Al-ALCW South Heat exchanger H15 and H16 valves closed
Implementation: Number:
2024-04-24 09:30:00 2024-204

Eric Chapman

Removed
Estimated Duration:
2 days

Al-ALCW offline with RAW leak in South Heat exchanger ME-31. Valves H15 and H16 fully closed to stop leak.

3

DCR

RAW side valves H15 and H16 fully closed.

System offline. When restarted fully open H15 and H16. Al-ALCW shut down for RF Q1 resonator latch troubleshooting/lid up.





Eric Chapman: 2024-04-24 09:32:28.776382
Main discharge valve D10 and surge tank valve D2 closed as well.
Riley Schick-Martin: 2024-04-30 15:33:37.497888
H-18 and D-17 remain throttled under defeat #2023-668
Elena Bylinskaia: 2024-05-01 13:01:08.37538
Al-ALCW heat exchangers are back in their normal shutdown configuration. H-18 is closed, D-17 is throttled. All other valves are open.
Elena Bylinskaia: 2024-05-01 13:04:04.512625
Al-ALCW heat exchangers are back in their normal shutdown configuration. H-18 is closed, D-17 is throttled. All other valves are open.