Interlock Defeat


Targets

2A3Tgt Prot and Beam Dump intlks: All Water Flow switches
Implementation: Number:
2024-07-03 02:34:00 2024-354

Robert Scheepmaker

Removed
Estimated Duration:
1 days

As explained by Carla Babcock, Water Flow trips are being caused by High Voltage sparks, not actual water flow.


Defeated devices(5) are 2A3BD WFS1, 2A3DSP WFS2, 2A3TANK WFS1, 2A3W1 WFS1, 2A3COL WFS1

1

DCR Defeats board

Rack 5B ISAC Elec Room.

Device T/Cs





Eric Chapman: 2024-07-04 11:08:40.13412
ISAC electrical room Rack 5B. Protect pins 2, 4, 13 and Dump side pins 1 and 7 un-jumpered. Confirmed signals no longer defeated on XTpages 2A3P and 2A3D. Hopefully target conditioning has reduced sparking to the point where flow switch trips are no longer an issue or controls can implement a work around.
Robert Scheepmaker: 2024-07-03 02:51:36.439902
Short term solution involving a Controls initiated time delay on the trip signal will be implemented so that the defeats may be removed.