Interlock Defeat /
Device Disable
Management System
v1.5
(Driver)
Accelerator Complex:
Driver
RIB
TR13
☰
Ops Apps Page
3DB
Webplan
Home
List of Defeats ▸
All
Active
Unacked
List of Disables ▸
All
Active
Unacked
Fill Out a Defeat
Fill Out a Disable
Add/Modify User
Add/Modify System
Login
Help
Implementation
Removal
Interlock Defeat
System(s) Affected:
Fire Alarm System
Interlock to be Defeated:
Zone 4 test and numerous ARIEL B2 smoke detectors.
Implementation:
Number:
Date:
2023-12-05
Time:
09:00:00
2023-639
Implemented By:
Eric Chapman
In Consultation With:
Status:
Removed
Estimated Duration:
8 hours
Reason for Defeat:
Hot cell ducting smoke test. FAS in Zone 4 test until 18:00. Nearby smoke detectors 09-094-003/4/9/10/13/14, VESDA detector 09-094-045 and Target hall linear beam detectors 09-095-001/002 disarmed for duration of testing.
Number of Yellow Tags:
1
Location of Defeat Tag(s):
DCR
How Was Defeat Implemented?
Where is Defeat Located?:
DCR FAS graphics terminal
Describe Alternate Protection:
Fire watch - work taking place in area.
Fault Reports:
Work Permits:
A2023-12-05-1
Disables:
Interlock Defeat
Removal:
Number:
Date:
2023-12-05
Time:
23:00:00
2023-639
Removed by:
Gauhar Hayat
Status:
Removed
Interlock Verification Method:
Devices re-armed, system reset.
Number of Tags Removed:
1
Comments:
Brandon Humphries
David Bandiera
Elena Bylinskaia
Jason Wait
Robert Scheepmaker
Eric Chapman
Ryan Lovelidge
Riley Schick-Martin
Dale Nagra
Travis Kurucz
Chris Sooley
Kevin Lucow
Jas Uppal
Kathleen Genge
Gauhar Hayat
Frank Hosta
Ryan Anderson