Interlock Defeat / Device Disable
Management System v1.5 (Driver)

Accelerator Complex:



Home
List of Defeats   ▸
List of Disables ▸
Fill Out a Defeat
Fill Out a Disable
Add/Modify User
Add/Modify System
Login
Help

Search Criteria




SEARCH RESULTS for DISABLES

ACK = Requires Acknowledgement
# Status: Implemented by: System: Device: Reason:
2024-248 Implemented on: 2024-05-14 Removed Riley Schick-Martin In consultation with: , Safety Beamline 1U ignition key Beamline 1U ignition key 1U ASU OK and Emergency trip p ... 1U ASU OK and Emergency trip pinned for work on ASU (Defeat 2024-247)
2024-207 Implemented on: 2024-04-24 Active David Bandiera In consultation with: , Shielding Cyclotron Ignition Key and BL1 ... Cyclotron Ignition Key and BL1 Ignition Key locked out Shielding blocks removed from ... Shielding blocks removed from SE corner of Cyclotron Vault Roof for BL1 Diagnostics cable pull.
2024-206 Implemented on: 2024-04-24 Active Ryan Anderson In consultation with: , Shielding Cyclotron and BL1A Ignition ke ... Cyclotron and BL1A Ignition key Shielding blocks by SE corner ... Shielding blocks by SE corner of Vault Roof removed for cabling work
2024-200 Implemented on: 2024-04-23 Active Gauhar Hayat In consultation with: , Safety Breathable Air Use Disabled. Breathable Air Use Disabled. ARIEL compressor motor overhau ... ARIEL compressor motor overhaul
2024-176 Implemented on: 2024-04-08 Active Eric Chapman In consultation with: , Services Al-ALCW chain valve Al-ALCW chain valve Chain valve has failed and is ... Chain valve has failed and is difficult to operate. Must be left open for Main Magnet cooling.
2024-159 Implemented on: 2024-03-20 Active Eric Chapman In consultation with: , Other / Misc 2C ignition key removed for ST ... 2C ignition key removed for STF hot cell maintenance STF hot cell maintenance under ... STF hot cell maintenance under C2024-03-20-5.
2024-158 Implemented on: 2024-03-19 Removed Kevin Lucow In consultation with: , Diagnostics E-Linac Ignition Key E-Linac Ignition Key ELBT:FC2/EOECM interlocks bypa ... ELBT:FC2/EOECM interlocks bypassed.
2024-157 Implemented on: 2024-03-18 Active David Bandiera In consultation with: Frank Hosta, Shielding Cyclotron Ignition Key Cyclotron Ignition Key E-Hall/BL4N shielding removed. E-Hall/BL4N shielding removed.
2024-142 Implemented on: 2024-03-06 Removed Kevin Lucow In consultation with: , Safety E-Linac Ignition Key E-Linac Ignition Key ERMS and ERSS Safety Component ... ERMS and ERSS Safety Components removed.
2024-141 Implemented on: 2024-03-06 Removed Kevin Lucow In consultation with: , Safety E-Linac Ignition Key E-Linac Ignition Key E-Hall/BL4N shielding removed. E-Hall/BL4N shielding removed.
2024-138 Implemented on: 2024-03-01 Active Kevin Lucow In consultation with: , Safety BL1 Ignition Key BL1 Ignition Key IPF/IPF hot cell are open for ... IPF/IPF hot cell are open for maintenance.
2024-119 Implemented on: 2024-02-20 Active Kathleen Genge In consultation with: , Services Cu-ALCW south pump (SA1-15) Cu-ALCW south pump (SA1-15) Pump has difficult spot on rot ... Pump has difficult spot on rotation. Mechanical services has deemed it unfit to run.
2024-64 Implemented on: 2024-01-29 Active Kevin Lucow In consultation with: , Shielding M9A M9A Uncover M9A Q,3,4,5. Uncover M9A Q,3,4,5.
2024-14 Implemented on: 2024-01-09 Active Eric Chapman In consultation with: , Shielding M9B / M9H shielding removal M9B / M9H shielding removal Uncover M9HQ5 to M9HQ8 for new ... Uncover M9HQ5 to M9HQ8 for new M9H installation/construction.
2023-564 Implemented on: 2023-10-13 Removed Riley Schick-Martin In consultation with: , Targets Beamline 2C ignition key remov ... Beamline 2C ignition key removed to lockout cabinet STF cannot receive beam until ... STF cannot receive beam until approved by experts and RPG
2023-560 Implemented on: 2023-10-12 Removed Gauhar Hayat In consultation with: Ryan Lovelidge, Safety BL2C ignition key removed. BL2C ignition key removed. Suspected STF Target failure. Suspected STF Target failure.
