Interlock Defeat
System(s) Affected:
Fire Alarm System
Interlock to be Defeated:
IAMI L1, B1 & B2 smoke detectors
Implementation:
Number:
Date:
2024-01-09
Time:
08:30:00
2024-13
Implemented By:
Travis Kurucz
In Consultation With:
Eric Chapman
Status:
Removed
Estimated Duration:
8 hours
Reason for Defeat:
Smoke detectors 13:075-001 through 004, 13;075-013 through 019, 13:075-034 through 045 and 13:075-086 through 089 disarmed for the day for cutting and re-welding of nuclear exhaust ducting.
Number of Yellow Tags:
1
Location of Defeat Tag(s):
How Was Defeat Implemented?
Where is Defeat Located?:
MCR FAS graphics
Describe Alternate Protection:
Area occupied.
Fault Reports:
Work Permits:
C2024-01-08-1
Disables:
Interlock Defeat
Removal:
Number:
Date:
2024-01-09
Time:
16:15:00
2024-13
Removed by:
David Bandiera
Status:
Removed
Interlock Verification Method:
Smoke Detectors armed on FAS XL Graphics panel, Node 13 reset OK
Number of Tags Removed:
1
Comments:
Brandon Humphries
David Bandiera
Elena Bylinskaia
Jason Wait
Robert Scheepmaker
Eric Chapman
Ryan Lovelidge
Riley Schick-Martin
Dale Nagra
Travis Kurucz
Chris Sooley
Kevin Lucow
Jas Uppal
Kathleen Genge
Gauhar Hayat
Frank Hosta
Ryan Anderson