction work in Target Hall |
2021-253 Implemented on: 2021-07-22 | Removed | Robert Scheepmaker In consultation with: , | Fire Alarm System | ARIEL TGT HALL LBD 09-095-001/ ... ARIEL TGT HALL LBD 09-095-001/002 | Workers using lifts. Workers using lifts. |
2021-252 Implemented on: 2021-07-21 | Removed | Robert Scheepmaker In consultation with: , | Fire Alarm System | ARIEL TGT HALL LBD 09-095-001/ ... ARIEL TGT HALL LBD 09-095-001/002 | Workers on lifts Workers on lifts |
2021-251 Implemented on: 2021-07-20 | Removed | Robert Scheepmaker In consultation with: , | Fire Alarm System | 02-0070027/28 02-0070027/28 | Grinding in ISIS L1 area. Grinding in ISIS L1 area. |
2021-250 Implemented on: 2021-07-19 | Removed | Jas Uppal In consultation with: , | Fire Alarm System | 02-007-027/028 02-007-027/028 | Grinding underway in ISIS L1 a ... Grinding underway in ISIS L1 area. |
2021-249 Implemented on: 2021-07-16 | Removed | Kyle Mollard In consultation with: , | Targets | STF Cooling Package Pump Press ... STF Cooling Package Pump Pressure BYP-012 | PLC data error is seen on pump ... PLC data error is seen on pump pressure signal. Defeat requested for STF water pump, as pressure sensor failed just after 23:00 on 2021-07-16. Sensor to be changed during next maintenance day. |
2021-248 Implemented on: 2021-07-15 | Removed | Ryan Lovelidge In consultation with: , | Fire Alarm System | 09:095-001 & 09:095-002 ARIEL ... 09:095-001 & 09:095-002 ARIEL Target Hall LBDs disarmed | X ray work in ARIEL Target Hal ... X ray work in ARIEL Target Hall - defeat requested by Chris Peterson at 13:00 |
2021-247 Implemented on: 2021-07-14 | Removed | Jason Wait In consultation with: , | Fire Alarm System | 09:095-001 & 09:095-002 ARIEL ... 09:095-001 & 09:095-002 ARIEL Target Hall LBDs disarmed | X ray work in ARIEL Target Hal ... X ray work in ARIEL Target Hall - defeat requested by Chris Peterson at 13:00 |
2021-245 Implemented on: 2021-07-13 | Removed | Jason Wait In consultation with: , | Services | STF Water jacket water level ( ... STF Water jacket water level (BYP-005) defeated | Experts who completed work und ... Experts who completed work under WP C2021-07-13-11 have requested that Operations defeat BYP-005 in order to deliver beam due to data readback not representing the correct value |
2021-244 Implemented on: 2021-07-12 | Removed | David Bandiera In consultation with: , | Fire Alarm System | 09:095-001 & 09:095-002 ARIEL ... 09:095-001 & 09:095-002 ARIEL Target Hall LBDs disarmed | Construction work in ARIEL Tar ... Construction work in ARIEL Target Hall |
2021-243 Implemented on: 2021-07-07 | Removed | Eric Chapman In consultation with: , | Fire Alarm System | ARIEL target hall beam detecto ... ARIEL target hall beam detectors | 09-095-001 and 002 disarmed fo ... 09-095-001 and 002 disarmed for grinding in ARIEL target hall. |
2021-242 Implemented on: 2021-07-07 | Removed | Eric Chapman In consultation with: , | Fire Alarm System | Zone 2 test Zone 2 test | Ongoing FAS upgrades and sprin ... Ongoing FAS upgrades and sprinkler modification in MHESA B1. |
2021-241 Implemented on: 2021-07-07 | Removed | Eric Chapman In consultation with: , | Fire Alarm System | MHESA B1 smokes and sprinkler ... MHESA B1 smokes and sprinkler flow/tamper swtiches | Sprinkler system modificiation ... Sprinkler system modificiation as on WPC2021-06-21-1. Flow switch 02-001-059 and tamper 02-001-060 disarmed in addition to the normal collective 02-001-001 and smokes 02-001-011, 02-001-010 for renovations. |
2021-240 Implemented on: 2021-07-06 | Removed | Dale Nagra In consultation with: , | Fire Alarm System | Zone 2 test Zone 2 test | Ongoing FAS upgrades. Ongoing FAS upgrades. |
2021-239 Implemented on: 2021-07-06 | Removed | Eric Chapman In consultation with: , | Fire Alarm System | ARIEL Target Hall Linear Beam ... ARIEL Target Hall Linear Beam Detectors 09:095-001 & 09:095-002 disarmed | Welding work in ARIEL Target H ... Welding work in ARIEL Target Hall |
2021-238 Implemented on: 2021-07-05 | Removed | Robert Scheepmaker In consultation with: , | Fire Alarm System | Zone 2 test Zone 2 test | Ongoing FAS upgrades. Ongoing FAS upgrades. |
2021-237 Implemented on: 2021-07-05 | Removed | Riley Schick-Martin In consultation with: , | Fire Alarm System | ARIEL Target Hall Linear Beam ... ARIEL Target Hall Linear Beam Detectors 09:095-001 & 09:095-002 disarmed | Welding work in ARIEL Target H ... Welding work in ARIEL Target Hall |
2021-236 Implemented on: 2021-07-05 | Removed | Riley Schick-Martin In consultation with: , | Fire Alarm System | 02:001-001,010,011 disabled 02:001-001,010,011 disabled | Construction work in MHESA. Un ... Construction work in MHESA. Until end of day. |
2021-234 Implemented on: 2021-07-02 | Removed | Frank Hosta In consultation with: , | Fire Alarm System | Zone 2 offline until 18:00 Zone 2 offline until 18:00 | Ongoing FAS upgrade work Ongoing FAS upgrade work |
2021-233 Implemented on: 2021-06-30 | Removed | Ryan Lovelidge In consultation with: , | Targets | STF water jacket low/low switc ... STF water jacket low/low switch BYP-002 | Per Steve S: There is a suffi ... Per Steve S: There is a sufficient water level above the STF target, even though it is below the LOW-LOW Water Switch. Please monitor Water column height and reservoir height (B2,234) and (B2,237) respectively and bypass the LOW-LOW water switch. As beam hits the target hopefully the water level will raise in the water column to activate the LOW-LOW Water Switch |
2021-232 Implemented on: 2021-06-30 | Removed | Brandon Humphries In consultation with: , | Ion sources and injection BL | EGUN:BIAS interlock defeated, ... EGUN:BIAS interlock defeated, vacuum interlock changed | To allow for EGUN:BIAS HV cond ... To allow for EGUN:BIAS HV conditioning without tripping at the usual vacuum trip point of 1e-7 Torr (interlock was "EGUN:IG1 < 100nTorr"). Changed to 1e-6 Torr (EGUN:IG1 < 1uTorr) trip level approved by Friedhelm. |
2021-231 Implemented on: 2021-06-30 | Removed | Kyle Mollard In consultation with: Jas Uppal, | Safety | 2A areas secured, key in and 2 ... 2A areas secured, key in and 2AV1 magnets signals | To allow for 2A extraction pro ... To allow for 2A extraction probe controls troubleshooting as we are delivering beam to other users and work is ongoing in ISAC exclusion areas. |
2021-230 Implemented on: 2021-06-30 | Removed | Kyle Mollard In consultation with: , | Fire Alarm System | Zone 2 offline until 17:00 Zone 2 offline until 17:00 | Ongoing FAS upgrade work Ongoing FAS upgrade work |
2021-229 Implemented on: 2021-06-29 | Removed | Kyle Mollard In consultation with: Riley Schick-Martin, Brandon Humphries | Safety | EGUN HV off signal EGUN HV off signal | Replace control PCB in the Mas ... Replace control PCB in the Master and slave 350KV power supply and test its instabilities. Safety system cable was removed, causing an access trip alarm with the E-Hall open and the EGUN HV signal in an indeterminate state. |
2021-226 Implemented on: 2021-06-29 | Removed | Riley Schick-Martin In consultation with: , | Fire Alarm System | Zone 2 offline until 17:00 Zone 2 offline until 17:00 | Ongoing FAS upgrade work Ongoing FAS upgrade work |
2021-225 Implemented on: 2021-06-28 | Removed | Ryan Lovelidge In consultation with: , | Fire Alarm System | Zone 2 offline until 17:00 Zone 2 offline until 17:00 | Ongoing FAS upgrade work Ongoing FAS upgrade work |
2021-222 Implemented on: 2021-06-25 | Removed | Micheal Donohoe In consultation with: , | Safety | EXTR 2A "IN" Signal on CSS - I ... EXTR 2A "IN" Signal on CSS - IBOP 0121 pinned | Defining beamline 2A off in or ... Defining beamline 2A off in order to access to ISAC B1 Electrical Room and ISAC B2 while 2A probe malfunction is being investigated. |
2021-221 Implemented on: 2021-06-25 | Removed | Ryan Lovelidge In consultation with: , | Fire Alarm System | Zone 2 offline until 17:00 Zone 2 offline until 17:00 | Ongoing FAS upgrade work Ongoing FAS upgrade work |
2021-220 Implemented on: 2021-06-24 | Active | Micheal Donohoe In consultation with: , | RF | LESW Spill TC #1 (RF,322) LESW Spill TC #1 (RF,322) | Noisy readback causing beam to ... Noisy readback causing beam to trip. |
2021-219 Implemented on: 2021-06-24 | Removed | David Bandiera In consultation with: , | Fire Alarm System | Zone 2 offline until 17:00 Zone 2 offline until 17:00 | Ongoing FAS upgrade work Ongoing FAS upgrade work |
2021-217 Implemented on: 2021-06-23 | Removed | Micheal Donohoe In consultation with: , | Fire Alarm System | Zone 2 into Test Mode until 17 ... Zone 2 into Test Mode until 17:00 | FAS Upgrade work ongoing FAS Upgrade work ongoing |
2021-216 Implemented on: 2021-06-22 | Removed | David Bandiera In consultation with: Eric Chapman, | Diagnostics | 2A3M20 L-R/Halo & U-D/Halo sig ... 2A3M20 L-R/Halo & U-D/Halo signals pinned in ISAC Electrical Room | Halo too small with 4.0mm beam ... Halo too small with 4.0mm beam spot causing excessive trips. This bypass is for P2N target only, planned on running until Jun 29th. |
2021-215 Implemented on: 2021-06-22 | Removed | David Bandiera In consultation with: , | Fire Alarm System | ARIEL Target Hall Linear Beam ... ARIEL Target Hall Linear Beam Detectors | Construction work in ARIEL Tar ... Construction work in ARIEL Target Hall |
2021-213 Implemented on: 2021-06-22 | Removed | Micheal Donohoe In consultation with: , | Fire Alarm System | Zone 2 into Test Mode until 17 ... Zone 2 into Test Mode until 17:00 | FAS Upgrade work ongoing FAS Upgrade work ongoing |
2021-212 Implemented on: 2021-06-22 | Removed | Kyle Mollard In consultation with: Jas Uppal, Tiffany Angus | Targets | 2A3M20 Protect Mon Density 2A3M20 Protect Mon Density | 2A3M20 U-D/halo ratio bypass/t ... 2A3M20 U-D/halo ratio bypass/trip code is linked with the density signal. Approval has been given by controls and target experts to defeat this additionally as beam will trip on 2A3M20 U-D/halo still despite being already defeated. |
2021-211 Implemented on: 2021-06-21 | Removed | Dale Nagra In consultation with: , | Fire Alarm System | ARIEL Target Hall Linear Beam ... ARIEL Target Hall Linear Beam Detectors 09:095-001 & 09:095-002 disarmed | Welding work in ARIEL Target H ... Welding work in ARIEL Target Hall |
