Interlock Defeat /
Device Disable
Management System
v2.0
(Driver)
Accelerator Complex:
Driver
RIB
TR13
☰
Ops Apps Page
3DB
Webplan
Home
List of Defeats ▸
All
Active
Unacked
List of Disables ▸
All
Active
Unacked
Fill Out a Defeat
Fill Out a Disable
Add/Modify User
Add/Modify System
Login
Help
Implementation
Removal
Interlock Defeat
System(s) Affected:
Fire Alarm System
Interlock to be Defeated:
Ariel Target Hall and B2 smoke detectors
Implementation:
Number:
Date:
2024-11-18
Time:
14:42:00
2024-515
Implemented By:
Ryan Anderson
In Consultation With:
Frank Hosta, David Bandiera
Status:
Removed
Estimated Duration:
4 hours
Reason for Defeat:
Construction Hot Work in Ariel Target Hall,
Number of Yellow Tags:
1
Location of Defeat Tag(s):
n/a
How Was Defeat Implemented?
Where is Defeat Located?:
Devices input was disarmed using FAS graphics panel
Describe Alternate Protection:
Area occupied during construction work
Fault Reports:
Work Permits:
A2024-11-15-1
Disables:
Interlock Defeat
Removal:
Number:
Date:
2024-11-18
Time:
16:39:00
2024-515
Removed by:
Chris Sooley
Status:
Removed
Interlock Verification Method:
Devices re-enabled in FAS panel, system reset.
Number of Tags Removed:
1
Comments:
Chris Sooley:
2024-11-18 16:39:56.998008
Defeat removed for November 18th, 2024
Ryan Anderson:
2024-11-18 14:52:55.449823
Affected devices are 09:095-001 and 2; 09:091-005,006,007,008; 09:094-002,003,004,009,010,013,014,015
Brandon Humphries
David Bandiera
Elena Bylinskaia
Jason Wait
Sierra Dean
Robert Scheepmaker
Eric Chapman
Ryan Lovelidge
Riley Schick-Martin
Dale Nagra
Travis Kurucz
Chris Sooley
Kevin Lucow
Jas Uppal
Kathleen Genge
Gauhar Hayat
Frank Hosta
Ryan Anderson