Interlock Defeat
System(s) Affected:
Fire Alarm System
Interlock to be Defeated:
ARIEL Target Hall Linear Beam Detectors 09:095-001 and B2 VESDA 09:094-045
Implementation:
Number:
Date:
2023-11-16
Time:
07:30:00
2023-601
Implemented By:
Gauhar Hayat
In Consultation With:
Ryan Lovelidge
Status:
Removed
Estimated Duration:
8 hours
Reason for Defeat:
ARIEL Target Hall construction.
Number of Yellow Tags:
1
Location of Defeat Tag(s):
N/A
How Was Defeat Implemented?
Where is Defeat Located?:
DCR FAS Graphics Console.
Describe Alternate Protection:
Fire Watch. Area occupied.
Fault Reports:
Work Permits:
A2023-07-31-1
Disables:
Interlock Defeat
Removal:
Number:
Date:
2023-11-17
Time:
00:15:00
2023-601
Removed by:
David Bandiera
Status:
Removed
Interlock Verification Method:
Devices were found enabled at start of shift
Number of Tags Removed:
1
Comments:
Gauhar Hayat:
2023-11-16 07:27:07.679197
ARIEL Target Hall East LBD already disarmed due to FR #16484.
Brandon Humphries
David Bandiera
Elena Bylinskaia
Jason Wait
Robert Scheepmaker
Eric Chapman
Ryan Lovelidge
Riley Schick-Martin
Dale Nagra
Travis Kurucz
Chris Sooley
Kevin Lucow
Jas Uppal
Kathleen Genge
Gauhar Hayat
Frank Hosta
Ryan Anderson