2021-210 Implemented on: 2021-06-21 | Removed | Eric Chapman In consultation with: , | Fire Alarm System | Zone 2 into Test Mode until 17 ... Zone 2 into Test Mode until 17:00 | FAS Upgrade work ongoing FAS Upgrade work ongoing |
2021-209 Implemented on: 2021-06-19 | Removed | Eric Chapman In consultation with: , | Diagnostics | 2A3M20 Protect Monitor Density ... 2A3M20 Protect Monitor Density Trip limit | Yield measurements of new P2N ... Yield measurements of new P2N UCx target at 4.0mm spot size. M20 protect calculating a density of 0%, generating a trip condition if set at normal 7.0mm setting of 9%. |
2021-208 Implemented on: 2021-06-18 | Removed | Eric Chapman In consultation with: , | Fire Alarm System | Zone 2 into Test Mode until 17 ... Zone 2 into Test Mode until 17:00 | FAS Upgrade work ongoing FAS Upgrade work ongoing |
2021-206 Implemented on: 2021-06-17 | Removed | Robert Scheepmaker In consultation with: , | Fire Alarm System | Zone 2 test until 1700 Zone 2 test until 1700 | Ongoing FAS upgrades Ongoing FAS upgrades |
2021-205 Implemented on: 2021-06-16 | Removed | Kyle Mollard In consultation with: , | Targets | STF Ion Exchanger Return Resis ... STF Ion Exchanger Return Resistivity pinned at STF BYP 010 | Ion Exchanger resistivity is p ... Ion Exchanger resistivity is poor. Signal pinned again until resistivity improves or experts decide what to do. |
2021-204 Implemented on: 2021-06-16 | Removed | Riley Schick-Martin In consultation with: , | Fire Alarm System | Zone 2 into Test Mode until 17 ... Zone 2 into Test Mode until 17:00 | FAS Upgrade work ongoing FAS Upgrade work ongoing |
2021-203 Implemented on: 2021-06-15 | Active | Riley Schick-Martin In consultation with: , | Targets | 2A3COL-TC3 2A3COL-TC3 | TC is reading -95 deg. Defeat ... TC is reading -95 deg. Defeat approved by Alex Gottberg. |
2021-202 Implemented on: 2021-06-15 | Removed | Riley Schick-Martin In consultation with: , | Fire Alarm System | Zone 2 into Test Mode until 17 ... Zone 2 into Test Mode until 17:00 | FAS Upgrade work ongoing FAS Upgrade work ongoing |
2021-201 Implemented on: 2021-06-14 | Removed | Kyle Mollard In consultation with: , | Fire Alarm System | ARIEL Target Hall Linear Beam ... ARIEL Target Hall Linear Beam Detectors 09:095-001 & 09:095-002 disarmed | Welding work in ARIEL Target H ... Welding work in ARIEL Target Hall |
2021-200 Implemented on: 2021-06-14 | Removed | Kyle Mollard In consultation with: , | Fire Alarm System | Zone 2 into Test Mode until 17 ... Zone 2 into Test Mode until 17:00 | FAS Upgrade work ongoing FAS Upgrade work ongoing |
2021-199 Implemented on: 2021-06-11 | Removed | Jas Uppal In consultation with: , | Fire Alarm System | ARIEL Target Hall Linear Beam ... ARIEL Target Hall Linear Beam Detectors 09:095-001 & 09:095-002 disarmed | Welding work in ARIEL Target H ... Welding work in ARIEL Target Hall |
2021-198 Implemented on: 2021-06-11 | Removed | Kyle Mollard In consultation with: , | Fire Alarm System | Zone 2 into Test Mode until 17 ... Zone 2 into Test Mode until 17:00 | FAS Upgrade work ongoing FAS Upgrade work ongoing |
2021-197 Implemented on: 2021-06-10 | Removed | David Bandiera In consultation with: , | Diagnostics | T1 HV Bias Trip Limit lowered ... T1 HV Bias Trip Limit lowered from 250V to 230V | Bias readback is noisy and vol ... Bias readback is noisy and voltage has been dropping steadily. |
2021-196 Implemented on: 2021-06-10 | Removed | Gordon Roy In consultation with: , | Fire Alarm System | Zone 2 into Test Mode until 16 ... Zone 2 into Test Mode until 16:00 | FAS Upgrade work ongoing FAS Upgrade work ongoing |
2021-195 Implemented on: 2021-06-09 | Removed | Gordon Roy In consultation with: , | Fire Alarm System | FAS Zone 2 into Test Mode unti ... FAS Zone 2 into Test Mode until 16:00 | FAS upgrades in Service Annex ... FAS upgrades in Service Annex (Zone 2) |
2021-193 Implemented on: 2021-06-09 | Removed | Ryan Lovelidge In consultation with: , | Services | Heat exchanger valve D-17 thro ... Heat exchanger valve D-17 throttled and H-18 closed | MM and RF off for extended mai ... MM and RF off for extended maintenance day. |
2021-192 Implemented on: 2021-06-08 | Removed | Gordon Roy In consultation with: , | Fire Alarm System | FAS Zone 2 off-line until 17:0 ... FAS Zone 2 off-line until 17:00 | F.A.S. upgrade work. F.A.S. upgrade work. |
2021-191 Implemented on: 2021-06-07 | Removed | Micheal Donohoe In consultation with: , | Fire Alarm System | Zone 2 offline until 17:00 Zone 2 offline until 17:00 | FAS upgrades continuing in MAB FAS upgrades continuing in MAB |
2021-190 Implemented on: 2021-06-06 | Removed | David Bandiera In consultation with: Elena Bylinskaia, | Safety | Air Monitor #28 TR13 Enclosure ... Air Monitor #28 TR13 Enclosure, BC Cancer Hot Cell | Air monitor counts are spiking ... Air monitor counts are spiking up to 95 kcpm with no activity occurring at TR13 |
2021-189 Implemented on: 2021-06-06 | Removed | Kyle Mollard In consultation with: , | Targets | STF Ion Exchanger Flow - BYP-0 ... STF Ion Exchanger Flow - BYP-008 | Flow is dropping below 2.0 lpm ... Flow is dropping below 2.0 lpm, but average is still above trip point. |
2021-187 Implemented on: 2021-06-05 | Removed | Kyle Mollard In consultation with: , | Safety | IBOP 1616 - Gas Monitor #16 IBOP 1616 - Gas Monitor #16 | EOXY:OM3, B3 West Service Tunn ... EOXY:OM3, B3 West Service Tunnel oxygen monitor's signal is noisy. |
2021-186 Implemented on: 2021-06-04 | Removed | David Bandiera In consultation with: , | Fire Alarm System | Zone 2 offline until 17:00 Zone 2 offline until 17:00 | FAS upgrades continuing in MAB FAS upgrades continuing in MAB |
2021-185 Implemented on: 2021-06-03 | Removed | Brandon Humphries In consultation with: , | Diagnostics | ELBT:RFSH2 out limit is forced ELBT:RFSH2 out limit is forced | ELBT:RFSH2 was removed then in ... ELBT:RFSH2 was removed then installed in the EGUN:RFSH1 spot (EGUN:RFSH1 was removed for repair). To allow for use of other devices in ELBT diagnostic box #2 (as well as beam mode interlocks), the ELBT:RFSH2 signal has been forced (faked) to be at the OUT position. |
2021-184 Implemented on: 2021-06-03 | Removed | Eric Chapman In consultation with: , | Fire Alarm System | Zone 2 offline until17:00 Zone 2 offline until17:00 | FAS upgrades continuing in MAB FAS upgrades continuing in MAB |
2021-183 Implemented on: 2021-06-02 | Removed | Eric Chapman In consultation with: , | Safety | IBOP I0113 pinned for 2C1 oper ... IBOP I0113 pinned for 2C1 operation | 2CVB1 Safety interlock gives M ... 2CVB1 Safety interlock gives Machine Protect with the bender OFF after installation of new VB1 power supply this shutdown. In order to continue to run 1A without interruption. |
2021-182 Implemented on: 2021-06-02 | Removed | Dale Nagra In consultation with: Eric Chapman, | Fire Alarm System | Zone 2 offline untill17:00 Zone 2 offline untill17:00 | FAS upgrades continuing in MAB FAS upgrades continuing in MAB |
2021-181 Implemented on: 2021-06-01 | Removed | Eric Chapman In consultation with: Dale Nagra, | Fire Alarm System | Zone 1&2 offline untill17:00 Zone 1&2 offline untill17:00 | FAS upgrades continuing. FAS upgrades continuing. |
2021-180 Implemented on: 2021-05-31 | Removed | Robert Scheepmaker In consultation with: , | Fire Alarm System | Zone 2 offline untill1700 Zone 2 offline untill1700 | FAS upgrades continuing. FAS upgrades continuing. |
2021-179 Implemented on: 2021-05-28 | Active | Brandon Humphries In consultation with: , | Optics | EHDT:Q6 removed from MPS Optic ... EHDT:Q6 removed from MPS Optics OK summary | EHDT:Q6 should not be used for ... EHDT:Q6 should not be used for the upcoming beam time to allow for using the last three BPMs up to EHD for beam position interlock. This device was already degaussed then locked out (2021-134), this defeat will allow for satisfying the MPS Optics OK summary (would usually fail if device wasn't on). |
2021-178 Implemented on: 2021-05-28 | Removed | Riley Schick-Martin In consultation with: , | Fire Alarm System | ARIEL Target Hall Linear Beam ... ARIEL Target Hall Linear Beam Detectors 09:095-001 & 09:095-002 disarmed | Welding work in ARIEL Target H ... Welding work in ARIEL Target Hall |
2021-177 Implemented on: 2021-05-28 | Removed | Robert Scheepmaker In consultation with: , | Fire Alarm System | Zone 2 offline until 1700 Zone 2 offline until 1700 | WP:C2021-05-26-3 and C2021-05 ... WP:C2021-05-26-3 and C2021-05-26-4. As we cannot disarm devices 02:001-001/010/011/020/021 given the current state of the FAS, Zone 2 was taken offline. FAS system upgrade with Node 2 (WP #C2021-05-10-1) continues. |
2021-176 Implemented on: 2021-05-27 | Removed | Jas Uppal In consultation with: , | Fire Alarm System | ARIEL Target Hall Linear Beam ... ARIEL Target Hall Linear Beam Detectors 09:095-001 & 09:095-002 disarmed | Welding work in ARIEL Target H ... Welding work in ARIEL Target Hall |
2021-175 Implemented on: 2021-05-27 | Removed | Kyle Mollard In consultation with: , | Fire Alarm System | Zone 2 offline until 17:00 Zone 2 offline until 17:00 | Involves WP:C2021-05-26-3 and ... Involves WP:C2021-05-26-3 and C2021-05-26-4. As we cannot disarm devices 02:001-001/010/011/020/021 given the current state of the FAS, Zone 2 was taken offline. FAS system upgrade with Node 2 (WP #C2021-05-10-1) is expected to start later this morning |
2021-174 Implemented on: 2021-05-26 | Removed | Kyle Mollard In consultation with: , | Fire Alarm System | Zone 2 offline until 15:00 Zone 2 offline until 15:00 | FAS system upgrade with Node 2 ... FAS system upgrade with Node 2. WP #C2021-05-10-1 |
2021-173 Implemented on: 2021-05-26 | Removed | Eric Chapman In consultation with: , | Targets | STF Ion Exchanger Return Resis ... STF Ion Exchanger Return Resistivity pinned at STF BYP 010 | Ion Exchanger resistivity is p ... Ion Exchanger resistivity is poor. Signal pinned again until resistivity improves or experts decide what to do. |
