Interlock Defeat
System(s) Affected:
Fire Alarm System
Interlock to be Defeated:
ARIEL Target Hall Linear Beam Detectors 09:095-001, 09:095-002 and B2 VESDA 09:094-045
Implementation:
Number:
Date:
2023-09-21
Time:
07:30:00
2023-519
Implemented By:
Robin Swanson
In Consultation With:
Dale Nagra
Status:
Removed
Estimated Duration:
8 hours
Reason for Defeat:
ARIEL Target Hall construction.
Number of Yellow Tags:
1
Location of Defeat Tag(s):
N/A
How Was Defeat Implemented?
Where is Defeat Located?:
DCR FAS Graphics Console.
Describe Alternate Protection:
Fire Watch. Area occupied.
Fault Reports:
Work Permits:
A2023-07-31-1
Disables:
Interlock Defeat
Removal:
Number:
Date:
2023-09-21
Time:
14:30:00
2023-519
Removed by:
Robin Swanson
Status:
Removed
Interlock Verification Method:
Devices rearmed, FAS reset ok.
Number of Tags Removed:
1
Comments:
Robin Swanson:
2023-09-21 14:23:40.366002
Workers finished for today.
Brandon Humphries
David Bandiera
Elena Bylinskaia
Jason Wait
Robert Scheepmaker
Eric Chapman
Ryan Lovelidge
Riley Schick-Martin
Dale Nagra
Travis Kurucz
Chris Sooley
Kevin Lucow
Jas Uppal
Kathleen Genge
Gauhar Hayat
Frank Hosta
Ryan Anderson