2023-556 Implemented on: 2023-10-11 Removed Ryan Lovelidge In consultation with: , Safety BL1 ignition key removed from ... BL1 ignition key removed from above rack H BSM 44 removed for calibration ... BSM 44 removed for calibration following a failure during weekly testing.
2023-552 Implemented on: 2023-10-09 Removed Eric Chapman In consultation with: , Services SAB2 AC #5 SAB2 AC #5 Water found leaking from unit. Water found leaking from unit.
2023-545 Implemented on: 2023-10-05 Removed Ryan Lovelidge In consultation with: , Services AL-ALCW Heat Exchangers H-18 c ... AL-ALCW Heat Exchangers H-18 closed and D-17 throttled Reduced heat load, main magnet ... Reduced heat load, main magnet is off.
2023-542 Implemented on: 2023-10-03 Removed Chris Sooley In consultation with: David Bandiera, Services AL-ALCW Heat Exchangers H-18 c ... AL-ALCW Heat Exchangers H-18 closed and D-17 throttled Reduced heat load, main magnet ... Reduced heat load, main magnet is off.
2023-540 Implemented on: 2023-10-03 Removed Chris Sooley In consultation with: David Bandiera, Services AL-ALCW Heat Exchangers H-18 c ... AL-ALCW Heat Exchangers H-18 closed an D-17 throttled Reduced heat load, main magnet ... Reduced heat load, main magnet is off.
2023-484 Implemented on: 2023-08-25 Removed Kathleen Genge In consultation with: , Safety M9A channel M9A channel M9A ASU commissioning tests fa ... M9A ASU commissioning tests failed; no beam permitted until tests pass.
2023-479 Implemented on: 2023-08-24 Removed Travis Kurucz In consultation with: Eric Chapman, Safety BL1A Ignition Key BL1A Ignition Key ATG working on the IPF flask p ... ATG working on the IPF flask plug motor system.
2023-478 Implemented on: 2023-08-24 Cancelled Travis Kurucz In consultation with: Eric Chapman, Safety BL1A Ignition Key BL1A Ignition Key IPF ventilation system comissi ... IPF ventilation system comissioning is incomplete.
2023-477 Implemented on: 2023-08-23 Active Riley Schick-Martin In consultation with: , Safety M11 beamline ignition key remo ... M11 beamline ignition key removed and M11 B1 locked out Neutron Monitor #11 removed fr ... Neutron Monitor #11 removed from M11 area.
2023-470 Implemented on: 2023-08-17 Removed Gauhar Hayat In consultation with: , Safety BL1A Ignition Key BL1A Ignition Key IPF ventilation system comissi ... IPF ventilation system comissioning is incomplete.
2023-465 Implemented on: 2023-08-16 Removed Chris Sooley In consultation with: David Bandiera, Safety BL1 Ignition Key BL1 Ignition Key IPF ventilation system comissi ... IPF ventilation system comissioning is incomplete.
2023-460 Implemented on: 2023-08-14 Removed Ryan Anderson In consultation with: , Safety BL1A ignition key BL1A ignition key BL1A shielding over T2 removed BL1A shielding over T2 removed
2023-423 Implemented on: 2023-07-27 Removed David Bandiera In consultation with: , Vacuum ELNS SV01 ELNS SV01 Nitrogen valve inspection duri ... Nitrogen valve inspection during E-Linac shutdown
2023-323 Implemented on: 2023-06-15 Active Eric Chapman In consultation with: , RF RF Booster RF Booster RF booster transmission line d ... RF booster transmission line disconnected at feed-through to tank as part of temporary RFB coupler repair. Water lines for coupling loop disconnected and open to air.
2023-285 Implemented on: 2023-05-31 Removed Kevin Lucow In consultation with: , Shielding BL1 Ignition Key BL1 Ignition Key BL1A shielding removed to repa ... BL1A shielding removed to repair 1AM9.
2023-267 Implemented on: 2023-05-24 Removed Eric Chapman In consultation with: , Other / Misc 520MeV Cyclotron 520MeV Cyclotron Fast Target stuck in retracted ... Fast Target stuck in retracted position.
2023-259 Implemented on: 2023-05-17 Removed David Bandiera In consultation with: Robert Scheepmaker, Safety BL1 Ignition Key removed to Op ... BL1 Ignition Key removed to Ops key cabinet Shielding blocks removed over ... Shielding blocks removed over Meson Hall targets storage pit
2023-257 Implemented on: 2023-05-12 Active Brandon Humphries In consultation with: , Optics EMBD:MB0 P/S EMBD:MB0 P/S E-LINAC commissioning license ... E-LINAC commissioning license does not allow for sending beam to FLASH experiment at the end of EMBD.