2021-172 Implemented on: 2021-05-25 | Removed | Ryan Lovelidge In consultation with: , | Ion sources and injection BL | ISIS ground side interlocks: ... ISIS ground side interlocks: NIM Diff, overcurrent and Bend 1/2 ON signal defeated at CON020 0465 #8 J11, J13, J19 | Bends to be opened for emittan ... Bends to be opened for emittance scans |
2021-171 Implemented on: 2021-05-25 | Removed | Ryan Lovelidge In consultation with: , | Targets | STF BYP-002 STF BYP-002 | STF water jacket low-low switc ... STF water jacket low-low switch pinned for STF startup. As per Steve Sapriken's E log entry 2021-05-25 16:17:16, the water jacket should rise when the target sees some beam. |
2021-170 Implemented on: 2021-05-25 | Removed | Kyle Mollard In consultation with: , | Fire Alarm System | Zone 2 offline until 16:00 Zone 2 offline until 16:00 | FAS system upgrade with Node 2 ... FAS system upgrade with Node 2. WP #C2021-05-10-1 |
2021-169 Implemented on: 2021-05-25 | Active | Dale Nagra In consultation with: Eric Chapman, | Ion sources and injection BL | Skimmer #1 "B" side cable grou ... Skimmer #1 "B" side cable grounded | Skimmer #1 trip at 5am. With ... Skimmer #1 trip at 5am. With beam and optics off in skimmer #1 section still in alarm. |
2021-168 Implemented on: 2021-05-22 | Removed | David Bandiera In consultation with: , | Targets | STF Ion Exchanger Return Resis ... STF Ion Exchanger Return Resistivity pinned at STF BYP 010 | Flow is very low through Ion E ... Flow is very low through Ion Exchanger resulting in poor resistivity. Signal pinned until flow can be increased and resistivity improved. |
2021-167 Implemented on: 2021-05-20 | Removed | Brandon Humphries In consultation with: , | Ion sources and injection BL | EGUN:BIAS interlock defeated, ... EGUN:BIAS interlock defeated, vacuum interlock changed | To allow for EGUN:BIAS HV cond ... To allow for EGUN:BIAS HV conditioning without tripping at the usual vacuum trip point of 1e-7 Torr (interlock was "EGUN:IG1 < 100nTorr"). Changed to 2e-6 Torr (EGUN:IG1 < 2uTorr) trip level approved by Friedhelm. |
2021-166 Implemented on: 2021-05-20 | Removed | David Bandiera In consultation with: , | Fire Alarm System | SA L1 & L2 Smoke/Heat Detector ... SA L1 & L2 Smoke/Heat Detectors disarmed. 02:007-003, 012, 013, 014, 017, 018, 019, 021, 022, 023, 024, 027, 028, 030 | Grinding work in ISIS L1 area Grinding work in ISIS L1 area |
2021-165 Implemented on: 2021-05-20 | Removed | David Bandiera In consultation with: , | Fire Alarm System | Zone 1 offline until 17:00 Zone 1 offline until 17:00 | FAS system upgrade in MOB. WP ... FAS system upgrade in MOB. WP #C2021-05-10-1 |
2021-164 Implemented on: 2021-05-19 | Removed | Eric Chapman In consultation with: , | Other / Misc | STF Ion Exchanger Flow interlo ... STF Ion Exchanger Flow interlock | Flow meter suffering readback ... Flow meter suffering readback issues. Flow instantaneously drops then comes back. As requested by Steve Sapriken. |
2021-163 Implemented on: 2021-05-19 | Removed | Micheal Donohoe In consultation with: , | Fire Alarm System | Zone 1 offline until 17:00 Zone 1 offline until 17:00 | FAS system upgrade. WP #C2021- ... FAS system upgrade. WP #C2021-05-10-1 |
2021-162 Implemented on: 2021-05-19 | Removed | Jas Uppal In consultation with: , | Fire Alarm System | 01-035-19 and 10 Smoke detecto ... 01-035-19 and 10 Smoke detectors | Smoke in MOB from oil leak in ... Smoke in MOB from oil leak in mechanical room compressor. |
2021-161 Implemented on: 2021-05-18 | Removed | David Bandiera In consultation with: , | Fire Alarm System | DCR and SA 103 underfloor smok ... DCR and SA 103 underfloor smoke detectors disarmed | For network cable pull down to ... For network cable pull down to SAB2. |
2021-160 Implemented on: 2021-05-18 | Removed | Brandon Humphries In consultation with: , | Ion sources and injection BL | EGUN:BIAS interlock defeated, ... EGUN:BIAS interlock defeated, EGUN:CATHB signal forced | To allow for conditioning of t ... To allow for conditioning of the EGUN:BIAS HV, the HV cabling is configured in such a way that the EGUN:CATHB and EGUN:CHT are disconnected. To allow for the EGUN:BIAS to turned on for conditioning, the "EGUN:CATHB>50V" interlock has been forced (by Julie of Controls group) to be okay. This allows for protection from the other EGUN:BIAS interlocks (instead of bypassing the EGUN:BIAS through EPICS as described in the procedure). |
2021-158 Implemented on: 2021-05-18 | Removed | David Bandiera In consultation with: , | Fire Alarm System | Zone 2 offline for sprinkler t ... Zone 2 offline for sprinkler testing in RCA | Quarterly sprinkler testing in ... Quarterly sprinkler testing in RCA. |
2021-157 Implemented on: 2021-05-18 | Removed | David Bandiera In consultation with: , | Fire Alarm System | Zone 1 offline until 17:00 Zone 1 offline until 17:00 | FAS system upgrade. WP #C2021- ... FAS system upgrade. WP #C2021-05-10-1 |
2021-155 Implemented on: 2021-05-17 | Removed | Eric Chapman In consultation with: Dale Nagra, | Fire Alarm System | All zones offline for 8 hours ... All zones offline for 8 hours until 15:45 | FAS system upgrade. WP #C2021- ... FAS system upgrade. WP #C2021-05-10-1 |
2021-153 Implemented on: 2021-05-14 | Removed | Eric Chapman In consultation with: Dale Nagra, | Fire Alarm System | Zone 1 offline until 17:00 Zone 1 offline until 17:00 | FAS system upgrade. WP #C2021- ... FAS system upgrade. WP #C2021-05-10-1 |
2021-152 Implemented on: 2021-05-13 | Removed | Kyle Mollard In consultation with: , | Targets | STF water jacket low and high ... STF water jacket low and high level sensors, BYP-001 and BYP-003 | Allow more range water jacket ... Allow more range water jacket level |
2021-151 Implemented on: 2021-05-13 | Removed | Riley Schick-Martin In consultation with: , | Fire Alarm System | Zone 1 offline until 17:00 Zone 1 offline until 17:00 | FAS system upgrade. WP #C2021- ... FAS system upgrade. WP #C2021-05-10-1 |
2021-150 Implemented on: 2021-05-12 | Removed | Riley Schick-Martin In consultation with: , | Fire Alarm System | MHESA B1 smoke detectors disar ... MHESA B1 smoke detectors disarmed; 02:001-001,10,11 | Air flow visualization test of ... Air flow visualization test of fumehood in RCR lab |
2021-149 Implemented on: 2021-05-12 | Removed | Riley Schick-Martin In consultation with: , | Fire Alarm System | Zone 1 offline until 17:00 Zone 1 offline until 17:00 | FAS system upgrade. WP #C2021- ... FAS system upgrade. WP #C2021-05-10-1 |
2021-148 Implemented on: 2021-05-11 | Removed | Kyle Mollard In consultation with: , | Targets | STF Target Cooling Supply Resi ... STF Target Cooling Supply Resistivity Signal | Resistivity signal has failed ... Resistivity signal has failed displaying PLCDat. This is tripping the beam. |
2021-147 Implemented on: 2021-05-11 | Removed | Riley Schick-Martin In consultation with: , | Targets | STF BYP-019 pinned - Double Wi ... STF BYP-019 pinned - Double Window Return Temperature | Bypassed to due failed tempera ... Bypassed to due failed temperature sensor. |
2021-145 Implemented on: 2021-05-11 | Removed | Riley Schick-Martin In consultation with: , | Fire Alarm System | All MOB pull stations and dete ... All MOB pull stations and detectors disarmed & Zone 1 offline | FAS system upgrade. WP #C2021- ... FAS system upgrade. WP #C2021-05-10-1 |
2021-144 Implemented on: 2021-05-10 | Removed | David Bandiera In consultation with: , | Targets | 2C4 Double Window Return Water ... 2C4 Double Window Return Water Temp STF BYP-019 pinned at SAB2 rack 1A | Double Window Return Water Tem ... Double Window Return Water Temp is erratic and tripping beam. Temperature swings over ~100 C range in seconds. |
2021-143 Implemented on: 2021-05-10 | Removed | Jason Wait In consultation with: , | Targets | STF BYP-043 pinned - STF targe ... STF BYP-043 pinned - STF target cooling supply (Mohm) | Bypassed at request of experts ... Bypassed at request of experts during commissioning |
2021-142 Implemented on: 2021-05-10 | Removed | Kyle Mollard In consultation with: , | Fire Alarm System | FAS Zone 1 into "Test Mode" wi ... FAS Zone 1 into "Test Mode" with Monitoring Co. | FAS software update for MOB pa ... FAS software update for MOB panel. |
2021-140 Implemented on: 2021-05-04 | Removed | David Bandiera In consultation with: Eric Chapman, | Ion sources and injection BL | J-11, J-13, J-19 Interlocks By ... J-11, J-13, J-19 Interlocks Bypassed | To remove ISIS BST 030 with Be ... To remove ISIS BST 030 with Bend 1 off for emittance measurements. |
2021-139 Implemented on: 2021-05-03 | Removed | Micheal Donohoe In consultation with: , | Safety | MHESA RCR Lab Warn and Alarm MHESA RCR Lab Warn and Alarm | Calibration of MHESA RCR Lab p ... Calibration of MHESA RCR Lab pressure transmitters. |
2021-138 Implemented on: 2021-04-30 | Removed | Elena Bylinskaia In consultation with: Elena Bylinskaia, | Safety | IBOP I0113 TEMPORARY pinned IBOP I0113 TEMPORARY pinned | 2CVB1 Safety interlock gives M ... 2CVB1 Safety interlock gives Machine Protect with the bender OFF. In order to continue to run 1A. To run 2C1 pin must be removed. |
2021-137 Implemented on: 2021-04-28 | Removed | Kevin Lucow In consultation with: , | Safety | MHESA RCR Lab Warn and Alarm MHESA RCR Lab Warn and Alarm | Calibration of MHESA RCR Lab p ... Calibration of MHESA RCR Lab pressure transmitters. |
2021-132 Implemented on: 2021-04-23 | Removed | Jas Uppal In consultation with: , | Targets | B1A:T2CS:FGTGT B1A:T2CS:FGTGT | Target flow readback is noisy ... Target flow readback is noisy and sometimes dips below the trip setpoint of 3.0 gpm. Trip setpoint lowered from 3.0 gpm to 2.8 gpm. Warn lowered from 3.1 gpm to 2.9 gpm. New values had been approved by Isaac Earle. |
2021-129 Implemented on: 2021-04-22 | Removed | Jason Wait In consultation with: , | Safety | Neutron Monitor 11 (M11 Area o ... Neutron Monitor 11 (M11 Area on East Wall) warn limit increased to 40 uSv/h - at direction of RPG | From RPG: "NM11 was moved into ... From RPG: "NM11 was moved into the UCN pit yesterday and remains there; Please go ahead and raise the warn level as necessary."
