Interlock Defeat /
Device Disable
Management System
v1.5
(Driver)
Accelerator Complex:
Driver
RIB
TR13
☰
Ops Apps Page
3DB
Webplan
Home
List of Defeats ▸
All
Active
Unacked
List of Disables ▸
All
Active
Unacked
Fill Out a Defeat
Fill Out a Disable
Add/Modify User
Add/Modify System
Login
Help
Implementation
Removal
Interlock Defeat
System(s) Affected:
Safety
Interlock to be Defeated:
MHESA RCR1 RM 6 Warn and Alarm pinned in IBOP cabinet
Implementation:
Number:
Date:
2023-06-15
Time:
12:15:00
2023-324
Implemented By:
Travis Kurucz
In Consultation With:
Riley Schick-Martin, Eric Chapman
Status:
Removed
Estimated Duration:
6 hours
Reason for Defeat:
RCR Lab Static Pressure Transmitters yearly calibration.
Number of Yellow Tags:
2
Location of Defeat Tag(s):
IBOP Cabinet and Defeat bulletin board.
How Was Defeat Implemented?
Where is Defeat Located?:
15-07 and 15-08 pinned in IBOP cabinet.
Describe Alternate Protection:
Lab chained off.
Fault Reports:
Work Permits:
C2023-06-12-3
Disables:
Interlock Defeat
Removal:
Number:
Date:
2023-06-16
Time:
15:15:00
2023-324
Removed by:
Travis Kurucz
Status:
Removed
Interlock Verification Method:
Pins removed in IBOP cabinet.
Number of Tags Removed:
2
Comments:
Travis Kurucz:
2023-06-16 15:13:31.399177
Ops was not informed of work completion. Manually checked lab and RCR alert panel.
Brandon Humphries
David Bandiera
Elena Bylinskaia
Jason Wait
Robert Scheepmaker
Eric Chapman
Ryan Lovelidge
Riley Schick-Martin
Dale Nagra
Travis Kurucz
Chris Sooley
Kevin Lucow
Jas Uppal
Kathleen Genge
Gauhar Hayat
Frank Hosta
Ryan Anderson