# | Status: | Implemented by: | System: | Device: | Reason: |
---|---|---|---|---|---|
2024-248 Implemented on: 2024-05-14 | Removed | Riley Schick-Martin In consultation with: , | Safety | Beamline 1U ignition key Beamline 1U ignition key | 1U ASU OK and Emergency trip p ... 1U ASU OK and Emergency trip pinned for work on ASU (Defeat 2024-247) |
2024-207 Implemented on: 2024-04-24 | Active | David Bandiera In consultation with: , | Shielding | Cyclotron Ignition Key and BL1 ... Cyclotron Ignition Key and BL1 Ignition Key locked out | Shielding blocks removed from ... Shielding blocks removed from SE corner of Cyclotron Vault Roof for BL1 Diagnostics cable pull. |
2024-206 Implemented on: 2024-04-24 | Active | Ryan Anderson In consultation with: , | Shielding | Cyclotron and BL1A Ignition ke ... Cyclotron and BL1A Ignition key | Shielding blocks by SE corner ... Shielding blocks by SE corner of Vault Roof removed for cabling work |
2024-200 Implemented on: 2024-04-23 | Active | Gauhar Hayat In consultation with: , | Safety | Breathable Air Use Disabled. Breathable Air Use Disabled. | ARIEL compressor motor overhau ... ARIEL compressor motor overhaul |
2024-176 Implemented on: 2024-04-08 | Active | Eric Chapman In consultation with: , | Services | Al-ALCW chain valve Al-ALCW chain valve | Chain valve has failed and is ... Chain valve has failed and is difficult to operate. Must be left open for Main Magnet cooling. |
2024-159 Implemented on: 2024-03-20 | Active | Eric Chapman In consultation with: , | Other / Misc | 2C ignition key removed for ST ... 2C ignition key removed for STF hot cell maintenance | STF hot cell maintenance under ... STF hot cell maintenance under C2024-03-20-5. |
2024-158 Implemented on: 2024-03-19 | Removed | Kevin Lucow In consultation with: , | Diagnostics | E-Linac Ignition Key E-Linac Ignition Key | ELBT:FC2/EOECM interlocks bypa ... ELBT:FC2/EOECM interlocks bypassed. |
2024-157 Implemented on: 2024-03-18 | Active | David Bandiera In consultation with: Frank Hosta, | Shielding | Cyclotron Ignition Key Cyclotron Ignition Key | E-Hall/BL4N shielding removed. E-Hall/BL4N shielding removed. |
2024-142 Implemented on: 2024-03-06 | Removed | Kevin Lucow In consultation with: , | Safety | E-Linac Ignition Key E-Linac Ignition Key | ERMS and ERSS Safety Component ... ERMS and ERSS Safety Components removed. |
2024-141 Implemented on: 2024-03-06 | Removed | Kevin Lucow In consultation with: , | Safety | E-Linac Ignition Key E-Linac Ignition Key | E-Hall/BL4N shielding removed. E-Hall/BL4N shielding removed. |
2024-138 Implemented on: 2024-03-01 | Active | Kevin Lucow In consultation with: , | Safety | BL1 Ignition Key BL1 Ignition Key | IPF/IPF hot cell are open for ... IPF/IPF hot cell are open for maintenance. |
2024-119 Implemented on: 2024-02-20 | Active | Kathleen Genge In consultation with: , | Services | Cu-ALCW south pump (SA1-15) Cu-ALCW south pump (SA1-15) | Pump has difficult spot on rot ... Pump has difficult spot on rotation. Mechanical services has deemed it unfit to run. |
2024-64 Implemented on: 2024-01-29 | Active | Kevin Lucow In consultation with: , | Shielding | M9A M9A | Uncover M9A Q,3,4,5. Uncover M9A Q,3,4,5. |
2024-14 Implemented on: 2024-01-09 | Active | Eric Chapman In consultation with: , | Shielding | M9B / M9H shielding removal M9B / M9H shielding removal | Uncover M9HQ5 to M9HQ8 for new ... Uncover M9HQ5 to M9HQ8 for new M9H installation/construction. |
2023-564 Implemented on: 2023-10-13 | Removed | Riley Schick-Martin In consultation with: , | Targets | Beamline 2C ignition key remov ... Beamline 2C ignition key removed to lockout cabinet | STF cannot receive beam until ... STF cannot receive beam until approved by experts and RPG |
2023-560 Implemented on: 2023-10-12 | Removed | Gauhar Hayat In consultation with: Ryan Lovelidge, | Safety | BL2C ignition key removed. BL2C ignition key removed. | Suspected STF Target failure. Suspected STF Target failure. |
2023-556 Implemented on: 2023-10-11 | Removed | Ryan Lovelidge In consultation with: , | Safety | BL1 ignition key removed from ... BL1 ignition key removed from above rack H | BSM 44 removed for calibration ... BSM 44 removed for calibration following a failure during weekly testing. |
