Interlock Defeat


Safety

BSM 55 and 56 defeated for UCN commissioning
Implementation: Number:
2024-10-16 12:06:00 2024-491

Eric Chapman

Rene Tanaja
Removed
Estimated Duration:
1 days

BL1U commissioning up to 40uA with 100uA extracted. Elevated BSM 55 and 56 values when kicking causing audible warning and occasional trip. New operational levels need to be determined after 1U testing completed.

2

DCR Rack A rear, Defeats board

Rack A BSM #55 and 56 pinned. BSM#55 working level set to "101" from 25 (aka: not in use) to stop audible alarms.

BSMs plotted in DCR, watching during UCN is kicking. Defeat of BSM #55 and 56 approved by RSO via email on OCT 9, 2024 for duration of UCN tests, until Jan 2025.





Eric Chapman: 2024-10-17 08:00:21.69539
I did not consult with Rene T. This was a typo/bug.