Interlock Defeat /
Device Disable
Management System
v1.5
(Driver)
Accelerator Complex:
Driver
RIB
TR13
☰
Ops Apps Page
3DB
Webplan
Home
List of Defeats ▸
All
Active
Unacked
List of Disables ▸
All
Active
Unacked
Fill Out a Defeat
Fill Out a Disable
Add/Modify User
Add/Modify System
Login
Help
Implementation
Removal
Interlock Defeat
System(s) Affected:
Fire Alarm System
Interlock to be Defeated:
Smoke detectors in MHESA B1 Lab disarmed for fume hood calibration.
Implementation:
Number:
Date:
2023-08-18
Time:
12:30:00
2023-474
Implemented By:
Gauhar Hayat
In Consultation With:
Ryan Lovelidge, Elena Bylinskaia
Status:
Removed
Estimated Duration:
8 hours
Reason for Defeat:
02:001-005 and 02:001-006 smoke detectors disarmed to allow for smoke testing of Fume Hood.
Number of Yellow Tags:
1
Location of Defeat Tag(s):
N/A
How Was Defeat Implemented?
Where is Defeat Located?:
MCR FAS Graphics Display Panel.
Describe Alternate Protection:
Workers in area.
Fault Reports:
Work Permits:
C2023-08-18-3
Disables:
Interlock Defeat
Removal:
Number:
Date:
2023-08-21
Time:
08:30:00
2023-474
Removed by:
Gauhar Hayat
Status:
Removed
Interlock Verification Method:
Devices re-armed, system reset.
Number of Tags Removed:
1
Comments:
Brandon Humphries
David Bandiera
Elena Bylinskaia
Jason Wait
Robert Scheepmaker
Eric Chapman
Ryan Lovelidge
Riley Schick-Martin
Dale Nagra
Travis Kurucz
Chris Sooley
Kevin Lucow
Jas Uppal
Kathleen Genge
Gauhar Hayat
Frank Hosta
Ryan Anderson