Ops was given permission to raise the warn limit to 50 uSv/hr - the limit is currently set to 40 uSv/hr. |
2021-127 Implemented on: 2021-04-22 | Removed | Jas Uppal In consultation with: , | Fire Alarm System | ISAC sprinkler flow switch rep ... ISAC sprinkler flow switch replacement - Zone 3 offline until 12:15 with monitoring company | Fire sprinkler flow switch rep ... Fire sprinkler flow switch replacement (05-051-23) in ISAC 1 |
2021-126 Implemented on: 2021-04-21 | Removed | Jas Uppal In consultation with: , | Fire Alarm System | FAS 05-051-23 FAS 05-051-23 | Device 05-051-23 "ISAC EXPHAL ... Device 05-051-23 "ISAC EXPHAL MAIN SPRNK FS" goes into alarm state when armed. Johnson Controls tech was not able to bring the system into a state where it wouldn't alarm when armed. Device is disarmed. |
2021-124 Implemented on: 2021-04-20 | Removed | Jas Uppal In consultation with: , | Safety | NM #11 NM #11 | Relocate Neutron Monitor # 11 ... Relocate Neutron Monitor # 11 from BL1U Area. |
2021-123 Implemented on: 2021-04-20 | Removed | Jas Uppal In consultation with: , | Fire Alarm System | ISAC sprinkler deficiency test ... ISAC sprinkler deficiency testing - Zone 3 offline until 15:00 with monitoring company | Fire sprinkler deficiency test ... Fire sprinkler deficiency testing to take place in ISAC 1 |
2021-121 Implemented on: 2021-04-19 | Removed | Jason Wait In consultation with: , | Fire Alarm System | MOB sprinkler deficiency testi ... MOB sprinkler deficiency testing - flow switches and hose disarmed (01-035-053, 01-035-055, 01-035-059). Zone 1 offline for 8 hours with monitoring company | Fire sprinkler deficiency test ... Fire sprinkler deficiency testing to take place in MOB |
2021-119 Implemented on: 2021-04-17 | Removed | Riley Schick-Martin In consultation with: , | Safety | Air Monitor #20 pinned Air Monitor #20 pinned | Air monitor #20 (MHESA B1 RCR1 ... Air monitor #20 (MHESA B1 RCR1 Room 6 Alpha) is intermittently becoming noisy enough to alarm for extended periods of time. Readback shows a high level of noise. |
2021-118 Implemented on: 2021-04-15 | Removed | Kevin Lucow In consultation with: , | Ion sources and injection BL | ISIS Ground Side Interlocks an ... ISIS Ground Side Interlocks and BST 030. | Until emittance measurements c ... Until emittance measurements completed. |
2021-117 Implemented on: 2021-04-14 | Removed | Elena Bylinskaia In consultation with: , | Ion sources and injection BL | IB1:RV030CYP bypassed IB1:RV030CYP bypassed | At T. Stanford request in orde ... At T. Stanford request in order to open the valve. |
2021-116 Implemented on: 2021-04-14 | Active | Elena Bylinskaia In consultation with: Elena Bylinskaia, | Safety | IBOP I1416 pinned IBOP I1416 pinned | BL 1U BB locked out for 1U exc ... BL 1U BB locked out for 1U exclusion area reconfiguration. IBOP I1416 pinned to allow 1A operation. |
2021-114 Implemented on: 2021-04-14 | Removed | David Bandiera In consultation with: , | Fire Alarm System | SA G 103 Computer Room Under-F ... SA G 103 Computer Room Under-Floor Smoke Detectors 02:008-024, 027, 028, 029 | Pulling of network cable for C ... Pulling of network cable for CCS SA-B2 network switch |
2021-113 Implemented on: 2021-04-14 | Removed | David Bandiera In consultation with: , | Fire Alarm System | ARIEL Target Hall Linear Beam ... ARIEL Target Hall Linear Beam Detectors 09:095-001 & 09:095-002 disarmed | Construction work in ARIEL Tar ... Construction work in ARIEL Target Hall |
2021-112 Implemented on: 2021-04-12 | Removed | Dale Nagra In consultation with: , | Fire Alarm System | ARIEL Target Hall Linear Beam ... ARIEL Target Hall Linear Beam Detectors 09:095-001 & 09:095-002 disarmed | Construction work in ARIEL Tar ... Construction work in ARIEL Target Hall |
2021-111 Implemented on: 2021-04-12 | Removed | Gordon Roy In consultation with: , | Fire Alarm System | FAS Zone 2 into "Test Mode" wi ... FAS Zone 2 into "Test Mode" with Monitoring Co. | Monthly testing of FAS. April ... Monthly testing of FAS. April is Service Annex as per schedule |
2021-110 Implemented on: 2021-04-09 | Removed | Eric Chapman In consultation with: , | Fire Alarm System | ARIEL Target Hall Linear Beam ... ARIEL Target Hall Linear Beam Detectors 09:095-001 & 09:095-002 disarmed | Construction work in ARIEL Tar ... Construction work in ARIEL Target Hall |
2021-109 Implemented on: 2021-04-07 | Removed | Kyle Mollard In consultation with: , | Safety | MHESA B1 RCR1 RM6 Warn Signal ... MHESA B1 RCR1 RM6 Warn Signal - IBOP 1507 | Holding Tank in RH area is ful ... Holding Tank in RH area is full. Alarm is latched. |
2021-108 Implemented on: 2021-04-01 | Removed | Jason Wait In consultation with: , | Fire Alarm System | ARIEL Target Hall Linear Beam ... ARIEL Target Hall Linear Beam Detectors 09:095-001 & 09:095-002 disarmed | Construction work in ARIEL Tar ... Construction work in ARIEL Target Hall |
2021-107 Implemented on: 2021-03-31 | Removed | Jason Wait In consultation with: , | Fire Alarm System | ARIEL Target Hall Linear Beam ... ARIEL Target Hall Linear Beam Detectors 09:095-001 & 09:095-002 disarmed | Construction work in ARIEL Tar ... Construction work in ARIEL Target Hall |
2021-106 Implemented on: 2021-03-29 | Removed | David Bandiera In consultation with: , | Fire Alarm System | ARIEL Target Hall Linear Beam ... ARIEL Target Hall Linear Beam Detectors 09:095-001 & 09:095-002 disarmed | Construction work in ARIEL Tar ... Construction work in ARIEL Target Hall |
2021-105 Implemented on: 2021-03-26 | Removed | David Bandiera In consultation with: , | Fire Alarm System | FAS Zone 2 offline until 17:30 FAS Zone 2 offline until 17:30 | Siemens tech on site to replac ... Siemens tech on site to replace faulty detector in CMMS building |
2021-104 Implemented on: 2021-03-25 | Removed | Kevin Lucow In consultation with: , | Fire Alarm System | ARIEL Traget Hall Linear Beam ... ARIEL Traget Hall Linear Beam detectors 09:095-001 and 09:095-002. | Construction in ARIEL Target P ... Construction in ARIEL Target Pit. |
2021-103 Implemented on: 2021-03-24 | Removed | Kevin Lucow In consultation with: , | Fire Alarm System | ARIEL Traget Hall Linear Beam ... ARIEL Traget Hall Linear Beam detectors 09:095-001 and 09:095-002. | Construction in ARIEL Target P ... Construction in ARIEL Target Pit. |
2021-102 Implemented on: 2021-03-23 | Removed | Kevin Lucow In consultation with: , | Fire Alarm System | ARIEL Traget Hall Linear Beam ... ARIEL Traget Hall Linear Beam detectors 09:095-001 and 09:095-002. | Construction in ARIEL Target P ... Construction in ARIEL Target Pit. |
2021-101 Implemented on: 2021-03-22 | Removed | Robert Scheepmaker In consultation with: , | Fire Alarm System | 01-002-018(M8 Gnd Flr Pull Stn ... 01-002-018(M8 Gnd Flr Pull Stn) | Device causing false alarms. Device causing false alarms. |
2021-99 Implemented on: 2021-03-22 | Removed | Riley Schick-Martin In consultation with: , | Fire Alarm System | ARIEL Traget Hall Linear Beam ... ARIEL Traget Hall Linear Beam detectors disarmed. 09:095-001 and 09:095-002. | Cutting and grinding work in A ... Cutting and grinding work in ARIEL Target Pit. |
2021-96 Implemented on: 2021-03-19 | Removed | Robert Scheepmaker In consultation with: , | Fire Alarm System | ARIEL Traget Hall Linear Beam ... ARIEL Traget Hall Linear Beam detectors disarmed. 09:095-001 and 09:095-002. | Cutting and grinding work in A ... Cutting and grinding work in ARIEL Target Pit. |
2021-95 Implemented on: 2021-03-18 | Removed | Riley Schick-Martin In consultation with: , | Fire Alarm System | ARIEL Traget Hall Linear Beam ... ARIEL Traget Hall Linear Beam detectors disarmed. 09:095-001 and 09:095-002. | Cutting and grinding work in A ... Cutting and grinding work in ARIEL Target Pit. |
2021-94 Implemented on: 2021-03-17 | Removed | Kyle Mollard In consultation with: Robin Swanson, | Fire Alarm System | SA rm 103 and 104 smoke deteco ... SA rm 103 and 104 smoke detecors. 02:008-020 to 02:008-024 and 02:008-027 to 02:008-035 | Cable routing. Cable routing. |
2021-93 Implemented on: 2021-03-17 | Removed | Kyle Mollard In consultation with: , | Fire Alarm System | ARIEL Traget Hall Linear Beam ... ARIEL Traget Hall Linear Beam detectors disarmed. 09:095-001 and 09:095-002. | Cutting and grinding work in A ... Cutting and grinding work in ARIEL Target Pit. |
2021-92 Implemented on: 2021-03-16 | Removed | Kyle Mollard In consultation with: , | Fire Alarm System | FAS Zone 2 in test mode FAS Zone 2 in test mode | Main Drain Test for sprinkler ... Main Drain Test for sprinkler system |
2021-91 Implemented on: 2021-03-16 | Removed | Kyle Mollard In consultation with: , | Fire Alarm System | ARIEL Traget Hall Linear Beam ... ARIEL Traget Hall Linear Beam detectors disarmed. 09:095-001 and 09:095-002. | Cutting and grinding work in A ... Cutting and grinding work in ARIEL Target Pit. |
2021-88 Implemented on: 2021-03-15 | Removed | Jason Wait In consultation with: , | Fire Alarm System | ARIEL Traget Hall Linear Beam ... ARIEL Traget Hall Linear Beam detectors disarmed. 09:095-001 and 09:095-002. | Cutting and grinding work in A ... Cutting and grinding work in ARIEL Target Pit. |
2021-87 Implemented on: 2021-03-12 | Removed | Ryan Lovelidge In consultation with: , | RF | 'Resonators all unlatched' pin ... 'Resonators all unlatched' pinned at IBOP 0204 | The elevating system interlock ... The elevating system interlock pages displays 'RESONATORS ALL UNLATCHED - NO'. Resonators were unlatched for lid up and RF group have visually confirmed that the resonators are unlatched. Element pinned to allow for lid down. |
2021-86 Implemented on: 2021-03-12 | Removed | Jason Wait In consultation with: , | Fire Alarm System | ARIEL Traget Hall Linear Beam ... ARIEL Traget Hall Linear Beam detectors disarmed. 09:095-001 and 09:095-002. | Cutting and grinding work in A ... Cutting and grinding work in ARIEL Target Pit. |
2021-83 Implemented on: 2021-03-09 | Removed | David Bandiera In consultation with: , | Fire Alarm System | ARIEL Traget Hall Linear Beam ... ARIEL Traget Hall Linear Beam detectors disarmed. 09:095-001 and 09:095-002. | Cutting and grinding work in A ... Cutting and grinding work in ARIEL Target Pit. |
2021-82 Implemented on: 2021-03-08 | Removed | Kevin Lucow In consultation with: , | Fire Alarm System | All FAS zones in test mode. All FAS zones in test mode. | ACME technician is working on ... ACME technician is working on "ACME protective signal box." |
2021-81 Implemented on: 2021-03-08 | Removed | Kevin Lucow In consultation with: , | Fire Alarm System | ISAC I experimental hall linea ... ISAC I experimental hall linear beam detectors. 05:054-002, 05:054-003, and 05:054-004. | Lighting upgrades in ISAC 1 ex ... Lighting upgrades in ISAC 1 experimental hall. |
2021-80 Implemented on: 2021-03-08 | Removed | Kevin Lucow In consultation with: , | Fire Alarm System | ARIEL Traget Hall Linear Beam ... ARIEL Traget Hall Linear Beam detectors disarmed. 09:095-001 and 09:095-002. | Cutting and grinding work in A ... Cutting and grinding work in ARIEL Target Pit. |