2023-552 Implemented on: 2023-10-09 | Removed | Eric Chapman In consultation with: , | Services | SAB2 AC #5 SAB2 AC #5 | Water found leaking from unit. Water found leaking from unit. |
2023-545 Implemented on: 2023-10-05 | Removed | Ryan Lovelidge In consultation with: , | Services | AL-ALCW Heat Exchangers H-18 c ... AL-ALCW Heat Exchangers H-18 closed and D-17 throttled | Reduced heat load, main magnet ... Reduced heat load, main magnet is off. |
2023-542 Implemented on: 2023-10-03 | Removed | Chris Sooley In consultation with: David Bandiera, | Services | AL-ALCW Heat Exchangers H-18 c ... AL-ALCW Heat Exchangers H-18 closed and D-17 throttled | Reduced heat load, main magnet ... Reduced heat load, main magnet is off. |
2023-540 Implemented on: 2023-10-03 | Removed | Chris Sooley In consultation with: David Bandiera, | Services | AL-ALCW Heat Exchangers H-18 c ... AL-ALCW Heat Exchangers H-18 closed an D-17 throttled | Reduced heat load, main magnet ... Reduced heat load, main magnet is off. |
2023-484 Implemented on: 2023-08-25 | Removed | Kathleen Genge In consultation with: , | Safety | M9A channel M9A channel | M9A ASU commissioning tests fa ... M9A ASU commissioning tests failed; no beam permitted until tests pass. |
2023-479 Implemented on: 2023-08-24 | Removed | Travis Kurucz In consultation with: Eric Chapman, | Safety | BL1A Ignition Key BL1A Ignition Key | ATG working on the IPF flask p ... ATG working on the IPF flask plug motor system. |
2023-478 Implemented on: 2023-08-24 | Cancelled | Travis Kurucz In consultation with: Eric Chapman, | Safety | BL1A Ignition Key BL1A Ignition Key | IPF ventilation system comissi ... IPF ventilation system comissioning is incomplete. |
2023-477 Implemented on: 2023-08-23 | Active | Riley Schick-Martin In consultation with: , | Safety | M11 beamline ignition key remo ... M11 beamline ignition key removed and M11 B1 locked out | Neutron Monitor #11 removed fr ... Neutron Monitor #11 removed from M11 area. |
2023-470 Implemented on: 2023-08-17 | Removed | Gauhar Hayat In consultation with: , | Safety | BL1A Ignition Key BL1A Ignition Key | IPF ventilation system comissi ... IPF ventilation system comissioning is incomplete. |
2023-465 Implemented on: 2023-08-16 | Removed | Chris Sooley In consultation with: David Bandiera, | Safety | BL1 Ignition Key BL1 Ignition Key | IPF ventilation system comissi ... IPF ventilation system comissioning is incomplete. |
2023-460 Implemented on: 2023-08-14 | Removed | Ryan Anderson In consultation with: , | Safety | BL1A ignition key BL1A ignition key | BL1A shielding over T2 removed BL1A shielding over T2 removed |
2023-423 Implemented on: 2023-07-27 | Removed | David Bandiera In consultation with: , | Vacuum | ELNS SV01 ELNS SV01 | Nitrogen valve inspection duri ... Nitrogen valve inspection during E-Linac shutdown |
2023-323 Implemented on: 2023-06-15 | Active | Eric Chapman In consultation with: , | RF | RF Booster RF Booster | RF booster transmission line d ... RF booster transmission line disconnected at feed-through to tank as part of temporary RFB coupler repair. Water lines for coupling loop disconnected and open to air. |
2023-285 Implemented on: 2023-05-31 | Removed | Kevin Lucow In consultation with: , | Shielding | BL1 Ignition Key BL1 Ignition Key | BL1A shielding removed to repa ... BL1A shielding removed to repair 1AM9. |
2023-267 Implemented on: 2023-05-24 | Removed | Eric Chapman In consultation with: , | Other / Misc | 520MeV Cyclotron 520MeV Cyclotron | Fast Target stuck in retracted ... Fast Target stuck in retracted position. |
2023-259 Implemented on: 2023-05-17 | Removed | David Bandiera In consultation with: Robert Scheepmaker, | Safety | BL1 Ignition Key removed to Op ... BL1 Ignition Key removed to Ops key cabinet | Shielding blocks removed over ... Shielding blocks removed over Meson Hall targets storage pit |
2023-257 Implemented on: 2023-05-12 | Active | Brandon Humphries In consultation with: , | Optics | EMBD:MB0 P/S EMBD:MB0 P/S | E-LINAC commissioning license ... E-LINAC commissioning license does not allow for sending beam to FLASH experiment at the end of EMBD. |
2023-254 Implemented on: 2023-05-11 | Removed | Travis Kurucz In consultation with: Eric Chapman, | Shielding | BL1 BL1 | BL1 disabled for moving shield ... BL1 disabled for moving shielding blocks to troubleshoot stuck T1 ladder. |
