Estimated Duration:
20 weeks
|
The replacement RUG3 for the EGUN turbine has an offset of about 0.5 V compared to the previous one. So the interlock and alarms (warn/trip) needed to be lowered by 0.5 V until a new RUG3 is obtained. Warn level lowered from 22.5 V to 22.0 V and trip level lowered from 22.0 V to 21.5 V.
|