Interlock Defeat /
Device Disable
Management System
v1.5
(Driver)
Accelerator Complex:
Driver
RIB
TR13
☰
Ops Apps Page
3DB
Webplan
Home
List of Defeats ▸
All
Active
Unacked
List of Disables ▸
All
Active
Unacked
Fill Out a Defeat
Fill Out a Disable
Add/Modify User
Add/Modify System
Login
Help
Implementation
Removal
Interlock Defeat
System(s) Affected:
Fire Alarm System
Interlock to be Defeated:
RCA1 B1 smoke detectors 03:020-014 and 03:020-015
Implementation:
Number:
Date:
2023-09-29
Time:
09:30:00
2023-535
Implemented By:
Kevin Lucow
In Consultation With:
Status:
Removed
Estimated Duration:
8 hours
Reason for Defeat:
Construction.
Number of Yellow Tags:
1
Location of Defeat Tag(s):
N/A.
How Was Defeat Implemented?
Where is Defeat Located?:
MCR FAS graphics.
Describe Alternate Protection:
Fire watch. Area occupied.
Fault Reports:
Work Permits:
C2023-09-25-4
Disables:
Interlock Defeat
Removal:
Number:
Date:
2023-09-29
Time:
16:00:00
2023-535
Removed by:
Eric Chapman
Status:
Removed
Interlock Verification Method:
Detectors seen armed as of 16:00. Defeat closed.
Number of Tags Removed:
1
Comments:
Brandon Humphries
David Bandiera
Elena Bylinskaia
Jason Wait
Robert Scheepmaker
Eric Chapman
Ryan Lovelidge
Riley Schick-Martin
Dale Nagra
Travis Kurucz
Chris Sooley
Kevin Lucow
Jas Uppal
Kathleen Genge
Gauhar Hayat
Frank Hosta
Ryan Anderson