2023-252 Implemented on: 2023-05-09 | Removed | Gauhar Hayat In consultation with: , | Diagnostics | 1B cage locked to prevent swit ... 1B cage locked to prevent switch to 1A. | IPF nuclear exhaust duct work ... IPF nuclear exhaust duct work ongoing. |
2023-250 Implemented on: 2023-05-08 | Removed | Gauhar Hayat In consultation with: , | Shielding | Beamline 1 defined off and ign ... Beamline 1 defined off and ignition key removed, placed in OPS cabinet. | Shielding removal for access t ... Shielding removal for access to TNF Resin Cans. |
2023-202 Implemented on: 2023-04-18 | Active | Elena Bylinskaia In consultation with: Elena Bylinskaia, | Diagnostics | Extraction 4 Control Cable Extraction 4 Control Cable | BL4 not in use till September, ... BL4 not in use till September, 2023. Installation project ongoing. |
2023-182 Implemented on: 2023-04-05 | Removed | Eric Chapman In consultation with: , | Safety | West Tunnel G7 Door Removed West Tunnel G7 Door Removed | G7 West Tunnel Door removed fo ... G7 West Tunnel Door removed for installation of ARIEL decay tanks in cyclotron vault tunnel. |
2023-143 Implemented on: 2023-03-16 | Removed | Elena Bylinskaia In consultation with: Elena Bylinskaia, | Other / Misc | M20: Q3 P/S M20: Q3 P/S | Swap M20:Q3 PS control cable f ... Swap M20:Q3 PS control cable from Xantrex to TDK-Lambda |
2023-141 Implemented on: 2023-03-14 | Removed | Gauhar Hayat In consultation with: , | Services | Al-ALCW Pump Al-ALCW Pump | Leak found from system on cycl ... Leak found from system on cyclotron tank. |
2023-138 Implemented on: 2023-03-11 | Removed | Eric Chapman In consultation with: , | Services | EHR:HVAC:AHUR01 gas valve lock ... EHR:HVAC:AHUR01 gas valve locked out | EHall requested to be secured ... EHall requested to be secured via email for RF operation during the week. On duty Shift Supervisor not comfortable with securing eHall or equipment operation without confirmation of no gas supply to the area after reported gas leak in elog on Mar 10, 2023. |
2023-132 Implemented on: 2023-02-28 | Removed | Eric Chapman In consultation with: , | Services | ME140 return fan ME140 return fan | ME140 return fan was discovere ... ME140 return fan was discovered to be off with 'Earth Fault' error message displayed on the VFD. |
2023-125 Implemented on: 2023-02-27 | Removed | Ryan Lovelidge In consultation with: , | Shielding | Cycloron ignition key Cycloron ignition key | Cyclotron ignition key taken f ... Cyclotron ignition key taken from console above rack H and placed in ops cabinet. Shielding is being removed on the vault roof to gain access to cable chase. |
2023-88 Implemented on: 2023-02-08 | Removed | Kathleen Genge In consultation with: , | Targets | BL1 ignition key BL1 ignition key | No beam to BL1A during IPF nuc ... No beam to BL1A during IPF nuclear ventilation upgrade. IPF ventilation has been disconnected from BL1A exhaust and is being upgraded to new stand-alone system. Upgrade is happening during 2023 winter shutdown. |
2023-87 Implemented on: 2023-02-08 | Removed | Ryan Lovelidge In consultation with: , | Shielding | BL1 ignition key BL1 ignition key | Shielding removal near IPF Shielding removal near IPF |
2023-68 Implemented on: 2023-01-31 | Removed | Robert Scheepmaker In consultation with: , | Shielding | 12' Sheild block over STF 12' Sheild block over STF | Block removed Block removed |
2023-62 Implemented on: 2023-01-30 | Removed | Kevin Lucow In consultation with: , | Services | Al-ALCW system shut down. Al-ALCW system shut down. | For cyclotron lid up. For cyclotron lid up. |
2023-50 Implemented on: 2023-01-23 | Removed | Frank Hosta In consultation with: , | Shielding | M15 Ignition Key M15 Ignition Key | Shielding blocks over M15 fron ... Shielding blocks over M15 front end are being removed. |
2023-37 Implemented on: 2023-01-17 | Removed | Brandon Humphries In consultation with: , | Ion sources and injection BL | EGUN:CHT P/S EGUN:CHT P/S | E-Linac beam delivery has been ... E-Linac beam delivery has been put on hold by the Accelerator Division Safety Officer until further notice. Disabling the EGUN:CHT will prevent the filament from coming on and producing beam. |
