Interlock Defeat
System(s) Affected:
Services
Interlock to be Defeated:
Cu-ALCW and Al-ALCW surge tanks valved closed.
Implementation:
Number:
Date:
2023-11-11
Time:
01:30:00
2023-596
Implemented By:
Travis Kurucz
In Consultation With:
Eric Chapman, Riley Schick-Martin
Status:
Removed
Estimated Duration:
8 hours
Reason for Defeat:
Tanks valved closed due to power outage as to not overfill them.
Number of Yellow Tags:
3
Location of Defeat Tag(s):
Cu-ALCW and Al-ALCW tank valve handles, defeat bulletin board
How Was Defeat Implemented?
Where is Defeat Located?:
Tank valves locally shut.
Describe Alternate Protection:
Systems offline due to power outage.
Fault Reports:
Work Permits:
Disables:
Interlock Defeat
Removal:
Number:
Date:
2023-11-11
Time:
15:00:00
2023-596
Removed by:
Frank Hosta
Status:
Removed
Interlock Verification Method:
Valves opened.
Number of Tags Removed:
3
Comments:
Frank Hosta:
2023-11-11 14:53:17.318688
Site power has come back on and water systems are being restarted.
Brandon Humphries
David Bandiera
Elena Bylinskaia
Jason Wait
Robert Scheepmaker
Eric Chapman
Ryan Lovelidge
Riley Schick-Martin