Implementation Removal

Interlock Defeat


Optics

M9 Q1 and Q2 (as shielding)
Implementation: Number:
2019-04-18 10:45:00 2019-47

Jas Uppal

Active
Estimated Duration:
104 weeks

Until M9 Q1 and Q2 are reinstalled. There are 2 steel shielding blocks in place of Q1 and Q2 to shield the downstream area.

1

n/a

M9 area.

Visual inspection. M9B beamblocker is "pinned in" as this provides beam shielding. If this shielding is removed, the beam blocker must be unpinned.





Jas Uppal: 2020-11-15 10:43:43.265485
Paper defeat #8504
Requested by Doug Preddy
Implemented by Jas Uppal
Approved by Doug Preddy