Interlock Defeat /
Device Disable
Management System
v2.0
(Driver)
Accelerator Complex:
Driver
RIB
TR13
☰
Ops Apps Page
3DB
Webplan
Home
List of Defeats ▸
All
Active
Unacked
List of Disables ▸
All
Active
Unacked
Fill Out a Defeat
Fill Out a Disable
Add/Modify User
Add/Modify System
Login
Help
Implementation
Removal
Interlock Defeat
System(s) Affected:
Fire Alarm System
Interlock to be Defeated:
FAS Zones 3 & 4 in test mode. ISAC 2 Node 6 Bell Circuits disarmed
Implementation:
Number:
Date:
2024-12-04
Time:
08:51:00
2024-537
Implemented By:
David Bandiera
In Consultation With:
Status:
Removed
Estimated Duration:
5 hours
Reason for Defeat:
Installation of a new Fire Alarm Bell in ISAC-2 Experimental Hall Clean Room. VESDA filter replacement in ARIEL B2 and ISAC-I G. Work to be completed today by Siemens techs.
Number of Yellow Tags:
1
Location of Defeat Tag(s):
N/A
How Was Defeat Implemented?
Where is Defeat Located?:
DCR FAS XL Graphics console
Describe Alternate Protection:
Fire Watch and Occupancy
Fault Reports:
Work Permits:
C2024-12-04-2
Disables:
Interlock Defeat
Removal:
Number:
Date:
2024-12-04
Time:
12:11:00
2024-537
Removed by:
David Bandiera
Status:
Removed
Interlock Verification Method:
FAS Zones 3 & 4 are online with the monitoring company. ISAC 2 Node 6 Bell Circuits armed.
Number of Tags Removed:
1
Comments:
Brandon Humphries
David Bandiera
Elena Bylinskaia
Jason Wait
Sierra Dean
Robert Scheepmaker
Eric Chapman
Ryan Lovelidge
Riley Schick-Martin
Dale Nagra
Travis Kurucz
Chris Sooley
Kevin Lucow
Jas Uppal
Kathleen Genge
Gauhar Hayat
Frank Hosta
Ryan Anderson