Interlock Defeat
System(s) Affected:
Fire Alarm System
Interlock to be Defeated:
Ariel Target Hall LBDs and Vesda Smoke Detectors Disarmed
Implementation:
Number:
Date:
2023-10-12
Time:
09:15:00
2023-561
Implemented By:
Gauhar Hayat
In Consultation With:
Elena Bylinskaia, Ryan Lovelidge
Status:
Removed
Estimated Duration:
8 hours
Reason for Defeat:
Ariel Target Hall LBDs and VESDA Smoke Detectors 09:094-045 and 09:094-047 disarmed for soldering work in Ariel Target Hall.
Number of Yellow Tags:
1
Location of Defeat Tag(s):
N/A
How Was Defeat Implemented?
Where is Defeat Located?:
MCR FAS Graphics Display System.
Describe Alternate Protection:
Workers in Area.
Fault Reports:
Work Permits:
Disables:
Interlock Defeat
Removal:
Number:
Date:
2023-10-12
Time:
13:30:00
2023-561
Removed by:
Gauhar Hayat
Status:
Removed
Interlock Verification Method:
Communicated with issuer of work permit that workers are finished with work and have left, work permit still needs to be acknowledged and greenlit. Devices re-armed, system reset.
Number of Tags Removed:
1
Comments:
Gauhar Hayat:
2023-10-12 13:26:06.060736
Work permit #A2023-10-10--1.
Brandon Humphries
David Bandiera
Elena Bylinskaia
Jason Wait
Robert Scheepmaker
Eric Chapman
Ryan Lovelidge
Riley Schick-Martin
Dale Nagra
Travis Kurucz
Chris Sooley
Kevin Lucow
Jas Uppal
Kathleen Genge
Gauhar Hayat
Frank Hosta
Ryan Anderson