# | Status: | Implemented by: | System: | Device: | Reason: |
---|---|---|---|---|---|
2024-207 Implemented on: 2024-04-24 | Active | David Bandiera In consultation with: , | Shielding | Cyclotron Ignition Key and BL1 ... Cyclotron Ignition Key and BL1 Ignition Key locked out | Shielding blocks removed from ... Shielding blocks removed from SE corner of Cyclotron Vault Roof for BL1 Diagnostics cable pull. |
2024-206 Implemented on: 2024-04-24 | Active | Ryan Anderson In consultation with: , | Shielding | Cyclotron and BL1A Ignition ke ... Cyclotron and BL1A Ignition key | Shielding blocks by SE corner ... Shielding blocks by SE corner of Vault Roof removed for cabling work |
2024-200 Implemented on: 2024-04-23 | Active | Gauhar Hayat In consultation with: , | Safety | Breathable Air Use Disabled. Breathable Air Use Disabled. | ARIEL compressor motor overhau ... ARIEL compressor motor overhaul |
2024-176 Implemented on: 2024-04-08 | Active | Eric Chapman In consultation with: , | Services | Al-ALCW chain valve Al-ALCW chain valve | Chain valve has failed and is ... Chain valve has failed and is difficult to operate. Must be left open for Main Magnet cooling. |
2024-159 Implemented on: 2024-03-20 | Active | Eric Chapman In consultation with: , | Other / Misc | 2C ignition key removed for ST ... 2C ignition key removed for STF hot cell maintenance | STF hot cell maintenance under ... STF hot cell maintenance under C2024-03-20-5. |
2024-157 Implemented on: 2024-03-18 | Active | David Bandiera In consultation with: Frank Hosta, | Shielding | Cyclotron Ignition Key Cyclotron Ignition Key | E-Hall/BL4N shielding removed. E-Hall/BL4N shielding removed. |
2024-138 Implemented on: 2024-03-01 | Active | Kevin Lucow In consultation with: , | Safety | BL1 Ignition Key BL1 Ignition Key | IPF/IPF hot cell are open for ... IPF/IPF hot cell are open for maintenance. |
2024-119 Implemented on: 2024-02-20 | Active | Kathleen Genge In consultation with: , | Services | Cu-ALCW south pump (SA1-15) Cu-ALCW south pump (SA1-15) | Pump has difficult spot on rot ... Pump has difficult spot on rotation. Mechanical services has deemed it unfit to run. |
2024-64 Implemented on: 2024-01-29 | Active | Kevin Lucow In consultation with: , | Shielding | M9A M9A | Uncover M9A Q,3,4,5. Uncover M9A Q,3,4,5. |
2024-14 Implemented on: 2024-01-09 | Active | Eric Chapman In consultation with: , | Shielding | M9B / M9H shielding removal M9B / M9H shielding removal | Uncover M9HQ5 to M9HQ8 for new ... Uncover M9HQ5 to M9HQ8 for new M9H installation/construction. |
2023-477 Implemented on: 2023-08-23 | Active | Riley Schick-Martin In consultation with: , | Safety | M11 beamline ignition key remo ... M11 beamline ignition key removed and M11 B1 locked out | Neutron Monitor #11 removed fr ... Neutron Monitor #11 removed from M11 area. |
2023-323 Implemented on: 2023-06-15 | Active | Eric Chapman In consultation with: , | RF | RF Booster RF Booster | RF booster transmission line d ... RF booster transmission line disconnected at feed-through to tank as part of temporary RFB coupler repair. Water lines for coupling loop disconnected and open to air. |
2023-257 Implemented on: 2023-05-12 | Active | Brandon Humphries In consultation with: , | Optics | EMBD:MB0 P/S EMBD:MB0 P/S | E-LINAC commissioning license ... E-LINAC commissioning license does not allow for sending beam to FLASH experiment at the end of EMBD. |
2023-202 Implemented on: 2023-04-18 | Active | Elena Bylinskaia In consultation with: Elena Bylinskaia, | Diagnostics | Extraction 4 Control Cable Extraction 4 Control Cable | BL4 not in use till September, ... BL4 not in use till September, 2023. Installation project ongoing. |
2023-21 Implemented on: 2023-01-10 | Active | Riley Schick-Martin In consultation with: , | Other / Misc | ISAC II HV transformer (12B1-T ... ISAC II HV transformer (12B1-T-005) tap changer | Tap changer disabled to preven ... Tap changer disabled to prevent equipment damage |