2023-254 Implemented on: 2023-05-11 Removed Travis Kurucz In consultation with: Eric Chapman, Shielding BL1 BL1 BL1 disabled for moving shield ... BL1 disabled for moving shielding blocks to troubleshoot stuck T1 ladder.
2023-252 Implemented on: 2023-05-09 Removed Gauhar Hayat In consultation with: , Diagnostics 1B cage locked to prevent swit ... 1B cage locked to prevent switch to 1A. IPF nuclear exhaust duct work ... IPF nuclear exhaust duct work ongoing.
2023-250 Implemented on: 2023-05-08 Removed Gauhar Hayat In consultation with: , Shielding Beamline 1 defined off and ign ... Beamline 1 defined off and ignition key removed, placed in OPS cabinet. Shielding removal for access t ... Shielding removal for access to TNF Resin Cans.
2023-202 Implemented on: 2023-04-18 Active Elena Bylinskaia In consultation with: Elena Bylinskaia, Diagnostics Extraction 4 Control Cable Extraction 4 Control Cable BL4 not in use till September, ... BL4 not in use till September, 2023. Installation project ongoing.
2023-182 Implemented on: 2023-04-05 Removed Eric Chapman In consultation with: , Safety West Tunnel G7 Door Removed West Tunnel G7 Door Removed G7 West Tunnel Door removed fo ... G7 West Tunnel Door removed for installation of ARIEL decay tanks in cyclotron vault tunnel.
2023-143 Implemented on: 2023-03-16 Removed Elena Bylinskaia In consultation with: Elena Bylinskaia, Other / Misc M20: Q3 P/S M20: Q3 P/S Swap M20:Q3 PS control cable f ... Swap M20:Q3 PS control cable from Xantrex to TDK-Lambda
2023-141 Implemented on: 2023-03-14 Removed Gauhar Hayat In consultation with: , Services Al-ALCW Pump Al-ALCW Pump Leak found from system on cycl ... Leak found from system on cyclotron tank.
2023-138 Implemented on: 2023-03-11 Removed Eric Chapman In consultation with: , Services EHR:HVAC:AHUR01 gas valve lock ... EHR:HVAC:AHUR01 gas valve locked out EHall requested to be secured ... EHall requested to be secured via email for RF operation during the week. On duty Shift Supervisor not comfortable with securing eHall or equipment operation without confirmation of no gas supply to the area after reported gas leak in elog on Mar 10, 2023.
2023-132 Implemented on: 2023-02-28 Removed Eric Chapman In consultation with: , Services ME140 return fan ME140 return fan ME140 return fan was discovere ... ME140 return fan was discovered to be off with 'Earth Fault' error message displayed on the VFD.
2023-125 Implemented on: 2023-02-27 Removed Ryan Lovelidge In consultation with: , Shielding Cycloron ignition key Cycloron ignition key Cyclotron ignition key taken f ... Cyclotron ignition key taken from console above rack H and placed in ops cabinet. Shielding is being removed on the vault roof to gain access to cable chase.
2023-88 Implemented on: 2023-02-08 Removed Kathleen Genge In consultation with: , Targets BL1 ignition key BL1 ignition key No beam to BL1A during IPF nuc ... No beam to BL1A during IPF nuclear ventilation upgrade. IPF ventilation has been disconnected from BL1A exhaust and is being upgraded to new stand-alone system. Upgrade is happening during 2023 winter shutdown.
2023-87 Implemented on: 2023-02-08 Removed Ryan Lovelidge In consultation with: , Shielding BL1 ignition key BL1 ignition key Shielding removal near IPF Shielding removal near IPF
2023-68 Implemented on: 2023-01-31 Removed Robert Scheepmaker In consultation with: , Shielding 12' Sheild block over STF 12' Sheild block over STF Block removed Block removed
2023-62 Implemented on: 2023-01-30 Removed Kevin Lucow In consultation with: , Services Al-ALCW system shut down. Al-ALCW system shut down. For cyclotron lid up. For cyclotron lid up.
2023-50 Implemented on: 2023-01-23 Removed Frank Hosta In consultation with: , Shielding M15 Ignition Key M15 Ignition Key Shielding blocks over M15 fron ... Shielding blocks over M15 front end are being removed.
