Interlock Defeat
System(s) Affected:
Fire Alarm System
Interlock to be Defeated:
ARIEL Target Hall and Vesda detectors (09-095-001 and 002, 09:094-045)
Implementation:
Number:
Date:
2024-06-14
Time:
07:30:00
2024-313
Implemented By:
Gauhar Hayat
In Consultation With:
Status:
Removed
Estimated Duration:
8 hours
Reason for Defeat:
Concrete prep and construction in the ARIEL target hall generating dust. Detectors disarmed at request of Eric Lahe (Remote Handling). Construction to be ongoing ~1 year.
Number of Yellow Tags:
1
Location of Defeat Tag(s):
N/A
How Was Defeat Implemented?
Where is Defeat Located?:
MCR FAS Graphics Display Panel
Describe Alternate Protection:
Workers in area, local firewatch.
Fault Reports:
Work Permits:
A2024-05-27-1
Disables:
Interlock Defeat
Removal:
Number:
Date:
2024-06-14
Time:
14:45:00
2024-313
Removed by:
Gauhar Hayat
Status:
Removed
Interlock Verification Method:
Devices re-armed, system reset.
Number of Tags Removed:
1
Comments:
Brandon Humphries
David Bandiera
Elena Bylinskaia
Jason Wait
Sierra Dean
Robert Scheepmaker
Eric Chapman
Ryan Lovelidge
Riley Schick-Martin
Dale Nagra
Travis Kurucz
Chris Sooley
Kevin Lucow
Jas Uppal
Kathleen Genge
Gauhar Hayat
Frank Hosta
Ryan Anderson