2022-379 Implemented on: 2022-12-28 | Active | Riley Schick-Martin In consultation with: , | Other / Misc | RF transformer High Voltage Co ... RF transformer High Voltage Compartment Locked | Previous lock replaced by ops ... Previous lock replaced by ops lock at electrical services group's request |
2022-329 Implemented on: 2022-11-22 | Active | Kathleen Genge In consultation with: , | Safety | M9B beamblocker M9BBB M9B beamblocker M9BBB | M9B decommissioned & area bein ... M9B decommissioned & area being converted to M9H channel. No beam permitted to M9B. |
2022-316 Implemented on: 2022-11-09 | Active | Brandon Humphries In consultation with: , | Optics | EMBD:MB0 P/S EMBD:MB0 P/S | Cooling water has been shut of ... Cooling water has been shut off to EMBD:DUMP to prevent erosion of the target. Locking out this dipole will remove the possibility of sending beam down the EMBD. This is added protection on top of the beam mode interlock. |
2022-228 Implemented on: 2022-08-08 | Active | Brandon Humphries In consultation with: , | Targets | DarkLight target ladder DarkLight target ladder | Need to prevent target ladder ... Need to prevent target ladder from driving into beamline during high power tests. |
2022-23 Implemented on: 2022-02-07 | Active | Frank Hosta In consultation with: , | Services | BL1 LCW South Heat Exchanger BL1 LCW South Heat Exchanger | The heat exchanger has a small ... The heat exchanger has a small leak. |
2021-134 Implemented on: 2021-04-26 | Active | Riley Schick-Martin In consultation with: , | Optics | EHDT:Q6 Power Supply power cor ... EHDT:Q6 Power Supply power cord | Insufficient beam position pro ... Insufficient beam position protection at EHD:DUMP. Requested by Thomas Planche. |
2021-120 Implemented on: 2021-04-16 | Active | David Bandiera In consultation with: Brandon Humphries, | Vacuum | ELBD:IV0 locked out ELBD:IV0 locked out | ELBD:IV0 is no longer connecte ... ELBD:IV0 is no longer connected to the ELBT vacuum section (ELBD:MB0 removed to allow for ACCT installation) |
2021-115 Implemented on: 2021-04-14 | Active | Elena Bylinskaia In consultation with: Elena Bylinskaia, | Safety | BL1U BB ( Beam Blocker) Locked ... BL1U BB ( Beam Blocker) Locked out, I 1416 pinned at IBOB | Re-configuration of BL 1U excl ... Re-configuration of BL 1U exclusion area.
BL1U key is locked in DCR Lock out Box #1 with personal K. Ardron lock. IBOB I1416 pinned in order to run 1A. |
2021-37 Implemented on: 2021-01-26 | Active | Kevin Lucow In consultation with: , | Safety | BL1U Ignition Key BL1U Ignition Key | BL1U disabled for 2021. Beamli ... BL1U disabled for 2021. Beamlines group have disabled BL1U Beam Blocker. Safety group have disabled BL1U ASU. |
2020-48 Implemented on: 2020-01-21 | Active | Jason Wait In consultation with: , | Optics | EHAT:MB4 polarity switch locke ... EHAT:MB4 polarity switch locked out | EHAT:MB4 polarity switch locke ... EHAT:MB4 polarity switch locked out until beam path to tunnel is ready |
2018-784 Implemented on: 2018-12-24 | Active | Jas Uppal In consultation with: , | Optics | M20 Helmholtz power supply M20 Helmholtz power supply | Water leak in plumbing externa ... Water leak in plumbing external to cabinet. |
2017-3 Implemented on: 2017-08-24 | Active | Micheal Donohoe In consultation with: , | Diagnostics | 1AM8 1AM8 | Magnetic coupling failure. Magnetic coupling failure. |
2016-692 Implemented on: 2016-03-11 | Active | Jason Wait In consultation with: , | Services | E-Hall crane A/C disconnect an ... E-Hall crane A/C disconnect and pendant locked out to all unauthorized personnel | E-Hall crane A/C disconnect an ... E-Hall crane A/C disconnect and pendant locked out (Key # E-LINAC OPS #2) to all personnel whose JPM & Training on E-Hall Crane bypass has yet to be completed |
2012-2 Implemented on: 2012-10-25 | Active | Micheal Donohoe In consultation with: , | Optics | M9 Q1, Q2, and B1 P/S M9 Q1, Q2, and B1 P/S | M9 blanked off and not operati ... M9 blanked off and not operational |