2023-37 Implemented on: 2023-01-17 Removed Brandon Humphries In consultation with: , Ion sources and injection BL EGUN:CHT P/S EGUN:CHT P/S E-Linac beam delivery has been ... E-Linac beam delivery has been put on hold by the Accelerator Division Safety Officer until further notice. Disabling the EGUN:CHT will prevent the filament from coming on and producing beam.
2023-25 Implemented on: 2023-01-12 Removed Gauhar Hayat In consultation with: , RF E-Linac Klystron Power Supplie ... E-Linac Klystron Power Supplies Locked Out Work being done on Cu-LCW Syst ... Work being done on Cu-LCW System.
2023-21 Implemented on: 2023-01-10 Active Riley Schick-Martin In consultation with: , Other / Misc ISAC II HV transformer (12B1-T ... ISAC II HV transformer (12B1-T-005) tap changer Tap changer disabled to preven ... Tap changer disabled to prevent equipment damage
2023-11 Implemented on: 2023-01-05 Removed Chris Sooley In consultation with: Ryan Lovelidge, Shielding BL1 Ignition key BL1 Ignition key Annual 1A shielding block migr ... Annual 1A shielding block migration.
2022-379 Implemented on: 2022-12-28 Active Riley Schick-Martin In consultation with: , Other / Misc RF transformer High Voltage Co ... RF transformer High Voltage Compartment Locked Previous lock replaced by ops ... Previous lock replaced by ops lock at electrical services group's request
2022-374 Implemented on: 2022-12-28 Removed Ryan Lovelidge In consultation with: , Services Al-ALCW system pump discharge ... Al-ALCW system pump discharge valve & surge tank valves closed Al-ALCW system off for planned ... Al-ALCW system off for planned power outage.
2022-373 Implemented on: 2022-12-24 Removed Jas Uppal In consultation with: , Vacuum ELNS SV01 ELNS SV01 To allow for access to area (A ... To allow for access to area (ARIEL compressor room) without the use of personal O2 sensors.
2022-372 Implemented on: 2022-12-24 Removed Jas Uppal In consultation with: , Vacuum EOXY SV01, SV02 EOXY SV01, SV02 To allow for access to areas ( ... To allow for access to areas (SAB B2) without the use of personal O2 sensors.
2022-337 Implemented on: 2022-12-03 Removed Kevin Lucow In consultation with: , Services South RF-LCW Pump SA3-3. South RF-LCW Pump SA3-3. RF-LCW South VFD (SA3-3) fault ... RF-LCW South VFD (SA3-3) faulty.
2022-329 Implemented on: 2022-11-22 Active Kathleen Genge In consultation with: , Safety M9B beamblocker M9BBB M9B beamblocker M9BBB M9B decommissioned & area bein ... M9B decommissioned & area being converted to M9H channel. No beam permitted to M9B.
2022-316 Implemented on: 2022-11-09 Active Brandon Humphries In consultation with: , Optics EMBD:MB0 P/S EMBD:MB0 P/S Cooling water has been shut of ... Cooling water has been shut off to EMBD:DUMP to prevent erosion of the target. Locking out this dipole will remove the possibility of sending beam down the EMBD. This is added protection on top of the beam mode interlock.
2022-283 Implemented on: 2022-10-11 Removed Kevin Lucow In consultation with: , Shielding M9 Ignition Key M9 Ignition Key Shielding blocks above M9B Q3, ... Shielding blocks above M9B Q3, Q4 and Q5 removed.
2022-228 Implemented on: 2022-08-08 Active Brandon Humphries In consultation with: , Targets DarkLight target ladder DarkLight target ladder Need to prevent target ladder ... Need to prevent target ladder from driving into beamline during high power tests.
2022-217 Implemented on: 2022-08-02 Removed David Bandiera In consultation with: , Diagnostics HE2 radial drive motor and hea ... HE2 radial drive motor and head down motor cables disconnected HE2 radial position is stuck p ... HE2 radial position is stuck partway through travel and cannot move
2022-201 Implemented on: 2022-07-22 Removed Eric Chapman In consultation with: Robin Swanson, Safety Cyclotron Ignition key removed ... Cyclotron Ignition key removed for Vault exhaust work Vault exhaust MRO work. Vault exhaust MRO work.
2022-151 Implemented on: 2022-06-02 Removed Robin Swanson In consultation with: , Shielding BL1 Ignition Key BL1 Ignition Key Shielding blocks removed over ... Shielding blocks removed over Beamline 1A for inspection of 1AQ13.
2022-150 Implemented on: 2022-06-02 Removed Robin Swanson In consultation with: , Shielding Bl1A Ignition Key Bl1A Ignition Key Shielding blocks removed over ... Shielding blocks removed over Beamline 1A for inspection of 1AQ13.
