Interlock Defeat


Optics

M11Q1 Magnet Overtemp
Implementation: Number:
2015-05-29 15:00:00 2015-1

Jas Uppal

Active
Estimated Duration:
104 weeks

Power supply is required to run.

2

1) M11Q1 p/s
2) MCR defeat board

Magnet overtemp jumpered at the power supply.

Waterflow meters interlock.

8163




Jas Uppal: 2020-11-14 11:35:50.326963
paper defeat #7255
requested by Bruno Gasbarri
implemented by Bill Beck/Bruno Gasbarri
approved by Frank Hosta