2021-77 Implemented on: 2021-03-04 | Removed | Frank Hosta In consultation with: , | Diagnostics | Periscope down limit Periscope down limit | South periscope has been remov ... South periscope has been removed. |
2021-76 Implemented on: 2021-03-04 | Removed | Frank Hosta In consultation with: , | Fire Alarm System | 09:095-001, 09:095-002 ARIEL L ... 09:095-001, 09:095-002 ARIEL L1 Traget Hall Linear Beam detectors disarmed | Cutting and grinding work in A ... Cutting and grinding work in ARIEL Target Pit |
2021-75 Implemented on: 2021-03-03 | Removed | Robert Scheepmaker In consultation with: , | Fire Alarm System | 2-001-025,02-001-059(Flow Swit ... 2-001-025,02-001-059(Flow Switches) | Water flow will be disrupted d ... Water flow will be disrupted during tie-in to IAMI |
2021-74 Implemented on: 2021-03-03 | Removed | Riley Schick-Martin In consultation with: , | Fire Alarm System | 09:095-001, 09:095-002 ARIEL L ... 09:095-001, 09:095-002 ARIEL L1 Traget Hall Linear Beam detectors disarmed | Cutting and grinding work in A ... Cutting and grinding work in ARIEL Target Pit |
2021-73 Implemented on: 2021-03-02 | Removed | David Bandiera In consultation with: , | Fire Alarm System | 09:095-001, 09:095-002 ARIEL L ... 09:095-001, 09:095-002 ARIEL L1 Traget Hall Linear Beam detectors disarmed | Cutting and grinding work in A ... Cutting and grinding work in ARIEL Target Pit |
2021-70 Implemented on: 2021-02-26 | Removed | Kyle Mollard In consultation with: , | Fire Alarm System | Service Annex B3 Pump Room Hea ... Service Annex B3 Pump Room Heat Detectors 02:001-051, 02:001-052, 02:001-053 | Hot work to be performed in SA ... Hot work to be performed in SAB3 pump room |
2021-69 Implemented on: 2021-02-26 | Removed | Jas Uppal In consultation with: , | Fire Alarm System | Smoke detectors: 008-024, -027 ... Smoke detectors: 008-024, -027,-028,-029,-032,-033. | Check CAMAC branch cable lengt ... Check CAMAC branch cable lengths under Computer Room & Elinac Control Room |
2021-68 Implemented on: 2021-02-26 | Removed | Jas Uppal In consultation with: , | Services | ME140 and 141 ME140 and 141 | Complains of diesel fumes in t ... Complains of diesel fumes in the SA. ME140 for MCR forced into mechanical cooling. Both 140 and 141 dampers closed via control panel on SA L1, can be placed back into auto overnight when trucks are gone. |
2021-67 Implemented on: 2021-02-25 | Removed | Ryan Lovelidge In consultation with: , | Fire Alarm System | SA L1 floor smoke detectors 02 ... SA L1 floor smoke detectors 02:008-024/27/28/29/32/33 | Cabling work under the floor. Cabling work under the floor. |
2021-66 Implemented on: 2021-02-23 | Removed | Micheal Donohoe In consultation with: , | Fire Alarm System | Smoke Detectors 02:008-024/027 ... Smoke Detectors 02:008-024/027/028/029/032/033 | Work being done underneath com ... Work being done underneath computer room floor tiles. |
2021-65 Implemented on: 2021-02-22 | Removed | David Bandiera In consultation with: , | Fire Alarm System | Service Annex B3 Pump Room Hea ... Service Annex B3 Pump Room Heat Detectors 02:001-051, 02:001-052, 02:001-053 | Hot work to be performed in SA ... Hot work to be performed in SAB3 pump room |
2021-64 Implemented on: 2021-02-19 | Removed | Brandon Humphries In consultation with: David Bandiera, | Ion sources and injection BL | EGUN RF EGUN RF | To allow for testing of the EG ... To allow for testing of the EGUN RF amplifier using a dummy load. |
2021-63 Implemented on: 2021-02-19 | Removed | David Bandiera In consultation with: , | Services | ME140 and 141 ME140 and 141 | Complains of diesel fumes in t ... Complains of diesel fumes in the SA. ME140 for MCR forced into mechanical cooling. Both 140 and 141 dampers closed via DDC computer, can be placed back into auto overnight when trucks are gone. |
2021-62 Implemented on: 2021-02-18 | Removed | Eric Chapman In consultation with: Jeremy Pratt, | Services | Cu-LCW System running on South ... Cu-LCW System running on South Pump only | Cu-LCW is running on the South ... Cu-LCW is running on the South Pump (SA3-3) only at a setting of 54.0Hz. DO NOT exceed a setting of 56.0Hz (94 Amps) or the pump will trip! Done for maintenance over the next 2-3 weeks. |
2021-61 Implemented on: 2021-02-18 | Removed | Dale Nagra In consultation with: , | Fire Alarm System | 9:091:019 : Ariel G N Alis Rm ... 9:091:019 : Ariel G N Alis Rm HVAC duct | Operate Air handler and test v ... Operate Air handler and test various modes of operation. |
2021-60 Implemented on: 2021-02-18 | Removed | Eric Chapman In consultation with: , | Fire Alarm System | 06-065-001/002/003 ISAC II Acc ... 06-065-001/002/003 ISAC II Accelerator Vault Detectors | Annual Crane inspection in ISA ... Annual Crane inspection in ISAC II accelerator vault. All three Linear Beam Detectors disarmed. |
2021-59 Implemented on: 2021-02-18 | Removed | Dale Nagra In consultation with: , | Fire Alarm System | Zone #2 Communication to ACME, ... Zone #2 Communication to ACME, all strobes and bells | Replacement of Relay in FAS of ... Replacement of Relay in FAS of Remote Handling |
2021-58 Implemented on: 2021-02-18 | Removed | Eric Chapman In consultation with: , | Services | ME140 and 141 ME140 and 141 | Complains of diesel fumes in t ... Complains of diesel fumes in the SA. ME140 for MCR forced into mechanical cooling. Both 140 and 141 dampers closed via DDC computer, can be placed back into auto overnight when trucks are gone. |
2021-57 Implemented on: 2021-02-17 | Removed | Eric Chapman In consultation with: , | Services | ME140 and 141 ME140 and 141 | Complains of diesel fumes in t ... Complains of diesel fumes in the SA. ME140 for MCR forced into mechanical cooling. Both 140 and 141 dampers closed via DDC computer, can be placed back into auto overnight when trucks are gone. |
2021-56 Implemented on: 2021-02-17 | Removed | Dale Nagra In consultation with: , | Fire Alarm System | Zone #2 Communication to ACME, ... Zone #2 Communication to ACME, all strobes and bells | Replacement of Relay in FAS of ... Replacement of Relay in FAS of Remote Handling |
2021-55 Implemented on: 2021-02-16 | Removed | Eric Chapman In consultation with: , | Fire Alarm System | eHall Duct Smoke 02-02-025 eHall Duct Smoke 02-02-025 | Technician working on e-Hall r ... Technician working on e-Hall roof top burner unit, may disturb dust. |
2021-54 Implemented on: 2021-02-16 | Removed | Eric Chapman In consultation with: , | Fire Alarm System | ISAC I Communication to ACME, ... ISAC I Communication to ACME, all strobes and bells | FAS testing/replacement of VES ... FAS testing/replacement of VESDA detector in ISAC1. |
2021-53 Implemented on: 2021-02-10 | Removed | Jas Uppal In consultation with: , | Fire Alarm System | ISAC I linear beam detectors i ... ISAC I linear beam detectors in experimental hall. 05-054-002,003 & 004 | Hydro Power Smart lighting upg ... Hydro Power Smart lighting upgrade in experimental hall. |
2021-52 Implemented on: 2021-02-10 | Removed | Robin Swanson In consultation with: , | Fire Alarm System | ISAC II linear beam detectors ... ISAC II linear beam detectors in experimental hall. 06-066-001,002 & 003 | Hydro Power Smart lighting upg ... Hydro Power Smart lighting upgrade in experimental hall. |
2021-51 Implemented on: 2021-02-10 | Removed | Eric Chapman In consultation with: , | Fire Alarm System | SA103 underfloor smokes SA103 underfloor smokes | Lifting floor tiles for cable ... Lifting floor tiles for cable inspection |
2021-50 Implemented on: 2021-02-09 | Removed | Robin Swanson In consultation with: , | Services | Cu-LCW system throttled. Runni ... Cu-LCW system throttled. Running on South pump only. | MMPS and various RF equipment ... MMPS and various RF equipment valved off for shut down. Only one Cu-LCW pump needed. North pump is running and South pump is off.
Had switched to South pump only, but tripped on motor overload. North is back running. |
2021-49 Implemented on: 2021-02-09 | Removed | Robin Swanson In consultation with: , | Services | Cu-LCW system throttled. Runni ... Cu-LCW system throttled. Running on South pump only. | MMPS and various RF equipment ... MMPS and various RF equipment valved off for shut down. Only one Cu-LCW pump needed. South pump is running and North pump is off. |
2021-48 Implemented on: 2021-02-09 | Removed | Robin Swanson In consultation with: , | Fire Alarm System | ISAC II linear beam detectors ... ISAC II linear beam detectors in experimental hall. 06-066-001,002 & 003 | Hydro Power Smart lighting upg ... Hydro Power Smart lighting upgrade in experimental hall. |
2021-45 Implemented on: 2021-02-04 | Removed | David Bandiera In consultation with: , | Fire Alarm System | SA L1 Smoke Detectors 02:007-0 ... SA L1 Smoke Detectors 02:007-008, 013, 014, 015, 032, 056, 057, 058, 059 | Brazing of copper pipe for ME- ... Brazing of copper pipe for ME-140 servicing. |
2021-44 Implemented on: 2021-02-03 | Removed | Elena Bylinskaia In consultation with: Elena Bylinskaia, | Fire Alarm System | 02-002-060 02-002-060 | Investigate and repair non fu ... Investigate and repair non functioning RTU for Remote Handling. |
2021-43 Implemented on: 2021-02-01 | Removed | Riley Schick-Martin In consultation with: , | Fire Alarm System | Zone 2 offline with ACME monit ... Zone 2 offline with ACME monitoring and nodes 2 and 8 disarmed | Sprinkler testing and verifica ... Sprinkler testing and verification |
2021-42 Implemented on: 2021-01-29 | Removed | Kevin Lucow In consultation with: , | Services | Cu-LCW system throttled. Runni ... Cu-LCW system throttled. Running on North pump only. | MMPS and various RF equipment ... MMPS and various RF equipment valved off for shut down. Only one Cu-LCW pump needed. North pump is running and South pump is off. |
2021-41 Implemented on: 2021-01-29 | Removed | Frank Hosta In consultation with: , | Fire Alarm System | Zone 4 test. Zone 4 test. | Back flow valve being replaced ... Back flow valve being replaced in the AREIEL building. |
2021-40 Implemented on: 2021-01-29 | Removed | Frank Hosta In consultation with: , | Fire Alarm System | Zone 1 test Zone 1 test | Annual verification/maintenanc ... Annual verification/maintenance of cafeteria fume hood. |
2021-39 Implemented on: 2021-01-27 | Removed | Kevin Lucow In consultation with: , | Fire Alarm System | ISAC 1 Experimental Hall Linea ... ISAC 1 Experimental Hall Linear Beam Detectors: 05:054-002, 05:054-003, and 05:054-004. | Crane movement in ISAC 1 Exper ... Crane movement in ISAC 1 Experimental Hall. |
2021-36 Implemented on: 2021-01-25 | Removed | Jas Uppal In consultation with: , | Shielding | Bl1A Ignition Key Bl1A Ignition Key | Shielding blocks removed over ... Shielding blocks removed over Beamline 1A. |
2021-35 Implemented on: 2021-01-22 | Removed | Kyle Mollard In consultation with: , | Fire Alarm System | Zones 1,2,3 and 4 in test mode Zones 1,2,3 and 4 in test mode | F.A.S. annual testing. F.A.S. annual testing. |
2021-34 Implemented on: 2021-01-21 | Removed | David Bandiera In consultation with: , | Vacuum | EHCD:FPV01 bypassed EHCD:FPV01 bypassed | Cryogenics warmed up for E-Lin ... Cryogenics warmed up for E-Linac shutdown |
