Interlock Defeat / Device Disable
Management System v1.5 (Driver)

Accelerator Complex:



Home
List of Defeats   ▸
List of Disables ▸
Fill Out a Defeat
Fill Out a Disable
Add/Modify User
Add/Modify System
Login
Help
Implementation Removal

Interlock Defeat


Targets

2A3COL-TC2
Implementation: Number:
2021-09-19 21:15:00 2021-314

Eric Chapman

Active
Estimated Duration:
4 weeks

2A3COL-TC2 readback suddenly dropped to -95C at 08:39 15 Sept 2021. TC2 bypassed for this run.

2

DCR, ISAC electrical room rack 5D.

ISAC-1 Electrical Services Room Rack 5D

2A3COL-TC3 is also bypassed (general collimator temp). Water flow and water temp interlocks still operational providing protection to collimator.





Riley Schick-Martin: 2022-07-04 09:27:44.264797
There is currently no plan to repair the associated fault #14312. This defeat is to be extended indefinitely.