Shielding |
Cyclotron Ignition Key |
Implementation: | Number: |
2024-03-18 09:15:00 | 2024-157 |
David Bandiera |
|
Frank Hosta |
Active |
Est. Duration: 8 weeks |
E-Hall/BL4N shielding removed. |
All shielding blocks replaced and verified by CSO and Beamlines Group Supervisor. |
2 |
1) DCR Lockout Box #3, end of Rack M 2) DCR Defeat Board |
Cyclotron Ignition Key removed from safety console. Cyclotron Ignition Key locked in DCR Group Lockout Box #3 with Doug Preddy personal lock. |
Cyclotron Safety System displays OFF and Control Room Key OUT. Safety Critical Devices cannot be Enabled on the Central Safety System and remain Disabled and Off. |
Beamlines #132, Doug Preddy. |
|
|
|
David Bandiera: 2024-03-18 09:42:11.472699
Work Permit #: C2024-03-12-2