Implementation Removal

Interlock Defeat


Optics

1AQ13 Flow meter trip limit reduced from "4 to 4.5 GPM" to "3 to 3.5 GPM"
Implementation: Number:
2020-10-12 08:45:00 2020-42

Jason Wait

Active
Estimated Duration:
104 weeks

1AQ13 flow meter trip point reduced from 4-4.5GPM to 3-3.5GPM - Water flow to magnet is below previous trip limit

2

1) DCR defeat board

2) 1AQ13 Power Supply

Flow meter trip point reduced at 1AQ13 water package in BL1A tunnel

Trip set point still active at a lower value


C2020-10-12-1



Jason Wait: 2020-11-18 02:06:10.525737
Paper defeat #8889
Requested by
Implemented by David B
Approved by David B

Kyle Mollard: 2021-08-21 11:50:47.555284
After inquiring on this defeat's status, Doug Preddy responded. "I would like to leave this defeated. The flow meter needs to be disassembled and cleaned. I will add this to our shutdown jobs."