Interlock Defeat / Device Disable
Management System v1.5 (Driver)

Accelerator Complex:



Home
List of Defeats   ▸
List of Disables ▸
Fill Out a Defeat
Fill Out a Disable
Add/Modify User
Add/Modify System
Login
Help
Implementation Removal

Interlock Defeat


Other / Misc

STF PLC bypass 034/035
Implementation: Number:
2021-11-12 18:30:00 2021-377

Dale Nagra

Active
Estimated Duration:
8 weeks

STF stack valve removed from water package. Note: 034/035 are the limit switches for the stack valve.

1

1: B2 level rack 1A// 2: control room notice board

B2 level on PLC bypass panel

n/a





Dale Nagra: 2021-11-12 18:33:09.826011
Work done through directors notice to improve STF water emissions and exhaust ventilation.