Estimated Duration:
4 weeks
|
Noise started on the beam dump water flow signal (EWS:HAW:FG02) on Dec 10. The noise spikes were causing trips of the EHD run permit and preventing beam tests. Signal smoothing increased from 0.8 to 0.95 to help smooth out the large spikes.
|