Interlock Defeat / Device Disable
Management System v1.5 (Driver)

Accelerator Complex:



Home
List of Defeats   ▸
List of Disables ▸
Fill Out a Defeat
Fill Out a Disable
Add/Modify User
Add/Modify System
Login
Help
Implementation Removal

Interlock Defeat


Safety

High energy section BLMs
Implementation: Number:
2023-05-11 13:15:00 2023-256

Brandon Humphries

Removed
Estimated Duration:
3 hours

Performing beam spill measurements in the high energy section for confirming calibrations. Need to see full measurements of losses without BLMs tripping.

2

1-On ESS panel

1-On cork board in the back of the DCR

Mike (Controls) changed the calculation on the BLM summaries to ignore the high energy BLM channels. This allows the FSD interlocks to be satisfied.

Approval obtained from head of commissioning. Beam power is being restricted by the EOECM.