2022-128 Implemented on: 2022-05-20 Removed Ryan Lovelidge In consultation with: , Diagnostics 2A2M18 2A2M18 Monitor cylinder is leaking co ... Monitor cylinder is leaking compressed air, control cable disconnected and locked out.
2022-124 Implemented on: 2022-05-17 Removed Brandon Humphries In consultation with: , Optics EABD:MB0 P/S EABD:MB0 P/S Bira controller was borrowed b ... Bira controller was borrowed by P/S group for BL1 (until new controllers arrive).
2022-122 Implemented on: 2022-05-16 Removed Robert Scheepmaker In consultation with: , Safety 1A/1B Switchover Cage 1A/1B Switchover Cage To satisfy 1B safety requireme ... To satisfy 1B safety requirements while BL selection signal not available( due to 1A P/S not yet hooked up)
2022-118 Implemented on: 2022-05-12 Removed Riley Schick-Martin In consultation with: , Shielding M9 Channel Key M9 Channel Key Shielding removed from M9A bea ... Shielding removed from M9A beamblocker
2022-117 Implemented on: 2022-05-12 Removed Riley Schick-Martin In consultation with: , Shielding BL 2C ignition key BL 2C ignition key Shielding removed from STF hot ... Shielding removed from STF hotcell
2022-68 Implemented on: 2022-03-25 Removed Elena Bylinskaia In consultation with: , Diagnostics HE3 probe cable unplugged. HE3 probe cable unplugged. HE3 probe is not working prope ... HE3 probe is not working properly, making the grinding noise while operating. Probe is disabled for repair.Redesign and rebuild to be planned for Shutdown 2023.
2022-67 Implemented on: 2022-03-25 Removed Elena Bylinskaia In consultation with: Dale Nagra, Diagnostics HE3 probe cable unplugged. HE3 probe cable unplugged. HE3 probe is not working prope ... HE3 probe is not working properly, making the grinding noise while operating. Probe is disabled for repair.Redesign and rebuild to be planned for Shutdown 2023.
2022-63 Implemented on: 2022-03-23 Removed Robert Scheepmaker In consultation with: , Other / Misc 1AQ14,15,16 1AQ14,15,16 Work on respective P/S Work on respective P/S
2022-39 Implemented on: 2022-02-28 Removed David Bandiera In consultation with: , Vacuum EHSAS:SAP01 locked out EHSAS:SAP01 locked out Pump removed for repairs Pump removed for repairs
2022-35 Implemented on: 2022-02-22 Removed Ryan Lovelidge In consultation with: , Shielding BL 1 ignition key BL 1 ignition key Shielding is being rearranged ... Shielding is being rearranged near UCN and 1B to address a shielding leak in that area.
2022-34 Implemented on: 2022-02-18 Removed Elena Bylinskaia In consultation with: Tiffany Angus, Optics 2AB3 & 2AB4 P/S's 2AB3 & 2AB4 P/S's 2AB3 P/S water leak & P.Bratt ... 2AB3 P/S water leak & P.Bratt request (2nd efault forthcoming)
2022-33 Implemented on: 2022-02-17 Removed Robin Swanson In consultation with: , Services Cu-ALCW south pump (SA1-15) Cu-ALCW south pump (SA1-15) Pump has difficult spot on rot ... Pump has difficult spot on rotation. Mechanical services has deemed it unfit to run.
2022-23 Implemented on: 2022-02-07 Active Frank Hosta In consultation with: , Services BL1 LCW South Heat Exchanger BL1 LCW South Heat Exchanger The heat exchanger has a small ... The heat exchanger has a small leak.
2022-3 Implemented on: 2022-01-04 Removed Kevin Lucow In consultation with: , Shielding BL1 Ignition Key BL1 Ignition Key BL1A shielding moved for shutd ... BL1A shielding moved for shutdown.
2021-379 Implemented on: 2021-11-15 Removed Gordon Roy In consultation with: , Shielding M11 Shielding block removed M11 Shielding block removed One shielding block removed fr ... One shielding block removed from M-11 by D, Preddy
2021-376 Implemented on: 2021-11-12 Removed Micheal Donohoe In consultation with: , Safety 2C ignition key removed 2C ignition key removed To prevent running to 2C4. To prevent running to 2C4.