2021-33 Implemented on: 2021-01-21 | Removed | Gordon Roy In consultation with: , | Fire Alarm System | 2-001-001 , 2-001-010, 2-001-0 ... 2-001-001 , 2-001-010, 2-001-011 | Ventilation tests being carrie ... Ventilation tests being carried out with smoke generator |
2021-32 Implemented on: 2021-01-21 | Removed | Elena Bylinskaia In consultation with: Gordon Roy, | Fire Alarm System | Zones 1,2,3 and 4 in test mode Zones 1,2,3 and 4 in test mode | F.A.S. annual testing. F.A.S. annual testing. |
2021-30 Implemented on: 2021-01-20 | Removed | Elena Bylinskaia In consultation with: Gordon Roy, | Fire Alarm System | F.A.S. zones 1,2,3,4 test mod ... F.A.S. zones 1,2,3,4 test mode | F.A.S. annual testing. F.A.S. annual testing. |
2021-29 Implemented on: 2021-01-19 | Removed | Eric Chapman In consultation with: , | Services | Cooling tower cells shut down ... Cooling tower cells shut down due to cool weather | Low heat load and outdoor air ... Low heat load and outdoor air temperature causing the RAW temperature to go out of regulation. |
2021-28 Implemented on: 2021-01-19 | Removed | Elena Bylinskaia In consultation with: Gordon Roy, | Fire Alarm System | Zone 1,2,3,4 intest mode till ... Zone 1,2,3,4 intest mode till 16:00 | F.A.S. annual testing. Sprinkl ... F.A.S. annual testing. Sprinklers testing around the site. |
2021-27 Implemented on: 2021-01-18 | Removed | Jason Wait In consultation with: , | Fire Alarm System | FAS zones 1, 2, 3, and 4 in te ... FAS zones 1, 2, 3, and 4 in test mode until 16:00 | Annual FAS testing and inspect ... Annual FAS testing and inspection. |
2021-26 Implemented on: 2021-01-15 | Removed | David Bandiera In consultation with: , | Fire Alarm System | FAS zones 2 and 3 in test mode ... FAS zones 2 and 3 in test mode until 15:00 | Annual FAS testing and inspect ... Annual FAS testing and inspection. |
2021-25 Implemented on: 2021-01-14 | Removed | Frank Hosta In consultation with: , | Safety | 1A vault exhaust differential ... 1A vault exhaust differential pressure | Curtis is doing preventative m ... Curtis is doing preventative maintenance on the 1A exhaust motor. System is offline until maintenance is completed. |
2021-24 Implemented on: 2021-01-14 | Removed | Riley Schick-Martin In consultation with: , | Fire Alarm System | All 4 FAS zones in test mode f ... All 4 FAS zones in test mode for 8 hours. | Annual FAS testing and inspect ... Annual FAS testing and inspection. |
2021-23 Implemented on: 2021-01-13 | Removed | Frank Hosta In consultation with: , | Fire Alarm System | Zone 1 & 3 in test Zone 1 & 3 in test | Annual FAS verification tests Annual FAS verification tests |
2021-22 Implemented on: 2021-01-12 | Removed | Riley Schick-Martin In consultation with: , | Fire Alarm System | FAS Zone 2 in test mode for 8 ... FAS Zone 2 in test mode for 8 hours. | Annual FAS testing and inspect ... Annual FAS testing and inspection. |
2021-21 Implemented on: 2021-01-11 | Removed | Robert Scheepmaker In consultation with: , | Fire Alarm System | 06-65-001,2,3 linear beam dete ... 06-65-001,2,3 linear beam detectors | Hi Bay light bulb replacement ... Hi Bay light bulb replacement ISAC2 accelerator hall |
2021-20 Implemented on: 2021-01-11 | Removed | Robert Scheepmaker In consultation with: , | Fire Alarm System | 06-65-001,2,3 06-65-001,2,3 | Hi Bay light bulb replacement Hi Bay light bulb replacement |
2021-19 Implemented on: 2021-01-11 | Removed | Robert Scheepmaker In consultation with: , | Services | 2C Hot Cell Air Flow NoK 2C Hot Cell Air Flow NoK | 2C Hot Cell Exhaust Fan motor ... 2C Hot Cell Exhaust Fan motor and bearings being replaced |
2021-18 Implemented on: 2021-01-08 | Removed | Kevin Lucow In consultation with: , | Safety | MHESA RCR Lab Warn and Alarm. MHESA RCR Lab Warn and Alarm. | PLC work causing alarms. PLC work causing alarms. |
2021-17 Implemented on: 2021-01-08 | Removed | Kevin Lucow In consultation with: , | Fire Alarm System | FAS Zone 4 in test mode. FAS Zone 4 in test mode. | Annual FAS testing and inspect ... Annual FAS testing and inspection. |
2021-15 Implemented on: 2021-01-08 | Removed | Kevin Lucow In consultation with: , | Fire Alarm System | FAS Zone 2 in test mode for 8 ... FAS Zone 2 in test mode for 8 hours. | Annual FAS testing and inspect ... Annual FAS testing and inspection. |
2021-14 Implemented on: 2021-01-08 | Removed | David Bandiera In consultation with: Eric Chapman, | Fire Alarm System | DCR, Computer Room, SA G Hallw ... DCR, Computer Room, SA G Hallway ceiling and under floor Smoke Detectors disarmed | Pulling floor tiles and docume ... Pulling floor tiles and documentation of equipment in DCR |
2021-13 Implemented on: 2021-01-07 | Removed | Ryan Lovelidge In consultation with: , | Fire Alarm System | 06:066-001/002/003 06:066-001/002/003 | ISAC II experimental hall line ... ISAC II experimental hall linear beam detectors disarmed for light bulb replacement. |
2021-12 Implemented on: 2021-01-07 | Removed | Micheal Donohoe In consultation with: , | Fire Alarm System | Zone 2 in test mode with monit ... Zone 2 in test mode with monitoring company for 8 hours. | Annual Fire Alarm & Sprinkler ... Annual Fire Alarm & Sprinkler System testing and inspection. |
2021-10 Implemented on: 2021-01-06 | Removed | Micheal Donohoe In consultation with: , | Fire Alarm System | Zone 2 in test mode with monit ... Zone 2 in test mode with monitoring company for 6 hours. | Annual Fire Alarm & Sprinkler ... Annual Fire Alarm & Sprinkler System testing and inspection. |
2021-8 Implemented on: 2021-01-05 | Removed | Micheal Donohoe In consultation with: , | Safety | IBOP1614 - Gas Monitor 14 - Be ... IBOP1614 - Gas Monitor 14 - BeathAir2 SAB1 | Maintenance work being done on ... Maintenance work being done on Compressed Air Dryer Tower 2. |
2021-7 Implemented on: 2021-01-05 | Removed | Micheal Donohoe In consultation with: , | Fire Alarm System | Zone 2 offline with monitoring ... Zone 2 offline with monitoring company. | Annual Fire Alarm & Sprinkler ... Annual Fire Alarm & Sprinkler System testing and inspection. |
2021-6 Implemented on: 2021-01-04 | Removed | Gordon Roy In consultation with: , | Fire Alarm System | FAS Zone 1 into "Test Mode" wi ... FAS Zone 1 into "Test Mode" with Monitoring Co. | FAS Zone 1 into "Test Mode" fo ... FAS Zone 1 into "Test Mode" for six hours for annual FAS Verification by Siemens |
2021-5 Implemented on: 2021-01-02 | Removed | Eric Chapman In consultation with: , | Fire Alarm System | DCR, Computer Room, SA G Hallw ... DCR, Computer Room, SA G Hallway ceiling and under floor Smoke Detectors disarmed | Pulling floor tiles, vacuuming ... Pulling floor tiles, vacuuming and documentation of equipment in Server Room |
2021-4 Implemented on: 2021-01-02 | Removed | Eric Chapman In consultation with: Gordon Roy, | Services | Cu-LCW system throttled, MMPS ... Cu-LCW system throttled, MMPS water supply and return valved off | MMPS water supply and return v ... MMPS water supply and return valves closed for shutdown. Cu-LCW system throttled. North Cu-LCW pump shut off and discharge closed. South Cu-LCW pump VFD adjusted to obtain nominal system pressure of ~97psi. |
2021-3 Implemented on: 2021-01-02 | Removed | Jason Wait In consultation with: , | Safety | Safety IBOP I1508 Pinned and d ... Safety IBOP I1508 Pinned and defeated until site air pressure is restored. | MHESA B1 RCR1 RM6 ALARM (IBOP ... MHESA B1 RCR1 RM6 ALARM (IBOP 1508) occurred as fans have lost power during a power outage. Lab is in alarm until fans can be restarted. Signal pinned and defeated |
2021-2 Implemented on: 2021-01-01 | Removed | David Bandiera In consultation with: , | Fire Alarm System | DCR, Computer Room, SA G Hallw ... DCR, Computer Room, SA G Hallway ceiling and under floor Smoke Detectors disarmed | Pulling floor tiles, vacuuming ... Pulling floor tiles, vacuuming and documentation of equipment |
2021-1 Implemented on: 2021-01-01 | Removed | Kyle Mollard In consultation with: , | Safety | Safety IBOP I1507 - RCR lab wa ... Safety IBOP I1507 - RCR lab warn only | Fume hood flow is insufficient ... Fume hood flow is insufficient and warning. Only warn defeated as alarm signal is still active. |
2020-94 Implemented on: 2020-12-17 | Removed | David Bandiera In consultation with: Brandon Humphries, | Diagnostics | ELBT:PMT1A and ELBD:PMT0 ELBT:PMT1A and ELBD:PMT0 | TBLM3 board does not have a fi ... TBLM3 board does not have a fibre connection to the FSD. Two TBLM1 PMTs were swapped with two TBLM3 PMTs to commission all 10 high energy PMTs. |
2020-92 Implemented on: 2020-12-26 | Removed | Kevin Lucow In consultation with: Robin Swanson, | Safety | CSS Defeat Timer. IBOP 1006 un ... CSS Defeat Timer. IBOP 1006 unplugged. | 2021 Winter Shutdown. 2021 Winter Shutdown. |
2020-91 Implemented on: 2020-12-25 | Removed | Riley Schick-Martin In consultation with: , | Safety | Safety IBOP I1507 & I1508 - RC ... Safety IBOP I1507 & I1508 - RCR lab warn and alarm | Fume hood fans have failed in ... Fume hood fans have failed in RCR lab. Lab is in alarm until fans can be restarted. |
2020-90 Implemented on: 2020-12-23 | Removed | Kevin Lucow In consultation with: , | Safety | IBOP 1507 and 1508: RCR lab wa ... IBOP 1507 and 1508: RCR lab warning/alarm. | RCR lab is still alarming from ... RCR lab is still alarming from yesterdays power outage. All hotcell/fume hood fan appear to be offline. |
2020-89 Implemented on: 2020-12-22 | Removed | Kathleen Genge In consultation with: , | Services | Meson Hall Cu-LCW raw water in ... Meson Hall Cu-LCW raw water inlet valve | Meson Hall Cu-LCW raw water in ... Meson Hall Cu-LCW raw water inlet valve throttled to help reduce heat exchanger leak (raw water). |
2020-88 Implemented on: 2020-12-22 | Removed | Kathleen Genge In consultation with: , | Ion sources and injection BL | skimmer alarm skimmer alarm | site power is off, skimmer ala ... site power is off, skimmer alarm is beeping continuously. |
2020-87 Implemented on: 2020-12-22 | Removed | Kevin Lucow In consultation with: , | Safety | IBOP 0617, 0723, 1122, 1209, 1 ... IBOP 0617, 0723, 1122, 1209, 1221, 1409, 1603, 1604, 1908, 1919 | Planned site power outage. Planned site power outage. |
2020-85 Implemented on: 2020-12-22 | Removed | Kevin Lucow In consultation with: , | Safety | IBOP 0102, 1508, 1510, 1511. IBOP 0102, 1508, 1510, 1511. | Planned site power outage. Planned site power outage. |
2020-84 Implemented on: 2020-12-22 | Removed | Kevin Lucow In consultation with: , | Safety | IBOP 0124, 1507, 1615, 1621, 1 ... IBOP 0124, 1507, 1615, 1621, 1622 | Planned site power outage. Planned site power outage. |
2020-81 Implemented on: 2020-12-21 | Removed | Elena Bylinskaia In consultation with: Gordon Roy, | Services | Heat Ex Valves H-18 and D-17 Heat Ex Valves H-18 and D-17 | MM turned off for winter shutd ... MM turned off for winter shutdown. |
