Interlock Defeat /
Device Disable
Management System
v1.5
(Driver)
Accelerator Complex:
Driver
RIB
TR13
☰
Ops Apps Page
3DB
Webplan
Home
List of Defeats ▸
All
Active
Unacked
List of Disables ▸
All
Active
Unacked
Fill Out a Defeat
Fill Out a Disable
Add/Modify User
Add/Modify System
Login
Help
Implementation
Removal
Interlock Defeat
System(s) Affected:
Safety
Interlock to be Defeated:
IBOP 1919 Pinned 'ISAC Summary Services OK'
Implementation:
Number:
Date:
2024-01-25
Time:
08:45:00
2024-55
Implemented By:
David Bandiera
In Consultation With:
Status:
Removed
Estimated Duration:
8 hours
Reason for Defeat:
Safety Group replacing failing flammable gas sensor (Flammable gas monitor #3) in DRAGON area in ISAC.
Number of Yellow Tags:
2
Location of Defeat Tag(s):
1) IBOP Left Cabinet
2) DCR Defeat Board
How Was Defeat Implemented?
Where is Defeat Located?:
Pin inserted in IBOP 1919 'ISAC Summary Services OK'. In DCR behind Rack A
Describe Alternate Protection:
Workers in area, RIB Ops on duty to inform DCR of other alarms that may occur
Fault Reports:
Work Permits:
I2024-01-25-1
Disables:
Interlock Defeat
Removal:
Number:
Date:
2024-01-25
Time:
08:45:00
2024-55
Removed by:
David Bandiera
Status:
Removed
Interlock Verification Method:
Pin removed from IBOP 1919.
Number of Tags Removed:
2
Comments:
Brandon Humphries
David Bandiera
Elena Bylinskaia
Jason Wait
Robert Scheepmaker
Eric Chapman
Ryan Lovelidge
Riley Schick-Martin
Dale Nagra
Travis Kurucz
Chris Sooley
Kevin Lucow
Jas Uppal
Kathleen Genge
Gauhar Hayat
Frank Hosta
Ryan Anderson