Interlock Defeat / Device Disable
Management System v2.0 (Driver)
Accelerator Complex:



Home
List of Defeats   ▸
List of Disables ▸
Fill Out a Defeat
Fill Out a Disable
Add/Modify User
Add/Modify System
Login
Help
Implementation Removal

Interlock Defeat


Ion sources and injection BL

EGUN RF interlock
Implementation: Number:
2025-01-07 10:25:00 2025-10

Brandon Humphries

Removed
Estimated Duration:
1 days

To allow for testing of the EGUN RF amplifier using a dummy load.

2

1- On ERSS console.


1- On cork board in back of DCR.

EGUN:INTRF interlock is bypassed through EPICS.

E-Hall is open (preventing BIAS HV turning on). EGUN RF cable is disconnected and plugged into a dummy load. Confirmed that EGUN BIAS can't be turned on and that RF power can't go to the EGUN.