Interlock Defeat
System(s) Affected:
Safety
Interlock to be Defeated:
BSM 55 and 56 defeated for UCN commissioning
Implementation:
Number:
Date:
2024-10-16
Time:
12:06:00
2024-491
Implemented By:
Eric Chapman
In Consultation With:
Rene Tanaja
Status:
Removed
Estimated Duration:
1 days
Reason for Defeat:
BL1U commissioning up to 40uA with 100uA extracted. Elevated BSM 55 and 56 values when kicking causing audible warning and occasional trip. New operational levels need to be determined after 1U testing completed.
Number of Yellow Tags:
2
Location of Defeat Tag(s):
DCR Rack A rear, Defeats board
How Was Defeat Implemented?
Where is Defeat Located?:
Rack A BSM #55 and 56 pinned. BSM#55 working level set to "101" from 25 (aka: not in use) to stop audible alarms.
Describe Alternate Protection:
BSMs plotted in DCR, watching during UCN is kicking. Defeat of BSM #55 and 56 approved by RSO via email on OCT 9, 2024 for duration of UCN tests, until Jan 2025.
Fault Reports:
Work Permits:
Disables:
Interlock Defeat
Removal:
Number:
Date:
2024-10-17
Time:
01:45:00
2024-491
Removed by:
Travis Kurucz
Status:
Removed
Interlock Verification Method:
BSM 55 and 56 pins removed from rack A. BSM 55 returned to default value.
Number of Tags Removed:
2
Comments:
Eric Chapman:
2024-10-17 08:00:21.69539
I did not consult with Rene T. This was a typo/bug.
Brandon Humphries
David Bandiera
Elena Bylinskaia
Jason Wait
Sierra Dean
Robert Scheepmaker
Eric Chapman
Ryan Lovelidge
Riley Schick-Martin
Dale Nagra
Travis Kurucz
Chris Sooley
Kevin Lucow
Jas Uppal
Kathleen Genge
Gauhar Hayat
Frank Hosta
Ryan Anderson