2021-375 Implemented on: 2021-11-12 Removed Jason Wait In consultation with: , Optics EMBD MB0 power supply locked o ... EMBD MB0 power supply locked out EMBD MB0 locked out at request ... EMBD MB0 locked out at request of Thomas Planche
2021-370 Implemented on: 2021-11-09 Removed David Bandiera In consultation with: , Safety M9 Beam Blocker CR9 relay and ... M9 Beam Blocker CR9 relay and M9 Ignition key temporarily inserted. To test M9 Beam Blocker operat ... To test M9 Beam Blocker operation
2021-368 Implemented on: 2021-11-09 Removed David Bandiera In consultation with: , Safety BL1 Ignition key removed BL1 Ignition key removed Work in UCN cryostat pit on/ne ... Work in UCN cryostat pit on/near BL1 shielding blocks
2021-364 Implemented on: 2021-11-05 Removed Eric Chapman In consultation with: , Other / Misc STF water pump STF water pump Steve has locked out the STF w ... Steve has locked out the STF water pump for repair of the STF exhaust line.
2021-335 Implemented on: 2021-10-13 Removed Kevin Lucow In consultation with: , Safety M15 Channel Key M15 Channel Key Experiment S2129 missing safet ... Experiment S2129 missing safety approval.
2021-330 Implemented on: 2021-10-04 Removed Kevin Lucow In consultation with: , Shielding E-LINAC Ignition Key E-LINAC Ignition Key EMBD beam dump dissembled. EMBD beam dump dissembled.
2021-328 Implemented on: 2021-10-04 Removed Kevin Lucow In consultation with: , Shielding Beamline 1 (BL1) Ignition Key Beamline 1 (BL1) Ignition Key UCN shielding removed. UCN shielding removed.
2021-325 Implemented on: 2021-10-01 Removed Kevin Lucow In consultation with: , Safety Cyclotron Ignition Key Cyclotron Ignition Key Vault shielding removed for wo ... Vault shielding removed for work on STF Hotcell exhaust.
2021-323 Implemented on: 2021-09-28 Removed Riley Schick-Martin In consultation with: , Ion sources and injection BL BST 127 BST 127 No power in ISIS to transfer t ... No power in ISIS to transfer the BST limit switch signal to the control room.
2021-311 Implemented on: 2021-09-13 Removed Frank Hosta In consultation with: , Safety BL1 ignition key BL1 ignition key Workers on blocks over BL1 in ... Workers on blocks over BL1 in Meson Hall
2021-281 Implemented on: 2021-08-17 Removed Kathleen Genge In consultation with: , Shielding BL1 ignition key BL1 ignition key UCN shielding change - C2021-0 ... UCN shielding change - C2021-08-17-2
2021-257 Implemented on: 2021-07-27 Removed David Bandiera In consultation with: , Safety BL1 ignition key BL1 ignition key Workers on blocks over BL1 in ... Workers on blocks over BL1 in Meson Hall
2021-227 Implemented on: 2021-06-29 Removed Riley Schick-Martin In consultation with: , Shielding BL1 ignition key BL1 ignition key UCN shielding change UCN shielding change
2021-224 Implemented on: 2021-06-25 Removed David Bandiera In consultation with: , Safety 2A Ignition Key removed from c ... 2A Ignition Key removed from cyclotron console to Ops locked key cabinet To prevent operation of 2A bea ... To prevent operation of 2A beam inhibit devices
2021-223 Implemented on: 2021-06-25 Removed David Bandiera In consultation with: , Optics 2AVB1 & 2AVB2 locked out at Pa ... 2AVB1 & 2AVB2 locked out at Panel-140 on Vault Roof. VB1 breakers 26,28,30; VB2 breakers 20,22,24 To define BL2A offline and pre ... To define BL2A offline and prevent beam down BL2A.
2021-214 Implemented on: 2021-06-22 Removed David Bandiera In consultation with: , Diagnostics HE1 Radial Drive motor disconn ... HE1 Radial Drive motor disconnected Failed / Jammed radial drive f ... Failed / Jammed radial drive for HE1
2021-207 Implemented on: 2021-06-17 Removed Frank Hosta In consultation with: , Shielding BL1A ignition key removed BL1A ignition key removed Waiting confirmation that UCN ... Waiting confirmation that UCN shielding is acceptable.
2021-194 Implemented on: 2021-06-09 Removed Brandon Humphries In consultation with: Ryan Lovelidge, Ion sources and injection BL EGUN:BIAS HV and Isolation Tra ... EGUN:BIAS HV and Isolation Transformer The grounding rod for the EGUN ... The grounding rod for the EGUN HV enclosure has broken. Therefore the EGUN:BIAS HV (including the isolation transformer) can not be run until it's repaired.