2023-25 Implemented on: 2023-01-12 | Removed | Gauhar Hayat In consultation with: , | RF | E-Linac Klystron Power Supplie ... E-Linac Klystron Power Supplies Locked Out | Work being done on Cu-LCW Syst ... Work being done on Cu-LCW System. |
2023-21 Implemented on: 2023-01-10 | Active | Riley Schick-Martin In consultation with: , | Other / Misc | ISAC II HV transformer (12B1-T ... ISAC II HV transformer (12B1-T-005) tap changer | Tap changer disabled to preven ... Tap changer disabled to prevent equipment damage |
2023-11 Implemented on: 2023-01-05 | Removed | Chris Sooley In consultation with: Ryan Lovelidge, | Shielding | BL1 Ignition key BL1 Ignition key | Annual 1A shielding block migr ... Annual 1A shielding block migration. |
2022-379 Implemented on: 2022-12-28 | Active | Riley Schick-Martin In consultation with: , | Other / Misc | RF transformer High Voltage Co ... RF transformer High Voltage Compartment Locked | Previous lock replaced by ops ... Previous lock replaced by ops lock at electrical services group's request |
2022-374 Implemented on: 2022-12-28 | Removed | Ryan Lovelidge In consultation with: , | Services | Al-ALCW system pump discharge ... Al-ALCW system pump discharge valve & surge tank valves closed | Al-ALCW system off for planned ... Al-ALCW system off for planned power outage. |
2022-373 Implemented on: 2022-12-24 | Removed | Jas Uppal In consultation with: , | Vacuum | ELNS SV01 ELNS SV01 | To allow for access to area (A ... To allow for access to area (ARIEL compressor room) without the use of personal O2 sensors. |
2022-372 Implemented on: 2022-12-24 | Removed | Jas Uppal In consultation with: , | Vacuum | EOXY SV01, SV02 EOXY SV01, SV02 | To allow for access to areas ( ... To allow for access to areas (SAB B2) without the use of personal O2 sensors. |
2022-337 Implemented on: 2022-12-03 | Removed | Kevin Lucow In consultation with: , | Services | South RF-LCW Pump SA3-3. South RF-LCW Pump SA3-3. | RF-LCW South VFD (SA3-3) fault ... RF-LCW South VFD (SA3-3) faulty. |
2022-329 Implemented on: 2022-11-22 | Active | Kathleen Genge In consultation with: , | Safety | M9B beamblocker M9BBB M9B beamblocker M9BBB | M9B decommissioned & area bein ... M9B decommissioned & area being converted to M9H channel. No beam permitted to M9B. |
2022-316 Implemented on: 2022-11-09 | Active | Brandon Humphries In consultation with: , | Optics | EMBD:MB0 P/S EMBD:MB0 P/S | Cooling water has been shut of ... Cooling water has been shut off to EMBD:DUMP to prevent erosion of the target. Locking out this dipole will remove the possibility of sending beam down the EMBD. This is added protection on top of the beam mode interlock. |
2022-283 Implemented on: 2022-10-11 | Removed | Kevin Lucow In consultation with: , | Shielding | M9 Ignition Key M9 Ignition Key | Shielding blocks above M9B Q3, ... Shielding blocks above M9B Q3, Q4 and Q5 removed. |
2022-228 Implemented on: 2022-08-08 | Active | Brandon Humphries In consultation with: , | Targets | DarkLight target ladder DarkLight target ladder | Need to prevent target ladder ... Need to prevent target ladder from driving into beamline during high power tests. |
2022-217 Implemented on: 2022-08-02 | Removed | David Bandiera In consultation with: , | Diagnostics | HE2 radial drive motor and hea ... HE2 radial drive motor and head down motor cables disconnected | HE2 radial position is stuck p ... HE2 radial position is stuck partway through travel and cannot move |
2022-201 Implemented on: 2022-07-22 | Removed | Eric Chapman In consultation with: Robin Swanson, | Safety | Cyclotron Ignition key removed ... Cyclotron Ignition key removed for Vault exhaust work | Vault exhaust MRO work. Vault exhaust MRO work. |
2022-151 Implemented on: 2022-06-02 | Removed | Robin Swanson In consultation with: , | Shielding | BL1 Ignition Key BL1 Ignition Key | Shielding blocks removed over ... Shielding blocks removed over Beamline 1A for inspection of 1AQ13. |
2022-150 Implemented on: 2022-06-02 | Removed | Robin Swanson In consultation with: , | Shielding | Bl1A Ignition Key Bl1A Ignition Key | Shielding blocks removed over ... Shielding blocks removed over Beamline 1A for inspection of 1AQ13. |
