Interlock Defeat
System(s) Affected:
Fire Alarm System
Interlock to be Defeated:
ARIEL Target Hall Linear Beam Detectors 09:095-001 and 09:095-002
Implementation:
Number:
Date:
2024-12-18
Time:
08:15:00
2024-571
Implemented By:
Chris Sooley
In Consultation With:
Dale Nagra
Status:
Removed
Estimated Duration:
5 hours
Reason for Defeat:
Crane inspection and maintenance in ARIEL target hall using elevated work platform.
Number of Yellow Tags:
1
Location of Defeat Tag(s):
FAS Panel
How Was Defeat Implemented?
Where is Defeat Located?:
FAS Panel
Describe Alternate Protection:
Area occupancy, fire watch.
Fault Reports:
Work Permits:
A2024-12-16--2
Disables:
Interlock Defeat
Removal:
Number:
Date:
2024-12-18
Time:
15:15:00
2024-571
Removed by:
Elena Bylinskaia
Status:
Removed
Interlock Verification Method:
F.A.S. reset ok.
Number of Tags Removed:
1
Comments:
Brandon Humphries
David Bandiera
Elena Bylinskaia
Jason Wait
Sierra Dean
Robert Scheepmaker
Eric Chapman
Ryan Lovelidge
Riley Schick-Martin
Dale Nagra
Travis Kurucz
Chris Sooley
Kevin Lucow
Jas Uppal
Kathleen Genge
Gauhar Hayat
Frank Hosta
Ryan Anderson