Interlock Defeat / Device Disable
Management System v1.5 (Driver)

Accelerator Complex:



Home
List of Defeats   ▸
List of Disables ▸
Fill Out a Defeat
Fill Out a Disable
Add/Modify User
Add/Modify System
Login
Help
Implementation Removal

Interlock Defeat


Vacuum

EHGMS:SV01, EHCDFPV01, EHCD:FPV04, EHCD:FPV06, EINJ:FPVCD, EACA:FPVCD interlocks bypassed
Implementation: Number:
2023-09-20 09:45:00 2023-518

Brandon Humphries

Removed
Estimated Duration:
1 weeks

Cryogenics group is scrubbing the helium system in preparation for cool down.

2

1-ESS safety panel

1-Cork board in the back of the DCR.

Interlocks were bypassed through EPICS using the Bypass/Force utility.

Procedure is performed by experts while the system is warm, they will monitor any relevant signals.


A2023-09-18-1