# Status: Implemented by: System: Device: Reason:
2024-207 Implemented on: 2024-04-24 Active David Bandiera In consultation with: , Shielding Cyclotron Ignition Key and BL1 ... Cyclotron Ignition Key and BL1 Ignition Key locked out Shielding blocks removed from ... Shielding blocks removed from SE corner of Cyclotron Vault Roof for BL1 Diagnostics cable pull.
2024-206 Implemented on: 2024-04-24 Active Ryan Anderson In consultation with: , Shielding Cyclotron and BL1A Ignition ke ... Cyclotron and BL1A Ignition key Shielding blocks by SE corner ... Shielding blocks by SE corner of Vault Roof removed for cabling work
2024-200 Implemented on: 2024-04-23 Active Gauhar Hayat In consultation with: , Safety Breathable Air Use Disabled. Breathable Air Use Disabled. ARIEL compressor motor overhau ... ARIEL compressor motor overhaul
2024-176 Implemented on: 2024-04-08 Active Eric Chapman In consultation with: , Services Al-ALCW chain valve Al-ALCW chain valve Chain valve has failed and is ... Chain valve has failed and is difficult to operate. Must be left open for Main Magnet cooling.
2024-159 Implemented on: 2024-03-20 Active Eric Chapman In consultation with: , Other / Misc 2C ignition key removed for ST ... 2C ignition key removed for STF hot cell maintenance STF hot cell maintenance under ... STF hot cell maintenance under C2024-03-20-5.
2024-157 Implemented on: 2024-03-18 Active David Bandiera In consultation with: Frank Hosta, Shielding Cyclotron Ignition Key Cyclotron Ignition Key E-Hall/BL4N shielding removed. E-Hall/BL4N shielding removed.
2024-138 Implemented on: 2024-03-01 Active Kevin Lucow In consultation with: , Safety BL1 Ignition Key BL1 Ignition Key IPF/IPF hot cell are open for ... IPF/IPF hot cell are open for maintenance.
2024-119 Implemented on: 2024-02-20 Active Kathleen Genge In consultation with: , Services Cu-ALCW south pump (SA1-15) Cu-ALCW south pump (SA1-15) Pump has difficult spot on rot ... Pump has difficult spot on rotation. Mechanical services has deemed it unfit to run.
2024-64 Implemented on: 2024-01-29 Active Kevin Lucow In consultation with: , Shielding M9A M9A Uncover M9A Q,3,4,5. Uncover M9A Q,3,4,5.
2024-14 Implemented on: 2024-01-09 Active Eric Chapman In consultation with: , Shielding M9B / M9H shielding removal M9B / M9H shielding removal Uncover M9HQ5 to M9HQ8 for new ... Uncover M9HQ5 to M9HQ8 for new M9H installation/construction.
2023-477 Implemented on: 2023-08-23 Active Riley Schick-Martin In consultation with: , Safety M11 beamline ignition key remo ... M11 beamline ignition key removed and M11 B1 locked out Neutron Monitor #11 removed fr ... Neutron Monitor #11 removed from M11 area.
2023-323 Implemented on: 2023-06-15 Active Eric Chapman In consultation with: , RF RF Booster RF Booster RF booster transmission line d ... RF booster transmission line disconnected at feed-through to tank as part of temporary RFB coupler repair. Water lines for coupling loop disconnected and open to air.
2023-257 Implemented on: 2023-05-12 Active Brandon Humphries In consultation with: , Optics EMBD:MB0 P/S EMBD:MB0 P/S E-LINAC commissioning license ... E-LINAC commissioning license does not allow for sending beam to FLASH experiment at the end of EMBD.
2023-202 Implemented on: 2023-04-18 Active Elena Bylinskaia In consultation with: Elena Bylinskaia, Diagnostics Extraction 4 Control Cable Extraction 4 Control Cable BL4 not in use till September, ... BL4 not in use till September, 2023. Installation project ongoing.
