Interlock Defeat
System(s) Affected:
Fire Alarm System
Interlock to be Defeated:
RCA B1 smoke detectors 03:020-014 and 03:020-015, 04:027-15
Implementation:
Number:
Date:
2024-02-29
Time:
15:15:00
2024-135
Implemented By:
Chris Sooley
In Consultation With:
Ryan Lovelidge, Dale Nagra
Status:
Removed
Estimated Duration:
6 hours
Reason for Defeat:
Welding and grinding work in RCA B1 level to be performed in Room 043 (B1 level, RCA3), and Room 017 (B1 level RCA 2). Hot work permit (HWP) #1065 covers work to be completed in areas.
Number of Yellow Tags:
1
Location of Defeat Tag(s):
FAS Panel
How Was Defeat Implemented?
Where is Defeat Located?:
Devices disabled in FAS Panel
Describe Alternate Protection:
Worker occupancy, fire watch.
Fault Reports:
Work Permits:
C2024-02-29-5
Disables:
Interlock Defeat
Removal:
Number:
Date:
2024-03-01
Time:
02:00:00
2024-135
Removed by:
Travis Kurucz
Status:
Removed
Interlock Verification Method:
Devices rearmed on FAS panel.
Number of Tags Removed:
1
Comments:
Brandon Humphries
David Bandiera
Elena Bylinskaia
Jason Wait
Robert Scheepmaker
Eric Chapman
Ryan Lovelidge
Riley Schick-Martin
Dale Nagra
Travis Kurucz
Chris Sooley
Kevin Lucow
Jas Uppal
Kathleen Genge
Gauhar Hayat
Frank Hosta
Ryan Anderson