Estimated Duration:
17 hours
|
Air Monitors 24, 25, 26 have been de-pinned in the back of Rack A CSS-RMS interface panel. ATG has had a PLC failure and is requesting DCR Ops to monitor the signals for these air monitors overnight and inform ATG Ops if there are any alarms.
|