2020-80 Implemented on: 2020-12-21 | Removed | Ryan Lovelidge In consultation with: , | Fire Alarm System | FAS - ARIEL Target Hall Linear ... FAS - ARIEL Target Hall Linear Beam Detectors - 09:095:001 and 09:095:002 | Construction in the ARIEL targ ... Construction in the ARIEL target hall. |
2020-79 Implemented on: 2020-12-21 | Removed | Ryan Lovelidge In consultation with: , | Fire Alarm System | 05:054-002/003/004 05:054-002/003/004 | ISAC I EH linear beam detector ... ISAC I EH linear beam detectors disarmed for a LN2 dewar fill. |
2020-78 Implemented on: 2020-12-18 | Removed | Micheal Donohoe In consultation with: , | Fire Alarm System | ARIEL Target Hall LBDs and B2 ... ARIEL Target Hall LBDs and B2 Smokes: 09:095-001/002, 09:094-003/004/009/010/013/014 | Construction work in area unti ... Construction work in area until the end of the day. |
2020-76 Implemented on: 2020-12-17 | Removed | Gordon Roy In consultation with: , | Fire Alarm System | ARIEL flow switches 09:094-018 ... ARIEL flow switches 09:094-018 and 9:093-031. FAS Zone 4 offline | They are about to connect the ... They are about to connect the new sprinkler piping to the existing system and refill system. |
2020-75 Implemented on: 2020-12-17 | Removed | Gordon Roy In consultation with: , | Fire Alarm System | FAS - ARIEL Target Hall Linea ... FAS - ARIEL Target Hall Linear Beam Detectors - 09:095:001 and 09:095:002 | ARIEL Target hall linear beam ... ARIEL Target hall linear beam detectors disabled for construction during the work day. |
2020-74 Implemented on: 2020-12-15 | Removed | Kyle Mollard In consultation with: , | Fire Alarm System | FAS - ARIEL Target Hall Linea ... FAS - ARIEL Target Hall Linear Beam Detectors - 09:095:001 and 09:095:002 | ARIEL Target hall linear beam ... ARIEL Target hall linear beam detectors disabled for construction during the work day. |
2020-73 Implemented on: 2020-12-14 | Removed | Jason Wait In consultation with: , | Services | IBOP 1614 Gas Monitor - Breath ... IBOP 1614 Gas Monitor - BreathAir2 SAB1 signal pinned | IBOP 1614 Gas monitor BreathAi ... IBOP 1614 Gas monitor BreathAir2 SAB1 signal pinned while work to replace CO2 monitor on the Zeks compressed air dryer takes place |
2020-72 Implemented on: 2020-12-14 | Removed | Jason Wait In consultation with: , | Fire Alarm System | FAS - ARIEL Target Hall Linea ... FAS - ARIEL Target Hall Linear Beam Detectors - 09:095:001 and 09:095:002 | ARIEL Target hall linear beam ... ARIEL Target hall linear beam detectors disabled for construction during the work day |
2020-71 Implemented on: 2020-12-14 | Removed | Eric Chapman In consultation with: , | Fire Alarm System | Ariel B2 smoke detectors Ariel B2 smoke detectors | Installation of sprinkler pipi ... Installation of sprinkler piping in ARIEL B2 in general accordance with Document-172424. Smoke detectors 09-094-002/003/004/005/007/009/010/013/014 disarmed for pipe and drywall cutting. |
2020-70 Implemented on: 2020-12-11 | Removed | Eric Chapman In consultation with: Eric Chapman, | Fire Alarm System | Zone 1 and 2 remote monitoring Zone 1 and 2 remote monitoring | FAS zone 1 and 2 (MOB and insi ... FAS zone 1 and 2 (MOB and inside the fence) remote monitoring disabled for testing by Siemens. Audibles and strobes disarmed on nodes 1 and 3. |
2020-69 Implemented on: 2020-12-11 | Removed | Jason Wait In consultation with: , | Fire Alarm System | MOB G ELEVATOR Device: 01:035- ... MOB G ELEVATOR Device: 01:035-040 | Device testing inspection and ... Device testing inspection and replacement work taking place by Siemens and Johnson and Controls Techs |
2020-68 Implemented on: 2020-12-11 | Removed | Jason Wait In consultation with: , | Fire Alarm System | ARIEL LBD's 09:095-001, 09:095 ... ARIEL LBD's 09:095-001, 09:095-002 | Construction in area Construction in area |
2020-67 Implemented on: 2020-12-10 | Removed | Riley Schick-Martin In consultation with: , | Fire Alarm System | ARIEL LBD's 09:095-001/2 ARIEL LBD's 09:095-001/2 | Construction in area Construction in area |
2020-66 Implemented on: 2020-12-09 | Removed | Riley Schick-Martin In consultation with: , | Fire Alarm System | ARIEL LBD's 09:095-001/2 ARIEL LBD's 09:095-001/2 | Construction in area Construction in area |
2020-64 Implemented on: 2020-12-08 | Removed | Riley Schick-Martin In consultation with: , | Fire Alarm System | ARIEL LBD's 09:095-001/2 ARIEL LBD's 09:095-001/2 | Construction in area Construction in area |
2020-60 Implemented on: 2020-11-30 | Removed | Jason Wait In consultation with: , | Fire Alarm System | FAS - ARIEL Target Hall Linea ... FAS - ARIEL Target Hall Linear Beam Detectors - 09:095:001 and 09:095:002 | ARIEL Target hall linear beam ... ARIEL Target hall linear beam detectors disabled for construction during the work day |
2020-59 Implemented on: 2020-11-27 | Removed | Jason Wait In consultation with: , | Safety | IBOP 1507 - MHESA B1 RCR1 RM6 ... IBOP 1507 - MHESA B1 RCR1 RM6 WARN signal pinned in DCR south IBOP cabinet | Workers are filling a nearby d ... Workers are filling a nearby dewar. |
2020-58 Implemented on: 2020-11-27 | Active | Jason Wait In consultation with: , | RF | ILRF,617 "DEE gap water W out ... ILRF,617 "DEE gap water W out TC T/C OVERTEMP (RF,513) | Defeated until resolved - Nois ... Defeated until resolved - Noisy read-back is causing RF trips. *Do not retire this defeat until Fault Report 13317 is resolved. If ILRF 617 is found back on scan, disable it again. Fault is intermittent and will trip again. See defeats 8507 and 8805 |
2020-57 Implemented on: 2020-11-27 | Removed | Jason Wait In consultation with: , | Fire Alarm System | FAS - ARIEL Target Hall Linea ... FAS - ARIEL Target Hall Linear Beam Detectors - 09:095:001 and 09:095:002 | ARIEL Target hall linear beam ... ARIEL Target hall linear beam detectors disabled for construction during the work day |
2020-56 Implemented on: 2020-11-26 | Removed | Jason Wait In consultation with: , | Fire Alarm System | FAS - ARIEL Target Hall Linear ... FAS - ARIEL Target Hall Linear Beam Detectors - 09:095:001 and 09:095:002 | ARIEL Target hall linear beam ... ARIEL Target hall linear beam detectors disabled for construction during the work day
|
2020-55 Implemented on: 2020-11-25 | Removed | Jason Wait In consultation with: , | Fire Alarm System | FAS - ARIEL Target Hall Linea ... FAS - ARIEL Target Hall Linear Beam Detectors - 09:095:001 and 09:095:002 | ARIEL Target hall linear beam ... ARIEL Target hall linear beam detectors disabled for construction during the work day |
2020-54 Implemented on: 2020-11-24 | Removed | Jason Wait In consultation with: , | Fire Alarm System | FAS - Sprinkler System obstruc ... FAS - Sprinkler System obstruction test - Zone 1 and 2 offline with monitoring company - 02-002-055, 02-002-058, 01-035-053, 01-035-055 | Sprinkler system obstruction t ... Sprinkler system obstruction testing to be completed today |
2020-53 Implemented on: 2020-11-24 | Removed | Jason Wait In consultation with: , | Fire Alarm System | FAS - ARIEL Target Hall Linear ... FAS - ARIEL Target Hall Linear Beam Detectors - 09:095:001 and 09:095:002 | ARIEL Target hall linear beam ... ARIEL Target hall linear beam detectors disabled for construction during the work day |
2020-52 Implemented on: 2020-06-03 | Active | Jason Wait In consultation with: , | Safety | EHD:TS03 alarm signal EHD:TS03 alarm signal | Until TS03 is repaired - TS03 ... Until TS03 is repaired - TS03 is fount to be faulty and is causing unnecessary alarms |
2020-50 Implemented on: 2020-01-30 | Removed | Jason Wait In consultation with: , | Safety | EHAT:MB4 1% Current limit EHAT:MB4 1% Current limit | EHAT:MB4 1% current limit defe ... EHAT:MB4 1% current limit defeated while commissioning is under way below 100 W |
2020-49 Implemented on: 2020-01-28 | Removed | Jason Wait In consultation with: , | Safety | Flow trip threshold for EWS:HA ... Flow trip threshold for EWS:HAW:FG02 and FG03 | Flow trip threshold for EWS:HA ... Flow trip threshold for EWS:HAW:FG02 and FG03 - FG02 adjusted from 34.9 to 32.0, FG03 adjusted from 15.3 to 11.0, units not specified in original defeat |
2020-46 Implemented on: 2020-11-16 | Removed | Jason Wait In consultation with: , | Safety | IBOP i-1507 MESA B1 RCR1 RM6 ... IBOP i-1507 MESA B1 RCR1 RM6 Warning signal has been pinned | Intermittent alarms due to hot ... Intermittent alarms due to hot cell fan work taking place associated with WP #C2020-11-16-1 |
2020-45 Implemented on: 2020-10-27 | Removed | Jason Wait In consultation with: , | Diagnostics | IL2C_FAST "2CVM1 bad L positio ... IL2C_FAST "2CVM1 bad L position interlock" | 2C1 at 70 MeV - X2C L position ... 2C1 at 70 MeV - X2C L position of 1.780 - Interlock does not agree with 70 MeV tune - BL2C Probe indexing changed in 2019 |
2020-44 Implemented on: 2020-10-17 | Removed | Jason Wait In consultation with: , | Optics | 1VB1 Magnet flow trip limit ra ... 1VB1 Magnet flow trip limit raised | Poor flow in the 1VB1 magnet t ... Poor flow in the 1VB1 magnet tripping the power supply |
2020-43 Implemented on: 2020-10-13 | Removed | Jason Wait In consultation with: , | Other / Misc | DIS ILRF,618 and 616 Upper Dee DIS ILRF,618 and 616 Upper Dee | Gap water line W out TC has be ... Gap water line W out TC has become noisy - high warning and trip disabled after OK by Iouri B. |
2020-42 Implemented on: 2020-10-12 | Active | Jason Wait In consultation with: , | Optics | 1AQ13 Flow meter trip limit re ... 1AQ13 Flow meter trip limit reduced from "4 to 4.5 GPM" to "3 to 3.5 GPM" | 1AQ13 flow meter trip point re ... 1AQ13 flow meter trip point reduced from 4-4.5GPM to 3-3.5GPM - Water flow to magnet is below previous trip limit |
2020-41 Implemented on: 2020-10-10 | Removed | Jason Wait In consultation with: , | Targets | B1A T2CS:FGTGT:RDFLOW Trip Low ... B1A T2CS:FGTGT:RDFLOW Trip Low Limit set to 2.8 GPM from 3.0GPM | B1A:T2CS Tripping - I. Earle c ... B1A:T2CS Tripping - I. Earle consulted and trip limit reduced from 3.0 GPM to 2.8 GPM: "Limit may be lowered to 2.5 GPM", if still tripping, call I. Earle. |
2020-39 Implemented on: 2020-09-22 | Removed | Jason Wait In consultation with: , | Fire Alarm System | FAS - 3:019:038 - CAGCA Warm S ... FAS - 3:019:038 - CAGCA Warm Storage Bld | FAS - 3:019:038 "Device detect ... FAS - 3:019:038 "Device detected waveform error" and "Device communication error" messages seen in DCR at FAS XLS Graphics terminal - device defeated until repaired - Fault report #13442 |
2020-38 Implemented on: 2020-09-21 | Removed | Jason Wait In consultation with: , | Fire Alarm System | FAS - Manual Pull Station outp ... FAS - Manual Pull Station output disabled - FAS 03:019:006 and 03:019:004 | SIEMENS Tech work took place o ... SIEMENS Tech work took place over two days - initial defeat included only FAS 03:019:006 which was defeated for work by SIEMENS tech to take place Sept 21 and Sept 22. Note on paper defeat from Sept 22 amending the defeat to include the output disable of 03:019:004. Work by SIEMENS tech was completed on Sept 22, however these devices were left disabled |
