Interlock Defeat /
Device Disable
Management System
v2.0
(Driver)
Accelerator Complex:
Driver
RIB
TR13
☰
Ops Apps Page
3DB
Webplan
Home
List of Defeats ▸
All
Active
Unacked
List of Disables ▸
All
Active
Unacked
Fill Out a Defeat
Fill Out a Disable
Add/Modify User
Add/Modify System
Login
Help
Implementation
Removal
Interlock Defeat
System(s) Affected:
Ion sources and injection BL
Interlock to be Defeated:
ISIS Skimmer #2 cable 0820 grounded
Implementation:
Number:
Date:
2024-07-11
Time:
18:49:00
2024-373
Implemented By:
Riley Schick-Martin
In Consultation With:
Status:
Active
Estimated Duration:
99 weeks
Reason for Defeat:
Skimmer is alarming even with beam off.
Number of Yellow Tags:
2
Location of Defeat Tag(s):
Cable 0820 at grounding strip, DCR defeat board
How Was Defeat Implemented?
Where is Defeat Located?:
Cable 0820 disconnected from skimmer breakout panel and connected to grounding strip with assistance from Marco M.
Describe Alternate Protection:
Remaining skimmers in section #2.
Fault Reports:
17170
Work Permits:
Disables:
Interlock Defeat
Removal:
Number:
Date:
Time:
2024-373
Removed by:
Status:
Active
Interlock Verification Method:
Number of Tags Removed:
0
Comments:
Brandon Humphries
David Bandiera
Elena Bylinskaia
Jason Wait
Sierra Dean
Robert Scheepmaker
Eric Chapman
Ryan Lovelidge
Riley Schick-Martin
Dale Nagra
Travis Kurucz
Chris Sooley
Kevin Lucow
Jas Uppal
Kathleen Genge
Gauhar Hayat
Frank Hosta
Ryan Anderson