Implementation Removal

Interlock Defeat


Vacuum

ELNS:TS02 and ELNS:TS03 forced to be ON (OK)
Implementation: Number:
2024-07-03 08:28:00 2024-355

Brandon Humphries

Active
Estimated Duration:
300 weeks

Required for tuning EINJ/EACA 80K shield cooling. When the LN2 supply valve feedback was changed to better control coupler temperature (from TS02 to EINJ:TS21 for example), this meant that TS02 and 03 could rise above "OK" temps as they would drift more. This would trip the helium supply valve (EHCD:FPV04 and 06). Ideally in the future, we will change the set-point of the OK Temp signal. Note this force was implemented on 2020-07-30.

2

1-ESS safety panel

1-Cork board in the back of the DCR.

Signals were forced through EPICS using the Bypass/Force utility.

Cryogenics experts will monitor any relevant signals.