Interlock Defeat
System(s) Affected:
Ion sources and injection BL
Interlock to be Defeated:
Cryo 165 gate valve temperature interlock
Implementation:
Number:
Date:
2023-11-19
Time:
09:30:00
2023-613
Implemented By:
Eric Chapman
In Consultation With:
Status:
Removed
Estimated Duration:
1 weeks
Reason for Defeat:
Cryo 165 cold head above trip threshold auto closing gate valve. Cryo effectively pumping on the beamline despite being over temperature interlock value improving vacuum from 9e-7T to 3e-7T on IG155.
Number of Yellow Tags:
1
Location of Defeat Tag(s):
none
How Was Defeat Implemented?
Where is Defeat Located?:
VIB EPICS window for IB:GV165CYP. "IB:CCYP165 temp ok" interlock bypassed in EPICs
Describe Alternate Protection:
Manually close gate valve if vacuum degrades too far in ISIS beamline due to cryopump out gassing. Strips running on CYCCON09 next to supervisor station.
Fault Reports:
Work Permits:
Disables:
Interlock Defeat
Removal:
Number:
Date:
2023-11-19
Time:
13:00:00
2023-613
Removed by:
Eric Chapman
Status:
Removed
Interlock Verification Method:
Interlock back in place, Cryo 165 cold head did not come down.
Number of Tags Removed:
1
Comments:
Eric Chapman:
2023-11-19 09:27:52.531674
This cryopump has been stubborn for ISIS personnel. Despite their best efforts continues to act up. Last time it was given some gas load for a few hours, the cold head cooled off and the interlock cleared.
Brandon Humphries
David Bandiera
Elena Bylinskaia
Jason Wait
Robert Scheepmaker
Eric Chapman
Ryan Lovelidge
Riley Schick-Martin
Dale Nagra
Travis Kurucz
Chris Sooley
Kevin Lucow
Jas Uppal
Kathleen Genge
Gauhar Hayat
Frank Hosta
Ryan Anderson