1
|
1- On cork board in back of DCR
1- On safety system box on E-LINAC side of the DCR
|
Controls group member (Mike) implemented it in the Controls system. As per Mike: The calculation on the FSD's BLM_OK signal was changed to look at just the argon flow. The BLM Okay signal to the PLC was also changed to just look at argon flow. In both cases the BLM summaries are bypassed as a result.
|