Interlock Defeat / Device Disable
Management System v1.5 (Driver)

Accelerator Complex:



Home
List of Defeats   ▸
List of Disables ▸
Fill Out a Defeat
Fill Out a Disable
Add/Modify User
Add/Modify System
Login
Help
Implementation Removal

Interlock Defeat


Fire Alarm System

ARIEL Target Hall Linear Beam Detectors 09:095-001/002 and B2 VESDA 09:094-045
Implementation: Number:
2023-12-18 09:30:00 2023-661

Robin Swanson

Frank Hosta
Removed
Estimated Duration:
8 hours

ARIEL Target Hall construction.

1

Rack A FAS graphics

DCR FAS Graphics Console.

Fire Watch. Area occupied.


A2023-12-15-1



David Bandiera: 2023-12-18 15:24:55.441961
Work finished for the day