2021-159 Implemented on: 2021-05-18 Removed David Bandiera In consultation with: , Shielding BL1A ignition key removed BL1A ignition key removed UCN shielding adjustments UCN shielding adjustments
2021-146 Implemented on: 2021-05-11 Removed Riley Schick-Martin In consultation with: , Shielding 2C ignition key 2C ignition key 2C shielding being removed. 2C shielding being removed.
2021-141 Implemented on: 2021-05-05 Removed Brandon Humphries In consultation with: , Ion sources and injection BL EGUN:BIAS HV and Isolation Tra ... EGUN:BIAS HV and Isolation Transformer EGUN HV stack is not connected ... EGUN HV stack is not connected as it was taken apart for maintenance inside the EGUN vessel. The EGUN HV can not be operated in this configuration.
2021-135 Implemented on: 2021-04-26 Removed Robert Scheepmaker In consultation with: , Safety M11 IGN Key M11 IGN Key No Neutron Monitor in M11 area ... No Neutron Monitor in M11 area.
2021-134 Implemented on: 2021-04-26 Active Riley Schick-Martin In consultation with: , Optics EHDT:Q6 Power Supply power cor ... EHDT:Q6 Power Supply power cord Insufficient beam position pro ... Insufficient beam position protection at EHD:DUMP. Requested by Thomas Planche.
2021-133 Implemented on: 2021-04-06 Removed David Bandiera In consultation with: Elena Bylinskaia, Safety I1723 Input removed "2C Line 4 ... I1723 Input removed "2C Line 4 OK" To prevent beam in 2C4 beamlin ... To prevent beam in 2C4 beamline while shielding blocks are removed from 2C Hot Cell but still allow 2C1 to operate
2021-131 Implemented on: 2021-04-23 Removed Riley Schick-Martin In consultation with: , Shielding BL1A ignition key removed BL1A ignition key removed UCN shielding adjustments UCN shielding adjustments
2021-122 Implemented on: 2021-04-19 Removed Gordon Roy In consultation with: , RF RF HVPS switchgear racked out ... RF HVPS switchgear racked out by TRIUMF Electrician RF personnel working on HVPS RF personnel working on HVPS
2021-120 Implemented on: 2021-04-16 Active David Bandiera In consultation with: Brandon Humphries, Vacuum ELBD:IV0 locked out ELBD:IV0 locked out ELBD:IV0 is no longer connecte ... ELBD:IV0 is no longer connected to the ELBT vacuum section (ELBD:MB0 removed to allow for ACCT installation)
2021-115 Implemented on: 2021-04-14 Active Elena Bylinskaia In consultation with: Elena Bylinskaia, Safety BL1U BB ( Beam Blocker) Locked ... BL1U BB ( Beam Blocker) Locked out, I 1416 pinned at IBOB Re-configuration of BL 1U excl ... Re-configuration of BL 1U exclusion area.







BL1U key is locked in DCR Lock out Box #1 with personal K. Ardron lock. IBOB I1416 pinned in order to run 1A.
2021-79 Implemented on: 2021-03-04 Removed Robert Scheepmaker In consultation with: , Services RFTWV RFTWV Al-ALCW sidestream being remov ... Al-ALCW sidestream being removed. Disabling TWV alleviates the necessity of draining an excessive amount of water.
2021-78 Implemented on: 2021-03-04 Removed Robert Scheepmaker In consultation with: , Services Al-ALCW Pump and sidestream Al-ALCW Pump and sidestream Bypass to be cut out and cappe ... Bypass to be cut out and capped
2021-37 Implemented on: 2021-01-26 Active Kevin Lucow In consultation with: , Safety BL1U Ignition Key BL1U Ignition Key BL1U disabled for 2021. Beamli ... BL1U disabled for 2021. Beamlines group have disabled BL1U Beam Blocker. Safety group have disabled BL1U ASU.
2021-9 Implemented on: 2021-01-05 Removed Micheal Donohoe In consultation with: , Other / Misc Cyclotron Elevating System Cyclotron Elevating System Maintenance work: replacement ... Maintenance work: replacement of elevating system jack components.
2020-93 Implemented on: 2020-12-16 Removed David Bandiera In consultation with: Brandon Humphries, Optics ELBD:MB0 Power Supply locked o ... ELBD:MB0 Power Supply locked out To prevent beam delivery throu ... To prevent beam delivery through ELBD as there are issues with the electronics for the PMTs in the ELBD section.
