Safety |
Gas monitors 25 to 28 pinned for calibration |
Implementation: | Number: |
2024-08-08 07:18:00 | 2024-398 |
Eric Chapman |
|
|
Removed |
Est. Duration: 5 hours |
Annual calibration of gas monitors by safety group. |
Testing completed and WP returned. |
2 |
DCR |
IBOP 1518 thru 1521 jumpered |
Jumper pin installed on IBOP 1518 thru 1521 |
none |
|
C2024-08-08-1 |
|
Eric Chapman: 2024-08-08 08:37:56.364308
Added ISAC summary bit IBOP 1919 for ISAC gas monitor testing.