Interlock Defeat / Device Disable
Management System v2.0 (Driver)
Accelerator Complex:



Home
List of Defeats   ▸
List of Disables ▸
Fill Out a Defeat
Fill Out a Disable
Add/Modify User
Add/Modify System
Login
Help
Implementation Removal

Interlock Defeat


Targets

2A2BD-TC5 Upper left TC Temp bypassed
Implementation: Number:
2024-07-27 11:07:00 2024-385

Travis Kurucz

Active
Estimated Duration:
20 weeks

Temperature readback noisy and above trip limit. Pinned as per Carla B.

2

DCR Defeat bulletin board




ISAC electrical room

ISAC electrical room Bypass board

3 other water TCs still working and reading back nominally.

17186