Interlock Defeat / Device Disable
Management System v2.0 (Driver)
Accelerator Complex:



Home
List of Defeats   ▸
List of Disables ▸
Fill Out a Defeat
Fill Out a Disable
Add/Modify User
Add/Modify System
Login
Help
Implementation Removal

Interlock Defeat


Safety

BSM 55 Working Trip Level increased from 25 to 30%.
Implementation: Number:
2024-06-18 20:30:00 2024-325

Kevin Lucow

Removed
Estimated Duration:
4 weeks

BSM 55 elevated.

2

1) DCR defeat board. 2) DCR Rack A rear.

Rack A, RMS PC.

BSM trip level elevated.





Kevin Lucow: 2024-06-18 20:36:44.99874
Permission for defeat given by RSO R. Ralea in 2024-06-17 email.