Interlock Defeat /
Device Disable
Management System
v1.5
(Driver)
Accelerator Complex:
Driver
RIB
TR13
☰
Ops Apps Page
3DB
Webplan
Home
List of Defeats ▸
All
Active
Unacked
List of Disables ▸
All
Active
Unacked
Fill Out a Defeat
Fill Out a Disable
Add/Modify User
Add/Modify System
Login
Help
Implementation
Removal
Interlock Defeat
System(s) Affected:
Fire Alarm System
Interlock to be Defeated:
ARIEL target hall and Vesda detectors
Implementation:
Number:
Date:
2023-10-31
Time:
07:15:00
2023-581
Implemented By:
Eric Chapman
In Consultation With:
Status:
Removed
Estimated Duration:
5 hours
Reason for Defeat:
Concrete pour in ARIEL target hall with pumper truck.
Number of Yellow Tags:
1
Location of Defeat Tag(s):
DCR
How Was Defeat Implemented?
Where is Defeat Located?:
FAS XL graphics. devices 09-094-045, 09-095-001 and 002
Describe Alternate Protection:
Firewatch, alternate smoke detectors in building.
Fault Reports:
Work Permits:
A2023-10-31-1
Disables:
Interlock Defeat
Removal:
Number:
Date:
2023-10-31
Time:
15:00:00
2023-581
Removed by:
Riley Schick-Martin
Status:
Removed
Interlock Verification Method:
Devices rearmed and node reset ok.
Number of Tags Removed:
1
Comments:
Riley Schick-Martin:
2023-10-31 14:46:34.771594
Work is done for the day.
Brandon Humphries
David Bandiera
Elena Bylinskaia
Jason Wait
Robert Scheepmaker
Eric Chapman
Ryan Lovelidge
Riley Schick-Martin
Dale Nagra
Travis Kurucz
Chris Sooley
Kevin Lucow
Jas Uppal
Kathleen Genge
Gauhar Hayat
Frank Hosta
Ryan Anderson