2023-21 Implemented on: 2023-01-10 Active Riley Schick-Martin In consultation with: , Other / Misc ISAC II HV transformer (12B1-T ... ISAC II HV transformer (12B1-T-005) tap changer Tap changer disabled to preven ... Tap changer disabled to prevent equipment damage
2022-379 Implemented on: 2022-12-28 Active Riley Schick-Martin In consultation with: , Other / Misc RF transformer High Voltage Co ... RF transformer High Voltage Compartment Locked Previous lock replaced by ops ... Previous lock replaced by ops lock at electrical services group's request
2022-329 Implemented on: 2022-11-22 Active Kathleen Genge In consultation with: , Safety M9B beamblocker M9BBB M9B beamblocker M9BBB M9B decommissioned & area bein ... M9B decommissioned & area being converted to M9H channel. No beam permitted to M9B.
2022-316 Implemented on: 2022-11-09 Active Brandon Humphries In consultation with: , Optics EMBD:MB0 P/S EMBD:MB0 P/S Cooling water has been shut of ... Cooling water has been shut off to EMBD:DUMP to prevent erosion of the target. Locking out this dipole will remove the possibility of sending beam down the EMBD. This is added protection on top of the beam mode interlock.
2022-228 Implemented on: 2022-08-08 Active Brandon Humphries In consultation with: , Targets DarkLight target ladder DarkLight target ladder Need to prevent target ladder ... Need to prevent target ladder from driving into beamline during high power tests.
2022-23 Implemented on: 2022-02-07 Active Frank Hosta In consultation with: , Services BL1 LCW South Heat Exchanger BL1 LCW South Heat Exchanger The heat exchanger has a small ... The heat exchanger has a small leak.
2021-134 Implemented on: 2021-04-26 Active Riley Schick-Martin In consultation with: , Optics EHDT:Q6 Power Supply power cor ... EHDT:Q6 Power Supply power cord Insufficient beam position pro ... Insufficient beam position protection at EHD:DUMP. Requested by Thomas Planche.
2021-120 Implemented on: 2021-04-16 Active David Bandiera In consultation with: Brandon Humphries, Vacuum ELBD:IV0 locked out ELBD:IV0 locked out ELBD:IV0 is no longer connecte ... ELBD:IV0 is no longer connected to the ELBT vacuum section (ELBD:MB0 removed to allow for ACCT installation)
2021-115 Implemented on: 2021-04-14 Active Elena Bylinskaia In consultation with: Elena Bylinskaia, Safety BL1U BB ( Beam Blocker) Locked ... BL1U BB ( Beam Blocker) Locked out, I 1416 pinned at IBOB Re-configuration of BL 1U excl ... Re-configuration of BL 1U exclusion area.







BL1U key is locked in DCR Lock out Box #1 with personal K. Ardron lock. IBOB I1416 pinned in order to run 1A.
2021-37 Implemented on: 2021-01-26 Active Kevin Lucow In consultation with: , Safety BL1U Ignition Key BL1U Ignition Key BL1U disabled for 2021. Beamli ... BL1U disabled for 2021. Beamlines group have disabled BL1U Beam Blocker. Safety group have disabled BL1U ASU.
2020-48 Implemented on: 2020-01-21 Active Jason Wait In consultation with: , Optics EHAT:MB4 polarity switch locke ... EHAT:MB4 polarity switch locked out EHAT:MB4 polarity switch locke ... EHAT:MB4 polarity switch locked out until beam path to tunnel is ready
2018-784 Implemented on: 2018-12-24 Active Jas Uppal In consultation with: , Optics M20 Helmholtz power supply M20 Helmholtz power supply Water leak in plumbing externa ... Water leak in plumbing external to cabinet.
2017-3 Implemented on: 2017-08-24 Active Micheal Donohoe In consultation with: , Diagnostics 1AM8 1AM8 Magnetic coupling failure. Magnetic coupling failure.
2016-692 Implemented on: 2016-03-11 Active Jason Wait In consultation with: , Services E-Hall crane A/C disconnect an ... E-Hall crane A/C disconnect and pendant locked out to all unauthorized personnel E-Hall crane A/C disconnect an ... E-Hall crane A/C disconnect and pendant locked out (Key # E-LINAC OPS #2) to all personnel whose JPM & Training on E-Hall Crane bypass has yet to be completed
2012-2 Implemented on: 2012-10-25 Active Micheal Donohoe In consultation with: , Optics M9 Q1, Q2, and B1 P/S M9 Q1, Q2, and B1 P/S M9 blanked off and not operati ... M9 blanked off and not operational