2022-128 Implemented on: 2022-05-20 | Removed | Ryan Lovelidge In consultation with: , | Diagnostics | 2A2M18 2A2M18 | Monitor cylinder is leaking co ... Monitor cylinder is leaking compressed air, control cable disconnected and locked out. |
2022-124 Implemented on: 2022-05-17 | Removed | Brandon Humphries In consultation with: , | Optics | EABD:MB0 P/S EABD:MB0 P/S | Bira controller was borrowed b ... Bira controller was borrowed by P/S group for BL1 (until new controllers arrive). |
2022-122 Implemented on: 2022-05-16 | Removed | Robert Scheepmaker In consultation with: , | Safety | 1A/1B Switchover Cage 1A/1B Switchover Cage | To satisfy 1B safety requireme ... To satisfy 1B safety requirements while BL selection signal not available( due to 1A P/S not yet hooked up) |
2022-118 Implemented on: 2022-05-12 | Removed | Riley Schick-Martin In consultation with: , | Shielding | M9 Channel Key M9 Channel Key | Shielding removed from M9A bea ... Shielding removed from M9A beamblocker |
2022-117 Implemented on: 2022-05-12 | Removed | Riley Schick-Martin In consultation with: , | Shielding | BL 2C ignition key BL 2C ignition key | Shielding removed from STF hot ... Shielding removed from STF hotcell |
2022-68 Implemented on: 2022-03-25 | Removed | Elena Bylinskaia In consultation with: , | Diagnostics | HE3 probe cable unplugged. HE3 probe cable unplugged. | HE3 probe is not working prope ... HE3 probe is not working properly, making the grinding noise while operating. Probe is disabled for repair.Redesign and rebuild to be planned for Shutdown 2023. |
2022-67 Implemented on: 2022-03-25 | Removed | Elena Bylinskaia In consultation with: Dale Nagra, | Diagnostics | HE3 probe cable unplugged. HE3 probe cable unplugged. | HE3 probe is not working prope ... HE3 probe is not working properly, making the grinding noise while operating. Probe is disabled for repair.Redesign and rebuild to be planned for Shutdown 2023. |
2022-63 Implemented on: 2022-03-23 | Removed | Robert Scheepmaker In consultation with: , | Other / Misc | 1AQ14,15,16 1AQ14,15,16 | Work on respective P/S Work on respective P/S |
2022-39 Implemented on: 2022-02-28 | Removed | David Bandiera In consultation with: , | Vacuum | EHSAS:SAP01 locked out EHSAS:SAP01 locked out | Pump removed for repairs Pump removed for repairs |
2022-35 Implemented on: 2022-02-22 | Removed | Ryan Lovelidge In consultation with: , | Shielding | BL 1 ignition key BL 1 ignition key | Shielding is being rearranged ... Shielding is being rearranged near UCN and 1B to address a shielding leak in that area. |
2022-34 Implemented on: 2022-02-18 | Removed | Elena Bylinskaia In consultation with: Tiffany Angus, | Optics | 2AB3 & 2AB4 P/S's 2AB3 & 2AB4 P/S's | 2AB3 P/S water leak & P.Bratt ... 2AB3 P/S water leak & P.Bratt request (2nd efault forthcoming) |
2022-33 Implemented on: 2022-02-17 | Removed | Robin Swanson In consultation with: , | Services | Cu-ALCW south pump (SA1-15) Cu-ALCW south pump (SA1-15) | Pump has difficult spot on rot ... Pump has difficult spot on rotation. Mechanical services has deemed it unfit to run. |
2022-23 Implemented on: 2022-02-07 | Active | Frank Hosta In consultation with: , | Services | BL1 LCW South Heat Exchanger BL1 LCW South Heat Exchanger | The heat exchanger has a small ... The heat exchanger has a small leak. |
2022-3 Implemented on: 2022-01-04 | Removed | Kevin Lucow In consultation with: , | Shielding | BL1 Ignition Key BL1 Ignition Key | BL1A shielding moved for shutd ... BL1A shielding moved for shutdown. |
2021-379 Implemented on: 2021-11-15 | Removed | Gordon Roy In consultation with: , | Shielding | M11 Shielding block removed M11 Shielding block removed | One shielding block removed fr ... One shielding block removed from M-11 by D, Preddy |
2021-376 Implemented on: 2021-11-12 | Removed | Micheal Donohoe In consultation with: , | Safety | 2C ignition key removed 2C ignition key removed | To prevent running to 2C4. To prevent running to 2C4. |
2021-375 Implemented on: 2021-11-12 | Removed | Jason Wait In consultation with: , | Optics | EMBD MB0 power supply locked o ... EMBD MB0 power supply locked out | EMBD MB0 locked out at request ... EMBD MB0 locked out at request of Thomas Planche |
2021-370 Implemented on: 2021-11-09 | Removed | David Bandiera In consultation with: , | Safety | M9 Beam Blocker CR9 relay and ... M9 Beam Blocker CR9 relay and M9 Ignition key temporarily inserted. | To test M9 Beam Blocker operat ... To test M9 Beam Blocker operation |
