Interlock Defeat
System(s) Affected:
Fire Alarm System
Interlock to be Defeated:
09:095-001/002 ARIEL target hall linear beam detectors
Implementation:
Number:
Date:
2023-05-18
Time:
07:45:00
2023-261
Implemented By:
David Bandiera
In Consultation With:
Status:
Removed
Estimated Duration:
8 hours
Reason for Defeat:
cutting rebar protruding from recent concrete pour
Number of Yellow Tags:
1
Location of Defeat Tag(s):
N/A
How Was Defeat Implemented?
Where is Defeat Located?:
DCR FAS graphics
Describe Alternate Protection:
Area is occupied
Fault Reports:
Work Permits:
A2023-05-16-3
Disables:
Interlock Defeat
Removal:
Number:
Date:
2023-05-18
Time:
13:30:00
2023-261
Removed by:
David Bandiera
Status:
Removed
Interlock Verification Method:
Detectors armed and FAS Node 9 reset OK
Number of Tags Removed:
1
Comments:
Brandon Humphries
David Bandiera
Elena Bylinskaia
Jason Wait
Robert Scheepmaker
Eric Chapman
Ryan Lovelidge
Riley Schick-Martin
Dale Nagra
Travis Kurucz
Chris Sooley
Kevin Lucow
Jas Uppal
Kathleen Genge
Gauhar Hayat
Frank Hosta
Ryan Anderson