Vacuum |
ELNS SV01 |
Implementation: | Number: |
2023-07-27 14:30:00 | 2023-423 |
David Bandiera |
|
|
Removed |
Est. Duration: 1 weeks |
Nitrogen valve inspection during E-Linac shutdown |
Work completed as per work permit. |
2 |
1) E-Linac Defeats Board in DCR 2) ELNS:SV01 on Lockout Box |
Valve closed and locked out. |
Attempted to open ELNS:SV01 and valve will not open |
E30 |
|
A2023-07-27-1 |
|
|