2020-36 Implemented on: 2020-06-08 | Active | Jason Wait In consultation with: , | Safety | Neutron Monitor #11 Warn limit ... Neutron Monitor #11 Warn limit lowered to 10 uS from 30 uS | Neutron Monitor #11 warn limit ... Neutron Monitor #11 warn limit changed from 30 uS to 10 uS until ongoing M9 work is completed, while 1B is planned to receive beam. From paper defeat: "This change makes it safer, no protection is being removed or defeated" |
2020-35 Implemented on: 2020-04-20 | Active | Jas Uppal In consultation with: , | Ion sources and injection BL | ISIS Skimmer-4 cable #61-0853 ISIS Skimmer-4 cable #61-0853 | Section alarming with no beam ... Section alarming with no beam on it. |
2019-57 Implemented on: 2019-05-08 | Removed | Jason Wait In consultation with: , | Safety | EOECM Watchdog interlock for M ... EOECM Watchdog interlock for MPS FSD | Defeated until FSD Logic is up ... Defeated until FSD Logic is updated - FSD (Beam mode?) requires the EOECM to be running for all beam paths although it is only needed for downstream of ELBT:FC2 - Cannot engage it |
2019-56 Implemented on: 2019-11-13 | Active | Micheal Donohoe In consultation with: , | Safety | Gas Monitor #17 Gas Monitor #17 | Work has started for implement ... Work has started for implementing Gas Monitor #17, an O2 deficiency monitor for TEM MOB149. |
2019-55 Implemented on: 2019-10-02 | Removed | Jas Uppal In consultation with: , | Safety | Air Monitor #19 no longer a sp ... Air Monitor #19 no longer a spare channel | AM#19 set up to detect Kr-79 i ... AM#19 set up to detect Kr-79 in STF Hot Cell. Monitor is no longer pinned and has a warn limit of 15 kcpm |
2019-54 Implemented on: 2019-10-01 | Removed | Micheal Donohoe In consultation with: , | RF | Quadrant 1 SW 1 signal bypasse ... Quadrant 1 SW 1 signal bypassed for resonator latching unit | Signal bypassed in order for l ... Signal bypassed in order for latching unit to work and provide "resonator latched" signal in DCR. Refer to DF #8485. |
2019-53 Implemented on: 2019-09-19 | Active | Jas Uppal In consultation with: , | Targets | 2A2COL-TC2 Collimator Plate Te ... 2A2COL-TC2 Collimator Plate Temp | TC reading 304C. TC reading 304C. |
2019-52 Implemented on: 2019-09-02 | Active | Micheal Donohoe In consultation with: , | Optics | 1AQ15 Water Flow Trip Limit In ... 1AQ15 Water Flow Trip Limit Increased | P/S tripping on mag flow. P/S tripping on mag flow. |
2019-51 Implemented on: 2019-08-29 | Removed | Jas Uppal In consultation with: , | Safety | Air Monitor #6 BL1U/UCN warn l ... Air Monitor #6 BL1U/UCN warn limit | Warn limit increased from 10 t ... Warn limit increased from 10 to 20 kcpm. Joe Mildenberger is monitoring the rates and believes it is real. Peak so far has been ~20 kcpm. |
2019-50 Implemented on: 2019-07-31 | Active | Micheal Donohoe In consultation with: , | Targets | (U+D)/Total trip limit increas ... (U+D)/Total trip limit increased | No reason given on defeat form ... No reason given on defeat form. Reason given on defeat yellow tag: Wrong calculation on new electronics for 1AT1 protect. |
2019-48 Implemented on: 2019-04-18 | Active | Micheal Donohoe In consultation with: , | Optics | 2C4VSM2 Mag OK interlock 2C4VSM2 Mag OK interlock | Magnet thermal switch most lik ... Magnet thermal switch most likely faulty. Issue occurred in Nov/18 and thought repaired. |
2019-47 Implemented on: 2019-04-18 | Active | Jas Uppal In consultation with: , | Optics | M9 Q1 and Q2 (as shielding) M9 Q1 and Q2 (as shielding) | Until M9 Q1 and Q2 are reinsta ... Until M9 Q1 and Q2 are reinstalled. There are 2 steel shielding blocks in place of Q1 and Q2 to shield the downstream area. |
2018-789 Implemented on: 2018-08-02 | Removed | Jason Wait In consultation with: , | Safety | ELBD:MB0 1% current limit ELBD:MB0 1% current limit | ELBD:MB0 1% current limit bypa ... ELBD:MB0 1% current limit bypassed while commissioning is under way |
2018-788 Implemented on: 2018-07-26 | Removed | Jason Wait In consultation with: , | Safety | EMBT:MBSA 1% Current limit EMBT:MBSA 1% Current limit | EMBT:MBSA 1 Current limit bypa ... EMBT:MBSA 1 Current limit bypassed in MPS code |
2018-787 Implemented on: 2018-06-29 | Removed | Jason Wait In consultation with: , | Safety | EMBD:MB0 MPS bypassed EMBD:MB0 MPS bypassed | EMBD:MB0 MPS bypassed to allow ... EMBD:MB0 MPS bypassed to allow operation of bender |
2018-786 Implemented on: 2018-06-29 | Removed | Jason Wait In consultation with: , | Safety | EABD:MB0 1% Current Limit EABD:MB0 1% Current Limit | While searching for beam at re ... While searching for beam at reduced gradient for duration of commissioning (Power less than 100 W) |
2018-785 Implemented on: 2018-06-18 | Removed | Jason Wait In consultation with: , | RF | EACA Cavity OK signal EACA Cavity OK signal | EACA Cavity OK signal logic ch ... EACA Cavity OK signal logic changed from "(CAV1 OK) AND (CAV2 OK)" to "(CAV1 OK) OR (CAV2 OK)" at E-LINAC RF Console. MPS Logic changed to ignore signal from eACA:CAV2RDY. Defeated in order to perform testing of one cavity only |
2018-783 Implemented on: 2018-10-25 | Active | Jas Uppal In consultation with: , | Other / Misc | LESW spill #2 thermocouple (RF ... LESW spill #2 thermocouple (RF,321) | Erratic temperature readings w ... Erratic temperature readings were causing cyclotron trips. |
2018-782 Implemented on: 2018-10-16 | Active | Jas Uppal In consultation with: , | Optics | 1BVB2 Mag Temp interlock bypas ... 1BVB2 Mag Temp interlock bypassed | Temp interlock faulty Temp interlock faulty |
2018-781 Implemented on: 2018-08-14 | Removed | Jas Uppal In consultation with: , | Services | 1AQ9 Booster pump pressure swi ... 1AQ9 Booster pump pressure switch | Pressure switch leaking badly. Pressure switch leaking badly. |
2018-780 Implemented on: 2018-07-26 | Active | Jas Uppal In consultation with: , | Targets | BL2A2 and 2A3 Dump trip limits ... BL2A2 and 2A3 Dump trip limits adjusted | Values too low for normal oper ... Values too low for normal operation. |
2018-778 Implemented on: 2018-04-20 | Active | Jas Uppal In consultation with: , | Other / Misc | IL2C 7,8 2C wall trip and warn ... IL2C 7,8 2C wall trip and warn temperature | To facilitate higher currents ... To facilitate higher currents down 2C4 |
2017-6 Implemented on: 2017-04-13 | Active | Jason Wait In consultation with: , | Vacuum | Lower Alarm limit in EHDT:IM66 ... Lower Alarm limit in EHDT:IM66 | EHDT:IM66 is reading close to ... EHDT:IM66 is reading close to the lower alarm limit (1 e^-10 Torr) and is causing nuisance alarms |
2017-5 Implemented on: 2017-11-20 | Removed | Micheal Donohoe In consultation with: , | Targets | 2C Beam Stop TC 2C Beam Stop TC | Temperature readback is noisy. Temperature readback is noisy. |
2017-4 Implemented on: 2017-08-25 | Removed | Micheal Donohoe In consultation with: , | Targets | T2 Protect Down Trip Limit T2 Protect Down Trip Limit | Beam centered on T2 Target and ... Beam centered on T2 Target and Coll A instead of misaligned protect plates. |
2017-2 Implemented on: 2017-08-22 | Active | Micheal Donohoe In consultation with: , | Optics | 1AQ15 ground current detection ... 1AQ15 ground current detection circuit bypassed | Ground currents in 1AQ15 are l ... Ground currents in 1AQ15 are low. With 1AQ15 current at ~750A, ground current is approximately 4A. |
2017-1 Implemented on: 2017-06-30 | Active | Micheal Donohoe In consultation with: , | Ion sources and injection BL | ISIS SK-1 Cable #610817 ISIS SK-1 Cable #610817 | SKIMMER section alarms with no ... SKIMMER section alarms with no beam on. |
2016-691 Implemented on: 2016-04-15 | Active | Jas Uppal In consultation with: , | Ion sources and injection BL | Skimmer #5 cable #61-0866 grou ... Skimmer #5 cable #61-0866 grounded | Cable was found to be faulty Cable was found to be faulty |
2016-690 Implemented on: 2016-11-01 | Active | Micheal Donohoe In consultation with: , | Targets | STF leak sensor STF leak sensor | Steve reports sensor is presen ... Steve reports sensor is presently NOT installed in nominal location and has possibly failed. |
2016-689 Implemented on: 2016-05-16 | Active | Micheal Donohoe In consultation with: , | Vacuum | BL1A TNF Vacuum BL1A TNF Vacuum | Vacuum at TNF jumped up. Vacuum at TNF jumped up. |
2015-3 Implemented on: 2015-08-04 | Active | Jas Uppal In consultation with: , | Vacuum | 1ACG3 trip value 1ACG3 trip value | Suspect 1A vacuum leak near T2 ... Suspect 1A vacuum leak near T2. |
2015-2 Implemented on: 2015-06-01 | Active | Jas Uppal In consultation with: , | Optics | M11 Septum TC #2 (TG304) M11 Septum TC #2 (TG304) | Noisy signal is causing trips. Noisy signal is causing trips. |
2015-1 Implemented on: 2015-05-29 | Active | Jas Uppal In consultation with: , | Optics | M11Q1 Magnet Overtemp M11Q1 Magnet Overtemp | Power supply is required to ru ... Power supply is required to run. |
2014-1 Implemented on: 2014-08-24 | Active | Jas Uppal In consultation with: , | Services | IBOP #1512: MESA Basement Rm01 ... IBOP #1512: MESA Basement Rm01A Airflow | Fume hood has not been operati ... Fume hood has not been operational in over 1 year. Fan is being removed. |
2013-1 Implemented on: 2013-05-10 | Active | Jas Uppal In consultation with: , | Ion sources and injection BL | Skimmer #2 cables:#61-0827, 61 ... Skimmer #2 cables:#61-0827, 61-0828, 61-0830 | Skimmer #2 plates discharging. Skimmer #2 plates discharging. |
2011-2 Implemented on: 2011-07-11 | Active | Jas Uppal In consultation with: , | Ion sources and injection BL | SK61-0869 Grounded SK61-0869 Grounded | Periodic signal found in cable ... Periodic signal found in cable/skimmer. |
2011-1 Implemented on: 2011-04-17 | Removed | Kathleen Genge In consultation with: , | Diagnostics | 2AM7 halo monitor bias enable 2AM7 halo monitor bias enable | The bias supply enable not see ... The bias supply enable not seem to be getting an enable signal. |
2010-1 Implemented on: 2010-06-15 | Active | Kathleen Genge In consultation with: , | Targets | 2A2COL-TC3 2A2COL-TC3 | 80 C limit is too low for BL2A ... 80 C limit is too low for BL2A operation. Past defeats (May 23, 2007 #4371, Oct. 31, 2007 #4616 for 2A3COL). |
2007-1 Implemented on: 2007-10-10 | Active | Kathleen Genge In consultation with: , | Targets | 2A2DSP-TC3 2A2DSP-TC3 | 2A2DSP-TC3 hardware I/P defeat ... 2A2DSP-TC3 hardware I/P defeat pinned. |
2001-1 Implemented on: 2001-06-04 | Removed | Kathleen Genge In consultation with: , | Optics | All BL4 magnet power supplies All BL4 magnet power supplies | All power supplies de powered ... All power supplies de powered and power supply cooling reduced to minimal flow. |
1999-1 Implemented on: 1999-08-13 | Active | Kathleen Genge In consultation with: , | Targets | TNF collimator thermocouple A ... TNF collimator thermocouple A & B | Disabled TNF collimator A+B by ... Disabled TNF collimator A+B by shorting thermocouple circuits. Taken Col. temp off scan on Xscan Manager. |
1998-1 Implemented on: 1998-11-06 | Active | Kathleen Genge In consultation with: , | Diagnostics | LESW back-up spill monitor HV ... LESW back-up spill monitor HV ok signal to safety | HV ok signal to safety defeate ... HV ok signal to safety defeated; spill monitor is a spare |