Implementation Removal

Interlock Defeat


Ion sources and injection BL

VIB-TNIM-022 and 023 readings swapped.
Implementation: Number:
2022-11-03 18:30:00 2022-310

Kevin Lucow

Removed
Estimated Duration:
6 weeks

Cables have been returned to their default historical (swapped) positions, until the corrections can be made in software. All VIB-TNIM-023 readings are presently coming from the VIB-TNIM-022 hardware and vice versa.

2

1) DCR defeat board. 2) CYCCON02_3.

Cables swapped in ISIS by diagnostics group.

The present state is the historical default configuration.


C2022-11-03-9



David Bandiera: 2022-12-22 10:28:47.793733