2021-368 Implemented on: 2021-11-09 | Removed | David Bandiera In consultation with: , | Safety | BL1 Ignition key removed BL1 Ignition key removed | Work in UCN cryostat pit on/ne ... Work in UCN cryostat pit on/near BL1 shielding blocks |
2021-364 Implemented on: 2021-11-05 | Removed | Eric Chapman In consultation with: , | Other / Misc | STF water pump STF water pump | Steve has locked out the STF w ... Steve has locked out the STF water pump for repair of the STF exhaust line. |
2021-335 Implemented on: 2021-10-13 | Removed | Kevin Lucow In consultation with: , | Safety | M15 Channel Key M15 Channel Key | Experiment S2129 missing safet ... Experiment S2129 missing safety approval. |
2021-330 Implemented on: 2021-10-04 | Removed | Kevin Lucow In consultation with: , | Shielding | E-LINAC Ignition Key E-LINAC Ignition Key | EMBD beam dump dissembled. EMBD beam dump dissembled. |
2021-328 Implemented on: 2021-10-04 | Removed | Kevin Lucow In consultation with: , | Shielding | Beamline 1 (BL1) Ignition Key Beamline 1 (BL1) Ignition Key | UCN shielding removed. UCN shielding removed. |
2021-325 Implemented on: 2021-10-01 | Removed | Kevin Lucow In consultation with: , | Safety | Cyclotron Ignition Key Cyclotron Ignition Key | Vault shielding removed for wo ... Vault shielding removed for work on STF Hotcell exhaust. |
2021-323 Implemented on: 2021-09-28 | Removed | Riley Schick-Martin In consultation with: , | Ion sources and injection BL | BST 127 BST 127 | No power in ISIS to transfer t ... No power in ISIS to transfer the BST limit switch signal to the control room. |
2021-311 Implemented on: 2021-09-13 | Removed | Frank Hosta In consultation with: , | Safety | BL1 ignition key BL1 ignition key | Workers on blocks over BL1 in ... Workers on blocks over BL1 in Meson Hall |
2021-281 Implemented on: 2021-08-17 | Removed | Kathleen Genge In consultation with: , | Shielding | BL1 ignition key BL1 ignition key | UCN shielding change - C2021-0 ... UCN shielding change - C2021-08-17-2 |
2021-257 Implemented on: 2021-07-27 | Removed | David Bandiera In consultation with: , | Safety | BL1 ignition key BL1 ignition key | Workers on blocks over BL1 in ... Workers on blocks over BL1 in Meson Hall |
2021-227 Implemented on: 2021-06-29 | Removed | Riley Schick-Martin In consultation with: , | Shielding | BL1 ignition key BL1 ignition key | UCN shielding change UCN shielding change |
2021-224 Implemented on: 2021-06-25 | Removed | David Bandiera In consultation with: , | Safety | 2A Ignition Key removed from c ... 2A Ignition Key removed from cyclotron console to Ops locked key cabinet | To prevent operation of 2A bea ... To prevent operation of 2A beam inhibit devices |
2021-223 Implemented on: 2021-06-25 | Removed | David Bandiera In consultation with: , | Optics | 2AVB1 & 2AVB2 locked out at Pa ... 2AVB1 & 2AVB2 locked out at Panel-140 on Vault Roof. VB1 breakers 26,28,30; VB2 breakers 20,22,24 | To define BL2A offline and pre ... To define BL2A offline and prevent beam down BL2A. |
2021-214 Implemented on: 2021-06-22 | Removed | David Bandiera In consultation with: , | Diagnostics | HE1 Radial Drive motor disconn ... HE1 Radial Drive motor disconnected | Failed / Jammed radial drive f ... Failed / Jammed radial drive for HE1 |
2021-207 Implemented on: 2021-06-17 | Removed | Frank Hosta In consultation with: , | Shielding | BL1A ignition key removed BL1A ignition key removed | Waiting confirmation that UCN ... Waiting confirmation that UCN shielding is acceptable. |
2021-194 Implemented on: 2021-06-09 | Removed | Brandon Humphries In consultation with: Ryan Lovelidge, | Ion sources and injection BL | EGUN:BIAS HV and Isolation Tra ... EGUN:BIAS HV and Isolation Transformer | The grounding rod for the EGUN ... The grounding rod for the EGUN HV enclosure has broken. Therefore the EGUN:BIAS HV (including the isolation transformer) can not be run until it's repaired. |
2021-159 Implemented on: 2021-05-18 | Removed | David Bandiera In consultation with: , | Shielding | BL1A ignition key removed BL1A ignition key removed | UCN shielding adjustments UCN shielding adjustments |
