Optics |
M11 septum power supply locked out |
Implementation: | Number: |
2002-07-31 11:30:00 | 2002-1 |
Kathleen Genge |
|
|
Removed |
Est. Duration: 52 weeks |
septum magnet will not operate until unit is repaired |
Approval from M11 FC, Beamlines FC, Power Supply Group |
2 |
MCC-H DCR Rack E |
lock out applied at MCC-H panel, using Ops Lock 109 |
n/a |
Ops lock 109. Key is in ops key cabinet |
|
|
|
Robert Scheepmaker: 2021-01-11 13:04:08.85304
OPS Lock 109 removed/ replaced by Electrician Lock. P/S to be removed
Kathleen Genge: 2020-11-04 15:30:14.621904
Status - still active Feb 22, 2004; lock 109 tagged by KL June 28/16
Paper defeat #3691, filed by J. Kaminski