Interlock Defeat /
Device Disable
Management System
v1.5
(Driver)
Accelerator Complex:
Driver
RIB
TR13
☰
Ops Apps Page
3DB
Webplan
Home
List of Defeats ▸
All
Active
Unacked
List of Disables ▸
All
Active
Unacked
Fill Out a Defeat
Fill Out a Disable
Add/Modify User
Add/Modify System
Login
Help
Implementation
Removal
Interlock Defeat
System(s) Affected:
Fire Alarm System
Interlock to be Defeated:
Ariel Target Hall Smoke Detectors disabled.
Implementation:
Number:
Date:
2024-01-11
Time:
08:45:00
2024-23
Implemented By:
Eric Chapman
In Consultation With:
Status:
Removed
Estimated Duration:
8 hours
Reason for Defeat:
Target Hall Linear Beam Detectors and VESDA Tunnel Smoke Detector disabled for hot work in target hall.
Number of Yellow Tags:
1
Location of Defeat Tag(s):
none
How Was Defeat Implemented?
Where is Defeat Located?:
FAS Graphics Display Panel, devices 09-095-001, 09-095-002 and 09-094-045.
Describe Alternate Protection:
Workers in area.
Fault Reports:
Work Permits:
A2024-01-03-1
Disables:
Interlock Defeat
Removal:
Number:
Date:
2024-01-11
Time:
21:45:00
2024-23
Removed by:
Ryan Anderson
Status:
Removed
Interlock Verification Method:
Devices re-armed using FAS graphics panel, and system was reset.
Number of Tags Removed:
1
Comments:
Ryan Anderson:
2024-01-11 21:45:21.411634
OPS was not informed that this work was done for the day.
Brandon Humphries
David Bandiera
Elena Bylinskaia
Jason Wait
Robert Scheepmaker
Eric Chapman
Ryan Lovelidge
Riley Schick-Martin
Dale Nagra
Travis Kurucz
Chris Sooley
Kevin Lucow
Jas Uppal
Kathleen Genge
Gauhar Hayat
Frank Hosta
Ryan Anderson