2021-146 Implemented on: 2021-05-11 | Removed | Riley Schick-Martin In consultation with: , | Shielding | 2C ignition key 2C ignition key | 2C shielding being removed. 2C shielding being removed. |
2021-141 Implemented on: 2021-05-05 | Removed | Brandon Humphries In consultation with: , | Ion sources and injection BL | EGUN:BIAS HV and Isolation Tra ... EGUN:BIAS HV and Isolation Transformer | EGUN HV stack is not connected ... EGUN HV stack is not connected as it was taken apart for maintenance inside the EGUN vessel. The EGUN HV can not be operated in this configuration. |
2021-135 Implemented on: 2021-04-26 | Removed | Robert Scheepmaker In consultation with: , | Safety | M11 IGN Key M11 IGN Key | No Neutron Monitor in M11 area ... No Neutron Monitor in M11 area. |
2021-134 Implemented on: 2021-04-26 | Active | Riley Schick-Martin In consultation with: , | Optics | EHDT:Q6 Power Supply power cor ... EHDT:Q6 Power Supply power cord | Insufficient beam position pro ... Insufficient beam position protection at EHD:DUMP. Requested by Thomas Planche. |
2021-133 Implemented on: 2021-04-06 | Removed | David Bandiera In consultation with: Elena Bylinskaia, | Safety | I1723 Input removed "2C Line 4 ... I1723 Input removed "2C Line 4 OK" | To prevent beam in 2C4 beamlin ... To prevent beam in 2C4 beamline while shielding blocks are removed from 2C Hot Cell but still allow 2C1 to operate |
2021-131 Implemented on: 2021-04-23 | Removed | Riley Schick-Martin In consultation with: , | Shielding | BL1A ignition key removed BL1A ignition key removed | UCN shielding adjustments UCN shielding adjustments |
2021-122 Implemented on: 2021-04-19 | Removed | Gordon Roy In consultation with: , | RF | RF HVPS switchgear racked out ... RF HVPS switchgear racked out by TRIUMF Electrician | RF personnel working on HVPS RF personnel working on HVPS |
2021-120 Implemented on: 2021-04-16 | Active | David Bandiera In consultation with: Brandon Humphries, | Vacuum | ELBD:IV0 locked out ELBD:IV0 locked out | ELBD:IV0 is no longer connecte ... ELBD:IV0 is no longer connected to the ELBT vacuum section (ELBD:MB0 removed to allow for ACCT installation) |
2021-115 Implemented on: 2021-04-14 | Active | Elena Bylinskaia In consultation with: Elena Bylinskaia, | Safety | BL1U BB ( Beam Blocker) Locked ... BL1U BB ( Beam Blocker) Locked out, I 1416 pinned at IBOB | Re-configuration of BL 1U excl ... Re-configuration of BL 1U exclusion area.
BL1U key is locked in DCR Lock out Box #1 with personal K. Ardron lock. IBOB I1416 pinned in order to run 1A. |
2021-79 Implemented on: 2021-03-04 | Removed | Robert Scheepmaker In consultation with: , | Services | RFTWV RFTWV | Al-ALCW sidestream being remov ... Al-ALCW sidestream being removed. Disabling TWV alleviates the necessity of draining an excessive amount of water. |
2021-78 Implemented on: 2021-03-04 | Removed | Robert Scheepmaker In consultation with: , | Services | Al-ALCW Pump and sidestream Al-ALCW Pump and sidestream | Bypass to be cut out and cappe ... Bypass to be cut out and capped |
2021-37 Implemented on: 2021-01-26 | Active | Kevin Lucow In consultation with: , | Safety | BL1U Ignition Key BL1U Ignition Key | BL1U disabled for 2021. Beamli ... BL1U disabled for 2021. Beamlines group have disabled BL1U Beam Blocker. Safety group have disabled BL1U ASU. |
2021-9 Implemented on: 2021-01-05 | Removed | Micheal Donohoe In consultation with: , | Other / Misc | Cyclotron Elevating System Cyclotron Elevating System | Maintenance work: replacement ... Maintenance work: replacement of elevating system jack components. |
2020-93 Implemented on: 2020-12-16 | Removed | David Bandiera In consultation with: Brandon Humphries, | Optics | ELBD:MB0 Power Supply locked o ... ELBD:MB0 Power Supply locked out | To prevent beam delivery throu ... To prevent beam delivery through ELBD as there are issues with the electronics for the PMTs in the ELBD section. |
2020-51 Implemented on: 2020-02-28 | Removed | Jason Wait In consultation with: , | Vacuum | EHSAS:SAP04 breaker to be lock ... EHSAS:SAP04 breaker to be locked out | Device to be sent out for main ... Device to be sent out for maintenance |
2020-48 Implemented on: 2020-01-21 | Active | Jason Wait In consultation with: , | Optics | EHAT:MB4 polarity switch locke ... EHAT:MB4 polarity switch locked out | EHAT:MB4 polarity switch locke ... EHAT:MB4 polarity switch locked out until beam path to tunnel is ready |