2020-51 Implemented on: 2020-02-28 Removed Jason Wait In consultation with: , Vacuum EHSAS:SAP04 breaker to be lock ... EHSAS:SAP04 breaker to be locked out Device to be sent out for main ... Device to be sent out for maintenance
2020-48 Implemented on: 2020-01-21 Active Jason Wait In consultation with: , Optics EHAT:MB4 polarity switch locke ... EHAT:MB4 polarity switch locked out EHAT:MB4 polarity switch locke ... EHAT:MB4 polarity switch locked out until beam path to tunnel is ready
2020-47 Implemented on: 2020-08-03 Cancelled Jason Wait In consultation with: , Safety E-LINAC Control room Operation ... E-LINAC Control room Operations lockbox to be made accessible to entire E-LINAC Operations group E-LINAC Control room operation ... E-LINAC Control room operations lockbox to allow E-LINAC operations lockout keys to be accessible to the whole E-LINAC Operations group
2020-40 Implemented on: 2020-10-06 Removed Jason Wait In consultation with: , Shielding BL2C - STF Hot Cell 12' Shield ... BL2C - STF Hot Cell 12' Shielding Block removed for inspection and cleaning STF Hot Cell 12' shielding blo ... STF Hot Cell 12' shielding block removed for inspection and cleaning - to be replaced when STF is ready for beam
2020-37 Implemented on: 2020-06-12 Removed Jason Wait In consultation with: , Services Power receptacles (P-005 break ... Power receptacles (P-005 breaker 34, SAB1) on East cooling tower locked out (Lock #OPS 135) Power receptacles locked out t ... Power receptacles locked out to complete trenching for new conduit
2019-49 Implemented on: 2019-06-04 Removed Jas Uppal In consultation with: , Services MCC-B Power Monitor disconnect ... MCC-B Power Monitor disconnect switch Power Monitor failed Power Monitor failed
2019-46 Implemented on: 2019-04-02 Removed Micheal Donohoe In consultation with: , Optics M9SEP1 DC MAgnet Power Supply M9SEP1 DC MAgnet Power Supply P/S is not connected to the lo ... P/S is not connected to the load.
2019-45 Implemented on: 2019-04-02 Removed Jas Uppal In consultation with: , Optics M9 Sep2 DC Magnet Power Supply M9 Sep2 DC Magnet Power Supply Power supply is not connected ... Power supply is not connected to the load
2018-784 Implemented on: 2018-12-24 Active Jas Uppal In consultation with: , Optics M20 Helmholtz power supply M20 Helmholtz power supply Water leak in plumbing externa ... Water leak in plumbing external to cabinet.
2018-779 Implemented on: 2018-05-02 Removed Jas Uppal In consultation with: , Optics M9BQ3E power supply M9BQ3E power supply Power supply leaking water Power supply leaking water
2017-3 Implemented on: 2017-08-24 Active Micheal Donohoe In consultation with: , Diagnostics 1AM8 1AM8 Magnetic coupling failure. Magnetic coupling failure.
2016-694 Implemented on: 2016-08-03 Removed Jason Wait In consultation with: , Safety E-LINAC Control room Operation ... E-LINAC Control room Operations lockbox to be made accessible to entire E-LINAC Operations group E-LINAC Control room operation ... E-LINAC Control room operations lockbox to allow E-LINAC operations lockout keys to be accessible to the whole E-LINAC Operations group
2016-693 Implemented on: 2016-08-03 Removed Jason Wait In consultation with: , Safety E-LINAC Ignition key to be sto ... E-LINAC Ignition key to be stored in E-LINAC key lockbox E-LINAC ignition key to be sto ... E-LINAC ignition key to be stored in E-LINAC key lockbox in order to restrict access to this with appropriate training and active work permit credentials
2016-692 Implemented on: 2016-03-11 Active Jason Wait In consultation with: , Services E-Hall crane A/C disconnect an ... E-Hall crane A/C disconnect and pendant locked out to all unauthorized personnel E-Hall crane A/C disconnect an ... E-Hall crane A/C disconnect and pendant locked out (Key # E-LINAC OPS #2) to all personnel whose JPM & Training on E-Hall Crane bypass has yet to be completed
2012-2 Implemented on: 2012-10-25 Active Micheal Donohoe In consultation with: , Optics M9 Q1, Q2, and B1 P/S M9 Q1, Q2, and B1 P/S M9 blanked off and not operati ... M9 blanked off and not operational
2012-1 Implemented on: 2012-08-28 Removed Micheal Donohoe In consultation with: , Safety M9 Channel M9 Channel M9 work during 2012 shutdown. M9 work during 2012 shutdown.
2002-1 Implemented on: 2002-07-31 Removed Kathleen Genge In consultation with: , Optics M11 septum power supply locked ... M11 septum power supply locked out septum magnet will not operate ... septum magnet will not operate until unit is repaired