2020-47 Implemented on: 2020-08-03 | Cancelled | Jason Wait In consultation with: , | Safety | E-LINAC Control room Operation ... E-LINAC Control room Operations lockbox to be made accessible to entire E-LINAC Operations group | E-LINAC Control room operation ... E-LINAC Control room operations lockbox to allow E-LINAC operations lockout keys to be accessible to the whole E-LINAC Operations group |
2020-40 Implemented on: 2020-10-06 | Removed | Jason Wait In consultation with: , | Shielding | BL2C - STF Hot Cell 12' Shield ... BL2C - STF Hot Cell 12' Shielding Block removed for inspection and cleaning | STF Hot Cell 12' shielding blo ... STF Hot Cell 12' shielding block removed for inspection and cleaning - to be replaced when STF is ready for beam |
2020-37 Implemented on: 2020-06-12 | Removed | Jason Wait In consultation with: , | Services | Power receptacles (P-005 break ... Power receptacles (P-005 breaker 34, SAB1) on East cooling tower locked out (Lock #OPS 135) | Power receptacles locked out t ... Power receptacles locked out to complete trenching for new conduit |
2019-49 Implemented on: 2019-06-04 | Removed | Jas Uppal In consultation with: , | Services | MCC-B Power Monitor disconnect ... MCC-B Power Monitor disconnect switch | Power Monitor failed Power Monitor failed |
2019-46 Implemented on: 2019-04-02 | Removed | Micheal Donohoe In consultation with: , | Optics | M9SEP1 DC MAgnet Power Supply M9SEP1 DC MAgnet Power Supply | P/S is not connected to the lo ... P/S is not connected to the load. |
2019-45 Implemented on: 2019-04-02 | Removed | Jas Uppal In consultation with: , | Optics | M9 Sep2 DC Magnet Power Supply M9 Sep2 DC Magnet Power Supply | Power supply is not connected ... Power supply is not connected to the load |
2018-784 Implemented on: 2018-12-24 | Active | Jas Uppal In consultation with: , | Optics | M20 Helmholtz power supply M20 Helmholtz power supply | Water leak in plumbing externa ... Water leak in plumbing external to cabinet. |
2018-779 Implemented on: 2018-05-02 | Removed | Jas Uppal In consultation with: , | Optics | M9BQ3E power supply M9BQ3E power supply | Power supply leaking water Power supply leaking water |
2017-3 Implemented on: 2017-08-24 | Active | Micheal Donohoe In consultation with: , | Diagnostics | 1AM8 1AM8 | Magnetic coupling failure. Magnetic coupling failure. |
2016-694 Implemented on: 2016-08-03 | Removed | Jason Wait In consultation with: , | Safety | E-LINAC Control room Operation ... E-LINAC Control room Operations lockbox to be made accessible to entire E-LINAC Operations group | E-LINAC Control room operation ... E-LINAC Control room operations lockbox to allow E-LINAC operations lockout keys to be accessible to the whole E-LINAC Operations group |
2016-693 Implemented on: 2016-08-03 | Removed | Jason Wait In consultation with: , | Safety | E-LINAC Ignition key to be sto ... E-LINAC Ignition key to be stored in E-LINAC key lockbox | E-LINAC ignition key to be sto ... E-LINAC ignition key to be stored in E-LINAC key lockbox in order to restrict access to this with appropriate training and active work permit credentials |
2016-692 Implemented on: 2016-03-11 | Active | Jason Wait In consultation with: , | Services | E-Hall crane A/C disconnect an ... E-Hall crane A/C disconnect and pendant locked out to all unauthorized personnel | E-Hall crane A/C disconnect an ... E-Hall crane A/C disconnect and pendant locked out (Key # E-LINAC OPS #2) to all personnel whose JPM & Training on E-Hall Crane bypass has yet to be completed |
2012-2 Implemented on: 2012-10-25 | Active | Micheal Donohoe In consultation with: , | Optics | M9 Q1, Q2, and B1 P/S M9 Q1, Q2, and B1 P/S | M9 blanked off and not operati ... M9 blanked off and not operational |
2012-1 Implemented on: 2012-08-28 | Removed | Micheal Donohoe In consultation with: , | Safety | M9 Channel M9 Channel | M9 work during 2012 shutdown. M9 work during 2012 shutdown. |
2002-1 Implemented on: 2002-07-31 | Removed | Kathleen Genge In consultation with: , | Optics | M11 septum power supply locked ... M11 septum power supply locked out | septum magnet will not operate ... septum magnet will not operate until unit is repaired |